HomeMy WebLinkAbout08-Public Works "9' - - '- ----',,"- ~ ... -~~----- c'lTv OF SAN BERNARDlflo - REQUEllTN~;6~IL ACT~., From: Roger G. Hardqrave . _ SIIJ~t: Approval of Change Order No, Two - REC D. AD~.lIM. Vl'Y. Modification of Traffic Signal s at Dept: Publ ic \Jorks/Engineering 1986 NOV 24 P'l 3' 22 Basel ine Street and Muscott Street, t' and Sixth Street and "D" Street, per Date: 11-2('-86 Pl an ilo. 6657 -- SIGNAL CONSTRUCTION CO. Synopsis of Previous Council action: 11-07-83 Resolution No. 83-370 adopted authorizing execution of Supplement No. 32 to Local Agency - State Agreement No. 8-5033. Resolution No. 84-53 adopted authorizing execution of Supplement No. 33 to Local Agency - State Agreement No. 8-5033. Plans approved and authorization granted to advertise for bids. Resolution No. 86-162 approved awarding contract to Signal Construction Co. for the low bid of $61,903.00. Approval of Change Order No. One authorizing Contractor to install three additional traffic control loops, a Type III Electrical service, and approximately 110' of rigid conduit, at a cost not to exceed $2,800.00, for an increase in the contract price from $61,903,00 to $64,703.00. 01-27-84 03-17-86 05-05-86 09-08-86 Recommended motion: That Change Order No. Two to the contract with Signal Construction Corporation, for modernization of traffic signals at Baseline and Muscott Streets and at Sixth and "D" Streets, in accordance with Plan No. 6657, be approved; to authorize the Contractor to install necessary wiring and conductors to connect the street lights at Sixth and "D" Streets to the 240 volt circuit, for a lump sum cost of $500.00. cc: Ray Schweitzer Warren Knudson Wayne Overstreet OAts;d:~ Contact person: Jon Roberts Phone: 5225 Supporting data attached: Staff Reoort & CCO #2 Ward: 1 FUNDING REQUIREMENTS: Amount: $500.00 Source: Account No. 001-329-402, Finance: /.1, C~ Fl~ctrical Charqes (Sixth & "D") Council Notes: 75.0262 Agenda Item NO.~ CITY OF SAN BERNARDIta) - REQUEst FOR COUNCIL ACTION STAFF REPORT The project directed the installation of four street lights, at the intersection of Sixth and "D" Streets, as part of the HES project to modify traffic signals at Sixth and "D" Streets and Baseline and Muscott Streets. The street lights were to be connected to the existing 240 volt series street light circuit. During construction, street improvements were constructed on 6th Street by the developer of the adjacent property to the west, which necessitated rerouting the series street lighting circuits, and installing a 240 volt circuit. The Contractor agreed to install 240 volt luminaires at no extra charge to the City. The 240 volt luminaires are more efficient and in accordance with current City policy. Additional wiring and conduit are required to connect the street lights to the new 240 volt circuit. The Contractor submitted a price quote of $500.00 for this extra work. We have reviewed this price and found it to be fair and reasonable. This change order will have to be paid entirely with City funds, since the work is not eligible for Federal-Aid Funds. This determination is due to the extra work being necessitated by improvements installed by a developer and City's desire to change the voltage of the street light circuit. The cost of this change order is $500.00, which will increase the contract price from $64,703.00 to $65,203.00. We recommend that Change Order No. Two be approved. 75-0264 . rojcct: Modif,ication of Traffi 'ignals- Baseline & Muscott Str1!t!t and 6th & "D" St. Datc: 11-21-86 Plan No. 6657 Filc No.1.0465/1.0466 ENGINEERING DIVISION DEPARTr~ENT or I'UULI C WORKS CITY or SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. 2 (Change necessitated because of ficld conditions) TO: Signal Construction Company 2720 Regal Park Drive Anaheim, CA 92806 Sentl emcn: You are hereby authorized and directed to install necessary wlrlng and conductors to connect the four street lights at 6th and "D" Streets to the existing 240 volt circuit, for a total cost of $500.00. Total extra work cost added to contract ....,..............,...,.....$ 500.00 Previous Contract Price .............................................$ 61,903.00 Amended Cost Price......................... ...........................$ 62,403.00 Additional time to complete contract due to change order ............30 working days.. CONTRACTOR: CITY OF SAN BERNARDINO: ----- By: By: ROGER G. H.I\I~Tl(;ff^VC-- Director of Public Works/City Engr. Title: Acceptcd Oatc: 11-24-86 Approvcd Oa te: "