HomeMy WebLinkAboutS01-Public Works - -- - 'cn:; OF SAN BERNARDIC~ File No. 6.1444-3 - REQUr:jT FOR COUNCIL AC~ON From: Roger G. Hardgrave Dept: Publ ic Works/Engineering Date: 11-12-86 Subject: Approva 1 of Change Order No. ONE -- Contract with Valley Crest Landscaping, Inc., for construction of Phase I-A, Zone B, of See combe Lake State Urban Recreation Area, per Plan No. 6878 Synopsis of Previous Council action: 02-17-86 -- Work on Phase I-A, Zone A, in accordance with Plan No. 6667, approved and accepted and final payment authorized at expiration of the lien period. Resolution No. 86-76 adopted authorizing execution of Agreement for development of the Seccombe Lake State Urban Recreation Area. Plans approved and authorization granted to advertise for bids. Resolution No. 86-328 adopted, awarding contract to Valley Crest Landscaping, Inc. for the low bid price of $915,000.00. 03-04-86 05-19-86 08-04-86 Recommemled motion: That Change Order No. One to the contract with Valley Crest Landscaping, Inc., for the construction of Phase I-A, Zone B, of See combe Lake State Urban Recreation Area, per Plan No. 6878, be approved; to authorize the Contractor to delete the Adobe Building re-construction, at a net decrease to the contract price of $56,266.00, from $915,000.00 to $858,734.00. cc: Ray Schweitzer Warren Knudson Annie Ramos Signature Contact person: ,Jon Rohprt, Phone: ~??~ Supporting data attached: Staff Rpport P. rhangp Ornpr #1 Ward: FUNDING REQUIREMENTS: Amount: ($~fi, ?fifi on) Source: D&c."....c..I'L .1.... f"""'~#.""""'''1 Finance: IJ,,: C'~ . Council Notes: 75.0262 Agenda Item No. 5-1 ~ Cll::~ OF SAN BERNARDI::~ - REQUr:;T FOR COUNCIL Ac'2oN STAFF REPORT During removal of the northerly addition to the old Adobe Building, portions of the North and East walls collapsed. All work within the adobe construction area was discontinued and a security fence was erected to secure the area and reduce liability exposure. Work on, or adjacent to the structure, has been suspended pending a review by the City and State, of the acceptable methods for reconstruction of the Adobe Building as a historical landmark. Change Order No. One will direct Valley Crest Landscaping, Inc. to continue with the removal of the remaining portions of the roof and brick gables, removal of the newer southerly addition, shoring of the remaining portions of the adobe walls, removal of debris, and salvaging the adobe bricks. It has been determined that the adobe structure will be reconstructed under a future contract, utilizing as much of the existing structure and materials as possible. The credit amount of $56,266 will be available for this reconstruction. In order to allow the completion of the Seccombe Lake Project, and obtain an acceptable restored adobe facility, it is recommended that the restoration of the Adobe Building and its related site work be deleted from the contract requirements with Valley Crest Landscaping. The total deductive cost for deletion of the adobe structure and amenities, not including $8,000 for demol ition, is $56,266.00, redu cing the contract price from $915,000.00 to $858,734.00. This is based upon a detailed breakdown of the Contractor's Bid Estimate. We recommend that Change Order No. One be approved. URGENCY CLAUSE: A potential liability is created by the partially demolished adobe house. Authority needs to be given to the Contractor to proceed with the demolition in order to abate any possible liability exposure. 75-0264 . r Pr<:lJ_.:t: Seccombe Lake, Phase I-A, ~e B ..... ....,; Date: 11-12-36 - ...J Plan No. 6878 File No. 6.1444-3 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. -1--- (Change necessitated because of field conditions) Valley Crest Landscaping, Inc. 1920 So. Yale Street TO: Santa Ana, CA 92704 Gentlemen: You are hereby authorized and directed to delete the reconstruction of the Adobe Building, (excepting demolition of the abutting structure,($8,000), and construction of associated amenities, as follows: Adobe House, Retaining Walls, Block/Stucco Wall, Teak Park Benches, Trash Receptacles, Adobe Trellis, Decomposed Granite, Concrete Flatwork, Irrigation, Landscaping and Electrical, at a lump sum credit of $56,266.00. (Demolition of existing structure shall proceed in accordance with section 13015 of the contract specifications. All adobe bricks shall be salvaged). $ ( 56,266.00) Total extra work cost added to contract ............................. $ 915,000.00 Previ ous Contract Pri ce ............................................. $ 858,734.00 Amended Cost Pri ce .................................................. Additional time to complete contract due to change order ............ -0- CONTRACTOR: CITY OF SAN BERNARDINO: By: By: ROGER G. HARDGRAVE Director of Public Works/City Engr. Title: Accepted Date: Approvert Date: