Loading...
HomeMy WebLinkAbout13-Public Works - .. ..It: II - II - - , C 0 CITY OF SAN BERNARDINO _ REQUiTNOFO~5COUNCILA~N From: ROGER G, HARDGRAVE, Director PUBLIC WORKS/ENGINEERING SEPTEMBER 18, 1986 Subject: Approval of Change Order No. One and Acceptance of Work -- Pavement Rehabilitation of Arrowhead Avenue, per Plan No. 6803 -- Matich Corporation -- Dept: Date: Synopsis of Previous Council action: June, 1984 An amount of $165,OOO allocated in 1984-85 Budget under Account No. 242-362-57354. 09-23-85 10-07-85 Supplemental funding in the amount of $25,000 approved. Plans approved and authorization granted to advertise for bids. Directive given to continue with repaving Arrowhead Ave. Alternative "B" approved and directive given to report on possible alternative funding on 5-19-86, Adopt Resolution awarding contract. 12-16-85 05-05-86 Recommsnded motion: That Contract Change Order No. One to the contract with Matich Corp., for Arrowhead Pavement Rehabilitation, be approved to authorize the removal of soft spots in subgrade at a net increase of $I,091.49, remove and replace concrete cross gutter at an increase of $I,709.46, install 8" edgeline and L marker at an increase of $176,09, and remove and replace 20' of curb and gutter at a net increase of $270.27, all with a total net increase in the contract of $3,247.27, from $261,964.00 to $265,211.26, and that the work performed by the contractor, in accordance with Specification No. 6803, be approved and accepted, and that final payment be authorized at the expiration of the lien period, cc: Ray Schweitzer, Assistant City Engineer Warren Knudson, Director - Finance Contact person: Gene R, Kl att Phone: ~1?<; Supporting data attached: Sta ff Report & CCO #l FUNDING REQUIREMENTS: Amount: $3.247,27 Acct. No, 242-362-57354 Ward: ~ Source: Strppt rnn<tr'lctiol1 FURd Finance: /J. c~~ Council Notes: 75-0262 Agenda Item No, J ~ . 4.- 4.. -- - ~ L _u _ ....--. . CI10 OF SAN BERNARDO - REQUIOT FOR COUNCIL ACOoN STAFF REPORT Contract Change Order N0. One provides for the removal of soft subgrade material encountered during construction and replacement with It-inch crushed rock to provide a stable base for the pave- ment at an increase in the contract of $1,091.44, for the removal and replacement of concrete curb, gutter and spandrel required to insure drainage at Mill Street, at an increase of $1,709,46, for the installation of an 8 inch wide painted edge line and paddle marker to direct traffic away from a storm drainage opening at an increase of $176,09, and for the removal and replacement of 20 feet of curb and gutter that did not fit the final construction of the street at an increase of $270.27. The total increase in the contract is $3,247.26, from $261,964.00 to $265,211.26. All work was performed on a time and materials basis in accordance with the specifications and has been verified by the project inspector. Staff recommends approval of contract Change Order No. One, The rehabilitation of Arrowhead Avenue, from Mill to Orange Show Road, was satisfactorily completed on 8-20-86. The contract was awarded for the low bid of $261,964.00. The final contract price is $259,029.92. This amount is under the original contract amount of $261,964.00 and is a result of reduced quantities of aggregate base material required to complete the project. All quantities have been checked and verified by the project inspector. Staff recommends the work be approved and accepted, and final payment be authorized at the expiration of the lien period. 75-0264 .11. - - - - P~ct: REffAB OF ARROWHEAD AVQE 0 Date: Q September 18, Plan No. 6308 File No. 1.0509 ENGINEERING DIVISION " DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. ~ (Change necessitated because of field conditions) TO: MATICH CORPORATION 1371 South La Cadena Drive Colton, CA 92324 Gentlemen: You are hereby quthorized and directed to perform the items of work as follows: 1. Removing soft spots with (l-i" rock). 2, Remove and replace curb and gutter spandrel 3. 8" edge line 688' at time and materials (L Marker) 4. 20' curb and gutter at time and materials, Remove & replace $1,091. 44 $1,709,46 $ 176.09 $ 270.27 Total extra work cost added to contract .............................$ 3,247.26 Previous Contract Price.,..................................,........$ 261,964,00 Amended Cost Pri ce .................................................. $ ?1=.t;.?1 1 ?F. . Additional time to complete contract due to change order ............ -0- CONTRACTOR: CITY OF SAN BERNARDINO: By: Title: By: ROGER G. HARDGRAVE Di rector of Pub Hc Works/City Engr. Accepted Date: Approved Date: