CITY OF SAN BERNARDINO - REQUEST FOR cOUN~~ION
REC'O.-ADMIN. OFF. ~
From: Roger G. Hardgrave Subject: Approval of Plans & Authorization to
19B6 AUG -7 PM 2: 31 Advertise for Bids --Construction of
Dept: Public Works/Engineering Cul-de-Sac on Piedmont Drive, East of
Victoria Avenue, per Plan No. 7063
Date: 8-06-86
Synopsis of Previous Council action:
5-19-86 Resolution No. 86-191 adopted closing Piedmont Drive at its
easterly terminus and directing construction of a cul-de-sac.
7-21-86 u Went on record supporting authorization to contract a temporary
emergency access along the Piedmont Drive alignment.
Recommen-:ted motion:
That the plans for construction of a cul-de-sac on
Piedmont Drive, east of Victoria Avenue, in accordance
with Plan No. 7063, be approved; and the Director of
Public Works/City Engineer authorized to advertise for
bids.
cc: Ray Schweitzer
\~a rren Knudson
-(]A sd:~
Contact person:
Roger G. Hardgrave
Phone:
50?5
4
Supporting data attached: Staff Report
Ward:
FUNDING REQUIREMENTS:
Acct. #242~362~57372
Amount: '1>50. 5DO
Source: Street Construction Fund u
Finance:-'.J~ c:::: ~___
Council Notes:
('.,.Of."''''' ~....I,_> F'....... :c_J~.... D:.). .r.-l...--,..
7!>-0262
Aoenrl" I tern Nn
1.:1:__
a. _
CITCoF SAN BERNARDI A - REQUEO FOR COUNCIL ACCN
STAFF REPORT
Plans for construction of a cul-de-sac on Piedmont Drive, east of
Victoria Avenue, have been prepared by the Engineering Division, and the
project is ready to be advertised for bids. The plans include a chain link
gate with reduced slats for emergency access and a pedestrian walkway to
Victoria Avenue. The plans have been reviewed by residents of the neighbor-
hood in order to get their input.
Listed below is an estimate of the total project cost:
Construction Contract
Engineering & Inspection (W.O. #1748)
Sub-Total
Contingencies (15%)~
TOTAL ESTIMATED PROJECT COST
$ 29,180
15,000
$ 44,180
6,320
$ 50,500
An amount of $50,000 was included in the settlement on the Indian
Bingo Parlor to finance this item of work.
Before the cul-de-sac can be constructed, Piedmont Drive will have
to be extended to the east. Negotiations are under way with the subdivider
to the south to accelerate the construction of Piedmont Drive. Preliminary
indications are that this proposal is acceptable, provided that the plans for
their entire subdivision are checked on a priority basis.
We recommend that the plans be approved and authorization granted to
advertise for bids. Advertisement for bids will be scheduled so that con-
struction is commenced as soon as the extension of Piedmont Drive to the
east is completed by the subdivider.
75-0264
o
1. L.S.
2. L.S.
3. 210 Ln.Ft.
4. 960 Sq. Ft.
5. 480 Sq. Ft.
6. 570 Sq. Ft.
7. 5100 Sq. Ft.
8. 135 Ln.Ft.
9. 1 ea.
10. L. S.
11. L.S.
o
o
File No. 1.372
August 6, 1986
PRELIMINARY ESTIMATE
CUL-DE-SAC
at
PIEDMONT DRIVE & VICTORIA AVENUE
PLAN NO. 7063
Concrete Removal @ L.S. of
A.C. Pavement Removal @ the L.S. of
Construct Curb & Gutter @ $12.00/Ln.Ft.
Construct Sidewalk @ $3.00/Sq. Ft.
Pattern Concrete @ $10.00/Sq. Ft.
Construct Driveway Approaches @ $4.00/Sq.Ft.
A.C. Pavement @ $.75/Sq. Ft.
6' Garden Wall @ $25.00/Ln. Ft.
Relocate Existing Street Light
@ $1,500/each
Landscaping & Irrigation @ the L.S. of
12' Chain Link Fence Emergency Crash
Gate w/wood slats at the L.S. of
Sub- Tota 1 $
Engineering & Inspection
Sub-Total $
Contingencies (15%)~.
~
$ 3,500
1,500
2,520
2,880
4,800
2,280
3,825
3,375
1,500
2,000
1,000
29.180
15,000
44,180
6,320
TOTAL
$
50,500
---------~-------
-----------------
-
i' el~ /t
r,jJ
~
'\
" <.,1
~
-
u
-
File No. 1.372
- REQ~1>>T FOR COUNCIL A':1ION
, . C~:'Y OF SAN BERNARIOIO
From:
Roger G. Hardgrave
Public Works/Engineering
Subject:
Authorization to Execute Agreements --
Reimbursement for Normal Costs for
Extension of Piedmont Drive --
HILL WILLIAMS DEVELOPMENT CORPORATION
Oept:
Date: 8-15-86
Synopsis of Previous Council action:
5-19-86 -- Resolution No. 86-191 adopted closing Piedmont Drive at its easterly
terminus and directing construction of a cul-de-sac.
7-21-86 -- Went on record supporting authorization to construct a temporary
emergency access along the Piedmont Drive alignment.
Recommended motion:
Adopt resolutions.
cc: Ray Schweitzer
Warren Knudson
Signatur
Supporting data attached: Staff Report
Phone: 5Q25
Ward: 4
Contact person: ling"" G Harrlgra\fe
FUNDING REQUIREMENTS: Amount: $113,000
Acct. #242-362-57372
Source: Strppt r.nn~t""rtinn F'Inrl
Finance: tJ ......t:: ~
Council Notes:
75.0262
SUPPLEMENTAL INFORMATION ON ITEM NO. 15
Agenda Item No.
"
-
-
CICf OF SAN BERNARq:)IO - REQUo;T FOR COUNCIL AOION
STAFF REPORT
Piedmont Drive will have to be extended to the east before a cul-de~
sac can be constructed to close off access to Victoria Avenue.
The Hill Williams Development Corporation has filed Tentative Tract
No. 13329 for the parcel south of Piedmont Drive, and will be submitting a
proposed development on the parcel north of Piedmont Drive in the near future.
Piedmont Drive will be improved by these developments as a normal condition of
approval. However, the improvement of Piedmont Drive wou1d not occur through
the normal development process for several months.
In order to accelerate the improvement of Piedmont Drive, a request
was made to the Hill Williams Development Corporation to allow the City to
construct the extension as soon as the plans and specifications can be prepared.
The attached Reimbursement Agreements were prepared by the Hill Williams
Corporation to accommodate our request.
These Agreements provide, in general, that the City will construct
grading, curbs and gutters, and paving on Piedmont Drive. The Hill Williams
Corporation will reimburse the City for the costs that they would normally
have incurred for the improvement of Piedmont Drive. Any costs above those
normally incurred by the subdivider will be borne by the City.
Sidewalks, street lights and the final 1 inch of paving will not be
included in the City's contract. These items will be installed by the sub-
divider during construction of the adjoining tracts.
Under provisions of these Agreements, the City would be required to
"up front" the funds to finance the extension of Piedmont Drive. A portion
would be later reimbursed by the subdivider.
Funds for the extension of Piedmont Drive are to be provided under
the Settlement Agreement with the San Manuel Band of Mission Indians relative
to the bingo parlor. This agreement has not been finalized but.it is hoped
that this can be accomplished within the next couple of weeks. .
An amount of $50,000 is to be paid to the City upon execution of this
agreement. Four quarterly payments of $62,500 are also to be made within one
year after, the effective date of the agreement. We understand these quarter-
ly payments are to be made from proceeds on the bingo operation.
In order that the extension of Piedmont Drive may proceed without
waiting for the development process, we recommend that these Reimbursement
Agreements be approved.
75.0264
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
7
8
9
10
o
o
o
RESOLUTION NO.
RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION
OF A REIMBURSEMENT AGREEMENT WITH THE HILL WILLIAMS DEVELOPMENT CORPORATION
RELATING TO THE EXTENSION OF PIEDMONT DRIVE ADJACENT TO TENTATIVE TRACT NO.
13329.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
BERNARDINO AS FOLLOWS:
SECTION 1. The Mayor of the City of San Bernardino is hereby
authorized and directed to execute on behalf of said City a Reimbursement
Agreement with the Hill Williams Development Corporation relating to the
extension of Piedmont Drive adjacent to Tentative Tract No. 13329, a copy
of which is attached hereto, marked Exhibit "A" and incorporated herein by .
reference as fully ~s though set forth at length, but such award will be
effective only upon the contract being fully signed.
SECT10N 2. Execution and Amendments. This agreement and any
amendments or modifications thereto shall not take effect or become
operative until fully signed and executed by the parties and no party shall
be obligated hereunder until the time of such full execution. No oral
agreements, amendments, modifications or waivers are intended or authorized
and shall not be implied from any act or course of conduct of any party.
I HEREBY CERTIFY that the foregoing resolution was duly adopted
by the Mayor and Common Council of the City of San Bernardino at a
meetin- thereof, held on the
. day of
AYES: Council Members
NAYS:
ABSENT:
Approved as to form:
C(~~ #~~
0_
........
o
o
o
REIMBORSIHNl' J!GREEJtENr - 'mAC'l' 13329
,
As consideration for work performed by the City of San Bernardino, or
his contractor, on the extention of Piedmont Drive, adjacent to Tentative
Tract No. 13329, prior to the development of the tract, The Hill WIlliams
Development Corporation hereby agrees, (subject to the fOllowing conditions)
to reimburse the city for costs normally incurred if the street construc-
tion was to occur concurrently with our development. This agreement shall
become valid upon approval of final plans and recordation of the final
tract map.
<XmITIONS
1. SWPE OF ~
A) Paving reimbursement quantities shall be to centerline of street.
S) Grading for Piedmont Drive would normally be done at the same
time as the tract grading. The grading of Piedmont Drive prior
to the interior lot grading may require additional work on-site.
Any additional grading costs for lots 11, 12, 13, 30, 31, 46,
47 and 48 caused by "out of sequence" grading operations will
be subtracted from said reimbursement amount paid by the developer
to the city.
C) Storm Drain - Required storm drain extensions within Piedmont
Drive for Tract 13329 will be reimbursable. However, if the
extention is not required for Tract 13329, reimbursement will
not be a part of this agreement.
D) Curb and gutter, sidewalk, street light work, trenching for
street light conduit, if installed, will be considered a reim-
bursable item. Cost for asphalt saw cutting and removal, trench
compaction and testing and re-paving of a utility trench, (or
street crossing) that would normally be avoided due to installation
of all utility crossings prior to paving shall be deducted fro:;]
said reimbursement amount paid by. the developer to the city.
(The city may opt to leave the final lift of AC paving approx-
imately 11 inches low so that if this si tuation occurs, the
final course of AC pavement could be placed by the developer
in one continuous operation. The sawcut, removal and patch
would still be non-reimbursable.)
2. DETERMINATION OF UNIT PRICES FOR PAY QUANl'ITIES.
Due to the tendancy of contractor's bid price for public works const-
ruction to be higher than that of bid prices for construction work
done in the private sector, th~ unit prices for pay quantities will
be determined as follows:
A) Pay quanti ties will be determined from plans on file with the
city engineer.
EXHIBIT "A"
4S
.~ '.
i!! ',t
~ "
8 .
-K
~
.g
e
8.
8
"
:i
!
~
..
~
l';l
.~
~ :1
i ~I
Ul
L
a1
-
-
-
c
o
o
o
B) Unit prices paid by the developer to the city will be based
upon the following:
1. The developer will submit awroved plans to his contractor
for a formal bid.
2. The contractor will also furnish other previous bids given
to the same developer on similar type work, ie: if pavement
section is 4" A.C. over 6" B.M. on Piedmont Drive, the con-
tractor will submit a previous bid (different project) on
the same item and scope or work (4" A.C. over 6" B.M.).
The substantiating bid will be dated no more than 18 months
prior to start of city construqtion.
3. With the developer's contractor's project bid, contractor's
substantiating previous bids. for similar work, and the actual
contract between Hill Williams Developnent Corporation and
the contractor an equitable unit price that the developer
normally pays for the work will be determined.
4. This unit price times the quantities built (less additional
charges mentioned above) will be the basis for payment of
reimbursement paid by developer to the city. In no case
shall the amount reimbursed by the developer exceed the
amount the city actually paid for the item of work.
3) TIMIN:; OF PAYMENT OF REIMBURSEMENr BY DEVEWPER 'It) CITY:
A) Payment of reimbursement by developer shall be prior to final
approval and acceptance of public street improvements and bond
release by the City of San Bernardino.
B) There will be no payment of interest by the developer to the
city on any portion of the reimbursement.
RESOLVED AND AGREED uroN 'lllIS I z -II, DAY
HILL WILLIAMS DEVEIDPMENI' roRroRATION/7'\
OF 411{IJI$(
A t'- I (),
, 1986 BY THE
.. "
STEWART
TITLE
COM~NY OF SOUTHERN CAUFORNIA
STATE OF CAUF~NIA }
COUNTY OF _ ie /f-,<J G e- . 5.5.
On this the-42'-117 _dayoL~tf lr 19.J'6.beforeme.
the undersigned. a NQ!8ry Public in and lor sal~ County and State.
personally appeared .~.,ijI,,, N. ('-~" u'cJJ-Jl..,:,
, personally
known to me or proved to me on the basis 01 satisfactory evidence to be
the .___ President, and ~. A, 1> iI. 1J.l!.Jd.JA.~'~1L
____. ,personally
known to me or proved to me on the basis of satisfactory evidence to be
._________ Secretary of the corporation that executed the within
instrument on behalf 01 the corporation therein named, and acknow~
ledged to me th~~..~rallOO executed the Within Instrument
pursuant to its bY-~~ a resot~t~ Of i~CJ of directors.
srgnature:/3< Rd~r
FOR NOTARY SEAL OR STAMP
. OFFICIAL SEAL
VICTOR A GENGLER
. NOTARY PUBLIC-CALIFORNiA
ORANGE COUNTY
MY COMM. EXP. JAN. 23,1990
o
o
o
RESOLUTION NO.
RESOLUTION.OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION
OF A REIMBURSEMENT AGREEMENT WITH THE HILL WILLIAMS DEVELOPMENT CORPORATION
RELATING TO THE EXTENSION OF PIEDMONT DRIVE ADJACENT TO A.P;N. 285-181-35
(EXPIRED TENTATIVE TRACT NO. 10722).
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
BERNARDINO AS FOLLOWS:
SECTION 1. The Mayor of the City of San Bernardino is hereby
authorized and directed to execute on behalf of said City a Reimbursement
Agreement with the Hill Williams Development Corporation relating to the
extension of Piedmont Drive adjacent. to A.P.N. 285-181-35 (expired Tentative
Tract No. 10722), a copy of which is attached hereto, marked Exhibit "A"
~nd incorporated herein by reference as fully as though set forth at length,
but such award will be effective only upon the contract being fully signed.
SECTION 2. Execution and Amendments. This agreement and any
amendments or modifications thereto shall not take effect or become operative
until fully signed and executed by the parties and no party shall be obligated
hereunder until the time of such full execution. No oral agreements,
amendments, modifications or waivers are intended or authorized and shall
.not be implied from any act or course of ~onduct of any party.
. '........
. I HEREBY CERTIFY that the foregoing resoluti.on was duly adopted
by the Mayor and .Common Council of the. City of San Bernardino at a
meeting thereof, held on the
day of
. r.
, 1986, by the following vote, to-wit:.
AYES: Counci 1 Members
NAYS:
ABSENT:
_... .--....'-,. '. '.". ..~-.....
Approved as to form:
Cie1~~~~
o
o
o
o
REIMBURSfJolFNr ~
PR>l'OSED PInJECl' !UmI OF PIEIJK:lNl' DRIVE EXTFNl'ION A.P.N. 285-181-35
(Expired Tentative Tract No. 10722)
lis consideration for work performed by the City of San Bernardino,
or his contractor, on the extent ion of Piedmont Drive, adjacent
to our project on the north side of the Piedoont Drive extention
north of Tentative Tract No. 13329, prior to the development of
the tract, The Hill Williams Development Corporation hereby agrees
(subject to the following conditions), to reirrburse the city for
costs normally incurred if the street construction was to occur
concurrently with our development. This agreement shall become
valid upon approval of final plans and recordation of a final tract map
on the subject property.
aH>ITlOOS
.
1. sroPE OF K)RK
A) Paving pay quantity shall be to centerline of street.
B) Grading for Piedoont Drive would norn>ally be done at the
same time as the tract grading. The grading of Piedoont
Drive prior to the interior lot grading n>ay require additional.
work on-site. Any additional grading cost for lots front-
ing Piedmont Drive caused by "out of sequence" grading opera-
tions will be subtracted from said reirrbursement amount
paid by the developer to the city.
C) Storm Drain - Required storm drain extensions within Piedoont
Drive for this proposed project will be reimbursable. However,
if the extention is not required for the project, reimburse-
ment will not be a part of this agreement.
D) Curb and gutter, sidewalk, street light work, trenching
for street light conduit, if installed will be considered
a reirrbursable item. Cost for asphalt saw cutirg arrl rarc:7Ycll.
trench compaction and. testing and re-paving of a utility
trench, (or street crossing) that would normally be avoided
due to installation of all utility crOSSings or installations
prior to paving shall be deducted from said reirrbursement
amount paid by the developer to the city. (The city may
cpt to leave the final lift of AC paving approximately Ii
inches low so that if this situation occurs, the final course
of AC pavement could be placed by the developer in one
continuous operation. The sawcut, removal and patch would
still be non-reirrbursab1e.)
EXHIBIT "A"
lid
1] -
llU
o
o
o
o
2. SPEX:IAL <nIDITIOOS/lW:lUIRtJmlrS ~ERNIR; SUBJECT POOPER'lY:
Al The city is advised that the site is presently utilized
as a citrus grove. This grove will be maintained as an
operational producing grove until the start of grading for
the development project north of the Piedmont Drive extension.
The city or city's contractor shall be responsible for any
damage to the grove, irrigation facilities, graded irrigation
troughs etc, and repair, replace or relocate said facilities
at their cost. Said repair costs are not a reimbursable
item. -
BI The repair of any irrigation facility damaged during the
construction of the extention of Piedmont Drive shall be
done within a 24 hour period. The city shall contact the
owner immediately at (7141921-0509 to notify him of the
extent of the damage and how and when it will be repaired.
C) Since the location of the intersecting north-south street
within the proposed development north of Piedmont D~lve
has not been established yet. curb and gutter constructed
on the north side of Piedmont Drive will have to be sawcut
and rerroved to accomodate the construction of curb returns,
cross gutter, and spandrel. The cost of sawcut, remval.
hauling, dumping of curb and gutter, and asphalt to accomodate
this construction will be subtracted from the total
reimbursement paid by the developer to the City of San
Bernardino.
3. DETERMINATIOO OF UNIT PRICES FOR PAY QUANl'ITIES.
Due to the tendancy of contractor's bid prices for public works
construction to be higher than that of bid prices for constructlon
work done in the private sector, the unit prices for pay ~tities
will be determined as follows:
A) Pay quantities will be determined from plans on file with
the city engineer.
i
2ft
! l'
...
c
.S!
1!
&
,3
'"
~
!
.
l
ij
~
i :f
in I
o~
--
o
o
o
B) Unit prices paid. by the developer to the city will be based
upon the following:'
1. The developer will submit approved plans to his contractor
for a formal bid.
2. The contractor will also furnish other previous bids given
to the same developer on similar type work, ie: if pavement
section is 4" A.C. over 6" B.M. on PiedIront Drive, the con-
tractor will submit a previous bid (different project) on
the same item and scope or work (4" A.C. over 6" B.M.).
The substantiating bid will be dated no more than 18 months
prior to start of city construction.
3. With the developer I s contractor I s project bid, contractor I s
substantiating previous bids. for similar work, and the actual
contract between Hill Williams Developnent corporation and
the contractor an equitable unit price that the developer
normally pays for the work will be determined.
4. This unit price times the quantities built (less additional
charges mentioned above) will be the basis for payment of
reimbursement paid by developer to the city. In no case
shall the amount reimbursed by the developer exceed the
amount the city actually paid for the item of work.
4) TIMIl'Ii OF PAYMENT OF REIMBURSEMENl' BY DEVEIDPER 'ID CITY:
A) Payment of reimbursement by developer shall be prior to final
approval and acceptance of publiC street improvements and bond
release by the City of San Bernardino.
B) There will be no payment of interest by the developer to the
city on any portion of the reimbursement.
RESOLVED AND AGREED UPON 'IlIIS /2.-11, DAY
HILL WILLIAMS DEVEWPMENI' CORJ.=URATION.
r7l
STATEOFCAlI~-1 }
COUNTY OF '7 / NG r _ ' 5.5,
On thIS the /~. - day oL~JS.!.i.1.L..__ 19.%1:_ before me.
the undersigned. a Notary Public in and for SjOid County and State.
personally appeared 2l.!lL01Ll> N,_J--'n-LU/8. :Jf.:.-
--- .pe"""",11y
known to me or proved 10 me on the basis of satisfactory evidence to be
the President, 8I'd i)..,,,, ,{ L b JL.....M..~.::2/L
, personally
known to me or proved to me on the basis of satisfactory evidence to be
_. _____ Secretary of the corporation that aX8Cuted the within
instrument on behalf of th rporation therein named. and acknow-
ledged to me that corporation executed the within instrument
pursuant 10 its - ws or a resolution of i .. ard of directors.
S 4../:L' ",
ignatur v--,7 . ..
OF IT "!tlS t , 1986 BY 'IlIE
All, 'VII dt1' ,Q
STEWAKr
TITLE
COMPANY OF SOUTHERN CAUFORNlA
FOR NOTARY SEAL OR STAMP
. omCIAl.SEAL
VICTOR A GENGLER
. NOTARY PUBlIc-cALlfORNIA
ORANGE COUNTY
MY COHN. EXP. JAN. 23,1990