- REQUEi,.NOpoFi8 COUNCIL ACTION
I"frr
Approval of Change Order No. ONE ---
Construction of Daley Canyon Road,
East of Chiquita Lane, per Plan No.
6824 --- MATICH CORPORATION
CITY OF SAN BERNARDINO
Roger G. Hardgrave REC'O. - AD'MIN. o~ject:
Publ ic Works/Engineerin~BS AUG -7 r~.j 3: S2
From:
Dept:
Date: 08-07 -86
02-18-85
Synopsis of Previous Council action:
01-06-86
02-03-86
04-21-86
06-16-86 u
Authorization granted to initiate proceedings to establish an
assessment district.
Engineer's Report adopted.
Resolution No. 86-34 adopted declaring the City's intention to
proceed to order the work and setting a public hearing.
Resolution No. 86-137 adopted finding that public convenience and
necessity require construction of Daley Canyon Road creating Assess-
ment District No. 966 and ordering the work.
RES. No. 86-236 adopted awarding a contract to Matich Corp. for the
low bid price of $42,581.00.
Recommemled motion:
cc: Ray Schweitzer
Warren Knudson
That Change Order No. One to the contract with Matich Corp.,
for construction of Daley Canyon Road, east of Chiquita Lane,
in accordanCe with Plan No. 6824, be approved; to authorize
the Contractor to raise subgrade in area of 1806 Daley Canyon
Road to conform with Revision No. 1 to the plans, on a time
and materials basis, not to exceed $1,400.0D, and remove west
transition for driveway approach on Daley Canyon Road for
1805, and reconstruct, on a time and materials basis, not to
exceed $300.00.
/ /~
.,
I
----~... /?,-/;
?- >'. ~{Vl,
Signature L t;/
Contact person:
Phone:
Roger G. Hardgrave
5025
-L-__
251-639-53925,
?54-000-:l0405
Supporting data attached:
Statt Rpport ~ r. r. 0 Hl
Ward:
FUNDING REQUIREMENTS:
Amount:
$1,700
Source: Acct. No.
.____ Finance:-p~
Jf~
Da ley Canyon Road_H(j j>.!! J_ecQYlle!!.througb-AS.Ses5ml'nts) _
Council Notes: ______
75-0262
A~enda Item No.
/~
CI'O OF SAN BERNARDOO - REQUOT FOR COUNCIL ACXJION
STAFF REPORT
A driveway was installed by Dr. John Hendy to serve his house under con-
struction at 1806 Daley Canyon Road. This driveway was installed too high to
match the curb and gutter to be installed by this contract. In order to avoid
having to remove this driveway, Dr. Hendy requested that the grade for the curb
and .gutter be raised. Upon reviewing the plans, we found that the grade could
be raised about 7 inches, without creating any problems. A slight change was
made in the alignment of the curb and gutter to assist in matching the driveway.
Dr. Hendy submitted a letter requesting this change and agreeing to be
assessed for the actual additional cost, not to exceed $1,400.00. The actual
costs will be determined by time and material reports submitted by the Contractor
and verified by our inspector.
The owner of 1805 Daley Canyon Road, Mr. Alan Smith, advised that he was
unable to traverse the driveway approach on Daley Canyon Road in his crew cab
pick-up and horse trailer. A field review revealed that the driveway approach
was adequate for automobiles and regular pick-ups, but not for Mr. Smith's special
vehicles.
The Contractor was directed to remove and reconstruct the west transition,
in order to increase the width of the driveway approach by 3 feet. Since Mr.
Smith was not responsible for this situation, and has not agreed to be assessed,
the cost for this item will apparently have to be charged to incidentals.
We recommend that Change Order No. One be approved.
75.0264
L
.
~ject:
'"'UII:>l.IUl.....UII VI UOIC,y OUfl ,,"vau,
East of Chiquita Lane
o
Date:
08-07-860
Plan No. 6824
File No. 2.118
ENGINEERING DIVISION
DEPARTMENT OF PUBLIC WORKS
CITY OF SAN BERNARDINO, CALIFORNIA
CONTRACT CHANGE ORDER NO. 1
(Change necessitated because of field conditions)
Matich Corporation
P. O. Box 50,000
TO: San Bernardino, CA. 92412
Gentlemen:
You are hereby authorized and directed to perform work as follows:
1. Raise subgrade in area of 1806 Daley Canyon Road, on the north side, in
accordance with Revision No.1, dated 7-29-86, to Drawing 6824, on a time and
materials basis (Section 3.3 of the Standard Specifications), at a cost not
to exceed $1,400.00.
2. Remove west transition for driveway approach on Daley Canyon Road for 1805 and
reconstruct 3 feet westerly, on a time and material basis, in accordance with
Section 3.3 of the Standard Specifications, at a cost not to exceed $300.00.
Total extra work cost added to contract .............................$ 1,700.00
Previous Contract Price.............................................$ 42,581.00
Amended Cost Price..................................................$ 44,281.00
Additional time to complete contract due to change order ............. 1
CONTRACTOR:
CITY OF SAN BERNARDINO:
By:
By:
ROGER G. HARDGRAVr------
Director of Public Works/City Engr.
Title:
Accepted Date: