Loading...
HomeMy WebLinkAbout14-Public Works o u o o 0 - REQUEi,.NOpoFi8 COUNCIL ACTION I"frr Approval of Change Order No. ONE --- Construction of Daley Canyon Road, East of Chiquita Lane, per Plan No. 6824 --- MATICH CORPORATION CITY OF SAN BERNARDINO Roger G. Hardgrave REC'O. - AD'MIN. o~ject: Publ ic Works/Engineerin~BS AUG -7 r~.j 3: S2 From: Dept: Date: 08-07 -86 02-18-85 Synopsis of Previous Council action: 01-06-86 02-03-86 04-21-86 06-16-86 u Authorization granted to initiate proceedings to establish an assessment district. Engineer's Report adopted. Resolution No. 86-34 adopted declaring the City's intention to proceed to order the work and setting a public hearing. Resolution No. 86-137 adopted finding that public convenience and necessity require construction of Daley Canyon Road creating Assess- ment District No. 966 and ordering the work. RES. No. 86-236 adopted awarding a contract to Matich Corp. for the low bid price of $42,581.00. Recommemled motion: cc: Ray Schweitzer Warren Knudson That Change Order No. One to the contract with Matich Corp., for construction of Daley Canyon Road, east of Chiquita Lane, in accordanCe with Plan No. 6824, be approved; to authorize the Contractor to raise subgrade in area of 1806 Daley Canyon Road to conform with Revision No. 1 to the plans, on a time and materials basis, not to exceed $1,400.0D, and remove west transition for driveway approach on Daley Canyon Road for 1805, and reconstruct, on a time and materials basis, not to exceed $300.00. / /~ ., I ----~... /?,-/; ?- >'. ~{Vl, Signature L t;/ Contact person: Phone: Roger G. Hardgrave 5025 -L-__ 251-639-53925, ?54-000-:l0405 Supporting data attached: Statt Rpport ~ r. r. 0 Hl Ward: FUNDING REQUIREMENTS: Amount: $1,700 Source: Acct. No. .____ Finance:-p~ Jf~ Da ley Canyon Road_H(j j>.!! J_ecQYlle!!.througb-AS.Ses5ml'nts) _ Council Notes: ______ 75-0262 A~enda Item No. /~ CI'O OF SAN BERNARDOO - REQUOT FOR COUNCIL ACXJION STAFF REPORT A driveway was installed by Dr. John Hendy to serve his house under con- struction at 1806 Daley Canyon Road. This driveway was installed too high to match the curb and gutter to be installed by this contract. In order to avoid having to remove this driveway, Dr. Hendy requested that the grade for the curb and .gutter be raised. Upon reviewing the plans, we found that the grade could be raised about 7 inches, without creating any problems. A slight change was made in the alignment of the curb and gutter to assist in matching the driveway. Dr. Hendy submitted a letter requesting this change and agreeing to be assessed for the actual additional cost, not to exceed $1,400.00. The actual costs will be determined by time and material reports submitted by the Contractor and verified by our inspector. The owner of 1805 Daley Canyon Road, Mr. Alan Smith, advised that he was unable to traverse the driveway approach on Daley Canyon Road in his crew cab pick-up and horse trailer. A field review revealed that the driveway approach was adequate for automobiles and regular pick-ups, but not for Mr. Smith's special vehicles. The Contractor was directed to remove and reconstruct the west transition, in order to increase the width of the driveway approach by 3 feet. Since Mr. Smith was not responsible for this situation, and has not agreed to be assessed, the cost for this item will apparently have to be charged to incidentals. We recommend that Change Order No. One be approved. 75.0264 L . ~ject: '"'UII:>l.IUl.....UII VI UOIC,y OUfl ,,"vau, East of Chiquita Lane o Date: 08-07-860 Plan No. 6824 File No. 2.118 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. 1 (Change necessitated because of field conditions) Matich Corporation P. O. Box 50,000 TO: San Bernardino, CA. 92412 Gentlemen: You are hereby authorized and directed to perform work as follows: 1. Raise subgrade in area of 1806 Daley Canyon Road, on the north side, in accordance with Revision No.1, dated 7-29-86, to Drawing 6824, on a time and materials basis (Section 3.3 of the Standard Specifications), at a cost not to exceed $1,400.00. 2. Remove west transition for driveway approach on Daley Canyon Road for 1805 and reconstruct 3 feet westerly, on a time and material basis, in accordance with Section 3.3 of the Standard Specifications, at a cost not to exceed $300.00. Total extra work cost added to contract .............................$ 1,700.00 Previous Contract Price.............................................$ 42,581.00 Amended Cost Price..................................................$ 44,281.00 Additional time to complete contract due to change order ............. 1 CONTRACTOR: CITY OF SAN BERNARDINO: By: By: ROGER G. HARDGRAVr------ Director of Public Works/City Engr. Title: Accepted Date: Approved Date: