Loading...
HomeMy WebLinkAboutR16-Public Works . CI'e OF SAN BERNARD-oO File No.7 .3710 - REQU'~T FOR COUNCIL ACOON '-' ,From: Roger G. Hardgrave ~f Public Works/Engineering Date: July 10, 1986 Subject: Approval of Change Order No. THREE - Construction of Community Center in Nicholson Park, per Plan No. 6781 -- DUNCAN CONSTRUCTION Synopsis of Previous Council action: 06/--/B5 -- Allocation of $30,000 approved for architectural and engineering services. 08/05/85 Allocation of $400,000 approved to finance construction costs and authorization granted to advertise for bids. 11/04/85 Resolution No. 85-464 adopted awarding a contract to Duncan Construction for the construction of a Community Center at Nicholson Park, in accordance with Plan No. 6781, for the low bid price of $396,215. 04/21/86 -- Contract Chanqe Order No. 1 approved to authorize credits and payment for increases for various items at a net increase in contract price of (Continued on 2nd Page) Recommended mati.on: o That Change Order No. Three to the contract be approved to authorize the Contractor to reinforce the center roof truss and provide lateral bracing between all roof trusses and end walls, on a time and material basis, with a cost not to exceed $5,000 dollars; install fire dampers at a cost of $345, install wire mesh instead of r.ebar in basketball court at a credit of ($739) and install carpet instead of vinyl tile in the senior room at a credit of ($372). This contract change will increase the contract price by an amount not to exceed $4,234 from the previous contract price of $418,495, to a contract price not to exceed $422,729. cc: Ken Henderson, RDA Ray Schweitzer Signature Phone: <;1?<; :3 Ward: ::l Source: Finance: Contact person: GIIAII Kl iltt Supporting data attached: Stitff Report & CllilRge Order No Not to exceed FUNDING REQUIREMENTS: Amount: $4,234 1985/86 CDSG Contingency Account Council Notes: o 75-0262 Agenda Item No ;(~ , CI~ OF SAN BERNARD'OO - REQU~T FOR COUNCIL AC:JON c~ o o 75-0264 STAFF REPORT Item 1: After the roof trusses were erected, a lack of lateral rigidity was observed. With the installation of the folding partition on the center truss, this flexibility would be detrimental to the operation of the partition. The roofing material was changed to a heavier type, which added to the loading of the trusses. The most economical solution to the rigidity problem is to install lateral bracing between the lower chords of all roof trusses and the end walls. The marginal load design relative to the center truss can be corrected with additional structural members added to the truss. These addi- tional members will insure sufficient load carrying capability relative to increased loading caused by the additional roofing material weight and loading caused by the folding partition. Design factors used in the other trusses were adequate to withstand the added roof weight. Item 2: Required fire dampers were not included in the original building design. This omission will be corrected with their installation. Item 3: A review of the basketball court design revealed that a savings of $739 could be made by using wire mesh in the concrete rather than the speci- fied reinforcement bars. This substitution will not detrimentally reduce the design strength of the court. Item 4: This is a credit for substituting carpet in lieu of tile on one-half of the community room. This substitution will reduce maintenance by having the entire room carpeted. A credit of $372 will be realized from this sub- stitution. In summation, the cost/credit of the above is: Item 1 not to exceed a cost of $5,000; Item 2 a cost of $345, Item 3 a credit of $739, and Item 4 a credit of $372. This contract change may be made for a total amount not to exceed $4,234. This Contract Change will necessitate a 15-day extension to the contract which will provide for a completion date of July 30, 1986. We recommend that Change Order No. 3 be approved. SYNOPSIS OF PREVIOUS COUNCIL ACTION Continued: $236.00, from $396,215 to $396,451. 5/19/86 -- Contract Change Order No. 2 approved the construction of a basketball court on a time and material basis not to exceed an increase in contract price of $22,044.00, from $396,451.00 to $418,495.00. o Dribution to: 0 OWNER 0 ARCHITECT 0 CONTRACTOR 0 FIELD 0 OTHER 0 o , G-tANGc ORDER AlA DOCUMENT G70t PRC>JECT: Nicholson Park Community Center (name. address) 2750 West Second Street San Bernardino, CA TC> (Contractor): r--Duncan Construction --, 1966 South Date Street Bloomington, CA 92316 ,L .J CHANGE C>RDER NUMBER: 3 INlTIATIC>N DATE: June 24, 1986 Revised Date: July 2, 1986 ARCHITECT'S PRC>JECT NC>: 84-238 CP CC>NTRACT FC>R: CC>NTRACT DATE: You are directed to make the following changes in this Contract: INCREASES 1. Truss revisions per sketches SKS-2 (dated 5/4/86), SKS-3 dated 5/12/86), and SKS-5 (dated 5/4/86). Includes additional painting of new truss plates. Fire dampers at Lobby $5,000.00 $ 345.00 2. TOTAL INCREASES .......... $5,345.00 , CREDITS o A.Credit for 6 x 6 x 10 x in lieu of 14 bars. 10 wire mesh at basket ball court $ 739.00 $372.00 TOTAL CREDITS ............ $1,111.00 NET CHANGE NOT TO EXCEED.. $4,234.00 Bill hourly time & materials B. Credit for capetingMultipurpose Room Not v..id unfit signed by both the Owner ,nd Architect SiS....."re of the Contr.CIOf .ndint6 his .Ir~menl herewith. includinSliny .diu~tmen'-.o the Conlrile' Sum or ContrUITIn,t>. The originallContract Sum) If\lIl<lill~lI~lI~j1) was ............. . ,. ,......... S 396,215.00 Net change by previously authorized Change Orders.. , . ... ..... . ..' ... . ..' ,. ........: S 22,280.00 The (Contract Sum) lOIlURldlf9l):llllll>>Jn<ft.lI) prior to this Change Orde' was .."....' S 418,495.00 The (Contract Sum) ~M\IIXilWl'<<lOOSll will be lincreased) ldelcoellllltkx,mdllllQecll . by this Change Order ............................................ ' . . . .. .. ., S 4,234 . 00 The new (Contract Sum) lIOU6~lCtullXfCJUI) including this Change Orde, will be . ., S 422,729.00 The C~tract Time will be lincreased) (ldlIl@llttxllO(aIldIlIlllJlldlby 24 work days. -~-----~.oav.. The Date of SubsUnt~1 Completion as of the date of this Change Order therelol\' is July 3D, 1986 Authorized: CITY OF SAN BERNARDINO ~WNER 00 North "0" <;tr""t Addr... San Bernardino, CA 92418 BY MIRALLES ASSOCIATES, INC. ffl"llCT est Woodbury Road Addreso Alta~ na, CA 91001 o BY DATE AlA OOCUMIHT ..,... . CHANCE ORDER . APRIL '''1 EDI ON . AlA- . · 1978 TN' AMI.ICA" INSTITUn Of ARCHITECTS, 17)5 NEW YORK AVE., N.W.. WASHINCTON, D.C.__ G701-1978