Loading...
HomeMy WebLinkAboutVOL_3_Appendix A Appendices Appendix A Air Quality Data General Plan Update and AJSociated Specific Plans EIR The Planning Center ~ Appendices This page intentionally left blank. Genera! Plan Update and AJsuciated Sj1ecijic Plam EIR The Planning Center Page, 1 URBEMIS ~O()~ For lo1indows 7.4./. File Name: SpICings.urb Pruject Name: Project Location, On Road Motor Vehicle C:\Prograrn Filcs\llRBEMlS 2002 FDIC Windows\PICojects2k2\Arrowhead Arrowhead Springs Development South Coast Air Basin (Lo,; Auyelp,; dred) Emissions Based on EMPAC2002 version 2.2 SUMl1ARY REPORT (Pounds/Day - Summer) CONSTRUCTION EMISSION ESTII1ATES PM10 PMIO PMIO . .. 2005 ... ROG NOx CO SO? TOTAl, EXH~UST DUST TOTALS (lbs/day,unmitigated) 23.36 178.03 175. 93 0.00 3,3G2.42 8.17 3,354.~5 PMIO PMlO PMIO '" 2006 ' " ROG NOx CU ;;02 TOTAL EXHAUST DUST TOTAL;; <lbs/day,urumitigatedl 23.36 Hi 7 . 56 183 .60 0.00 '., '.61.82 7 57 3.354.25 PMI0 PMIU PMIO . .. 2007 ... ROG NOx CO SO? TOTAl., EXHAUST DUST TOTA!~S (lbs/day,unmitigated) 23.36 157.23 191.35 0.00 ],3GO.97 6.72 3,354.25 AREA SOURCE EMISSION ESTIMATES TOTALS (lbs/day,unmitiqated; ROG 67.88 NOx 19.00 CO 11.74 S02 PMI0 0.07 0.04 '5U2 PlnO 1.50 230.14 '502 PIn 0 L 57 230 18 OPERATIUNAL (VEHICLE, EMISSION ESTIMATES ROG TOTAL;; (lbs/day,unmitigated) 117.03 NOx 112.73 cu 1,221.60 ;;UM or' AREA AND OPERATIONAL EMISSION ESTIMATES '" ROG NOx TOTAL;; (lbs/day,unmitigated) 184.91 1>1.7> CO 1,:;ll.34 Page- URBEMIS 2002 For Windows 7.4.2 File N.JffiC': Springs.urb ['roject N<1me, ProJect Location: On-Road Mater vehicle C. \Pro'Jram Files \URBEMIS 2002 For ',olindows\ PLOj ects~k~ \ALLuwhedu Arrowhead Springs Development Suuth Coast Air Basin (Los Angeles area) Emissions Based on EMPAC2002 version 2.2 S1JMMAF..Y REPORT (Puullus/DdY "inter) CONSTRUCTION Et1ISSION ESTII1i\TES PMID PMIO P1'11 0 . ,. 2005 '" ROG NOx CO so2 TOTAL EXHAUST DU;;'!' 'l'O'1'AJ~J5 (lbs/day, unmitigated) 23.30 17 8.03 l'i~.93 O.UO 3,362.4'2 8.17 >,154.25 PMI0 PM10 PMIU '" 2006 }:.l. ~ ROG NOx CO S02 TOTAL EXHAUST DUST '!'O'I'ALS [lbs/day, uruni tigatedJ 2'..36 167.56 183 60 0 00 3,361.82 7.57 3.354.25 PMI0 PMIO PMI0 ,,' 2007 ". RaG HOx CO :=;02 TOTAL EXH~_UST DUST TOTAL;; (lbs/day.unmitiSdLeul 23.36 157.23 191 .35 0.00 3,3GO.97 G.72 J.3S4.25 AREA SOURC~ EMISSION ESTIMATES A-l ROG NOx CO ::>02 PMlO TOTALS (lbs/day, unmitigated) 1,57960 36,09 1,675. 83 2.64 228.50 OPERATIONAL (VEHICLE) EMISSION ESTIMATES ROG NOx CO S02 PHIO TOTALS (lushJdY I unmi ligdLed) 99,03 161. 86 1,1~4.82 l.n 230.14 SUM OF A.REA AND OPERATIONAr, ElHSSION ESTTMA.TES ROG NOx CO 302 PM10 TOTALS (lbs/day,unmitiqated) 1,678.62 197.95 2,830. 64 3.85 458.64 Paye: 3 URBEMIS 2002 Fu~ Wimluws 7.4.2 C:\Progr~" Fi1es\URBEMIS 2002 Fur Windows\Projeets2k2\Arrowheau File Name: Springs_urb hoj eet Name: Project Location, On-Road Motor Vehicle Arrowhead Sp~ings Development South Coast Air Basin (Los Angeles area) Emissions Based on EMFAC20U2 version 2.2 DETAIL REPORT (Pounds/Day - Winter) construction Start Month and Year: November, 2005 Cunstr.uctiUll DUlation: ~4 Total Land use Area to be Developed: 185 acres Maxiluwu ACI~ag~ DistuLveu P~l Day: 18 acr~~ Single Family Units: 336 Multi-Family Units; 1014 Retdil/Ot t ice! Instl tuLiollal/Industrial Square Foot..age: 808167 CONSTRUCTION ErlISSION ES'rIMATES UNMITIGATED (lLs/udY) SUULce 't'+'t' 2-o05"'*~ Phdse 1 - Demulitiun Emls!.]iullS Fuqitive Dust Oft-Road Diesel On-Road Diesel WurkeL Trips Naximwn lbs/day 0.00 0,00 0,00 0,00 phase 2 - Site Grading Fugiliv~ Du.st Off-Road Diesel On-RUdU Diesel Worker Trips Mdximwll ltJ~:;/day Emissions 23,17 0.00 0.19 ? 3 . 3 6 Phase 3 - Building Cunstruction Bldg Const Uff-Road Diesel Bldg Const. Worker Trips Arch Coatings Off-Gas Arr.h Coatings t-Jorkcr 'Trips Asphalt Off-Gas Asphalt Olf-Roau Diesel Asphalt On-Road Diesel Asphal t vlu:rker TriIJs 11aximwn Ibs/day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 Max Ibs/day all phases 23.36 *""* 2UU6*** phase 1 - Demolition Emissions Fugitive Dust Off Road Diesel 0.00 Un-Road Diesel 0.00 \-lurk.er Tri!Js 0.00 Haximwn Ibs/day 0.00 phase 2 - Site Gradinq Fugitive Dust Off Roan nic>scl On-Road Diesel Emissions 23,17 0.00 ROG 0.00 0,00 O,OD O.OD 177,66 O.DO 0,37 178.03 0.00 0.00 0.00 0.00 0.00 0.00 0,00 178.03 NOx PNI0 TOTAL PNIO EXHl\DST 0.00 0.00 0.00 0.00 8.16 0.00 0.01 8.17 0.00 0.00 o 00 0.00 0.00 0.00 0.00 8.17 PNIO DUST 0,00 O.OU 0.00 O,O() 0.00 3,304,24 0.00 0.00 0.01 3,354.25 0.00 0.00 0,00 0.00 0.00 0.00 0.00 3.354.25 0.00 0,00 0.00 0.00 0.00 0.00 0.00 D.OO 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0,00 0,00 0.00 0.00 U,OD 0.00 0.00 U.OO 0.00 U.OU 3,354.24 3,304.24 167,19 179 .71 7.56 -:.56 0,00 0.00 D. 00 0.00 0.00 O. 00 U.UU CO S02 0.00 0.00 0.00 0.00 0,00 U.OO 0.00 0.00 0.00 0,00 0.00 0.00 172 . 00 o 00 3.93 175 93 3,154.24 8.10 0.00 0.02 3,162.42 0.00 0.00 0.00 0.00 o 00 0.00 0.00 o 00 0.00 0.00 o 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 O.GO 0.00 0.00 0.00 175.93 3,362.42 0.00 A-2 Worker Trips Maximum lbs/day Phase 3 Building Construction Eldg Const Off-Road Diesel Bldg Const Worker Trips Arch Coatings Off-Gas Arch Coatings worker Trips ASphalt Ott-Gas Asphalt Off-Road Diesel Asphalt On Road Diesel Asphalt Worker Trips Maximum Ibs/day Max Ibs/day all phase;; ..~ 2007~" Page: 4 Phase 1 - Demolition Emissions Fugitive Dust Off-Road Diesel On-Road Diesel Worker Trips Maximum Ibs/day phase 2 Site Grading Fugitive Dust Off-Road Diesel On-Road Diesel Worker Trips Maximum Ibs/day Emissi.ons Phase 3 - BUllding Construction Bldg Const Off-Road Diesel Bldg Const Worker Trips Arch Coatings Off Gas Arch Coatings Worker 1'1:'ips ^sphal t Off Gas Asphalt Off-Road Diesel Asphalt On Road Diesel Asphalt Worker Trips Maximum Ibs/day Max lbs/day all phases phase 0.19 7.CL 16 0.00 0.00 0.00 0.00 0.00 0,00 O.UU 0.00 O.OU 23.36 0.00 o 00 0.00 o 00 23.17 O.OU 0.19 23.36 000 U.OU 0.00 0.00 0.00 0.00 000 0.00 000 23.36 0.37 1fi7 . 'i6 0.00 (1.00 0.00 0.00 0.00 0.00 U.OU 16'1. '06 0.00 0.00 0.00 0.00 156.87 U.OO 0.36 157.23 0.00 U.OU 0.00 U.OU 0.00 U,OU 0.00 157.23 3.89 1S'.60 0.00 0.00 0.00 o 00 0.00 000 U.OU 183.6U 0.00 0.00 0.00 0.00 187.51 0.00 3 84 191. 3:' 000 U.OO 0.00 0.00 000 0.00 o 00 19135 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 o 00 0.00 0.00 O,UO o 00 0.00 u.oo 0.00 0.00 O.UO 0.00 0.00 Building (:onstruetion Assumptions, phase Turned OFF Pha~:;e 2 Site: Gradj ng Assumptions Start Month/Year for Phase 2: Nov 'US phase 2 Duration, 24 months On-Road Truck Travel (VMTI: 0 Off Road E(~lipmcnr No . Type 2 Rubber Tired Dozers 4 Scrapers 2 Tractor/Loaders/BackhoE's Page: J AREA SOVR~E EMISSION ESTII1ATES Source Nat.ural Gas Wuou Sloves Fireplaces Landscaping - Nu -'I"linLer emi~j:::;iCJns Consumer prdcts GG.05 TOTALS Ilbslday. UIU"itigaL"d) 1, ')79.60 {Winter ROG 1. 43 0.00 1,:'14.12 Pounds per NOx 18.92 0.00 17 .17 Horsepower 352 313 79 Load ""actor 0.590 0.660 0.465 Day, unmitigated) CO S02 7 .87 0.00 0.00 1,667,95 2.61 36 09 1,67')83 .64 A-3 0.02 1,%1.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,361.82 0.00 0.00 0.00 0.00 0.00 3,354.24 6.71 0.00 0.02 3,3GO.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,360.97 PM10 0.04 0.00 228.4'1 228.50 0.01 7.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.57 0.00 0.00 0.00 0.00 6.71 0.00 o 01 6.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 72 Hours/Day 8.0 8.0 8.0 0.01 3,354.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,354.25 0.00 0.00 0.00 0.00 0.00 3,354.24 0.00 0,00 0.01 3.354.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ,354.25 Page: 6 I~ITIGATED OPERATIONAL EMISSIONS ROG NOx CU SO" PMI0 Single family housing 1. 5~ ~.44 17.79 0.02 3.49 ApartJ.llentc: low rise 1. 03 1. 61 11.76 0.01 2.31 Condo/townhouse general 2b.0~ 40.')8 296.22 0.31 58.16 Retil.ement community 480 7.38 53.85 0.06 10.57 Golf Course 3.78 6.18 43 71 0.05 8.71 Quality re.sturant 6.73 11. 34 80.07 0.08 16.01 Hotel 18.15 29.99 21197 0.22 42.23 Strip mall 23.95 39.98 ~82.n 0.29 56.15 office park 13.02 22.37 156 52 0.17 32.50 TOTAL EMISSIONS (lbs/day) 99.01 161. 86 1.154. 82 1. 21 ~30.l4 Does not include correction tor passby trips. Does not include double counting adjustment for interndl L:r-ips. UPEAATIONAL (Vehicle) EMTS.SION ESTHIATES Analysis Year: 2015 Temperature on; 50 Summary 0 t Laml U"es: EMFAC Version: EMFAC2002 (9/2002) Unit Type Single tamily housing Apartments low rise CondoJtownhuuse general Retirement community Golf COULse Quality resturant Hotel Strip Ilk'lll Office parI:. Vehicle ASSUDlVtionS: c'leet Mix: Vehicle TyplO Light Auto Light Truck <: Light Truck Med Truck l,i ti>-Heavy Lite-HIOavy Med-Heavy Heavy-RedVY Line Haul > Urban Bus Motorcycle School Bus Motor HDme 3,750 1bs 3,751- 5,750 5,751 8,500 8,501-10,000 10,001-14,000 14,001-33,000 33,001-60,000 GO,OOD l!J~ Travel Conditions Urbdn Trip Length (milesl Rural Trip Length (miles) TLiV Speeds (mph) ~ of Trips - Residential ::;eaSQn: \rJinter Trip Rate Size Total Trips 9.58 trips dwelling unll~3 36 00 345.00 5.71 trips dwe 11 ing units 34.00 228.00 5.86 trips dwelliny uIlits 980.aD 5,743.00 3.4R trips dwell ing units 300.00 1,044.00 5.04 trips ! acres 19900 1,003.00 89.9 S trips ! lODD sq. ft. 20.00 1,799.00 8.00 trips 1 rooms 608 00 4,864.00 ~8.33 t.rips I 1000 sq. ft. 234.17 b,633.00 11.01 trips , 1000 sq:. ft 250.00 2,753.00 Percent Type 54.40 15.30 16.40 7.30 1.10 0.30 1.00 0.80 0.00 0.20 1. fiO 0.10 1. 50 Hom-e- ;Jork 11.5 11.5 JS.0 20.0 Residential Home-- Shop 4 9 4.~ 40.0 37.0 ~ of Trips - Commercial (by JJnd use/ Golf Course Quality resturant Hotel SLrip ITli! 11 Office park NUll-Catalyst 0.40 0.70 0.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 0.00 0.00 lIome- OthlO' 6 _ 0 6.0 40.0 43.0 A-4 Catalyst 99.40 98.00 98.80 98.60 81.80 66.70 20.00 0.00 0.00 50.00 50.00 0.00 ~3.3() Commercial Commute 10.3 10.3 40.0 Non-Work 5.5 5.5 40.0 5.0 ~.O 5 0 2.U 48.0 Diesel 0.20 1. 30 O.W 1. 40 18.20 33,30 BO.OO 100.00 100.00 50.00 0.00 100.00 6.70 Customer 5.5 5.5 40.0 2.5 4.0 2.5 1.0 24 0 ~~.5 B8 0 92.5 97 0 28.0 ],lage: 7 Changes made tu the default va] Uf'S for l.and Use Trip Percentages Changes made to the default values tor Constructiun Changes made to the default values tur Area Site Urading Fugitive Dust OlJlion changed trow Level 1 to Lceve] ? The wood stove optiun switch changed from on to off The landscape year changed from 2004 to 2015. Changes m;:lde to the default values for Operations The operational emission year changed from 2004 tu 2015. The double counting internal work trip limit changed from to 1471.9999792. The double counting shopping trip limit changed frOIn to 945.6850038948. The double counting other trip limj~ changed from to 3164.79995528. The travel mode environment settings changed from both to: buth page: 8 URBf.'MIS 20U2 For Windows File Name: Springs_llTb project Name: Project Location: On~Road Motor Vehicle. Emi""ions 7.4.2 ~,\Program Files\ORBEMIS 2002 For Windows\Projects2k2\Arrowhead Arrowhead Springs Development ;;outh Coast Air Basin (Los Angel"" area) Based on EMFAC2002 version 2.2 DETAIL REPORT (Pounds/Day - Summer! Construction Start Month and Year, November, 2005 Construction Duratiun: 24 Total Land Use Area to be Developed: 185 dcres Maximum Acreage DisLurbed Per Day: 18 acres Single Family Units: 336 Multi-Family Units, 10]4 Retail/ufficeilnstitutiulldl/Indus~rial Square Footage: 808167 CON;,iTRUCTION EMISSION ESTIMATES UNMITIGATED jIbs/day) m10 PMI0 PMIO Sout:ce ROO NOx CO S02 TOTAL EXHAUST DUST ** k 2005'" Phase 1 - Demolition EmiDsions Fugitive Dust 0.00 O.OU Off-Road Diesel 0 00 0.00 0.00 0.00 0.00 0.00 On. Road Diesel U.OO 0.00 0.00 0,00 0.00 0.00 O.OU Worker Trips 0.00 0.00 O.UD 0.00 0.00 0 00 0.00 Maximum lbs/day 0.00 0.00 0.00 0 00 0.00 0.00 0.00 phase 2 - Site Grading Fugitive Dust Off-.Road Diesel OIl-Road Diesel li'Jo:cker Tr.ips Maximum Ibs/day lmlissions 23.17 0.00 lJ.l9 23.36 Phase 3 - Building Construction Bldg Const Off Road Diesel Bldg Const Worker Trips Arch Cuatings Off Gas Arch coatings Worker Triys Asphalt Off-CdS Asphalt Off-Road Diesel Asphalt On-Roau Diesel Asphalt Worker Trips Maximum Ibs/day 0.00 0.00 0.00 o 00 O.OU 0.00 0.00 0.00 0.00 Max lbs/day all phases 23.36 *** 2005*** 3,354.24 3,354.24 177.66 172.00 8.16 8.16 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 0.37 3.93 0 00 0.02 0.01 0.01 178.03 175.93 0.00 j,362.12 8.17 3, 354 .25 0.00 0.00 0.00 0.00 O.UO 0.00 0.00 O.DU U.OO 0.00 0.00 0.00 0.00 0.00 0.00 O. 00 0 00 O. 00 0.00 O.OU 0.00 0 00 U. 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 D.OU 0.00 0.00 0.00 0.00 0.00 178.03 1'15.93 0.00 3,362.4? 8 17 3,354.25 A-S Phase 1 - Demolition ~missions Fugitive Dust Off-Road Diesel On Road Diesel Wm:-ker Trips Maximum lbs/day phase 2 - Site Grading Fugiliv-c: Dust Off-Road Diesel On-Road Die:sel Worker Trips Maximum lbs/day ~missions Phase 3 Building Construction Bldg Const Off-Road Diesel Bld!J Con"t Worker Trips Arch Coatings Off-Gas ALCh Cuar_ings t-torker Trips Asphalt Off-Gas Asphalt Off Road Diesel Asphalt On-Road Diesel Asphalt Worker Trips ~Iaximum lbs/day Max Ibs/day all phases ..."'* 2007*** P'lg!' , 9 phase 1 - Demolition Emissions Fugitive Dust Off-Road Diesel On-Road Di"s"l Worker Trips Maximum Ibs/day Phase ~ - Site Grading Fugitive Dust Off-Road Diesel On Road Diesel Worker Trips t1aximurn lbs/day Emissions Phase 3 - Building Construction Bldg Const Off-Road Diesel B]ng Canst Worker Trips Arch Coatings OIf-Cas Arch Coatings worker Trips Asphalt Off-GaB Asphalt Off-Road Diesel Asphalt OIl-Road Diesel Asphalt Worker Trips HaximuIIL Ibs/nay Max Ibs/day all phases phase 0.00 0.00 0.00 0.00 23.17 0.00 0.19 2336 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.36 0.00 0.00 0.00 0.00 23.17 0.00 0.19 23.36 0.00 o.on 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.36 0.00 0.00 0.00 U.OO 107.19 0.00 0.37 167.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 167.56 0.00 0.00 0.00 0.00 1S0.S? 0.00 0.30 157.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 157.23 o 00 0.00 0.00 0.00 179.71 0.00 "3.89 183.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 183.60 0.00 0.00 0.00 0.00 187.51 0.00 3.84 191.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19] .35 - Euiluing Construction Assumptions: Phase Turned OFF phase 2 - Site Grading Assumptions Start Mcmth/Year for Phase 2: Nuv 'O'i Phase 2 Duration: 24 months On-Road Truck: Travel (~IT), 0 Off-Road Equipment No. Type 2 Rubber Tired Duzprs 1 Scrapers 2 Tractor/Loaders/Backhoes Paye: 10 llorsepower 352 313 '19 A-6 Load Factol 0.590 0.660 0.465 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,354.24 7.56 0.00 0.02 3,361.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o 00 0.00 0.00 0.00 0.00 3,361.82 0.00 0.00 0.00 0.00 O.OU 0.00 0.00 0.00 0.00 0.00 0.00 3,354.21 6 71 0.00 o 02 3.360.97 0.00 0.00 0.00 0.00 0.00 000 O.UO o 00 0.00 0.00 0.00 0.00 0.00 3,%0.97 0.00 0.00 0.00 0.00 6.71 0.00 0.01 6.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.72 Hour~3/D.::lY 8.0 8.0 8 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.56 0.00 0.01 7.57 3,354 24 O.UO 000 0.01 3.354.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1).00 '1.57 3,354.25 0.00 0.00 0.00 0.00 0.00 'l. "154.24 O.O\! o 00 0.01 3."354.25 0.00 0.00 0.00 0.00 0.00 DOG O.OD 3,354.25 AREA SOURCE EMISSION ESTIMATES (Summer Pounds per Day, Unmitigdted) Source ROG NOx CO 502 PM10 Natural Gas 1.43 lS.92 7.87 0.04 wood Stoves - NO summer emissions Fireplaces - No swrune:t emissiuIl:::i Landscaping 0.40 0.08 3.87 0.07 0.00 COIlDumer Pructs 66.01) TOTALS (lbs/day, unmi tigated) G7. 88 19.00 11.74 0.07 0.04 Page: 11 UNMITIGATED OPERATIONAL EMISSIONS ROG NOx CO :002 PMIO Single family housing 1. 77 1. '10 19.05 0.02 3.49 Apartments low ri~H~ 1. 28 112 12.59 0.02 2.31 Condo/townhouse general 33.G8 28.22 317.13 0.38 58.16 Retirement community 7.45 5.13 57 65 0.07 10.57 Golf Course 5.48 4.:n 45.53 0.06 8.71 Quality resturant 6.27 7.90 83.80 0.10 16.01 Hotel 22.69 20.92 220.79 U.27 42.23 Strip mall 24.01 27.91 29321 0.37 56 .15 Office pClrk 14.38 15.51 171. 86 0.21 32.50 TOTAL EMISSIONS (lbs/day) 117.03 112. '13 1,221.~0 1')0 2"10.14 Does not include correction for passby trips. Does not include duuble counting adjustment for internal trips. OPERATIORr"L (Vehiclel EMIS.SION ESTIMll.TES Analysis Year: 2015 Temperature IF), 90 Season, Summer EMFAC Version: EMFAC2002 (9/20021 Summary of Ldnd Uses: Unit Type 1'rip Rate Size Total Tr"],!s 9 58 tdps d'tlell ing units 3u.00 34:,.UU u.71 trips dwelling un i t~~ 34.00 228 00 586 trips d'tle11 ing units 980.00 5, 713 . OU 3.4~ tritJ,s dwelling units 300.00 1,044.00 5 04 trips a.cres 199.00 1,003.UO S9.~" tl.lps 1000 sq it . 20.00 1,799.00 8.00 trips rOomS 60S.00 1,864.00 28.33 triJ)s 1000 "'I. n. 234 17 6,633.00 11.01 trips 1000 sq. ft. 250.00 ~,753.00 :Oingle tamily huu~ing Apurtments low rise Condo/townhouse general Retirement community Golf Course Quality resturant Hotel Strip mall Office pdrk Vehicle Assumptions: Fleet Mix: Vehicle Type Percent Type Non-Catalyst CalaiysL Dies'.,l Light Auto 54.40 0.40 99.40 0.20 Light Truck 3,750 1bs 15.30 U.70 98.00 1. ,0 Ught Truck 3.751- 5.750 16.10 0.60 98 80 0.60 Med Truck ;),751- 8,500 7.30 0.00 98.60 1. 40 Lite Heavy 8,501-10,000 1.10 0.00 81. 80 18.20 Lite-Heavy lO,OOl-H,OOO 0 30 0.00 66.70 :n.30 Med Heavy 14,001-33,000 1. 00 0.00 20.00 80.00 Heavy-Heavy 33,001-60,000 0.80 0.00 0.00 100.00 Line Raul > 60,000 lbs 0.00 0.00 0.00 100.00 Urban Bus 0.20 0.00 50.011 50.00 Motorcycl., 1. GO "U.UO 50.00 0 00 School Bus 0.10 0.00 0.00 100.00 Motor Home 1. 50 U.OO 93.30 6 70 Travel ConditiorI1::J Home~ \'IQrk Urba.n Trip Length (mil"", 11.5 Re.:.:;id~ntial Home- SImp 4.9 Corrrnel:cial Home~ Other 6.0 Commute Non-Work Customer 10.3 J.~ 5.~ A-7 Rural Trip LC'ngth (miles) 11 5 4.9 G.O 10.3 5.5 5.5 Trip Speeds (mph) 35. 0 40.0 40.0 40.0 40.0 40.0 % of Trips - Residential 20 .0 37.0 43.0 % of Trips - Commercial (by land usel Golf CaUl-Se; 5.0 2.'.1 92.5 Quality resturant 8.0 40 88.0 Hotel 5.0 2.5 n.s Strip mall 2.0 1.0 97.0 Ollice park 18.U 24.0 2B.0 Page, 12 Changes made to the defaulL values for [,and Use Trip Percentages Changes made to the default values for Construction Site Grading Fugitive Dust Option changed iLum Levellt'o LC'vel 2 Changes made to the default values for Area The wood stove option switch changed from on tu uif. The landscape year chanyed from 2004 to 2015. Changes made to the default values for Operations The operational emission yeaL changed from 2004 to 2015. The double- counting internal wor!: trip limit changed irom to 1471 9999792. The double countillg shopping trip limit changed from to 945.6850038948. ThE' double counting other trip limit changeu trom to 3164.79995528. The travel mode teuviruruneIlc set:tings changed from both to, both A-8 Page: 1 URBEMIS 2002 For Windows 7.4.2 File Name: Springs-buildiny Project Name: Project Loc-ation~ On-Road Motor Vehicle C:\Program Files\URBEMIS 2002 For Windows\Projects2k2\Arrowhead constLuctlan.urv Arrowhead Springs Development-building construction Suuth Coast Air BdSiu {Los Angeles area) Emissions Based on EMFAC2002 version 2.2 SUMHARY REPORT (Powlus/Day - SUn[ner) CONSTRUCTION EMISSION ESTIMATES *** 2007 *** TOTALS (lbs/day,unmitigated) ROG 25.50 NOx 104.02 CO 391. 02 *u 2008 YYT RUlJ NOx CO TOTALS (Ibs/day, unmitigated) 25.08 100.6] 38R .73 *'* 2009 *** ROG NOx co TOTAfJS (lbs/day,unmitigatedl 24.64 97.32 386.23 , " 2010 ,,' ROG NOx CO TOTALS llbs/day,unmitigated) 24,2:) 94.29 383.91 *** 2011 H* ROG NOx CO TOTALS (lbs/day, unmitigated} 24.23 94.29 383.91 u, 2012 *x-'.\. ROG NOx CO TOTALS (lbs/day,unmitigdted) 815.49 1l1.0g 482 .58 AREA ::;UURCE EMIs:::rON E:::TIl~TES ROG NUx CO TOTAL::: (lbs/day, unmitigated) 6'/,88 19,00 11.74 OPERATIONAL IVEHTCT,E) EMISSION ESTIMATES ROG NOx CO TOTALS (lbs/day, unmit igatedl 117.03 112,73 1,221 .60 SUM OF AREA AND OPERATIONAL EMISSION EST1MA'rE~ ROG 184.91 TOTALS (lbs/day,unmitigated) Nax 131.73 CO 1,233.34 Page, 2 URBEMIS 2002 r'or Windows '1.4.2 File Name, Springs-LuiIclillg Project Name, Project Location: On Road Motor Vehicle S02 0.17 PM10 PMI0 PM10 TOTAl, EXHAUST DUST 4.70 3.75 0.95 PMI0 ?MI0 !CMI0 TOTAL EXHAUST DUST 4.40 3 45 0.95 PMlO PM10 PM10 TOTAL EXHAUST DUST 4.20 3.25 0.95 PM10 PMI0 ?MI0 TOTAL EXHAUST DUST 3.97 3 02 0.95 !CMIO PMI0 PM10 TOTAl, EXHAUST DUST 3.97 3.02 0,95 PMI0 PMI0 ?MI0 TOTAL EXHAUST DUST 6 11 4 20 1.91 :::02 0.17 S02 0.17 S02 0.17 S02 0.17 502 O.lB :;02 PM10 0.07 0.04 502 PIHO 1. 50 230.14 502 rMI0 1. 57 230.18 co C:\ProgIdIll Filros\lIRBEMT5 2002 1"or Windows\rrojects2k2\Arrowhead construcrion.urb ALruwhedu S~ring:.::; Dr:vo1npment hui lding construction South Coast Air Basin (LOS Angeles area) Emissions Based on EMFACi O()2 ,""r:';lOll 2.2 S02 PMI0 TOTAL PN10 DUST SUlolMARY REPORT (Pounds/Day - Willl;"r) CONSTRUCTION EMISSION E:::TlMATES "'** 2007 +*.., ROG NOx A-9 PNIO EXHAUST TOTALS (1bs/day,unmitiqatedJ 25.50 104.02 391. 02 0.17 4.70 3.75 0.95 PM10 PM10 PM10 'u 2008 .** ROG NOx co S02 TOTAL EXHAUST DUST TOTALS (lbO] /day, unfii tigatE'd) 25.08 100.61 388 .73 0.17 4.40 3.45 0.95 PMI0 PM10 PM10 , *' 2009 ' " ROG NOx CO SU2 TOTAL EXHAUST DUST TOTALS ( Ibs / day, UIlffii t igated) 24.64 97.32 386.23 0.17 4.20 3.25 0.95 PM10 PM10 PM10 **' 2010 "* ROG NOx CO S02 TOTAL 8XHAUST DUST TOTALS (lbslday,unmitigated) 24.23 94.29 383.91 0.17 3.97 3.0~ 0.95 PMIO PMI0 PM10 *' , 2011 u. ROG NOx CO 502 TOTAL EXHAUST DUST TOTAL::; (lbs/day,unmitigatedl 24.23 94.29 383 .91 O. J7 397 3.02 0.95 PM10 PM10 PMI0 . ** 2012 *u ROG NOx CO S02 TOTAL EXHAUST DUST TOTALS (lbs/day, unmitigated) 815.49 131. 09 482.58 0.18 b .11 4.20 1 .91 AR8A SOURCE EMTSSTON ESTIMATES ROG NOx CO S02 PM10 TOTALS (] bs/day, unmitigated) 1.579.60 36.09 1,675.83 2.64 228.S0 OPERATIONAL (VEHICLE) EMI::;SION ESTIMATES ROG NOx CO S02 PMIO TOTALS 11bs/day, unmitigated) 99.03 161. 86 1,154.82 J .21 230.14 SUM OF AREA AND OPERATIONAL EMISSION ESTIMATES ROG NOx CO ::;02 PMIO TOTALS 11bs/day, unmitigated) L 673 . 62 197.95 2,83D.M '1.8'5 458.64 PdY": 3 UPFlEMIS 2002 For Windo",s 7.4.2 File Ndme: Springs-.bui 1ding Pruject NdIUI2: Project Location; OH-RudU MuLor Vehic]e C;\Program Fi.1es\URBENIS 2002 FO. Windows\Projects2kl\ArrowheaLl construction.urb Arrowhead Springs Development-building construction South Coast Air Basin (Los Angr,;l r~s Llrea) Emi ssions Based on EMFAC2002 '.'e.sion 2.2 DE:TAIL REPORT (Pounds/Day - Winter) Construction Sta.t Month and Year: Nuv~lili"r, 2007 Construcrion Duration: 60 Total Land Use Area to be Developed: 185 dcres Mdximwn Acreage::: nist~llrbed rer Day~ 18 acres Single Family units: 336 Multi-Family Unitn: 1014 Retail/Oftice/Inotit.ut::ionaJ/lndustria1 Square Footage; 808167 CON::;TRUCTION EMISSION ESTIMATES UNMITIGATED Ilbs/day} Phase d - Site Crading FJl1i .ssions Fugitive Dust Off~Road Diesel 0 00 o 00 PMI0 PH10 PM10 Su2 'l'OTAL r:XHAUST DUST 0.00 0 00 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 00 0.00 0.00 0.00 O.UO Source ROG NOx CO *** 2007* H phase 1 - Demolition EmisoiuIlS Fugilive Dust- Off~Road Diesel 0.00 0.00 0 00 On-Road Diesel 0.00 0.00 0, uo Worker Trips 0.00 0.00 0 00 MaximUITI lbo/day 0.00 0.00 0.00 0.00 A-tO On-Road Diesel Worker Trips Maximum IbsJday Phase '3 Building Construct-i on Sldg Canst off-Road Diesel sldg ~onst Worker Trips ALeh Cuatil1gs Oft-Gas Arch Coatings worker Trips Asphalt Off-Gas Asphalt Off-Road Diesel Asphalt On Road Diesel Asphalt Worker Trips Naximum Ibs/day Nax Ibs/day all phases -I.**" 2008*** Phase 1 - Demolitiau Emissions Fugitive Dust Ott-Road Diesel On Road Diesel Worker Trips Maximum lbs/day Phase 2 - Site Grading Fugitive Dust Off-Road Diesel On-Road Diesel worker Trips Maximum lbs/day Emissions Phase 3 - Building Construction sldg Const off. Road Diesel Bldg Const Worker Trips Aroh Coatings Off. Gas Arch Coatings Worker Trips Asphalt Off-Gas Asphalt Off-Road Diesel Asphalt On Road Die's"l Asphalt Worker Trips Maximum Ibs/doy Max Ibs/day all phases ":*": 2009*** Page, 4 PhdSc 1 ~ Demulition Emissjons Fugitive Dust Of E Road Di csd. on-Kaad Diesel ~'1orker 'Trips 11axirnum Ibs/day Phase 2 - Site Grading Fllgitive Dust off-Road LJiesel Orl~RodU Die~1el Worker Trips Maximum IDs/day E...'TI.issions Phase .:! - Building Construct.ion Bldg Canst Off-Road Diesel Bldg Const Worker Tri~s Arch Coatings Off~Gas Arch Coatings Worker Trlv~ Asphalt OtE Gas Asphalt Off-Road Diesel Asphalt OIl-Road Dies,,] Asphalt Worker Trips Maximwn 1bs/day Max Ibsluay all ,'!lase" 0.00 0.00 0.00 10.GO 14.90 0.00 0.00 0.00 0.00 0.00 0.00 2'i.50 25.50 0.00 0.00 0.00 0,00 0,00 0,00 0.00 0.00 10.60 14. 4~ 0.00 0.00 0,00 0,00 0.00 0,00 25.08 25.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 10.60 ]4.04 0.00 0.00 0.00 0.00 o 00 0,00 2464 2464 0,00 0,00 0.00 75,96 28.06 0.00 0.00 0.00 0.00 104.02 104.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.76 'J7 . 8~ 0.00 0.00 0.00 0.00 100.61 100.G1 0,00 0,00 0,00 0.00 0.00 0.00 0.00 0.00 69.70 27 63 0.00 0.00 0.00 D.OD 97.32 97 32 0.00 0.00 0.00 81.78 309.23 0.00 0.00 0.00 0.00 391. 02 391. 02 0.00 o 00 0.00 0.00 0,00 0.00 0.00 0.00 83.83 304,90 0.00 D.DO 0.00 0.00 388.73 388.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 85.96 300 27 0.00 0.00 0.00 0.00 386.23 386.23 A-It 0.00 0,00 0.00 0.17 0.00 0.00 0.00 0.17 0.17 0.00 0.00 0.00 0.00 0.00 0.00 0.17 0.00 0.00 0.00 0.17 0.17 0.00 0.00 O.OIj 0.00 0.00 0.00 0.17 0.00 0.00 0.00 0.17 0.17 l),OO 0.00 0.00 3.18 1. 52 0.00 0.00 0.00 0.00 4.70 4.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.88 1. 52 0.00 0.00 0.00 0.00 4.40 4.40 0.00 0,00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 2.68 1. 52 0.00 0.00 0,00 0.00 4,20 4.20 0.00 0.00 0.00 3.18 0.57 0.00 0.00 0.00 0.00 3.75 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.88 0.57 0.00 0.00 0.00 0.00 3.45 3.4~ 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ?.68 0.57 0.00 000 0.00 0.00 3.25 3.25 0.00 0.00 0.00 0.00 0.95 0.00 0.00 0.00 0,00 o 95 0.95 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.95 0.00 0.00 0.00 0.00 0.95 0.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.95 0.00 0.00 0.00 0.00 U.'::IS 0.95 y..;,r 2:010...,..... Ph2E1e 1 Df::illol ition Emissions Fugitive Dust Off Road Dies"l On-Road Diesel worker Trips Maximum lbs/clay Pha~e 2 Site Grading Fugitive Dust Of[ Roan Diesel On-ROad Diesel ~1Jl)rker Trips Maximum Ibs/day Phase 3 - Building Construction Bldg Const Ott-Road Diesel Bldg Canst Worker Trips Arch Coatings Off-Gas Arch Coatings worker Trips Asphalt Off-Gas Asphalt Off-Road Diesel Asphalt On-Road Diesel Asphalt Worker Trips Maximum lbs/day Max lbs/day all phases ""* .?Oll~-I..~ Phase 1 - Demolition EmisDiuIlS Fugitive Dust Off-Road Diesel On Boad Di['sel Worker Trips Maximum Ibs/day Phase 7. Site Groding Fugitive Dust Off Road Diesel e>a-Road Diesel Wurker Trips Maximum lbs/day Emissions l?hase 3 - Building Constructiun Bldg Const Off-Road Diesel Bldg Canst Worker Trips Arch Coatings Off-Gas Arch Coatings Worker Trips Asphalt OffC"s Paqe; Asphalt Off-Road Diesel Asphalt On Road Diesel Asphalt Worker Trips Mdximwu Ins/day Max Ius/day all phases ;ht~ 2012"*'''''''' Phase 1 - Demolition F.missions Fugitive Dust Off-Road Diesel On Road Diesel Worker Trips Maximum los/day Phase ~ - Site Grading Fugitive Dust Off-Road Diesel On Road Diesel f,lllorker Tl ips Maximum Ibs/day Emissions phase 3 - Buildinq Construction Emissions 0.00 0.00 0.00 (LOO 0.00 O.UO 0.00 0.00 10.60 13 .63 0.00 0.00 0.00 0.00 0.00 0.00 24.23 24.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.GO 10.63 0.00 0.00 0.00 0.00 0.00 0.00 24.23 24.23 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 66.89 27.40 0.00 0.00 0.00 0.00 94.29 94 29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 G6.89 27 40 o 00 0.00 0.00 0.00 94.29 94.29 0.00 0.00 0.00 0.00 0.00 o 00 0.00 0.00 0.00 0.00 0.00 0.00 o 00 0,00 0.00 0.00 88 01 295.90 0,00 0.00 0.00 0.00 383.91 333 91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o 00 ~8.01 295.90 0.00 o.no 0.00 0.00 383.91 383.91 0.00 0.00 0.00 o 00 0.00 0.00 0.00 0.00 A-12 0.00 0.00 0.00 0.00 0.00 0.00 0.17 0.00 0.00 0.00 0.17 0.17 0.00 0.00 0.00 0.00 0.00 0.00 0.17 0.00 0.00 o 00 0.17 0.1'1 o 00 0.00 o 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.46 1. 52 0.00 0.00 0.00 0.00 3.97 3.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.46 1. 52 0.00 0.00 0.00 0.00 J.9'1 J.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 (j.OO 0.00 lJ.OO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.46 0.57 0.00 0.00 0.00 0.00 3.02 3.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.46 O. "7 0.00 0.00 0.00 0.00 3.02 '.07. 0.00 0.00 0.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.95 0.00 0.00 0.00 0.00 0.95 0.95 0.00 0.00 0.00 0.00 0.00 0.00 o 00 0.00 o 00 0.00 0.00 0.95 0.00 0.00 (1. 00 0.00 0.95 0.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Oldg Const Uff-koad Diesel Bldg Const Worker Trips Arch Coatings Off-Gas Ar~h Coatings Worker Trips Asphalt Uff-Gas Asphalt Off-Road Diesel Asphalt On-Road Diesel Asphalt worker Trips Maximum Ibs/day Max lbs/day all phases 10.60 13.63 7 81. ~4 4.00 0.00 5.68 0.00 0.03 815.49 815.49 66.89 27 40 88.01 295.90 2_46 2.46 D. 17 1.52 0.57 0.01 1.01 0.06 1.12 1.12 0.00 000 0.00 O.OU 0.01 0.00 018 6.11 4.20 O. 18 6.11 4.20 2 36 50 61 34.43 0.00 0.02 131. 09 47.71 0.00 0.34 482.58 131.09 482.58 Phase 2 - Sit" Grading Assumptions, phase Turned OFF phase 3 - Building Construction Assumptions Start Month/Year for Phase 3, Nov '07 phase 3 Duration; 60 months Start Month/Year lor SubPhase Building; Nov '07 SubPhase Building Duration, 60 months Off-Road Equipment No. Type Horsepower 1 Cranes 190 2 Other Equipment 190 2 Rough Terrain Forklifts 94 2 Signal Boards 119 Start Month/Year tor SuLPhase Architectural Coatings, subphase Architectural Coatings Duration; G months Start Month/Year tor SuLPhase Asphalt, Aug '12 Subphase Asphalt Duration; 3 months Acres to be Paved: 0 off--Road Equipment No. Type 2 Pavers 2 Paving Equi00ent 1 Rollers Page; G AREA ~OURCE EMISSION ESTIMATES Source Natural Gas ~'Joorl ~C':t""oves Fireplaces Ldndscaping No Consumer l'rdcts TOTALS (lLs/day,nnmi tigC1"ed) (Winter ROG 1. 43 0.00 L 512 .12 winter emissions 66.05 1,579 60 Page: ') Load Factor 0.430 0.620 0_475 0.820 ~lay '12 HaULs/Day 8.0 8.0 8.0 8.0 HorSE-power 132 11] 114 Load factor O,~~U o 530 0.430 HourS/Day 8.0 8.0 ~.O Pounds per NOx 18.92 0.00 17.17 Day, unmitigated, CO S02 7.87 0.00 0.00 1,667.95 2.64 Pl1l0 0.04 0.00 228.47 36.09 1.075.83 2.64 228.50 UNMITIGATE]) OPERATIONAL EMISSIONS ROG NOx ~o S02 PMIO Single tamlly hou~~ ing 1. 55 2.44 17.79 0.02 3.4~ Apartments low rise 1. 03 1. 61 11.76 0.01 2.31 Condo/ townhouse I,jeneral 26 02 40.58 2%.22 0.31 58.16 Retirement community 4. 80 ./ . :0 8 53.85 0.06 10.57 Golf Course 3 78 6.18 43.71 0.05 8.71 QUC11ity resturant G.73 11.34 80.07 0.08 16_01 Hotel 18 15 29.99 211.97 0.22 42.23 Strip mall 23.95 39.98 282.92 0.29 %_15 Office park 13.0d 2?.37 156.52 0 17 32.50 TOTAL EMISSIONS {lbs I day) 99.03 161 .81; 1,154. R? _21 230.14 Does not include correcticn for passvy Lrip~;. Does not include duuble cQuncing adjustment for internal trips. Ul'tlRA'l'lONAL IVehiclel EI1ISSION ES'l'TM."-TES A-13 0.00 0.95 0.95 0.00 0.00 0.01 1.91 1. 91 Analysis Year: 2015 Temperature (F): 50 Season: Winter EMcAC version: EMFAC2002 (9/2002) Summary of Land Uses: Single tamily housing Apartments low rise Condo/ tOWIlhOUSE:: gc::neral Ketirernent community GolE Course Quality resturant Hutel Strip mall OEtice IJark Trip Rate size Total Trips 9.58 trips dwelling units 36.00 345.00 6.71 trips dwelling unIts 34.00 228.0U 5.86 trips dwelling units 980.00 5,743.00 3.48 trips dwelling unit:.s 300.00 1,044.00 5.01 trips acres 199.00 1,003.00 89.95 trips 1000 sq. it . 20.00 1,799.00 8.00 trips rooms 608.00 4,864.00 28.33 trips 1000 sq. ft. 234.17 6,6B .OU 11. 01 trips 1000 sq. ft. 250.00 2,753.00 Unit Type Vehicle Assumptions: Fleet Mix: Vehicle Type Percent Type Non-Catalyst Catalyst Diesel Light Auto 54.40 0.40 99.40 0.20 Light Truck < 3,750 Ibs 15.30 0.70 98.00 1- 30 Light Truck 3,751- 5,750 16.40 0.60 98.<;0 0.60 Med Truck 5,751- 8,500 7.30 0.00 9860 1- 40 Lite-Heavy 8,501-10,000 1-10 0.00 81. 80 18.20 Lite-Heavy 10,001-14,000 0.30 0.00 66.70 33.30 Med Heavy 14,001-33,000 1- 00 0.00 20.00 80.00 Heavy-Heavy 33,001-GO.000 O.BO 0.00 0.00 100.OC f,jne Haul ;. 60,000 Ibs 0.00 0.00 0.00 100.00 Urban Bus 0.20 0.00 50.00 50.00 Motorcycle 1. 60 50.00 50.00 0.00 School Bus 0.10 0.00 0.00 100 00 Motor.- Home 1. 50 0.00 93.30 6.70 Travel Conditions Urban Trip Length (milesl Rural Trip Length (miles) Trip Speeds (rnph) % of Trips - Residential Home- work 11. 5 11. 5 3':>.0 20.0 Residential Home- Shop 4.9 4.9 10.0 37.0 Commercial Home~ Other 6.0 6.0 40.0 43.0 Commute' Non Work Customer 10.} 5.5 5.5 10.3 5 '; 5.5 40.0 40.0 40.0 % of Trips Commercial (by land use) Galt Course ~.O 2.S 92.5 Quality resturant 8.0 4.0 88.0 Hotel 5.0 2.5 92.5 Strip mall 2.0 1.0 97.0 Office park 48.0 24.0 2B.0 Page: Po Change::; ITld.de tu the uefaull values for Ldnu Use Trip PercellLdyes Changes made to the default values for Construction Chanyes maue to tht:: ul:::"!tdult values [or l\.red Th\:::::! woou stove oplioll ~witch chdHged (rum Url tu 0[[. The landscape year changed from 2004 to 2015. Changes made to the default values for Uperations The opcrat,onal emission year changed from 2004 to 2015 The double counting internal work trip limit changed tram to 1471.9999792. The douv1e cuuIlling shopping trip limiT chiJ.nged from tn 945 6850018948. The double counting other trip limit changed from to JIG4.79995528. The travel mode euvironment settings changed from both tu: out:.h page, A-14 URBEMIS 2002 Fur Wimlows File Name: Springs-building Project Name: Project Location: On-Ruau MoLur V~hicle 7.4.2 c: \Prugram Fi les\URBEMIS 2002 For ,Ii ndows\ projects2k2 \Arrowhead construction.urb Arrowhead 'springs Development building construction ~outh Coast Air Basin ILos Angeles areal Ellli~;sions Based on EMFAC2002 version 2.2 DETAIL REPORT (Pounds/Day - Summer) Construction ~tart Month and Year: November, 2007 Construction Duration: 60 Total Land Use Area to be Developed: 185 acres Maximum Acreage Disturbed Per Day: 18 acres Single Family Units: 336 Multi-Family Units: 1014 Retail/office/Institutional/Industrial Square Footage: 808167 CONSTRUCTION EMISSION ESTIMATES Um1ITIGATED (lbs/day) Sourcr:: ",."*'+ 2007'*-1-+ PhdBe 1 - D~molitioIl Emissions Fugitive Dust Oft-Road Diesel On-Road Diesel Wurker Trips Maximum Ibs/day phase 2 - Site Grading Fugitive Du~,t Off-Road Diesel OIl-Road Die~Jel Worker Trips Maximum Ib~; I day Emissions Phdse 3 - BuIlding Con~truction Bldg Const Off-Road Diesel Bldg COllst ]'>Jurk"r Trips Arch Coatings Off-Gas Arch Coatings WorkeL TLivs Asphalt Off-Gas Asphalt Off-Road Diesel Asphalt On-Road Diesel Asphalt Worker Trips Maximum Ibs/day Max Ibs/day all phases 0_00 0.00 0_00 0.00 0.00 0.00 0.00 0.00 10.GO 14.90 0.00 0.00 0.00 0.00 0.00 0_00 25.50 25.50 ROG O_OD 0.00 O_DD 0.00 0.00 0.00 0.00 0.00 75.% 28.06 O.OD O.OD 0.00 D_OO 104.02 104.02 NOx PM10 TOTAL PMI0 EXHAUST 0_00 0.00 0.00 0.00 0_00 0.00 0.00 0.00 3.18 0.57 0.00 0.00 0.00 0.00 3.75 3.75 PMI0 DUST 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 O.DO D.DO D.OO 0.95 0.00 0.00 0.00 0.00 0_95 0_95 '" 2008*** Phase 1 - Demolition Emissions Fugitive Dust 0 DD 0.00 Off-Road Diesel 0.00 0.00 0.00 0.00 D_DD 0.00 On-Road Diesel 0.00 0.00 0_00 0.00 000 0_00 0.00 worker Trips 0.00 0.00 0.00 0.00 0.00 0_00 0.00 Maximum Ibs/day 0.00 0.00 0.00 0.00 0 00 0 00 0.00 Phase 2 - Site Grading Emissions Fugitive Dust 0.00 0.00 Off-Road Viesel 0.00 0.00 0.00 0 DO 000 0.00 On Road Diesel 0 00 0.00 0.00 0.00 0.00 0.00 0.00 Worker Trips U.OO 0.00 0.00 0.00 0 00 0.00 0.00 Maximum Ibs/d"y D_OO 0.00 0.00 0.00 0.00 0.00 0.00 Phdse 3 Bujlding Canstructton Sldg Const Off-Road Diesel 10.60 72.76 8,.81 2.88 0 .33 0.00 ~ Bldg Canst. o;orker Trips 14.48 27.85 304.90 U.17 1. 52 0 .57 0_95 Arch Coatings Uff-Gas 0.00 An..:h COdLings Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Asphalt Off-Gas 0.00 Asphalt Oft-Roael Diesel n 00 O.OD 0.00 0.00 0.00 0.00 ADphalt On-Hoad Dies~l 0.00 0.00 0.00 0.00 0_00 0_00 0_00 Asphalt Worker Trips 0 00 0.00 000 0.00 0.00 0.00 0.00 Hdximum Ibs/duy 25.08 100.61 388.73 D.n 4.40 3.45 0_9~ Max lus/day all phases 25 08 100.61 388. n 0.17 4.40 3.4:' 0_95 CO 502 O.OD 0.00 o 00 0.00 0.00 O.DO 0_00 0_00 0.00 0.00 0.00 0.00 0.00 0_00 0.00 0_00 0.00 0.00 0.01} 0.00 0.00 0.00 0.00 0.00 81. 78 309.23 0.17 3.18 1. 52 O.OD o 00 0.00 O_OD O.OD 0.00 391.02 0.00 o 00 0_17 000 0.00 0.00 4_70 391. 02 0.17 4. ./0 A-IS 1<** 2UOY*** I?age, 10 phase 1 - Demolition Emissions Fugitive Dust uff-Road Diesel On. Road Diesel Worker TLiIJs Maximum lbs/day phase 2 - Site Grading Fugitive Dusl off-Road Diesel On~Road Diesel Worker Trips Maximum lb5/day ",'missions Phase 3 - i:3uilding Conbtr:ur:T~ion Bldg Const Off Road Diesel Eldg Const Worker Trips Arch COdtillgs Off Gas Arch Coatings Worker Trips Asphalt Oft-Gas Asphalt Off-Road Diesel Asphalt Oll-Road Diesel Asphalt Worker Trips Maximum lbslday Max lLs/day all phases rrr 2010*"'** Phase 1 - Demo1ition Emissions Fugitive Dust Off-Road Diesel on-Road Diesel Worker Trips Maximum lbs/day Phase 2 site Grading Fugitive Dust off .Road Diesel On-Road Diesel Worker Trips Maximum Ibs/ddY h'missions 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.60 14,04 0.00 0,00 0,00 0.00 0.00 0.00 24,64 24.64 0.00 0,00 0.00 0,00 0.00 0,00 0.00 0.00 Phase 3 - Building Construction Bldg Const Off-Road Diesel 10.60 Sldg Canst \\'uLker Trips 13.63 Arch Coatings Off-Gas 0.00 Ar-oh Coatings Worker- Trips 0 00 ",sphal t Off -GaS 0.00 Asphalt Off-Ruau Diesel 0.00 Asphalt OnnRoad Diesel 0.00 Asphalt Worker Trivs 0.00 Haxjmum lbs/day 21.:n Hax llmjday all phases ... 2011'" Phase 1 DRmalition Emissions Fugitive Dust off-Road Dles<el On-Road Diesel Worker Trips Haximum lbs/day Phas.e: 2. Site Grading Emis::;.ions Fuq i t i 'oe Dust Ott-Ruad D1esel on-Road Diesel WorkeL Tr-ips Maximum Ibs/day 24.23 0.00 0,00 (J. 00 0.00 o.on o 00 0.00 0,00 Pha~3~ 3 Building ConstrucLiun Dldg Const Ott ROCld Diesel 10.GO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 69.70 27.63 0,00 0.00 0.00 0.00 97.32 97.32 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 66.89 27.40 0.00 0.00 0,00 0.00 94,29 94.29 0.00 0.00 0.00 0.00 0,00 0.00 0,00 0.00 66.89 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 85,96 300.27 0.00 0.00 G.GG 0.00 386.23 386.23 O.ClO 0.00 O.DD O.DO 0.00 0.00 0.00 O.OD 88.01 295.9D 0.00 O.Oll 0.00 0.00 383,91 383.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 O.DO 88,01 A-16 000 0.00 0.00 0.00 0,00 0.00 0.1'1 0.00 0,00 O.OD D,17 0.17 0.00 o 00 0.00 0,00 0.00 0,00 0.17 0.00 0.00 0.00 0.17 0.17 0,00 0.00 0,00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 2.68 1. 52 0.00 0.00 0.00 0,00 4,20 4.20 0.00 0.00 0.00 0.00 0.00 0.00 O.OD 0.00 0.00 o 00 2.46 1.52 0_00 G.OO 0.00 o 00 3.9'1 3.97 0.00 0.00 0,00 0.00 0,00 0.00 0,00 0.00 0.00 o 00 2.46 o 00 0.00 000 0.00 0.00 0.00 0.00 0,00 2.63 0.57 0.00 0,00 0.00 0,00 3.25 3.25 0.00 0.00 0.00 0.00 o 00 0.00 0,00 0.00 2 46 0.57 0.00 0.00 0,00 0.00 3.02 3.02 0.00 0.00 0,00 0.00 o 00 0.00 0,00 0.00 2.16 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.95 0.00 0.00 0.00 0.00 0.95 0.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 O.DO 0.00 0.95 0.00 0,00 0,00 0.00 o 95 0.95 0.00 0.00 O.OD 0.00 0.00 0,00 0.00 0.00 0,00 0.0t,) 0.00 Bldg Coast \'iorker Trips Arch Coatings Off--Gas Arch CUdtiugs \'iorker Trips Asphalt off-Gas Pdge: 11 Asphalt Off Road Diesel Asphalt On~Road Diesel Asphalt Worker Trips Maximum lbs/day Max lbs/day all phases **'" 2012J;.l.~ Phase I - Demolition Emissions Fugitive nu~~t Off-Road Diesel On Road Die::;-el Worker Trips Maxiloum lbs/day Phdse ~ ~ Site Grading Fuqitive Dust DiE-Road Diesel on-Road Dies",l IcJorker Trips Maximum Ibs/day Emissions phase 3 - Building Construction Bldg COllSt Ott-Road Diesel Bldg Const Worker Trips AIch CUdtings Off-Gas Arch Coatings Worker Trips ll.sj,Jhalt Off-Gas Asphalt Off-Road DiRsel Asphalt On Road Diesel Asphalt Worker Trips Maximum 1bs/day Max lbs/day all phases 13 .63 0.00 0.00 0.00 0.00 0.00 U.OO 24.23 24.23 0.00 0.00 (l.00 0.00 0.00 0.00 0.00 0.00 10.60 1.3.63 781.54 4.00 0.00 5.68 0.00 0.03 815.49 81549 27 40 0.00 0.00 0.00 0.00 94.29 94.29 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 6689 27.40 ~.36 34.43 0.00 0.02 131.09 131. 09 295.90 0.00 0.00 0.00 0.00 383.91 383.91 0.00 o 00 0.00 0.00 0.00 0.00 0.00 O.UO 88 01 295.90 50.61 47.71 0.00 0.34 482.58 48?.S8 Phase ~ ~ite Grading Assumptions: phase Turned OFF Phase 3 Building CUIlsLLuction AssumptiDns Start Month/Year for Phase 3: Nov '07 phase "3 DUL"rttioI1: -6U months Start Month/Year for Subphase Building: Nov '07 Suhphase Buildillg DULation: 60 months Off-Road Equipment No. Type Horsepower 1 Cranes 190 ;> OLheL Equipment 190 ;> Rough Terrain Forklift's 94 ;> Signal Boards 119 Start Month/Year :for Subphase ArchitcctuI"dl CualiwJs: May SuLFhase Architectural Coatings Duration: 6 months Start Month/Year for SubphQSC Asphalt, Auy 'l~ SubPhase Asphalt Duration: 3 months Acres to be Paved: 0 Otf-Road Equipment NO Typ" 2 Pavers 2 Paving Equipmr:::nt I Rollers Page: U Hursl::;tJuwer 132 111 114 0.17 0.00 0.00 0.00 0.17 0.17 o 00 0.00 0.00 0.00 0.00 0.00 0.17 0.01 0.00 0.00 0.18 0.18 l.,oad Factor 0.130 0.620 0.415 o 820 '12 l.,oad [:'actor 0.590 0.530 0.430 AREA SOUKCE EMISSION ESTI}~TES (Summer Pounds per Day, Unmitigatedl A-I7 1. 52 0.00 0.00 0.00 0.00 3.97 3.97 0.00 0.00 0.00 000 0.00 0.00 0.00 000 0.00 0.00 2.46 1.52 1 12 0.00 0.01 6.11 6.11 0.57 0.00 0.00 0.00 0.00 3.02 3.02 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 2.46 0.57 01 0.06 1.12 0.00 0.00 4.20 4.20 Bours/DdY 8.0 8.0 8.0 8.0 Hours/Day 8.0 8.0 8.0 0.95 0.00 0.00 0.00 0.00 0.95 0.9S 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.95 0.9<; 0.00 0.00 0.01 1.91 1.91 Source RaG NOx co 502 I'MlO NatuLal Gas 1. 43 18_92 7 87 0 04 Wood Stoves -- No sU1\tffier emissl.ons Flr.eplacc:s - No S UUUlH::!r emissions Lands<:apinq 0.40 0.08 3.87 0.07 0.00 ConSWller Pnicts 66.05 TOTALS \ Ibs/day.unmitigatedl 67.88 19.00 11.74 0.07 0.04 page: 13 UNMITIGATED OPERATIONAL EMISSIONS ROG NOx CO S02 PM10 Single family housing 1. 77 1. 70 19.05 0.02 3.4Y Apartments low rise 1. 28 1.12 12 59 0.02 2.31 Condo/townhouse general 33.68 28.22 317.13 0.3b 58.16 R~tiremeIlt COIllffiwlity 7.45 5.13 57.65 0_07 10_57 Golf Course 5.48 4.31 45.53 0.06 8.71 Quality Lesturant 6.27 7.90 83.80 0 10 16_01 Hotel 22.69 20.92 220.79 0.27 42.23 Strip mall 24.01 27.91 293.21 0.37 ~6_1~ Office park 14.38 15.51 171.86 0.21 32.50 TOTAL EMISSIONS ( lbs/day\ 117 .03 112.73 1,221.60 1. 50 230.14 Does not include correction for passby trips. Does not include double counLing adjustment for interIldl trips. OPERATIONAL (Vehiclel EMISSION ESTIMATES Analysis Year: 2015 Temverdtun, IF): 90 Summary of Land Uses: EMFAC Version, EM~AC2002 19/2002l Unit Type Single family housing AlJd.r.tmenls luw rise Condo/townhouse general Retirement comnuniLy Golf Course Quality El:::slULdIlL Hotel Strip mall office park vehicle Assumptions: Fleet Mix: vehicle -r-ype Light Auto [,ight Truck < Light Truck Mc~d '1'TllCk Lite-Heavy Li te-HeaV)! Med-Heavy Heavy Heavy Line Haul ., Ur!JdIl Bu:-~ Motorcycle Schuol Bl1~j Motor Home 3,750 lbs 3.751- 5,'/30 5,151 8,500 S,501~10,000 10,001 14,000 14.001-33,000 33,001-60,000 GO.OOO lbs Travel Conditions Urban Trip Length Imi1es} Rural Trip Length (miles) Trip Sp~eds (mph) % of Trips - Residential Sed~JUn ~ SurrrrHer Trip Rate Size Total Trips 9.58 trips dwelling units 36.00 345.00 6_ ?1 trips dwelling uni ts 3400 228.00 5.86 trips dwelling units 980.00 5,'/43.00 3_48 trips dwelling units 300 00 1,044.00 5.04 trips acres 1')9.00 1,003.00 89_95 trips 1000 sq_ ft_ 20.00 1,799.00 8.00 trips rooms oOb_OO 4,864.00 28.3J trips 1000 sq_ fL 234_17 6,63300 11. 01 trips 1000 sq. ft. 2::>0.00 2, 'l'd.DO Percent Type 54.40 15.30 HJ _ 4U 7.30 1.10 0_30 1. 00 0.80 O.DO o 20 1. 60 0.10 1. 50 Home- Work 11.5 11,5 35_0 20.0 Residential Home- Shop 4.9 4.9 40.0 J'} .0 Non-Catalyst 0_40 0.70 0_60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 0.00 o.on Home- Other 6.0 6_0 40.0 43.0 A-I8 Catalyst 99_40 98.00 98.80 98.GO 81. 80 6G.70 20 _ 00 0.00 0_00 50.00 ~0_00 0.00 93 30 Comm,ercial Commute llJ.3 10_3 40.0 Non-work 5,3 5 5 40.0 Diesel 0_20 1.30 0_60 1.40 UL20 33.30 80 00 100"00 100_00 50.00 0_00 100.00 6.70 Customer 5.S 5-5 40.0 % of Trips - Commercial {by land use} Golf C-uur~e Qualitv resturant HuLel Strip mall Office paTk Page: 14 5.0 ~.O 5.0 2.0 48.0 Changes made to the default values for Construction Chang-es maue to the default value~3 for Lanri Use Trip Perccnt.Jges Changes made to the defaulL values for Area The wood stove option switch changed from on to off_ The landscape year changed from 2004 to 2015. Changes made to the default values for Operations 2.5 4.0 2.5 1.0 24.0 The uperational omission year changed from 2004 to 2015. The double counting internal work trip limit chauged tram tu 1471. 9999 79:L The duuLle Dounting shopping trip limit changed from to 945.6850038948. The double counting other trip limit changed frum to 3164.79995528. The travel mark environment settings changed from both to: both A~19 92.5 88.0 92.5 97. 0 28.0