Loading...
HomeMy WebLinkAboutNavigation Center Update PresentationNavigation Center Update Concept History Funding History Procurement History Current Design Proposal Current Project Status Anticipated Operation Costs Alternative Paths Forward Next Steps 1 Navigation Center Concept History Initial Concept – October 27, 2022 •Multi-phase project o Phase I: Interim Housing Utilizes modular unit construction. Part of the Implementation Plan (May 17, 2023). o Phase II: Transitional Housing Utilizes tiny homes (or similar). Possible future expansion (never officially approved). •Non-congregate o Separate interim housing units (modular design). o Provides privacy and dignity for the unsheltered. •200-225 initial bed capacity o Johnson vs Grants Pass & Martin vs Boise Rulings. o Judge Carter settlements. 2 Navigation Center Concept History Initial Phase I Concept: Interim Housing Units 3 Navigation Center Concept History Possible Future Expansion with Phase II: Transitional Housing Units 4 Navigation Center Funding History Secured Funding Sources Development •ARPA (original construction allocation) $12,450,000 •ARPA (reallocation from operations) $4,500,000 •HOME-ARP $4,229,671 •CDBG $1,901,365 •HHAP3 Grant $808,358 Total Secured Development Funding $23,889,394 Additional Potential Funding •Hospital donations $2,120,000 5 Navigation Center Funding History Secured One-Time Funding Operations •PLHA (2020-2023 Allocations) $4,300,000 Secured Future Annual Funding* •General Fund (beginning FY 27/28) $2,000,000 Estimated Secured Future Annual Funding** •Future Annual PLHA Allocations $1,000,000 •Future Annual CDBG Allocations $350,000 Total Future Annual Ongoing Funding $3,350,000 *Approved during September 2023 Strategic Initiatives Special Meeting. ** Future annual estimates are based on current annual allocations that are adjusted to prioritize homelessness activities funding. CDBG limited due to HUD’s Public Service cap and would be for “services” that augment operations. 6 Previous Administration’s Commitments •Promised design-build award date: June 2024 •Promised project completion date: July 2025 Previous RFP •Design-build o Site & module design o Modular procurement One contract, one price o Site construction •Adhered to Council’s approved concept o Non-congregate interim housing units o 200 total bed capacity o In-unit bathrooms o Individual air control and filtration systems o Doors with locks for privacy Navigation Center Procurement History Previous Concept 7 Initial Cost Challenges •Higher than anticipated construction costs. o RFP Cap: $15 Million o Internal Estimate: $15-19 Million o Bid Result (1): $24,430,270 (Stick Built) $28,941,960 (Modular) The modular non-congregate interim housing units alone were $13.4 million, without overhead (+ 8%) and profit (+ 4%). Does not include: Design costs, site work, renovation of existing School of Hope Buildings (administrative offices, kitchen, and dining hall), Mechanical/Electrical/Plumbing, Contingencies, etc. Unanswered Questions / Future Challenges •Long-term operational costs for non-congregate •Insurance costs for stick-built vs modular Navigation Center Procurement History Separate Line Items from Design Build RFP Cost Interim Housing Modulars $13,476,540 8% Total Overhead $1,072,000 (Adjusted for Modular Quote) 4% Total Profit $536,000 (Adjusted for Modular Quote) Estimated Total Actual Modular Cost $15,008,000 8 Cost of Modular Units from Previous RFP Current Design Proposal Hybrid Congregate Unit Design •180 Congregate semi-private units with sliding doors & communal bathrooms •20 Non-Congregate units with in-unit bathrooms Justification •Reduced module costs o $7.9 Million: Includes all hybrid congregate units, staff offices, kitchen, dining area, etc. o $13.4 Million: Non-congregate units only (initial bid results) •Reduced long-term operational & security costs •Current design is non-congregate in spirit o Sliding privacy doors o Privacy-height walls o Side table/desk space/storage space CONCEPT Design To Be Produced After Contract Award vs. 9 Current Design Proposal Congregate (Buena Park Navigation Center)Congregate / Non-Congregate Hybrid (Concept) Raised Pony Walls Larger Space Privacy Sliding Doors (To Be Added) vs 10 Current Project Status New RFP/Qs •3 new RFP/Qs were released in the past 40 days: o RFP for Modular Manufacture and Design Services -RFP Cap: $14.5 million -Bid Result (1): $8.8 million (Modules + Site Design) o RFQ for Fee for Service Developer -RFQ Cap: $1.2 million -RFQ Proposals (5): $700,000 - $1,100,000 o RFQ for General Contractor (No Responses) -RFP not yet released -Estimated Amount: $5 - 6 million for site work •Actions in the last 60 days o Draft, Review, and Release 3 RFP/Qs o Provide responses to bidder question/ Bid Conference o Review and Interview Proposals / Responses New Total Project Estimate: $15.9M 11 Anticipated Operation Costs Overview •City can choose to provide a flat operating contribution annually and the selected operator is to source or utilize existing Substance Abuse and Mental Health Services Administration (SAMHSA) funds, County Grants, CDRC/ORD funds, IST Funds, endowment and state/local grants. •City resources: HUD Emergency Shelter Grant (ESG), Dept. of State Hospitals- IST funding, etc. Partnership Exploration And More… 12 Anticipated Operation Costs The Reality of the Situation •Current Operator Costs o Estimated per person: $3,333 (per month). o Estimated annual: $8 million for 200 beds. •HUD Data o Emergency shelter beds are approximately $8,067 more than the average annual cost of a federal housing subsidy due to additional services. o A recent HUD study found that the cost of providing emergency shelter to families generally costs more than transitional or permanent housing. Not currently an option within the City. Will be addressed in a future presentation of the DRAFT Homeless Housing and Healthcare Action Plan. Estimated Cost Summary for 100 Beds Staff (8 FTEs Day + 1.5 FTEs Night)$ 790,000.00 Security $ 820,000.00 Utilities & Insurance $ 470,000.00 Meals (3x per Day)$ 1,130,000.00 Janitorial $ 315,000.00 Interior Maintenance $ 30,000.00 Exterior Maintenance $ 70,000.00 Bio/Hazmat/Pest Control $ 40,000.00 Legal $ 60,000.00 Compliance/Licensing/Audit $ 40,000.00 Administrative $ 235,000.00 Total for 100 beds $ 4,000,000.00 Per Person Per Month $ 3,333.33 Adjusted for 200 beds $ 8,000,000.00 13 Next Steps The Road Ahead Detailed Sources and Uses Budget with Vendor Comps. Staff discussion for phasing out navigation center participants enrollment by 100/100 Release Navigation Center RFP for Operator: Items for discussion matching funds via county contract and resources. City provides recommendations of the awardees to Council for approval in November. Engage Professional Services Agreement with Awardees by first week of Dec. Engage hard calendaring for timelines of City, Developer, Modular Manufacture and Contractor. Anticipated hurdles and engages resolution early. Learn more about Modular: Schedule tour of modular manufacture tours of fabrication facility (week of Oct. 28). 14 Alternative Paths Forward Phased Approach •Optional Downscale Phase I (Operating) o Allows staff to gauge how many unsheltered residents will utilize the facility. o Allows staff to better absorb operational costs without “breaking the bank.” •Implement Phase II o Potentially allows for a faster implementation of Phase II: Transitional Housing. Project Savings Estimate - $8.5M o Original Low Bid: $24,430,270 (Stick Built) o New Project Estimate: $15,900,000 (Modular) 15 Navigation Center Update RECOMMENDATION It is recommended that the Mayor and City Council of the City of San Bernardino, California: 1.Receive a presentation and update on the City of San Bernardino Homeless Navigation Center; and 2. Provide input to staff on the City’s operation plan of the homeless shelter. Questions?? 16