HomeMy WebLinkAbout09-City Clerk
c
c
o
CITY OF SAN BERNARDINO POST OFFICE BOX 131B. SAN BERNARDINO. CALIFORNIA 92402
SHAUNA CLARK March 20, 1986
CITY CLERK.
John R. Tindall
Attorney At Law
P. D . Box 864
San Bernardino, CA 92401
Dear Mr. Tindall:
At the meeting of the Mayor and Common Council held March 17, 1986,
your appeal filed on behalf of Manuel B. Enriquez on the Board of
Building Commissioners' decision to order the abatement of a struc-
ture at 1139 W. 19th Street, was continued and referred to the Board
of Building Commissioners for their review and monitoring with a re-
port back to Council.
The appeal hearing was scheduled for_June lQ,_J~_~~ at 9:00 a.m., in
the Council Cha<'1bers of City Hall; -300 North "D" Street, San Bernar-
dino.
Sincerely,
/!/;y;'/.,/ /c1 /t/7c? //'
.SHAUNA CLARK -
City Clerk
SC:dc
cc: City Attorney
Building & Safety
Planning
300 NORTH "0" STREET. SAN BERNARDINO. CALIFORNIA 9241B.()121
.)
9
elf:; OF SAN BERNARDIQ, - REQU.a:Jr FOR COUNCIL ~~N
From: JACK ROSEBRAUGH, SUPERINTENDENT
Dept: BUILDING AND SAFETY
Date: OCTOBER 24, 1985
IfEC'.rl
~~i\//APPEAL - BOARD OF BUILDING COMMISSIONERS
m05 Ocr ~R~OF ABATEMENT - 1139 W. 19th STREET
24 ~!JOHN~. TINDALL ON BEHALF OF
I~ARu~~ B. ENRIQUEZ
Synopsis of Previous Council action:
On October 21,1985, Mayor and Common Council set November 4,1985, at 9:00 a.m.
in the Council Chamber of City Hall to hear the appeal filed by John R. Tindall
on behalf of Manuel B. Enriquez.
Recommended motion:
To affirm, modify or deny the decision of the Board of Building Commissioners to
abate the nuisance by demolition.
-r ~..~
Signature
Contact person:
Jack Rosebraugh. .1~mp<; r.1 ~ rk
Phone:
5?74 - 5373
Supporting data attached: ___ Vp<;
Ward:
6
FUNDING REQUIREMENTS:
Amount:
Source:
Finance:
Council Notes:
CITf OF SAN BERNARDI.Q - REQUE~ FOR COUNCIL AC-hbN
STAFF REPORT
1139 W. 19th Street
Assessors No: 144 081 05
Report/Project No. 2190
1-16-79
10-16-81
4-26-82
4-26-82
4-27-82
8-8-83
7-16-85
7-19-85
9-6-85
9-6-85
9-17-85
9-27-85
10-2-85
10-23-85
10-23-85
Permit taken for addition of 3 bedrooms and 1 bath.
6 page correction notice left. Inspector told owner he would have to make
major changes and indicating no inspections made or called for. This
correction letter was sent by Greg Fraga who was Plan Check Engineer for the
Department of Building and Safety and he spoke fluent Spanish. Mr. Fraga had
had conversations with the owner on what needed to be done.
Letter to owner about zoning, R-1 zone.
2 page correction letter to owner and noted no inspections called for. Owner
called and spoke to Mr. Fraga about letter.
Notice of Pendency of ADministrative Proceedings filed.
Correction notice left, no corrections made for 10-16-81.
Special inspection made of the building.
3 page correction letter sent and noted no inspections called for. A person
who spoke Spanish was there for the inspection.
Case went to the Board of Building Commissioners.
BBC ordered additions removed and garage converted back.
Sent letter, posted property.
Owner came in and obtained demolition permit.
Letter of appeal received.
Between 9-6-85 and 9-27-85 owner had 2 contractors of his choice come in and
they said the same thing that the Board of Building Commissioners meeting
ordered. The building needs to be demolished to make repairs and major
changes.
This property is in an R-1 zone, which allows a maximum coverage of 35%.
This lot is 7,560 square feet, 35% = 2,646 maximum, house is 3,150 square
feet, building exceeds maximum area by 504 square feet.
The garage was enclosed and no new garage was added.
The building was added onto and built too close to property line on the
east and north sides.
Floors are uneven, walls built wrong, plumbing and electrical and mechanical
items are in unsafe condition. The owner has had conversations with both
Spanish speaking persons in this department about the problems at this
property. The owner still has not made any corrections. The conditions
described constitute an imminent danger to life and property.