HomeMy WebLinkAbout05-Public Works . . . . m.E NO. 1. 366 - REQUEST FOR COUNCIL ACTION CITY'OF SAN BERNARDINO Roger G. Hardgrave From: . Public Works/Engineering Dept: Date: April 23, 1986 liEe'O. - AO 14\ltuQj~lt: \135 Af'R 2~ I.M 10: \ 5 Approval of Change Order No. Three Extension of Hospitality Lane and Construction of Bridge on San Timoteo Creek, per Plan No. 6653 -- Bonadiman-McCain, Inc. Synopsis of Previous Council action: 11/84 Authorization granted to submit project profile to EOA. 03/85 Resolution No. 85-111 adopted authorizin9 filing of an applicatation for grant with EDA. 09/85 Plans approved and authorization granted to advertise for bids. 09/85 Allocation of $293,000 approved in the Street Construction Fund, under Account No. 242-362-57366 to finance the Local Agency share. (continued page 2) Recommended motion: That Change Order No. Three to the contract with Bonadiman-McCain, Inc., for the construction of a bridge on San Timoteo Creek, at Hospitality Lane, in accordance with Plan No. 6653, be approved; to authorize the Contractor to furnish and install chain link fences and gates on a time and material basis and as directed by the Engineer at an estimated increase in contract price of $ 2,250.00 from $535,679.29 to $537,929.29. cc: John Matzer Jr., City Administrator W."" ',"d"'. 01""" - Ff"~'~ ~ ~ Contact person: Gene R. Klatt Phone: 5125 Ward: 1 Sou rce: Street Construction Fund Finance: /1.. C ,A:-A- Supporting data attached: Staff Report & Chanqe Order #3 FUNDING REQUIREMENTS: Amount: $2.250.00 Acct. #242-362-57366 - Hospitality Lane Extension Council Notes: 1 - AQenda Item No. ~ , 75.0262 , . 11/18/85 02/17/86 03/17/86 . . . Synopsis of previous Council action continued from page 1 Resolution No. 85-492 adopted awarding a contract for the low bid price of $490,777.60. Change Order No. One approved to authori ze the Contractor to furnish steel piling material and weld to each side of steel pipe web, at an increase in the contract price of $689.09, from $490,777.60 to $491,466.69. Change Order No. Two approved to authori ze the Contractor to perform all work necessary to construct grouted rip rap protection at an estimated increase in the contract price of $44,212.60, from $491,466.69 to $535,679.29. 2 -- - -- . . CI. OF SAN BERNARD.O - REQU.T FOR COUNCIL A~ON STAFF REPORT Approximately 110 L.F. of six-foot chain link fence and two double drive chain link fence gates are indicated to be constructed on the plans. but have no provision in the contract for payment. This fencing is located at the east side of the new bridge where Hospitality Lane extends through the east right-of-way chain link fence of the San Bernardino County Flood Control Channel (San Timoteo Creek). This change order will authorize payment to the Contractor to ac- complish this work on a time and material basis at an estimated increase in contract cost of S2.250.00. The total estimated project cost included S81.822.40 for contin- gencies. which can be used to finance the cost of the change order. The fencing is a requirement of the Flood Control District. We. therefore. recommend that Change Order No. Three be approved. 75.0264 - , , '. ~ . . . Project: SAN TIMOTEO CREEK BRIDGE Date: 4/23/86 Plan No. 6653 Fll e No. 1..366 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. 3 (Change necessitated because of.field conditions) To: Bonadiman & McCain, Inc. P. O. Box 6444 San Bernardino, CA 92412 Gentlemen: You are hereby authorized and directed to furnish and install approxi- mately 110 L.F. of 6-foot chain link fencing and two double drive 16-foot chain link gates as indicated on Plan No. 6653. All work is to be done on a time and material basis per Section 9-1.03 of the Standard Specifi- cations of California Transportation Department and as directed by the Engineer. Total extra work cost added to contract(~s.t.ill1it6d. (;IO)5ot.)....$ 2,250.00 Previous Contract Prfce.................................$ 535,679.29 Amended Cost Prf ce... ,_..... .'............. ................ $ 537,929.29 Additional time to complete contract due to change order$ 5 days CONTRACTOR CITY OF SAN BERNARDINO By: Title: By: ROGER G. HARDGRAVE Director of Public Works Accepted Date: Approved Date: