HomeMy WebLinkAbout04-Public Works . . . . File No. 1.366 CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Roger G. Hardgrave Approval of SUPPLEMENTAL NO. ONE of Change Order No. Two -- Extension of Hospitality Lane and Construction of Bridge on San Timoteo Creek, per Plan No. 6653 -. Bonadiman-McCain, Inc. From: REC'D, - ADMIM.sOIJet: Public Works/Engineering I. IS 1986 APR 2 Ii PM..: April 23, 1986 Dept: Date: Synopsis of Previous Council action: 11/84 03/85 Authorization granted to submit project profile to EDA. 09/85 Resolution No. 85-111 adopted authorizing filing of an application for grant with EDA. Plans approved and authorization granted to advertise for bi d s. 09/85 Allocation of $293,000 approved in the Street Construction Fund, under Account No. 242-362-57366 to finance the Local Agency share. (continued page 2) Recommended motion: That Supplement No. One of Change Order No. Two to the contract with Bonadiman-McCain, Inc., for the construction of a bridge on San Timoteo Creek, at Hospitality Lane, in accordance with Plan No. 6653, be approved; to authorize the elimination of grout to the rip-rap protection and reduction of the estimated increase to the contract by Change Order No. Two, by approxi mately $20,000.00, from $535,679.29 to $515,679.29. cc: John Matzer Jr., City Administrator Warren Knudson, Director - Finance ~ ~ b&'A zD ~ Contact person: Gene R. Klatt Phone: 5125 1 Supporting data attached: Staff Report & C.C.O. #2 Ward: FUNDING REOUIREMENTS: Amount: ($20,000.00) Source: Acct. #242-362-57366 - Hospitality Lane Ext. Finance: Street Construction Fund \.Jwv~A\L~ ~ C\;v ~ Jo ,------ Council Notes: '7'Ln')~" / Aoenda Item No ~ . 11/18/85 02/17/86 03/17/86 . . . Synopsis of previous Council action continued from page 1 Resolution No. 85-492 adopted awarding a contract for the low bid price of $490,777.60. Change Order No. One approved to authori ze the Contractor to furnish steel piling material and weld to each side of steel pipe web, at an increase in the contract price of $689.09, from $490,777.60 to $491,466.69. Change Order No. Two approved to authori ze the Contractor to perform all work necessary to construct grouted rip rap protection as shown on Plan No. 6653, on a time and materials basis, at an estimated increase in the contract price of $44,212.60, from $491,466.69 to $535,679.29. 2 -' , CITeoF SAN BERNARDI. - REQUE. FOR COUNCIL AC,.N STAFF REPORT Change Order No. Two was a requirement by the S.B.C.F.C.D. to provide 60 feet of grouted rip-rap slope protection for the channel of San Timoteo Creek both up and down stream of the New Bridge. An estimated cost of the slope protection was $44,212.00. Approximately $20,000.00 of this estimate was attributed to the grouting of the rip-rap. Subsequent meetings with the Flood Control District resulted in eliminating the requirement of grouting the rip-rap. 75.0264