File No. 7.3710
Ct" OF SAN BERNARD. - REQUWT FOR COUNCIL ACWON
ROGER G. HARDGRAVE, Director
e:
Public Works/Engineering
Subject:
Approval of Change Order No. One --
Constructi on of Communi ty Center
in Nicholson Park, per Plan No. 6781
DUNCAN CONSTRUCTION
. From:
April 16, 1986
Date:
Synopsis of Previous Council action:
06/--/85
Allocation of $30,000 approved for architectural and
engineering services.
08/05/85
Allocation of $400,000 approved to finance construction
costs and authorization granted to advertise for bids.
Resol ution No. 85-464 adopted awarding a contract to
Duncan Construction for the construction of a Community
Center at Nicholson Park, in accordance with Plan No.
6781, for the low bid price of $396,215.
11/04/85
Recommended moti.on:
e
That Change Order No. One to the contract with Duncan Construction for
the construction of a Community Center at Nicholson Park, in accordance
with Plan No. 6781, be approved, to authorize credits and payment for
increases for various items of work at a net increase in contract price
of $236 ,from $396,215 to $396,451 .
cc:
John Matzer Jr., City Administrator
Annie Ramos, Director - Parks and Recreation
Ken Henderson
~~-~&~.
Signature
Contact person: Gene R. Klatt
Supporting data attached: Staff Report
Phone:
5125
FUNDING REQUIREMENTS:
and General Funds
Amount:
$236
Ward:
So 1884-85 & 1985-86 CDBG Funds,
urce:
Finance: I(/~ #' ~~
/4~
3
Incil Notes:
1
75-0262
Agenda Item No. RS - I
CI. OF SAN BERNARD. - REQU.ar FOR COUNCIL AcofoN
.
e
.
75-0264
STAFF REPORT
During construction, the contractor suggested substitutions and modifi-
cations of various work items to lower the cost of the contract. A
number of other items of work were requested by the Public Building
Department to increase maintenance and energy efficiency. These items
of work are listed as follows:
CREDITS:
1. provi de 3'-0" x 7'-0" doors wi th HM Frame wi th 4"
head in lieu of 3'-0" x 7'-2" door with 2" head HM
frame (credit).. . . . . . . . . . . . . . . . . .
. ( $1,000.00)
2. Provide base bid T-ll ceiling in lieu of Alternate
No.3, l"x6" wood ceiling {credit}, . . . . . . . . . .( $3,578.00)
3.
Provide conwed neutral fissured 11 lay-in panels
and DX-24 grid in lieu of Artran ceiling tiles and
9/16" Suprafine Grid System (credit) . . . . . . .
Provide 2"x4" oak rail in lieu of detail I/A-12
(credit). . . . . . . . . . . . . . . . . . . . .
$ 600.00)
.( $
500.00)
. .
4.
5. Water heater Mor-Flo American GVF 233T (credit). .. .( $ 100.00)
TOTAL CREDITS
$5,778.00
INCREASES:
1. Plaster Food Warmer Area for easier maintenance
(increase). . . . . . . . . . . . . . . . . . . . . . . ($ 300.00)
2. Provide new gas water heater and new gas heat
pumps in lieu of electrical water heater and
electrical heat pumps (increase approximately $425
per unit for 5 units). . . . .. ........... ( $2,225.00)
3. Furnish and install gas lines, vents and
connections for gas range, water heaters and heat
pumps. (Thi s item wi 11 be done on a ti me and
material basis) at an estimated cost
(increase). . . . . . . . . . . . . . . . . . . . . . . ( $2,489.00)
4.
Furnish and install cleanouts to the outside of
the food warmer area and furnish and install 2
each electrical outlets on the outside walls near
the cleanouts (increase).. ............. ( $ 500.00)
2
CIW OF SAN BERNARD. - REQU.T FOR COUNCIL ACWDN
.
.
.
75-0264
STAFF REPORT
5. Furnish and install access panels and vents to
inaccessible spaces (increase). . . .. ... ... ($ 500.00)
TOTAL INCREASES
NET INCREASE IN CONTRACT COST
$6,014.00
$ 236.00
------------
------------
Attached is a comparative cost analysis from the City's Public Building
Department showing the Electrical Heating System verses the Gas Heating
System for the Center. An annual energy cost savings of $2,779.00 is
indicated for the first year of operation.
Other items of work to be done can not show direct savings, however, an
indirect savings will be attained through maintenance efficiency.
We recommend that Change Order No. One be approved.
Attachment.
URGENCY CLAUSE:
In order to maintain time lines and allow
contractor to complete gas/electrical lines
in timely fashion, Change Order must be approved.
Failure to consider Change Order would delay
entire project until such time as matter is
approved.
3
.
.
.
.
-
-
-
.
.
.
73
C I T Y 0 F SAN B ERN A R DIN 0
INTEROFFICE MEMORANDUM
8604-205
TO: Roger G. Hardgrave, Director of Public Works/City
Engineer
FROM:
Wayne Overstreet
SUBJECT: COST ANALYSIS NICHOLSON RECREATION CENTER
ELECTRICAL VS. GAS SYSTEMS
DATE:
April 7, 1986
(6672)
COPIES:
Energy Auditor, Building Maintenance Supervisor,
Heating and Air Conditioning Foreman
-------------------------------------------------------------
A comparative cost analysis of change order for the heating
and air condition, water and cooking range, from all electric
to a gas system.
The major concern of this division is the cost of maintenance
difference between the two systems, manhours, materials and
energy) .
Our analysis will address each, utilizing two types of
existing facilities in the city inventory that have similar
functions and operating hours, with a combination of gas and
electric system, and another facility were we have all
electric, and an analysis of proposed cost of the two systems
as proposed by the contractor.
Analysis are as follows (all city facilities)
All electrical system (cost per square foot per year)
(a) Utilities.................................$1.82.0
lb) Maintenance & Materials...................$0.9l.l
TotaL.. $2.73.1
Combination of Electrical & Gas (cost per square foot per
year)
(a) Utilities.................................$1.33.0
(b) Maintenance & Materials...................$0.84.8
TotaL.. $2.17.8
.
'.
.
.
.
-
-
.
.
.
INTEROFFICE MEMORANDUM: 8604-205
COST ANALYSIS - NICHOLSON RECREATION CENTER - ELECTRICAL VS.
GAS SYSTEMS
Apr i1 7, 1986
Page 2
Analysis - Nicholson Recreation Center
1. All electrical system (cost per square foot per year)
(a) Utilities = 5024 sq. ft. X $1.82 =.......$9,144
(b) Maintenance & Material 5024 sq. ft. X
$0.91.1 =................................$4,577
Total......$13,72l
2. Combination of electrical & gas (cost per sq. ft.
per year)
(a) Utilities 5024 sq. ft. X $1.33 =........$6,682
3.
(b) Maintenance & Material 5024 sq. ft. X
$0.84.8 =...............................$4,260
Total......$10,942
Annual cost difference (first years).......$ 2,779
Based upon our experience with the maintenance of
heat pumps in other city HVAC systems, and electrical
hot water, and cooking ranges as those specified for
Nicholson Recreation Center, an annual cost saving in
maintenance can be anticipated if changed to electric
and gas system, of approximately $1,300 after the
first year of operation.
A comparison
equipment vs.
$22.34 as per
was also made on the cost of the original
the proposed units. The cost difference was
quote from Desert Service Company.
Based upon our cost analysis, utilizing only our first year
savings as a base point, this change order would pay it self
back in less than 2.08 years, therefore it is our conclusion
that this chan e or r is cost effective and should be
ap roved.
OVE STREET, Sup .
Buildings/Parking Control
WO:mal
File: Corrsp. 1-8 116
Maint. 8-1 & 2
-----.--,.....
-
-
~
----
.CHANGE
ORDER
AlA DOCUMENT G701
'stribUtion to: .
OWNER 0
ARCHITECT 0
CONTRACTOR 0
FIELD 0
OTHER 0
.
,
.
PROJECT: Nicholson Park Community Center
(name. address) 2750 West Second Street
San Bernardino, California
TO (Contractor):
CHANGE ORDER NUMBER: 1
r
Ouncan Construction
1966 South Oate Street
Bloomington, CA 92316
I
INITIATION DATE: 3/26/B6 (revised: 4/15/86:
ARCHlTEa'S PROJECT NO: 84-238
CONTRACT FOR: New Construction
L
..J CONTRACT DATE:
2.
CREDITS You are directed to make the following changes in this Contract:
1. Provide 3' -0" x 7' -0" doors with HM Masonry Frame with 4" head in 1 ieu
of 3' -0" x 7'-2" door with 2" head HM frame.
Provide base bit T-11 ceiling in lieu of add. Alt No.3 1x6 wood ceiling.
Provide conwed natural fissured 11 lay-in panels and DX-24 grid in lieu
of Artran ceil ing tiles and 9/16" Suprafine Grid System.
4. Provide 2x4 oak chair rail in 1 ieu of detail 1/A-12.
5. Provided ~as water heater Mor-Flo American GVF 233T/in lieu of
INCRE~~~~r hea er.
1.rovide new gas heat fumps similar and equal
o the following: HP ,2, & 3 - Payne No. 585JP42060, and
HP4 and 5 - Payne No. 579DP120231 in lieu of Elect. heat pumps.
Gas line from meter to water heater, range, and mechanical equipment
(to be done on time and material basis). not to exceed
Plaster food warming room walls,.
Install two clean-outsand electrical outlets.
Two access panels installed.
$1,000
$3,578
2.
3.
$
$
el ectric $ 100
TOTAL CREDITS:
500
600
$5,778
$2,225
Nol v.did until signed by hoth the Owner .and ArchilE-ct.
Signature ni thl..' Cllntr.actor indic.ates his .agreement herewith, including .any .adjustme!'H .,1 tnc ~ontracl Sum or Contracl TlOltc'
$2,489
$ 300
$ 500
$ 500
fOTAL INCREASES:$6,014
3.
4.
5.
.
The original (Contract Suml COUI~l\lIi_uMlc was.. . . . .. . . . . . . . . . . . .. S
Net change by previously authorized Change Orders. . . . . .. . ., . .. .. . . . . . . , , . . . . . . .. S
The (Contract Sum) (CXoUl~lMtlt~~1l prior to this Change Order was . . . . . . . . .. S
The (Contract Sum) (&II>>llIlCtll4ll:AriltltlloXllllGllll) will be (increased) ldeItlellllldlC:1l1I1dIlO"')
by this Change Order ........................................... . . . . . . . . ... S
The new (Contract Sum) (el_lllIIIItfd:lilDXiItllIUt1l~1l including this Change Oro1.r will be ... s
The Contract Time will be '"4frll~Il)(lt:Itxllllroltll (unchanged) by
Th~ Dale of Substanlial Completion as of the date of this Change Order the,el'_'e" June 25, 1986
Authorized:
City of San R~rnard;nn
OWNER
1nn Nnrth Ilnll ~tr4A+
Address
San Bernardino, CA 92418
396,215
91
396,215
236
396,451
( 91
) Days.
rli ra 11 es
1f~I~~h
Address
Altade ,CA 91001
Associates. Inc.
Woodbury Road
Duncan Construction
C?NTRA~OR
q66 ""th natp '\treet
Address
Bloomington, CA 92316
Mngr.
BY ..4_ .~./...~
BY
BY
DATE DATE
AlA DOCUMENT Gm . CHANCE ORDlR . APlll 1971 EDITION . AlAe . ~ 1978
THE AMERICAN INSTITUTE Of ARCHITECTS. 171S NEW YORK Avt.. NW.. WASHINGTON. D,C _ G701 -1978