Loading...
HomeMy WebLinkAboutRS01-Redevelopment Agency ~ , File No. 7.3710 Ct" OF SAN BERNARD. - REQUWT FOR COUNCIL ACWON ROGER G. HARDGRAVE, Director e: Public Works/Engineering Subject: Approval of Change Order No. One -- Constructi on of Communi ty Center in Nicholson Park, per Plan No. 6781 DUNCAN CONSTRUCTION . From: April 16, 1986 Date: Synopsis of Previous Council action: 06/--/85 Allocation of $30,000 approved for architectural and engineering services. 08/05/85 Allocation of $400,000 approved to finance construction costs and authorization granted to advertise for bids. Resol ution No. 85-464 adopted awarding a contract to Duncan Construction for the construction of a Community Center at Nicholson Park, in accordance with Plan No. 6781, for the low bid price of $396,215. 11/04/85 Recommended moti.on: e That Change Order No. One to the contract with Duncan Construction for the construction of a Community Center at Nicholson Park, in accordance with Plan No. 6781, be approved, to authorize credits and payment for increases for various items of work at a net increase in contract price of $236 ,from $396,215 to $396,451 . cc: John Matzer Jr., City Administrator Annie Ramos, Director - Parks and Recreation Ken Henderson ~~-~&~. Signature Contact person: Gene R. Klatt Supporting data attached: Staff Report Phone: 5125 FUNDING REQUIREMENTS: and General Funds Amount: $236 Ward: So 1884-85 & 1985-86 CDBG Funds, urce: Finance: I(/~ #' ~~ /4~ 3 Incil Notes: 1 75-0262 Agenda Item No. RS - I CI. OF SAN BERNARD. - REQU.ar FOR COUNCIL AcofoN . e . 75-0264 STAFF REPORT During construction, the contractor suggested substitutions and modifi- cations of various work items to lower the cost of the contract. A number of other items of work were requested by the Public Building Department to increase maintenance and energy efficiency. These items of work are listed as follows: CREDITS: 1. provi de 3'-0" x 7'-0" doors wi th HM Frame wi th 4" head in lieu of 3'-0" x 7'-2" door with 2" head HM frame (credit).. . . . . . . . . . . . . . . . . . . ( $1,000.00) 2. Provide base bid T-ll ceiling in lieu of Alternate No.3, l"x6" wood ceiling {credit}, . . . . . . . . . .( $3,578.00) 3. Provide conwed neutral fissured 11 lay-in panels and DX-24 grid in lieu of Artran ceiling tiles and 9/16" Suprafine Grid System (credit) . . . . . . . Provide 2"x4" oak rail in lieu of detail I/A-12 (credit). . . . . . . . . . . . . . . . . . . . . $ 600.00) .( $ 500.00) . . 4. 5. Water heater Mor-Flo American GVF 233T (credit). .. .( $ 100.00) TOTAL CREDITS $5,778.00 INCREASES: 1. Plaster Food Warmer Area for easier maintenance (increase). . . . . . . . . . . . . . . . . . . . . . . ($ 300.00) 2. Provide new gas water heater and new gas heat pumps in lieu of electrical water heater and electrical heat pumps (increase approximately $425 per unit for 5 units). . . . .. ........... ( $2,225.00) 3. Furnish and install gas lines, vents and connections for gas range, water heaters and heat pumps. (Thi s item wi 11 be done on a ti me and material basis) at an estimated cost (increase). . . . . . . . . . . . . . . . . . . . . . . ( $2,489.00) 4. Furnish and install cleanouts to the outside of the food warmer area and furnish and install 2 each electrical outlets on the outside walls near the cleanouts (increase).. ............. ( $ 500.00) 2 CIW OF SAN BERNARD. - REQU.T FOR COUNCIL ACWDN . . . 75-0264 STAFF REPORT 5. Furnish and install access panels and vents to inaccessible spaces (increase). . . .. ... ... ($ 500.00) TOTAL INCREASES NET INCREASE IN CONTRACT COST $6,014.00 $ 236.00 ------------ ------------ Attached is a comparative cost analysis from the City's Public Building Department showing the Electrical Heating System verses the Gas Heating System for the Center. An annual energy cost savings of $2,779.00 is indicated for the first year of operation. Other items of work to be done can not show direct savings, however, an indirect savings will be attained through maintenance efficiency. We recommend that Change Order No. One be approved. Attachment. URGENCY CLAUSE: In order to maintain time lines and allow contractor to complete gas/electrical lines in timely fashion, Change Order must be approved. Failure to consider Change Order would delay entire project until such time as matter is approved. 3 . . . . - - - . . . 73 C I T Y 0 F SAN B ERN A R DIN 0 INTEROFFICE MEMORANDUM 8604-205 TO: Roger G. Hardgrave, Director of Public Works/City Engineer FROM: Wayne Overstreet SUBJECT: COST ANALYSIS NICHOLSON RECREATION CENTER ELECTRICAL VS. GAS SYSTEMS DATE: April 7, 1986 (6672) COPIES: Energy Auditor, Building Maintenance Supervisor, Heating and Air Conditioning Foreman ------------------------------------------------------------- A comparative cost analysis of change order for the heating and air condition, water and cooking range, from all electric to a gas system. The major concern of this division is the cost of maintenance difference between the two systems, manhours, materials and energy) . Our analysis will address each, utilizing two types of existing facilities in the city inventory that have similar functions and operating hours, with a combination of gas and electric system, and another facility were we have all electric, and an analysis of proposed cost of the two systems as proposed by the contractor. Analysis are as follows (all city facilities) All electrical system (cost per square foot per year) (a) Utilities.................................$1.82.0 lb) Maintenance & Materials...................$0.9l.l TotaL.. $2.73.1 Combination of Electrical & Gas (cost per square foot per year) (a) Utilities.................................$1.33.0 (b) Maintenance & Materials...................$0.84.8 TotaL.. $2.17.8 . '. . . . - - . . . INTEROFFICE MEMORANDUM: 8604-205 COST ANALYSIS - NICHOLSON RECREATION CENTER - ELECTRICAL VS. GAS SYSTEMS Apr i1 7, 1986 Page 2 Analysis - Nicholson Recreation Center 1. All electrical system (cost per square foot per year) (a) Utilities = 5024 sq. ft. X $1.82 =.......$9,144 (b) Maintenance & Material 5024 sq. ft. X $0.91.1 =................................$4,577 Total......$13,72l 2. Combination of electrical & gas (cost per sq. ft. per year) (a) Utilities 5024 sq. ft. X $1.33 =........$6,682 3. (b) Maintenance & Material 5024 sq. ft. X $0.84.8 =...............................$4,260 Total......$10,942 Annual cost difference (first years).......$ 2,779 Based upon our experience with the maintenance of heat pumps in other city HVAC systems, and electrical hot water, and cooking ranges as those specified for Nicholson Recreation Center, an annual cost saving in maintenance can be anticipated if changed to electric and gas system, of approximately $1,300 after the first year of operation. A comparison equipment vs. $22.34 as per was also made on the cost of the original the proposed units. The cost difference was quote from Desert Service Company. Based upon our cost analysis, utilizing only our first year savings as a base point, this change order would pay it self back in less than 2.08 years, therefore it is our conclusion that this chan e or r is cost effective and should be ap roved. OVE STREET, Sup . Buildings/Parking Control WO:mal File: Corrsp. 1-8 116 Maint. 8-1 & 2 -----.--,..... - - ~ ---- .CHANGE ORDER AlA DOCUMENT G701 'stribUtion to: . OWNER 0 ARCHITECT 0 CONTRACTOR 0 FIELD 0 OTHER 0 . , . PROJECT: Nicholson Park Community Center (name. address) 2750 West Second Street San Bernardino, California TO (Contractor): CHANGE ORDER NUMBER: 1 r Ouncan Construction 1966 South Oate Street Bloomington, CA 92316 I INITIATION DATE: 3/26/B6 (revised: 4/15/86: ARCHlTEa'S PROJECT NO: 84-238 CONTRACT FOR: New Construction L ..J CONTRACT DATE: 2. CREDITS You are directed to make the following changes in this Contract: 1. Provide 3' -0" x 7' -0" doors with HM Masonry Frame with 4" head in 1 ieu of 3' -0" x 7'-2" door with 2" head HM frame. Provide base bit T-11 ceiling in lieu of add. Alt No.3 1x6 wood ceiling. Provide conwed natural fissured 11 lay-in panels and DX-24 grid in lieu of Artran ceil ing tiles and 9/16" Suprafine Grid System. 4. Provide 2x4 oak chair rail in 1 ieu of detail 1/A-12. 5. Provided ~as water heater Mor-Flo American GVF 233T/in lieu of INCRE~~~~r hea er. 1.rovide new gas heat fumps similar and equal o the following: HP ,2, & 3 - Payne No. 585JP42060, and HP4 and 5 - Payne No. 579DP120231 in lieu of Elect. heat pumps. Gas line from meter to water heater, range, and mechanical equipment (to be done on time and material basis). not to exceed Plaster food warming room walls,. Install two clean-outsand electrical outlets. Two access panels installed. $1,000 $3,578 2. 3. $ $ el ectric $ 100 TOTAL CREDITS: 500 600 $5,778 $2,225 Nol v.did until signed by hoth the Owner .and ArchilE-ct. Signature ni thl..' Cllntr.actor indic.ates his .agreement herewith, including .any .adjustme!'H .,1 tnc ~ontracl Sum or Contracl TlOltc' $2,489 $ 300 $ 500 $ 500 fOTAL INCREASES:$6,014 3. 4. 5. . The original (Contract Suml COUI~l\lIi_uMlc was.. . . . .. . . . . . . . . . . . .. S Net change by previously authorized Change Orders. . . . . .. . ., . .. .. . . . . . . , , . . . . . . .. S The (Contract Sum) (CXoUl~lMtlt~~1l prior to this Change Order was . . . . . . . . .. S The (Contract Sum) (&II>>llIlCtll4ll:AriltltlloXllllGllll) will be (increased) ldeItlellllldlC:1l1I1dIlO"') by this Change Order ........................................... . . . . . . . . ... S The new (Contract Sum) (el_lllIIIItfd:lilDXiItllIUt1l~1l including this Change Oro1.r will be ... s The Contract Time will be '"4frll~Il)(lt:Itxllllroltll (unchanged) by Th~ Dale of Substanlial Completion as of the date of this Change Order the,el'_'e" June 25, 1986 Authorized: City of San R~rnard;nn OWNER 1nn Nnrth Ilnll ~tr4A+ Address San Bernardino, CA 92418 396,215 91 396,215 236 396,451 ( 91 ) Days. rli ra 11 es 1f~I~~h Address Altade ,CA 91001 Associates. Inc. Woodbury Road Duncan Construction C?NTRA~OR q66 ""th natp '\treet Address Bloomington, CA 92316 Mngr. BY ..4_ .~./...~ BY BY DATE DATE AlA DOCUMENT Gm . CHANCE ORDlR . APlll 1971 EDITION . AlAe . ~ 1978 THE AMERICAN INSTITUTE Of ARCHITECTS. 171S NEW YORK Avt.. NW.. WASHINGTON. D,C _ G701 -1978