HomeMy WebLinkAboutS02-Public Works File No. 1.0471 .C1"iOF. SAN BERNARDIO - REQUWT FOR COUNCIL. AceaON From: Roger G. Hardgrave Subject: Approval of Contract Change Order No. NINETEEN -- Construction of New Tippecanoe Avenue Bridge over Santa Ana River, per Plan No. 6358 -- KASLER CORPORATION Dapt: Publ ic Works/Engineering Date: 4-1-86 Synopsis of Previous Council action: 08-06-84 Plans approved and authorization granted to advertise for bids. 01-21-85 --- Resolution 85-20 adopted, awarding a contact to Kasler Corporation for construction of the Tippecanoe Avenue Bridge over the Santa Ana River, for the low bid price of $4,283,034.00. 10-07-85 -- Change Order No. One approved to authorize payment for removing and replacing material which prevented piles being driven at north abut- ment of the bridge at an increase in contract price of $9,701.00 from $4,283,034.00 to $4,292,735.00. 10-07-85 -- Change Order No. Two approved to authorize payment for construction and maintaining a detour through the construction area, at an increase in contract price of $10,700.00 from $4,292,735.00 to $4,303,435.00. (continued on 2nd page) Recommended motion: That Contract Change Order No. Nineteen to the contract with Kasler Corporation be approved, to authorize payment for construction of an additional Catch Basin and approximately 140 L.F. of 24" Reinforced Concrete Pipe, on a time and material basis, at an estimated increase in contract cost of $16,000.00, from $4,327,586.00 to $4,343,586.00. cc: Ray Schweitzer, City Administrator Warren Knudson, Director of Finance -rA 1t:~ Contact person: Roger G. Hardgrave Supporting data attached: Staff Report & ee) #19 FUNDING REQUIREMENTS: Amount: $16,000.00 . Account No. 242-362-57339 "Ti ppecanoe Bri dge AF-AD60( 1)" Phone: 5025 Ward: 1 Source: Street Construction Fund Finance: j,L ~K -^-- . Council Notes: 1S.0262 Agenda Item No. S' ...".2......- , . , i SYNOPSIS OF PREVIOUS COUN'" ACTION Continu~ ~ 10-07-85 -- Change Order No. Seven approved to authorize payment for changing the type of material to be used in the construction of an apron at a culvert from asphalt to Portland Cement concrete, an an increase in the contract price of $290.00, from $4,303,435.00 to $4,303,725.00. 11-04-85 -- Change Order No. Eight approved to authorize the installation of a 4-inch pipe PVC conduit with pull rope at a net increase in contract price of $1,200.00 from $4,303,725.00 to $4,304,925.00. 11-18-85 Change Order No. Nine approved to authorize funds to compensate the Contractor for "on~the-job" training of six trainees, at an increase in contract price not to exceed $4,800.00 from $4,304,925.00 to $4,309,725.00. 12-02-85 Change Order No. Ten approved to authorize the Contractor to con- struct a cross-gutter on the north side of San Bernardino Avenue at Riverside Drive at an increase in contract price of $540.00 from $4,309,725.00 to $4,310,265.00. 12-02-85 Change Order No. Eleven approved to authorize the Contractor to excavate unsuitable material to a maximum depth of four feet, dis- pose of the material and backfill with suitable material at an estimated increase in contract cost of $4,000.00 from $4,310,265.00 to $4,314,265.00.. 12-02-85 -- Change Order No. Twelve approved to authorize the Contractor to break up P.C.C. surface found below the wearin9 surface on Tippecanoe Avenue on a Time & Material Basis (Force Account) at an estimated cost of $4,100.00 and to delete part of the scarifying of A.C. at a credit of ($720.00) for a net increase in contract price of $3,380.00, from $4,314,265.00 to $4,317,645.00. 01-06-86 __ Change Order No. Thirteen approved to authorize the Contractor to pro- vide additional maintenance to the detoun on Tippecanoe Avenue, in the vicinity of San Bernardino Avenue on a Time and r1aterial basis, at an estimated increase in the contract price of $4,300.00, from $4,317,645.00 to $4,321,945.00. 02-03-86 __ Change Order No. Fourteen approved to provide seven additional No. 5 pull boxes at an increase in cost of $1,650.00, from $4,321,945.00 to $4,323,595.00. 02-17-86 Change Order No. Fifteen approved to remove an existing concrete wall with interferes with the installation of a storm drain, by force account, at an estimated increase in contract price of $800.00 from $4,323,595.00 to $4,324,395.00. . 02-17-86 __ Change Order No. Sixteen approved to furnish and.place additional class 2 aggregate base, at the northerly end of'the project, at an estimated increase in the contract price of $1;300.00, from $4,324,395.00 to $4,325,695.00. C.lJ OF SAN BERNARDWO - REQUVT FOR COUNCIL A~ION STAFF REPORT After the construction of all street improvements, including the storm drain system, it was discovered that the sump on Tippecanoe Avenue did not drain properly, and water tended to build up during rainstorms. This ponding of storm water is due to the flat slope from the centerline of Tippecanoe Avenue to the catch basin. The large amount of storm water that drains in Tippecanoe Avenue is greater than the capability of the drainage system to handle on the flat cross slope of the street section. It is proposed that another catch basin be constructed on the east side of Tippecanoe Avenue. This catch basin will be installed near San Bernardino Avenue, and will intercept a considerable portion of the storm water and allevi- ate the flooding experienced at the sump. The cost of these additional drainage facilities is estimated at $16,000.00, and will be done on a time and material basis, as provided in the Standard Specifications. The total estimated project cost, based upon the actual low bid price, contained an amount of $713,215 for contingencies, which can be used to finance the cost of this change order. We recommend that Change Order No. Nineteen be approved. SYNOPSIS OF PREVIOUS COUNCIL ACTION Continued: 04-07-86 -- Change Order No. Seventeen on the agenda to be approved to authorize the Contractor to furnish and install 18 L.F. of 12" CMP on Tippecanoe Avenue at an estimated increase in contract cost of $320.00, from $4,325,695.00 to $4,326,015.00. 04-07-86 -- Change Order No. Eighteen on the agenda to be approved to authorize the Contractor to construct additional sidewalk under Item 24, to meet handicapped requirements, for an increase in contract price of $1,260.00, from $4,326,015.00 to $4,327,586.00. ,Urg~ncy Clause The Contractor is nearing completion of this project, and needs authority to proceed in time to complete this extra work before he pulls off the project. In the event this work is not done as a part of this project, we will have to suffer with the flooding conditions, or install these facilities at a later' date with City funds. 15-0264 .CITY OF!SAN BERNARDINU =-:.~ CONTRACT <:HANG.DER NO. 19 . R~D 08-SDdo-0-SBd AF-AD-60(J) surpL. NO. Slim ..l.- Of 2 . SIIEETS fEDERAL HO~SI CONTRACT NO. 61S8 To KASLER CORPORATION Contract... 'You ore hereby dilec1ed to moke the herein dC1Uibed chonoc1 from the pions and Ip<<if'cafion, or do 1I1e 'ollowing deKribed wolk not included in the pions Dnd specifico- tions on this contract. NOTE: This change order is not .ffodive until oppt'oved by tlul Enqin..... DcKriplton of wOllo.lo be done. estimate of quontities, and prices to be paid. Segregale between additional work at controd price, ogreed price and lorce o<count. Ullku otherwise Itoted. rotel for rental 01 cquipme-nt COWlr only such time 01 equipment is octually uKd and no allowance will be made 'or idle lime. Change requelted by En r;i nee r the losl percentage shown is the not occumulutr:d increaso or decreas. from the original quantity Nt the Engineer's E5timaN 1. Extra Work at Force Account: Construct Catch Basin #404 in Tippecanoe Avenue Station 11+12 Rt., Install 24" Reinforced Concrete Pipe from existing catch basin at Tippecanoe Avenue Station 12+55 Rt., shown on sheet 2 of 2, as directed by the Engineer. Estimated Cost $16,000.QO '" Es6-.dCost Deaeo..S or Increase S 16,000.00 ApptO'<l'Ola.c~. ..... :3-ZT- )?t By reason of this order tho lime of complelion will be odjusted os followsl ~ittedbyl ..... Approwd. [ng.....r by ..... w~. ttw IJftdoniOl\ed (onfr(l(tQt'. h_ oi...... (01.1,,1 (on~;d.,.otfon to tt.. d.e>nO" P'~ and "'r.l.,. GOtH. if "'" propolol n appto"". ttmt - witl pllVWido 011 fl'quipmonl. fumilh 011 MOtoIrioh. ..(ep' CIt -r ottterwiM be notod alto.... and penou" oll~' ne<c'uo'l' ilK' tho WCMiI. alto",. 'poKihcd. ond w\ll CK(~I)\' 01 tull p~ fher.lor tho ptKC1 "-own obo.... Auor_d.o.:-. Conho<io< KASI,ER CORPORATION 'r r... If tho COfltfoctor doel noIl~ oueplOAC. 01 "'1, order, hit onflf'fion h diroded to .... ..qui,emont' 01 tr.. JiMCilKolton 01 10 prO(..d~ with tho Ofd.,.d wod .-nd ''''lJ 0 w,.,.." ",..." wid\in.... I. thoe.-.in IpKlfted.