Loading...
HomeMy WebLinkAbout12-Public Works . . . . . Aoff({;( CITY OF SAN BERNARDINO File No. 2.114 - REQUEST FOR COUNCIL From: Roger G. Hardgrave REe'D.-AOm". ~ject: Approval of Change Order no FOUR Irrigation & Landscaping in Park Centre, per Plan No. 6760 -- ARTHUR SHOOTER ASSOCIATES, INC. Dept: Publ ic Works/Engineering !936 MAR 27 PH 3: 53 Date: 3-27-86 Synopsis of Previous Council action: 03-19-85 Final Actions taken to establish Assessment District No. 961. 05-20-85 Plans approved and authorization granted to advertise for bids. 08-05-85 RES. No. 85-300 adopted awarding a contract for $528,063.00 to Arthur Shooter Associates, Inc. for construction of irrigation and landscaping in Park Centre Assessment District No. 961. 10-07-85 -- Change Order No. One approved to authorize payment for various items of extra work at a net increase in the contract price of $102,456.00, from $528,063.00 to $630,519.00. (Continued on 2nd Page) Recommended motion: That Change Order No. Four to the contract with Arthur Shooter Associates, Inc. for construction of Irrigation and Landscaping at Park Centre, in accordance- with Plan No. 6760, be approved; to authorize payment for various items of extra work and delections, at a net increase in contract price of $2,817.00 from $640,845.87 to $643,662.87. cc: Ray Schweitzer, City Administrator Warren Knudson, Director of Finance Ok~~- Supporting data attached: Staff Report & Chan~rder. No.4 Ward: 5025 1 Contact person: Roger G. Hardgrave Phone: FUNDING REQUIREMENTS: Amount: $2,817.00 2'" CLe" District #961 -- Account No.~-&33-41033 Source: Proceeds from Assessment_ Finance: '.J tV ,'''"V'' Ij )~,~ ,..~-:--=- "t-Y UJv{\,~,-"":' :ON.'" Council Notes: '-"---'"--T~" '"" Aopnrt" Itpm No /~ I - - . C.. OF SAN BERNAR"O - REQU.T FOR COUNCIL A.ON STAFF REPORT Iii" 1'1,,"-,10' UI<' p,'oj"c!. illdic,,!.r'd UII' irrilJd!.ion ',ystelll for the landscape area along Waterman Avenue was to be supplied from a controller and water meter on the south side of Hospitality Lane at the San Timoteo Bridge. The landscape area along San Timoteo Channel was deleted from the contract, which left the Waterman Landscape area without an irrigation supply line. Change Order No. Three deleted 700 L.F. of landscape area on Vanderbilt Way, adjoining the Waterman landscape area. This deletion created enough unused stations in a controller located at Vanderbilt Way and Carnegie Drive to serve the Waterman landscape area. A two-inch PVC supply line could be continued from its terminus on Vanderbilt Way, 700 L.F. to the Waterman landscape area, and control wires constructed from the Waterman area to the controller so as to supply the irrigation system for the Waterman landscape area. The cost for doing this work less the electrical supply and irrigation controller at Hospitality Lane will increase the contract a net $1,499.00. A cost savings of $1,029.00 will be realized from the deletion of a one-inch water meter at Hospitality Lane plus its monthly bill. Please reference attached map. The plans and specifications did not indicate the shallow cover over Gage Canal on Brier Drive. The plans show the main line of the irrigation system to be installed with schedule 40 PVC pipe. In order to meet load requirements under the existing concrete driveway approach, the contractor must saw cut and remove the concrete, install a 4-inch Schedule 80 PVC sleeve and repour the concrete across the driveway approach at a net increase in contract price of $837.00. The Contractor was directed by the City to repair the street light electric system in the median of Brier Drive. It was thought at the time that the Contractor had damaged the system and that he was obligated to make repairs that consisted of placing new conduit and pulling additional conductors. It was later discovered that he was not responsible for this damage. A cost of $481 should be granted to the contractor for the repair work. The net increase in the contract price for Change Order No. Four is $2,817.00. We recommend this Change Order be approved. There is an estimated balance of $713,085.00 from the amount listed in the Engineer's Report for landscaping. The total estimated project cost, based upon the actual low bid price and the increase authorized by Change Order No. 1, 2, and 3, is $704,142.87 (not including contingencies). This leaves an available amount of $8,942.13 to finance the cost of this Change Order. 75-0264 . . . . SYNOPSIS OF PREVIOUS COUNCIL ACTION Continued: 10-07-85 -- Change Order No. Two approved to authorize payment for various items of work and deletions at a net increase in contract price of $77.00 from $630,519.00 to $630,596.00. 12-02-85 -- Change Order No. Three to authorize payment for various items of work and deletions, at a net increase in contract price of $10,249.87, from $630,596.00 to $640,845.87. . 'oject: Park Centre Landsca~mprovements . Dn te: 3-27-86 . Plan No. 6760 File No. 2.114 ENGINEERING DIVISION DEPARTMENT OF PUBLIC HORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. FOUR . (Change necessitated because of field conditions) Arthur Shooter Associates, Inc. 5225 Avenida Encinas, #G To: Carlsbad, CA 92008 Gentlemen: You are hereby authorized and directed to perform items of work as follows: . I. Extend a 2" main line and 11 ea. #14 remote control valve wires in Vanderbil t Way from contoller "C" on the corner of Vanderbilt and Carnegie to Waterman Avenue as directed by the Engineer and delete the electrical supply and irrigation con- troller as per sheet E.I.A. at a net increase in contract price of ______________________________________________________- 1,499.00 2. Install 4" schedule 80 sleeves to cross the driveway in front of the new building, on Brier Drive, 'west of Gage Canal; repair electrical conduit in Brier Street center medians damaged by others; pull additional ground wire for electroliers; all as directed by the Engineer, at a net increase in contract price of __________________________________________________ 1,318.00 Total extra work cost added to .contract.................$ 2,817.00 Previous Contract price.................................$ Arne n d e d Co s t P r ice. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 640.845 87 643,662.37 Additional time to complete contract due to change order$ CONTRACTOR CITY OF SAN BERNARDINO By: Title: By: ROGER G. HARDGRAVE Director of Public Works Accepted Date: Approved Date: - . '" _ n c;:-"S -_ (.v ~ d ______ .'." tf'~1 , .....- -~ ..- ::r ... "- '< . . - ~: . \ , 1 .1nll~ mN~^V lONV:)Jddll , -I "' r.' rf CO Z '" '" ... -< . ... l: ~ ~ ~ ..... , N ... . 0 . N " v. .!! 1~-'/'c/5i: .. ' . 'J7' ~ ::;J""-( g _- e~" (~ ,/1" 'V ~ 'l; ~ $ ~ ~~ \.u 'I ,J ~ ;l:~ ~ :..: ,'4.' ~ ~ , ~ . ~ :L-1~ '" ... .........../...,.... L,;y, ' G!' />1 .fS ~ i~,'Pci) ~2 ~g __ M ... N .' ... N on N , .~ . > 0( 3: 'A. W "- 0) '" ~ N .... 'l; ... "' 0 " .....r: ... .~ ) ({\ ..... 'lz- , . Q. m E x Q) c - ~ Q) Q) ..c lJ) ,ll?; '" .... .~ ,03 "'" ..... 10 ~z -< > '" N ~ .... "t- ~ .,. OJ ( '),lo"l(~ 3nNJ^ V NVV>llIU VM --.....- < . --- ---.- A.-. ..... f: ,.. ~l ~, ~ t~6 ,..,....,; \:,-li/ .....:."."~' ":::';1\" "-~--.... .. [!fVi ,Ii ........./ ........,..,,'r:!!!w.~ ~..."..........~...,._.; en w E--i ~ U o en en < C\ ~ 0) Z >--t .....:l o P-. ~ ~ cB M t- M '" Ol Qi .~ Q) ~ n 0 ~~:ag 000,,- ><- ,- <:. >< u'I~M ~o"OOl ~C06l' 00:09 ~e>:~C ~ 1 . , , I ; , ~ i , j I I I II I I Q) ... ::l ..... U Q) ..... ;a u E tJ'l~ C C 0.>"::= Q) E~o. c 8 0 0- u .~ 0.. -0 > Q) C c:';:: 0 W(f).....:! C tJ'l .- CIl Q) Q