Loading...
HomeMy WebLinkAbout07-Public Works - .-......~-".,..,~-~..,-...~". " _ REQUE~~NOi:OR2COUN~;ION CITY OF SAN BERNARDINO From: Roger G. Hardgrave "it'D.~""'K''''tQva 1 : Change Order No. SEVEN -- Constructlon of Box Culvert at 40th 1986 MAR -6 PMs&-dtll & Thi rd Avenue, per Pl an No. 6503 -- E. L. YEAGER CONSTRUCTION CO. Dept: Public Works/Engineering Date: 02-28-86 Synopsis of Previous Council action: 09-23-85 Plan approved and authorization granted to advertise for bids. --- Resolution No. 35-28 adopted authorizing execution of Program Suppl. No. 39. --- Resolution adopted authorizing execution of Consent to Common Use Agreement with the County. Resolution adopted awarding a contract to E. L. Yeager Construction Co. for the low bid price of $558,661.25. Change Order No. One approved to authorize the Contractor to delete Bid Item No. 17, Deck Seal of the contract at a reduction in contract price of $13,650, from $558,661.25 to $545,011.25. (Continued on second page) 08-06-35 01-21-35 06-03-85 06-17 -85 Recommended motion: That Change Order No. Seven to the contract with E. L. Yeager Construction Company, Inc., for the construction of a Box Culvert at Fortieth Street and Devil Creek Channel, in accordance with Plan No. 6503, be approved; to authorize the increase or decrease of items of work that the final quantities were over or under 25% of the Engineer's estimate at a net decrease in contract price of $6,951.66, from $534,515.43 to $527,563.77. cc: Ray Schweitzer, City Administrator Warren Knudson, Director or Finance rfl E~ Signature Supporting data attached: Roger Hardgrave Staff Report Phone: 5025 Contact person: Ward: 5 FUNDING REQUIREMENTS: Amount: ($6,951.66) Acct.#242-362-573I6- Box Culvert 40th E/O Kendall Dr. Source: Street Construction Fund Finance: p~ C ,.,.( -~ Council Notes: 75-0262 Agenda Item No, 7 , . CITY OF SAN BERNARDINO - REQUEST FOR' COUNCIL ACTION _..... -' ,.. ,".. ......' STAFF REPORT During construction, it was discovered that the Engineer's estimate of a number of contract bid items varied beyond a 25% increase and decrease. The Standard Specifications state that items over or under 25% of the Engi- neer's estimate must be adjusted in price "if requested by the Contractor or Engineer." The Contractor agreed not to adjust the contract bid Drice and to use the original bid price for each item. A net decrease of $6,951.66 in contract price will be realized by this contract change order. We recommend that this change order be approved. A copy of Change Order No. 7 is attached for reference. order shows the percentage over or under the quantities in the estimate. This change Engineer's SYNOPSIS OF PREVIOUS COUNCIL ACTION Cont. 11-04-85 --- Change Order No. Two approved to authorize the reduction of Bid Item No.7 and 26 (removal and reconstruction of wire rail revetment) 400 L.F., at a net decrease in contract price of $15,400, from $545,011.25 to $529,611.25. 11-04-85 --- Change Order No. Three approved to authorize the Contractor to increase the barrier wall in width 4 inches, from 8 to 12 inches on both ends of the box culvert at an increase of $476.00, from $ 529,611.25 to $530,087.25. 12-02-85 --- Change Order Four approved to authorize the Contractor to replace unsuitable material within the structure limits with suitable backfill at a net increase in the contract price of $2,278.18, from $530,087.25 to $532,365.43. 12-02-85 --- Change Order No. Five approved to authorize the Contractor to extend the northeast wing wall vertically approximately one foot in height at an increase in the contract price not to exceed $950.00, from $532,365.43, to $533,315.43. 12-16-85 --- Change Order No. Six approved to authorize the Contractor to install guide markers and to extend guard railing on a time and material basis, at an increase in contract price not to exceed $1,200.00, from $533,315.43 to $534,515.43. lOAD BOX CULVERT AT 40TH STP ,:HANNEL 1 . ANO DEVILS CREf , 1 $" Sllln .0._ HDlRAl "0.(')_ M-R070(l ) 6503 CONJRACr NO E. l. YEAGER CONSTRUCTION COMPANY, INC. c to__ , ' -- ~--- -.. ,.v co,. I..f.h, .1........1 ,.. ...nlr.. ,h. h...I., deur.b." ,honc,. Iro," ,h. plo." ....,d IP.dUc..tiotOI elf do th. folllllwlnQ d'Mrllo.... .,.,.,k ,,," 1"c1..~." I., ,hll ...1.... l...dli,OOI;O'" on ,hI. ,"""...,. t:OT~: 'hit ,....u...,.. M.I., I. 1101 I"tf...crh'. ~~~':."!,_..i1.., "'"e. ci tr.~~:.....,. 0..,,;,,1;"''' of '....<:11. ,.~ I.. "''''''''. ..II;~...'.. of ..,......,itle:,. ....1 11';('" to .... \.IU;.I. ~'.'I""lul. I............. ,..'.li'lo....' .....,,10 ", 10,""(1'1 ,,,i.., .1'1....-f I"'''~ ,.-.c ...... 100;.0...".. U..I... otl..,,,,,... ,'nl.."', H,I" for '':'''01 ., .......p.".", (OJ".' onl, IV'''' li",,_ "I .....;101.......' h ...hn,II.. "...1 find "0 ,,11"""'11'1(1 \.111 I... "..",.. 1- . tiMe. E . CI'O"A. ,.q....,'.d lot' nql neer .'he h,..' ..........,0\1. .too_n II lto. "01 _"........I.'..! lnuon'. 0' "'''''.0'. fro..... Ih. 011.,.....1 q..een,o.rln Ito.ln"Io._,'. hll,.....,'.. 1. Estimate of increases and decreases in contract orices above 125% and below 75%: , ' .. '" ~ u. :> . :> .. .. o ~ ~ ~ .. Item #2 Relocate existing mail boxes: 2 each (+50%) at $50 each = Item #3 Relocate existing si~ns: 1 each (+33%) at $200 each = Item #6 Structural backfill & compaction: 749.7 c.y. (+28%) at $7.90/c.y. = Item #11 Construct A.C. paving misc. areas: 3405.68 (-65%) at $1.10/s.f. = ($3.746.25) $ 100.00 $ 200.00 $5.922.63 Item #23 Construct 6" P.t.C. driveway approach: 793.35 s.f. (-32%) at $2.10/s.f. = ($1,666.04) o 2: Item #24 Construct 6' chain link railing 9 gauge: 59l.f. (-44%) $30/l.f. = ($1,770.00) ~ o a: "" z '" '" '" Item #25 Construct meta' briege railing and P.C.C. barrier: 601.f. (-45%) at $110/l.f. Item #30 Construct P.C.C. encasement: 16 l.f. (39%) at $38/l.f. = ($6,600.00) = $ 608.00 z "" v> Agreement between the Contractor and Engineer was to use contract prices for all items of work. "- o >- .... - u l'limo... Cod o.cn-ot. , 6,951. 66 M lnCf90M $ ." u''''",Qn (>r lh~, o~d., Ih. "mo or u,,,'pl..'io" ....ill .... 0.1;.......... o. f..llo...." . s"tmln.d b,.. \~il1iam J. Post '7~ J ,/'J~ 1>0.. 1-2 z- _oiJ-G , App,....dl ci ty e",;".., L, Rouer G. HirQ9n"1l .l>ot<o W,. I.... "........:\1...., ....'1'0110', ...... ur.... '<>'.'..1 10...;.1''''101:.", I~ d.. ."""0" ""I'ro..d ....J ....,..1..,. 00.... U d.l. """,>0,..1 I, Of'I,,.,..,,,I, 11'1,,1 .... wilt f~ .11 1'",,,,;,""""1, I",..;." "II ...."...i..l.. ........ o. .....,. olhuwi.. t.. "~I.d oloa... uul ....to,,,, "U ....1.., "0<0""')' ..., 110. ...",k I.IW.. .~.flll..l. ....d ..II . ". ....11,,1.0.,......"'1.'.,.10, ,... p.ll., 1100_" cob..... . G.\', Auop'''', Dol. . ,::;.. "'" 'f"] <; 1:. c......... ~~.t'.L,_. E. l. 'Yeaqer Construction Comryany C' C t'\...O C \1.. ~,._\. ~ ~JL T1rl..