Loading...
HomeMy WebLinkAboutRS06-Public Works Fi 1 e No. 6.1450 CI" OF SAN BERNARD. - REQUWT FOR COUNCIL ACIION ROGER G, HARDGRAVE, Director , From: Public Works/Engineering e: February 28, 1986 Approval of Change Order No, 3 Subject: Construction of Two Racquetball Courts at Boys Club per Plan No, 6684 -- SCC GENERAL CONTRACTOR Date: Synopsis of Previous Council action: 01/18/85 Plans approved and autyhorization granted to advertise for bids. 09/09/85 Report of Competitive Bid Opening accepted and filed; and matter of required supplemental finding referred to RDA Committee, Supplemental funding in the amount of $40,000 approved, (see page 2) 09/23/85 Recommended motion: e That Change Order No, Three to the contract with SCC General Contractors, for the construction of two racquetball courts, at the Boy's Club, in accordance with Plan No. 6684 be approved; to authorize the contractor fur the walls of the courts to meet the dimensions required by the vendor installing the courts at an increase in contract cost of $1,195.75, from $141,196,88 to $142,392.63, cc: Ray Schweitzer, Deputy City Administrator Warren Knudson, Director - Finance Signature Contact person: ROQer G. HardQrave Phone: 5025 Ward: 6 Source: CDBG Funds Supporting data attached: Staff Report FUNDING REQUIREMENTS: Amount: $2.208.44 Finance: .Cil Notes: 1 15-0262 Agenda Item No. R5 - 6 . ~ ~ ... . . . 10/07/85 Resol ution No. 85-392 adopted awarding the contract to the low bidder for the low bid price of $138.760,00, 02/17/86 Change Order No, One referred Staff for cost renegot- iation, 03/03/86 Change Order No. Two, on the agenda for approval to autorize the contractor to modify two exterior type doors to provide windows at an increase in contract price of $228.44, from $140,968,44 to $141,196.88, 2 . . CI'" OF SAN BERNARDI. - REQU.... FOR COUNCIL AC*N . . . 75.0264 STAFF REPORT The Contractor installed the walls for the racquetball courts in accordance with the dimensions shown on the plans. 1J0wever, the subcontractor that fur the panels on the interior walls discovered that one court was 1 1/2 inches, and the other was 2 inches wider than the standard 20-foot width. These walls have to be installed to exact tolerances, in order that the pre-cut pa ne 1 s will fi t. Furring stripes were nailed to the common wall between the courts, in order to reduce the widths of the courts to 20'. These furring strips were 2" x 4", with 1/2" plywood in the wider court. The Contractor has quoted a price of $1,195.75 for installing these furring strips. An estimate for Change Order, signed by Michael Murphy, Architect, is attached for reference, ,We have reviewed this price and feel that it is fair and reasonable for the work involved. Therefore, we recommend that Change Order No. Three be approved, Change Order No. One was referred back to staff for renegotiation with the Architect. The Architect has been contacted and recommends that negotiations be deferred until the end of the project when all change orders can be done at one time. The total estimated project cost, based upon the actual low bid price, contained an amount of $22,140,00 for contingencies, which can be used to finance the cost of the extra work. 3 . Projt~: Construction of Two RaCqu.all Courts at t. Boy's Club \ Plan No, 6684 Date: 2/28/86 File No. 6.1450 . . ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO, Three (Change necessitated because of field conditions) TO: SCC General Contractor 22816 La Paix Grande Terrace, CA, 92324 Gentlemen: You are hereby authorized and directed to construct furring on the center wall at 2 inches one side and 1 1/2 inches on the other side as directed by the Engineer at an agreed price of $1,195,75, . Total extra work cost added to contract ""..""..",.",.,."."..$ 1,195.75 Previous Contract Price ....................................io.......~$ 141~196-.88 Amended Cost Price ..................................................$ 142,392.63 Additional time to complete contract due to change order ".."",.., 2 days CITY OF SAN BERNARDINO: CONTRACTOR: flY: Title: By: ROGER G. HARDGRAVE . Di rector of Pub 1 i c Works/C i ty Engr. Accepted Date: Approved Date: '. -..' c . .,( . , ESTIMATE FOR CHANGE ORDER . · Estimate No.. 3 Amount $ 1. 195 . 75 Date Job No. Racquetball Courts/Encanto Park 2/18/86 To City Of San Bernardino Job 300 N. -.'0" SL San Bernardino San Bernardino, Ca 92418 We submit herewith Ihefollowing Eslimatefor: Furred walls to meet Court diml'>nsion.. Reason for Change: :_ ITEM SUBCONTRACTOR LASOR MATERIAL SUBCONTRACT TOTAL riP. :;. 11.). ~l:l ~ /D.':I8 j'laLerials ~ LUL.4b 262.46 - , . .- Tolal $ 978.44 :Ompeosation Insurance and Taxes on labor ( %x$ )., ............. :ub-totill.... .... .. .............. .. ............................................ ........................................ .................. Sub-Iolal ':1/8.44 )yerhud & Profit. . . . . . . . . . . . . . . , . . ... . , . , . . . . . . . . , . . . . , . . . , . . , . . . , . . , , , .1 %) 205.47 :utHolal . . . . . . . . . 'I . . . , . . . . . . . . '1' Uf:J . 91' . . , . . , . . . , . , . : : . , . . . . . . , . . . . . ., Sub-total Il,ll:lJ.':Il :Ontractor"s Bond ( % x $ ,.. ). .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 11. 84 'OT AL AMOUNT OF THIS ESTIMATE FOR CHANGE ORDER. . , , , . . . , . . . , . . . . . . , , , . , . . , . . . . , , . $ 1,1':1:>,7:> :xtension of Time Necessary for this Change: S~ENERAL CONTRACTOR 2_ LAPAIX . GRAND TERRACE, CA 92324 3 working days QQlI.'X~i~lr~KRm- .t~.;~~'i, ~.~~ ~ . ~'/Z./ .' ,tt; / '(.;t ./7" '&f/ '0'/ , . "''''';f' ~ - ~ ~~ rr" -A -" ( )lpv/ , , 0110 U. Rev. J"&