Loading...
HomeMy WebLinkAbout14-Public Works - .oN CI1- .. OF SAN BERNARDl ,0 - REQUE.T FOR COUNC From: ROGER G, HARDGRAVE Dept: Publ ic Works REC'D.-ADMlltuIQiJi; Approval and Acceptance -- Construction of Phase I-A of Seccombe Lake State 1985 fES -6 ~ 3: 1:6 Urban Recreation Area, per Plan No, 6403 -- Moulder Bras, Date: 02-06-86 Synopsis of Previous Council action: 08-08-84 Resolution No. 84-319 adopted awarding a contract to Moulder Bros, for the Base Bid and Alternate No, 2, for a total contract price of $3,201,000,00, 10-15-84 Change Order No, One approved adding two pedestrian bridges, pavilion slab, Sixth Street improvements, widening of Sierra Way, changed walkway light and substituted Val con valves and controllers at a new increase in contract price of $330,642,75 from $3,201,000,00 to $3,351,642,75, OI-19-84 -- Change Order No, Two approved the expense for equipment move-on and move-off charge, changing of curb grade on Sierra Way between Sixth Street and Seventh Street, after curb forms had been set, and the elimination of a tire ripper and warning signs in Parking Area No, One, at a net increase to the contract price of $5,253,88, from $3,531,642,75 to $3,896,63, (See Next Page) Recommen<Jed motion: That the work performed by the Contractor, in accordance with Specification No, 6667, be approved and accepted; and that final payment be authorized at the expiration of the lien period, cc: Ray Schweitzer, City Administrator Warren Knudson, Director of Finance Annie Ramos, Dir, of Parks, Rec, & Comm, Services Wayne Overstreet, Supt, of Public Buildings 0dr ~~~ Contact person: Roger G. Hardgra.'!'~~_.~. Phone: 5025 1 Supporting data attached: Staff Report._________ Ward: FUNDING REQUIREMENTS: Amount: N/A Source: 1980 State Bond Act, Presley Fishing Program, and Street Constr, Fund 243-353-57515 " Finance: \..:,/~v~ J ( /)C--y"....y,~..J<::tcl__ , , , / , / (/ Cou nc i I Notes: 75-0262 / Agenda Item NO,/""J'. SYNOPSIS OF PREVIOUS COUNCIAL ACTION: (continued) 01-21-85 -- Change Order No, Three approved to authorize over excavation; removal of railroad tracks on Sierra Way, removal of curb and gutter at the corner of 5th and Sierra Way and the elimination of a tire ripper and warning signs for the YWCA parking lot; removal of a 12-inch storm drain and manhole and replacement with 175 L.F, of 24-inch corrugated steel pipe; the removal and replacement of a curb depression in the YWCA parking lot; and the removal and replacement of a driveway approach into the YWCA and the construction of an adjacent stairway at a new increase to the contract price of $34,253,78, from $3,536,896,63 to $3,571,150.41, 05-13-85 -- Change Order No. Four approved to authorize various items of work to be down-graded, in accordance with the letter dated 4-25-85, from Moulder Bras" at a net decrease in the contract price of $11,075,79 from $3,571,150.42 to $3,560,074,62, 07-15-85 -- Change Order No, Five approved to authorize the construction of ceramic tile for the counter top in the concession building and 220-volt power to the lake aerator vault, at a new increase to the contract price of $2,567,90, from $3,560,074,62 to $3,562,642,52, 01-06-86 -- Change Order No, Six approved to authorize payment to the Contractor for the amount of $2,892,90 awarded by the arbitrators, relative to construction of a concrete collar and removal of thicker than normal pavement, for an increase in the contract price from $3,562,642,52 to $3,565,535,42, CIT~F SAN BERNARDIN-- - REQUE~, FOR COUNCIL ACTL-H STAFF REPORT All work was satisfactorily completed as of 1-31-86. The contract was awarded for the low bid price of $3,201,000.00, The actual final contract price is $3,565,535.42, due to the net increase authorized by Change Orders No, 1 through 6, We recommend that the work be approved and accepted, and that final payment be authorized. 75-0264