Loading...
HomeMy WebLinkAbout09-Public Works - - CITY OF SAN BERNARDINO - REQU~S;'NOFOFrCOUNC~ON Date: 1-27-86 flEe'o. - AOM\tt.b~l. Approval of Suppl ement No, One to Contract Change Order No, TWELVE -- ;~3G FEB -6 PM 3: OGConstruction of New Tippecanoe Avenue Bridge over Santa Ana River, per Plan No, 6358 --KASLER CORPORATION From: Roger G, Hardgrave Dept: Public Works/Engineering Synopsis of Previous Council action: 08-06-84 Plans approved and authorization granted to advertise for bids, 01-21-85 -- Resolution 85-20 adopted, awarding a contract to Kasler Corporation for construction of the Tippecanoe Avenue Bridge over the Santa Ana River, for the low bid price of $4,283,034,00, 10-07-85 -- Change Order No, One approved to authorize payment for removing and replacing material which prevented piles being driven at north abut- ment of the bridge at an increase in contract price of $9,701,00 from $4,283,034,00 to $4,292,735,00, 10-09-85 -- Change Order No, Two approved to authorize payment for construction and maintaining a detour through the construction area, at an in- crease in contract price of $10,700,00 from $4,292,735,00 to $4,303,435,00, (Continued on 2nd Paqe) Recommended motion: That Supplement No, One to Change Order No, Twelve, to the contract with Kasler Corporation, for construction of the new Tippecanoe Avenue Bridge, in accordance with Plan No, 6358, be approved; to authorize Contractor to break up additional concrete base as described in Contract Change Order No, 12, on a force account basis, at an estimated increase in the contract price of $1,900,00, from $~,325,695,OO to $4,327,595,00, cc: John Matzer, Jr" City Adminis~rator Warren Knudson, Director of Finance ()7' 'c~ Roger G, HardgraYe Sta!f Report & Suppl, No, 1 Amount: $1,900,00 Phone: .5.Cl25. . 1 Contact person: Supporting data attached: Ward: FUNDING REQUIREMENTS: Source: Street Construction Fund Acco~nt_ ~o ,~42~3..62 - 5 7339"T i ppecanoe B~idgeAF -Ag60( 1 )"_ Finance: I).. ~/~- Council Notes: 7~ 'v,,::') Aaenda 11em No, .~ --~--,---- - - - ---------- - - - Fil e No, 1. 0471 SYNOPSIS OF PREVIOUS COUNCIL ACTION Continued: 10-07-85 -- Change Order No, Seven approved to authorize payment for changing the type of material to be used in the construction of an apron at a culvert from asphalt to Portland Cement concrete, at an increase in the contract price of $290,00, from $4,303,435.00 to $4,303,725,00 11-04-85 -- Change Order No, Eight approved to authorize the installation of a 4-inch pipe PVC conduit with pull rope at a net increase in contract price of $1,200,00, from $4,303,725,00 to $4,304,925,00, 11-18-85 -- Change Order No, Nine approved to authorize funds to compensate the Contractor for "on-the-job" training of six trainees, at an increase in contract price not to exceed $4,800,00 from $4,304,925,00 to $4,309,725,00, 12-02-85 -- Change Order No. Ten approved to authorize the Contractor to con- struct a cross-gutter on the north side of San 8ernardino Avenue at Riverside Drive at an increase in contract price of $540,00 from $4,309,725,00 to $4,310,265,00, 12-02-85 -- Change Order No, Eleven approved to authorize the Contractor to excavate unsuitable material to a maximum depth of four feet, dispose of the material and backfill with suitable material at an estimated increase in contract cost of $4,000,00 from $4,310,265,00 to $4,314,265,00, 12-02-85 -- Change Order No, Twelve approved to authorize the Contractor to break up P,C,C, surface found below the wearing surface on Tippecanoe Avenue on a Time & Material basis (Force Account) at an estimated cost of $4,100,00 and to delete part of the scarifying of A,C, at a credit of ($720,00) for a net increase in contract price of $3,380,00, from $4,314,265.00 to $4,317,645.00, 01-06-86 -- Change Order No, Thirteen approved to authorize the Contractor to pro- vide additional maintenance to the detour on Tippecanoe Avenue, in the vicinity of San Bernardino Avenue on a Time and Material basis, at an estimated increase in the contract price of $4,300.00, from $4,317,645.00 to $4,321,945,00, 02-03-B6 -- Change Order No. Fourteen approved to provide seven additional No, 5 pull boxes at an increase in cost of $1,650,00, from $4,321,945,00 to $4,323,595,00, 02-03-86 -- Change Order No, Fifteen approved to remove an existing concrete wall which interferes with the installation of a storm drain, by force account, at an estimated increase in contract price of $800,00 from $4,323,595,00 to $4,324,395,00, '" CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT Contract Change Order No,' Twelve authori zed the Contractor to break up a layer of P,C,C, pavement, found below the ground surface on Tippecanoe Avenue, This extra work was paid for on a force account basis (time and materials basis), at an estimated price of $4,100,00, During construction, it was found that the buried P,C,C, pavement was more extensive than originally estimated, and the actual time and material costs amounted to $6,000,00, Supplement No, 1 to Change Order No, 12 will authorize payment to the Contractor for the actual costs incurred, The total estimated project cost, based upon the actual low bid price, contained an amount of $713,215 for contingencies, which can be used to finance the cost of this change order, We recommend that Supplement No, One to Change Order No, Twelve be approved, 75-0264 - . CITY't..!" SAN BERN/lRDhJ FC-.I KC~8 M't &-841 CONTRACT CH^NGE ORDER NO,12 08-SBdo-O-Slld SUI'Pl. NO, ) SHm --L.... or --1- slims ROAr} K[)(-RAl NO.(S) AF-ATl-60 (l) CON1R^CT NO. --9J5 n '0 KASLER CORPORA'l'ION _Co.",,,., You orc hen~Ly Jirec1",d 10 ",oke the h~H'ln de$(flhed dl{J/1g"'~ Irom the plo"' ond \pe<ificulion, or do 11'0 fol1owlrlg dtlS<:I,I",d work not included III .he I1lo'H and ~"c(II;(a' tion,onlhi\conlll>cf. NOT[: Thi, change 04'der f1 not effm:tivtl until opJ'Kovtld by Ihe fnqine(lt. Oesniption of work to bl'; tlo"'~. 1'\1110011': 01 quoo"""', \Itld I'we\ 10 I~ paid ~grf'Qotc ~tw,'''n llud,honul work,' Unlf'u (>,101"' wi'/' ~to'ed, rntc\ fOf ..:-nlol of ~q'''pmcnf f.OV!:' only \UI h lime 0\ f''l'''rJ".cnl t\ o<1u{llly uu:-d ond nO ollow( Chnr.ge.\-qut:\wdl>y j~r~f~inecr The 10\1 peru,nluyc shown is the nel o~_(umulotcd jfl(leaSC or dC(;reo\c trom the origmal qvanttty in the I:-f\gi~r'i Eitim"" 11'.;,.... oqr....,1 I"I(C ond for(e O((o,!"I. loudelol idl" 11m... 1. EXEra work at force account: Break up portland cement concrete base (supplemental fundS) Estimated cost ;);1.900.00 btimoted COil [)e<reo\e S orlncrca~eS 1.900.00 fly U:oion of lh;~ order the time of I I:.. complel;onw;l1l>eodlostcdo~lollows: no adjjustment /i {() 'Zl. (. {tot. ~, e>t?!Ct.,, C';f1 J. Verner. He,;ident ""'. 1- Z?-Jl Submitted by: Engineer Approvo! l<f,Kommenc:led, ""'. App.owd. fno'''"' by .... Wtt.rI>c .."d....,O....rl."....odQ., to".... {I....." u....I..1 <.Qm"j",nt.on 10 II-.".,.....IQ<: pI"".......d ...0 ....,~hy O\l'e<". " II,,~ 1""1"'>01 i~ 01'1"''''''..1. Ihol we w,ll I',o..i.... loll l'<\"'i''''l'"I, l",,~"" oli mut..,,,,I.. lunpl '" mol' "rhelw;le be noled ..bo..... unci ~rlo"" oil ,,,,...e.., .Ie(:n.....y 10. C~ .ro.l obo"" 'I'e""l..,d. gnU _II OU"pl ..,...11 poy....">llh,,.o:lOf th.. l',icc,1how""t.>ove. Auepkd.Dcrt" CDd.octo< KASLER CORPORATION lltl" 0, "ft... (('''''(>flu. d...., nol ..un ..,...,.Cn"".. "I ri". ("ck" t,.. utl....lK.on n d.....,..d 10 Ihe .cqo...e......... "I th., ,!--,Ioeul...."tn 10.> ......,..,.dong _l'h tf<e o"",...d wu,k ""d 1,I,,,u (I ....',".'" DU,I."l .....d..... Ih.. 1_ ......~l tt...ulo..d.