HomeMy WebLinkAbout08-Public Works -. . CITY OF SAN BERNARDINO - REQU~~T NF~~47~OUN~ON From: Roger G, Hardgrave Dept: Publ ic Works/Engineering ftEC'D. - AD Mt:NI.biffF. Approva 1 of Supplement No, One to Change Order No, ELEVEN --Construction ISSG FEB -8 PM 3: 08 of New Ti ppecanoe Avenue Bri dge over Santa Ana River, per Plan No, 6358 -- KASLER CORPORATION Date: 1-28-86 Synopsis of Previous Council action; 08-06-84 Plans approved and authorization granted to advertise for bids. 01-21-85 -- Resolution 85-20 adopted, awarding a contract to Kasler Corporation for construction of the Tippecanoe Avenue Bridge over the Santa Ana River, for the low bid price of $4,283,034,00. 10-07-85 -- Change Order No. One approved to authorize payment for removing and replacing material which prevented piles being driven at north abut- ment of the bri dge a t an increase in contract pri ce of $9,701. 00 from $4,283,034,00 to $4,292,735,OO, 10-09-85 -- Change Order No, Two approved to authorize payment for construction and maintaining a detour through the construction area, at an in- crease in contract price of $10,700,00 from $4,292,735,00 to $4,303,435,00, (Continued on 2nd Page) Recommen-ied motion: That Supplement No, One to Change Order No, Eleven to the contract with Kasler Corporation, for construction of the new Tippecanoe Avenue Bridge, in accordance with Plan No, 6358, be approved; to authorize an increase in the estimated cost of change order No, Eleven lt a net increase to the contract of $32,300, from $4,327,595,00 to $4,359,895,00, cc: John Matzer, Jr" City Administrator Warren Knudson, Director of Finance (}z~l ~~~/L-- Signalure Contact person: Roger Hardgr~~~_.__._______ Phone: _5025_ _____n___~_ 1 Supporting data attached: Staff Report & Supp, No, One Ward: FUNDING REQUIREMENTS: Amount: $32,300 Source; Street Bri dgenAF~AD60(1)"_ Finance:_~j r {., Construction Fund Account No, 242-362-57339 "Tippecanoe C / C L-= Council Notes: ? Aop.nrli1 Itp.m No File No, 1.0471 SYNOPSIS OF PREVIOUS COUNCIL ACTION Continued: 10-07-85 -- Change Order No. Seven approved to authorize payment for changing the type of material to be used in the construction of an apron at a culvert from asphalt to Portland Cement concrete, at an increase in the contract price of $290,OO, from $4,303,435,00 to $4,303,725,00 11-04-85 -- Change Order No. Eight approved to authorize the installation of a 4-inch pipe PVC conduit with pull rope at a net increase in contract price of $1,200.00, from $4,303,725,00 to $4,304,925,OO, 11-18-85 -- Change Order No. Nine approved to authorize funds to compensate the Contractor for "on-the-job" training of six trainees, at an increase in contract price not to exceed $4,800,00 from $4,304,925,00 to $4,309,725,00. 12-02-85 -- Change Order No, Ten approved to authorize the Contractor to con- struct a cross-gutter on the north side of San Bernardino Avenue at Riverside Drive at an increase in contract price of $540,00 from $4,309,725.00 to $4,310,265,00, 12-02-85 -- Change Order No, Eleven approved to authorize the Contractor to excavate unsuitable material to a maximum depth of four feet, dispose of the material and backfill with suitable material at an estimated increase in contract cost of $4,000.00 from $4,310,265,00 to $4,314,265.00, 12-02-85 -- Change Order No. Twelve approved to authorize the Contractor to break up P.C,C. surface found below the wearing surface on Tippecanoe Avenue on a Time & Material basis (Force Account) at an estimated cost of $4,100,00 and to delete part of the scarifying of A.C. at a credit of ($720,00) for a net increase in contract price of $3,380,00, from $4,314,265.00 to $4,317,645,00, .01-06-86 -- Change Order No. Thirteen approved to authorize the Contractor to pro- vide additional maintenance to the detour on Tippecanoe Avenue, in the vicinity of San Bernardino Avenue on a Time and Material basis, at an estimated increase in the contract price of $4,300.00, from $4,317,645.00 to $4,321,945.00. 02-03-86 -- Change Order No, Fourteen approved to provide seven additional No, 5 pull boxes at an increase in cost of $1,650,00, from $4,321,945,00 to $4,323,595,00, 02-03-86 -- Change Order No. Fifteen approved to remove an existing concrete wall which interferes with the installation of a storm drain, by force account, at an estimated increase in contract price of $800,00 from $4,323,595,00 to $4,324,395,00, CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT Change Order No, Eleven authorized the Contractor to excavate un- suitable material to a maximum depth of four feet, dispose of the material, and backfill with suitable material, at an estimated cost of $4,000 on a time and materials basis (Force Account), This work was very difficult and time consuming due to the various underground utilities encountered, which required temporary supports to be provided, The time to perform this work was considerably underestimated, Completion of this item of work.will entail an additional estimated cost of $32,300,00, The total estimated project cost, based upon the actual low bid price, contained an amount of $713,215 for contingencies, which can be used to finance the cost of this change order, We recommend that Supplement No. One to Change Order No, Eleven be approved. 75-0264 CITY .~ SAN BERNARDI~ Fo.. Me-a ...., .~. CONTRACT CHANGE ORDER NO, 11 08-SBdo-0-SBd SUPPL, NO, 1 .0...0 SHEET -l- OF ~ SHEETS CONTRACT NO. "oj' To KASLER CORPORATION Co,"."., You ore hereby directed to make the herein described chor'lges from tl-te pions and specifications or do the following de\uibed wor. not included in me plo,..s ood specllico- tioMon this contract. NOU: This chonge order is not .ffectiv. until approved by the En~i"e.r. AF-AD-60(1l 6"}58 'EOE....' NO.(S) [)e\Criplion of work to be done. estimate of quantities. ond pm;es to be paid. ~regate ~twecn odditiongl work 01 contract price. ogrcen priu: and force O(counl. Unleu othcrwi\O stated. rotes for rental of equipment cover only weh time 0\ equipmen' is octvolly used and no ollowance will be mode for idle lime. Change requested by n in e e r The los' percentage shown is the net accumulated increase or de<:reow from th. original quantity in the Engineer', htimatlll 1. Extra work at force account: Remove unsuitable material (Supplemental Funds) Estimated Cost $32.300.00 Eltimated Cost Oecreose $ ..,"'.....$ 32. "}OO. 00 SlANnitt.d by, ""'" /- 23-.5t, resldent Englneer Awo-J Rec:_dH, ""'" AW,_d, EnvinMr by ""'" We. .... und~n'9...,d (o",ro<:IO,. hoWl gi".,.. cOleful c:)nlid"ralion to tt.e chong" p1opo_l und hereby og'~. il "'" propo.al is tlpprowt:!d. Ihat _ ....11 provi,Je all equip....."'. lu..,;"" all ",atll.ials. ..ceplO1 moy ott..twiw b. noted oba.... ond perform all "1'V1{e. noc.uory fo, the wOIk ot.o... 'P'K,loed. ond....1I Q{{ep' 01 tull payment therelor.... fH'iu, 11'10....' uLo.... AU.pted.Dole ConI.octof KASLER CORPORATION " lift. " the COIltfQ{'or doe, not .;gn oc(tlp'onoce of tt.i\ 01"". hi. ollanhaool i, di.ec1"d 10 It.., .eqvir_.... of f1.. .....ull(nhOft o. to p'oc:eedong....... the OIdeled ....01.. and l.long a wrill..... Pfote.t...ithinlheli_tl....onlpe<llled,