CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL/J(CTION
From:
Roger G. Hardgrave
Publ ic Works/Engineeri~~)
ftEC'D. - ADMI H. OFFSubject:
J'N?" ~'I 3' .,,,
H t....' :: ,..-,..J
Approval of Contract Change Order
No. Fourteen -- Construction of New
Tippecanoe Avenue Bridge over Santa
Ana River, per Plan No. 6358 --
KASLER CORPORATION
Dept:
Date:
1-22-86
Synopsis of Previous Council action:
10-07-85 --
Plans approved and authorization granted to advertise for bids.
Resolution 85-20 adopted, awarding a contract to Kasler Corporation
for construction of the Tippecanoe Avenue Bridge over the Santa Ana
River. for the low bid price of $4,283,034.00.
Change Order No. One approved to authorize payment for removing and
replacing material which prevented piles being driven at north abut-
ment of the bridge at an increase in contract price of $9,701.00 from
$4,283,034.00 to $4,292,735.00.
10-09-85 -- Change Order No. Two approved to authorize payment for construction
and maintaining a detour through the construction area, at an increase
08-06-84
01-21-85
(Continued on 2nd Page)
Recommended motion:
That Change Order No. Fourteen to the contract with Kasler Corporation,
for construction of the new Tippecanoe Avenue Bridge, in accordance
with Plan No. 6358, be approved; to authorize Contractor to furnish
and install seven each, No.5 pull boxes, adjacent to new electrol ier
bases, at a net increase to the contract price of $1,650.00, from
$4,321,945.00 to $4,323.595.00.
cc: John Matzer, Jr., City Administrator
Warren Knudson, Director of Finance
~.~~~--
Signature
Contact person:
Roqer G. Hardqrave
Phone:
5025
Supporting data attached: Staff Report
Ward:
I
FUNDING REQUIREMENTS:
Amount: $ 1. 650.00
Source:
Street Construction Fund
IJ.. fZ/__
Account No. 242-362-57339 "Tippecanoe Bridqe i\F-AD60(I)"
Finance:
Council Notes:
75-0262
Agenda Item No. /?,
,
CI'. { OF SAN BERNARD~_..O - REQUl. .J T FOR COUNCIL AC. .ON
STAFF REPORT
The plans and specifications for this project do not provide for the
installation of pull boxes adjacent to the electroliers. Whenever an electro-
lier is damaged by a vehicle out of control, the repair is easier if a pull
box is nearby to disconnect the conductor and make these repairs.
For this reason, it is the City's policy to install pull boxes adjacent
to electroliers.
This change order will increase the contract cost by $1,650.00, from
$4,321,945.00 to $4,323,595.00.
The total estimated project cost, based upon the actual low bid
price, contained an amount of $713,215 for contingencies, which can be used
to finance the cost of this change order.
We recommend that this change order be approved.
SYNOPSIS OF PREVIOUS COUNCIL ACTION Continued
in contract price of $10,700.00, from $4,292,735.00 to
$4,303,435.00.
10-07-85-- Change Order No. Seven approved to authorize payment for changing
the type of material to be used in the construction of an apron at
a culvert from asphalt to Portland Cement concrete, at an increase
in the contract price of $290.00, from $4,303,435.00 to $4,303,725.00.
11-04-85 -- Change Order No. Eight approved to authorize the installation of a
4-inch pipe PVC conduit with pull rope at a net increase in contract
price of $1,200.00, from $4,303,725.00 to $4,304,925.00.
11-18-85 -- Change Order No. Nine approved to authorize funds to compensate the
Contractor for "on-the-job" training of six trainees, at an increase
in contract price not to exceed $4,800.00 from $4,304,925.00 to
$4,309,725.00.
12-02-85 -- Change Order No. Ten approved to authorize the Contractor to con-
struct a cross-gutter on the northside of San Bernardino Avenue at
Riverside Drive at an increase in contract price of $540.00 from
$4,309,725.00 to $4,310,265.00.
12-02-85 -- Change Order No. Eleven approved to authorize the Contractor to
excavate unsuitable material to a maximum depth of four feet, dispose
of the material and backfill with suitable material at an estimated
increase in contract cost of $4,000.00 from $4,310,265.00 to
$4,314,265.00.
12-02-85 -- Change Order No. Twelve approved to authorize the Contractor to break
up P.C.C. surface found below the wearing surface on Tippecanoe Avenue
on a Time & Material Basis (Force Account) at an estimated cost of
$4,100.00 and to delete part of the scarifying of A.C. at a credit of
($720.00) for a net increase in contract price of $3,380.00, from
$4,314,265.00 to $4,317,645.00.
(continued)
75-0264
Cll. OF SAN BERNARDI.. .) - REQUI. ~T FOR COUNCIL AC'. .ON
STAFF REPORT
SYNOPSIS OF PREVIOUS COUNCIL ACTION Continued:
1-06-86
Change Order No. Thirteen approved, to authorize the Contractor
to provide additional maintenance to the detour on Tippecanoe
Avenue in the vicinity of San Bernardino Avenue on a Time and
Material basis, at an estimated increase in the contract price
of $4,300.00, from $4,317,645.00 to $4,321,945.00.
75.0264
CITY OF SAN BERNARDINO
...... .s
...' "1ll4.
lOAD
CONTRACT CHANI..._ ORDER NO. 1 J
08-SBdo..O-SBd
SUPPL. NO.
SHEEr --1- Of -L SHEETS
ffD<IAl NO.IS)
AF-AD-60(1l
._ CONTRACT NO.
....)
61S8
T. KASLER CORPORATION e..."""",
You ONll hereby direded to moko tho herein desuibed chontJo, Irom tho pions and specifications or do the 'ollo....it1g deKribod work nol irIcNded in the plum and Ipt'cifico-
tion\ on ft.i, <ontroct.
NOTE: This change order it not .H"ctive until appro....d by the Engi""" . .
DeKription of work to be dOni!, e~I'mo'f!' 01 quantities, and prict's 10 ~ paid. Seqreoole between oddilionol work of contract prico. oqr~d puce ond fOfce account.
Union otherwiW! "atfi'd, ratos fOf rental of equipmenf (over only \uch time en equipment is actvally used Gnd no allowance will be mode lor idle lime.
Change requested ~y En in e e r
The lost percenlogo "hown is tho net occumulated increaMl or decreow from tho original quantity in the Engineer', Estimate
1. Extra Work at Agreed Prices:
Furnish and install #5 pull boxes adjacent to the new
electrolier base~ on the Tippecanoe Avenue bridge
approaches.
A payment of $150.00 and $300.00 pp-r box for boxes
installed westerly and easterly of CL of Tippecanoe Ave
respectively, will be considered as full compensation
for the work, including any additional costs by reason of
this change.
Estimated
#5 pull
#5 pull
extr.a
boxes
boxe.s
work.
(Rt)
(Lt)
4 Ea @ $300.00
3 Ea @ 150.00
Total
$1,200.00
450.00
$I,650.00
htimofed Cost
Decr~ S
or Increase S
l,6so.00
By rea,on of this order the time of
completion will be odluSI~d os follows:
A.pPl'ovot h(omm..ded,
No adjustment
rA<~ (jd"",V
rl. J. verner,
rteSloenc ~ng1neeI
....
/2 Z6//.r
Sut:.trlitI.dby'
....
AHw_d: Eno"-' by
....
W.,.... vnde.ltQrMtd (ont'o<lo., ho... given co,olul conl.de,of.o" to th" chcmo" p.upo--' and h...~by og..,.., .I,h" p,opolol t1 "pp.o_d~lhClI _ "",II p.o",d.. "u "qu'l"n....I, lu,,..J. <;III mllte.ioh,
"(.pt Pi moy 01+..'....... b. nofed 000"', and p"'.fo.m 011 .......K..' tlot"'tt1.lCIry lu. Ih.. ...orl. obove If_,loed. ond.....1I <Keepl 01 full poymenllh....IOf Ih. pm..' "'0"," oho.... '
c.."""". KA SLER
lit~
...
11111" Co(,fulKlf'lI rto~, nolli~n G<uplonu A. thi, o.d.., hi, ott.nllOl'l n di,tI<ftod to 111. ,.qutr.......'" 01.... 'f'<<.Ii<ohon 01 fa P'IKmtdlulI "".th tn. Q,dotted wo." oncIlil;~ 0 """ttorn
ptotu' with... tM lim. Ih...."_ ,..,."hed
.. """