HomeMy WebLinkAbout15-Public Works F"e No. 4.424 ~~ CITY OF SAN BERNARDINO - REQUEST FOR COUNCil: ACTION From: ~EC'D -ADM''' OF~ Roger G. Hardgrave . ,,,.. 'Subject: . .. !SSG J,\N 23 :~: 3: :;2 PubllC Works/Englneerlng . Approval of Contract Change Order No. One -- Construction of Seccombe Lake Storm Drain Lateral, per Plan No. 6769 --Kershaw Construction Dept: Date: 1-17 -86 Synopsis of Previous Council action: 3-07-85 ----Transfer of $7,125 to Account No. 48-510-673, "Seccombe Lake Storm Drain Lateral," approved. Plans approved and authorization granted to advertise for bids. Resolution adopted awarding a contract to Kershaw Construction Company, for the low bid price of $175,282.00. 7-15-85 9-09-85 Recommended motion: That Change Order No. One to the contract with Kershaw Construction Company, for the construction of Seccombe Lake Storm Drain Lateral, in accordance with Plan No. 6769, be approved; to authorize payment for removal of a concrete structure and for time lost due to unmarked water lines, on a time and materials basis, for a cost not to exceed $3,667.09, for an increase in the contract price from $175,282.00 to $178,949.09. cc: John Matzer, Jr., City Admin. Warren Knudson, Dir. of Finance {A;Zt~ Signature Contact person: Roger G. Hardgrave Phone: 5025 Supportingdataattached:~.if Report & Resolution Ward: I FUNDING REQUIREMENTS: Amount: $3,667.09 Source: Storm Drain Construction Finance: j.J ''-.- (?,A:~ Fund - Account No. <48-36e-5181o Council Notes: 75-0262 Agenda Item No. J~, CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT During excavation for the storm drain, the Contractor encountered an abandoned reinforced concrete vault. This structure was not shown on the plans, since it was not of record and its existence was unknown. Removal of this abandoned vault was required in order for the storm drain and appurten- ant facilities to be installed in accordance with the plans and specifications. Two water mains were also broken by the Contractor during excavation. These mains were not shown on the plans since the serving utility was not aware of their existence. The Contractor was compelled to shut down his entire crew, consisting of 6 personnel and 4 pieces of equipment, for a hour. Payment to the Contractor will be made on a time and materials basis, for removal of the vault and shut down time. The total estimated project cost, based upon the actual low bid price, contained an mount of $28,918 for contingencies, which will be used to finance the cost of this change order. We recommend Change Order No.1 be approved. 75.0264 yr")ject: Seccombe Lake Storm Drain'Lateral f-lan No. 6769 Date: 1-17-86 File No. 4.424 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNAnDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. ~ (Change necessitated because of field conditions) Kershaw Construction Company P. O. Box 9 iO: Montclair, CA 91763-0009 Gentlemen: You are hereby authorized and directed to perform work as follows: I. Remove a reinforced concrete structure and plug adjoining conduits. 2. Compensation for one hour time lost due to the breaking of two unmarked water mains. Work shall be done on a time and materials basis not to exceed $3,667.09. Tota 1 extra work cost added to contract ............................. $ 3,667.09 . P . $ 175,282.00 Prevlous Contract rl ce ............................................. Amended Cost Price ..................................................$ 178,949.09 Additional time to complete contract due to change order ............ 2 days CONTRACTOR: CITY OF SAN BERNARDINO: By: By: ROGER G.' HARDG'RAVE Director of Public Works/City Engr. Title: Accepted Date: Approved Dote: