Loading...
HomeMy WebLinkAbout14-Public Works ---'- -~ CITY OF SAN BERNARDINO - REQUESTNOFO.~l COUNCI&fI~N From: Roger G. Hardgrave REC'O.-ADHIM. O~.bject: Approval - Allocation of $30,000 -- Replace Expansion Joints in Three- Level Parking Structure Dept: Public Horks/Engineerin<l986 JAN -9 Pl,~ 3: 28 Date: 1-08-86 Synopsis of Previous Council action: None. Recommen<:led motion: That authorization be granted to prepare the plans, specifications and estimate, for replacement of expansion joints in the three- level parking structure, with the necessary supplemental funding to be identified after the bids are received. cc: John ~.1atzer, Jr., City Administrator \.Iarren Knudson Oir. of Finance Wayne Overstreet, Public Buildings Supt. -1J~P~ Signature Wayne Overstreet Phone: 5244 Contact person: Supporting data attached: Sta ff Report Ward: 1 .:'..r~ ....."- l.t: ..J,',__.Il.- FUNDING REQUIREMENTS: Amount: $30,000 Source: ~o Be- O,_,.;~.....R. ___~__.~ Finance: p - t:') ~ I.J~" /1,.PJ / I ~ Council Notes: 75-0262 I Agenda Item No./~ CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT The 3-level parking structure was constructed with metal plates over the expansion joints. During the time this structure has been in use, these plates have been torn loose by forces exerted by vehicular traffic. Repeated maintenance effort has been required over the years to secure these plates. However, the holes have been torn out and repaired so many times that in- sufficient material is left to perform effective repairs. One expansion compressible gasket. the ensuing problems. joint has recently been repaired by insertion of a This eliminates the necessity for the metal plate, with This treatment has been well received by all concerned. A preliminary estimate of cost for installing gaskets in the remaining expansion joints is $30,000. This amount is just for the driving lanes, since the metal plates within the parking spaces are still secured. Due to the continuing maintenance effort needed, and potential liability, it is recommended that action be taken to have the expansion joints replaced with the compression type. It is planned for the work to be done by a Contractor, in accordance with plans and specifications prepared by the Engineering Division. A price quote of $29,000 has been received from the contractor that installed a compression type gasket in one expansion joint as a pilot project. We feel a better price could probably be secured throu9h the competitive bidding process. These expansion joints have required continuing maintenance since the 3-level structure was constructed. It was not possible to predict with any degree of precision when the bolt holes in the concrete deck would reach a point where further repairs would no longer be effective. For this reason, no funds were included in the 1985-86 8udget. The operator of the Central City Mall has placed the City on notice about this condition. This action could possibly make the City liable in case of an accident. Therefore, we feel this matter should not be deferred until the 1986-87 Budget. These compression type joints are routinely installed on roadway bridges. They have an expected life of about 25 years. Approximately $12,000 of the needed funds have been identified from salary savings in the Publ ic Buildings Division. The additional funds required to finance the total project cost will be identified after the bids are opened and the actual contract price determined. 75-0264