CI"rY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
From:
Roger G. Hardgrave ftEC'D.-ADMIM~'dIif:.t=
Publ ic Harks/Engineering 1986 JAM -9 PH 3: 28
Authorize transfer of funds -- ~9l,3n~ --
installation of curb ~ nutter, si~ewalk
& fill-in street oavinn on Del ~osa Avenue
(:lest sirle), from Eureka St. to 39th St.
Dept:
Date: 1-09-86
Synopsis of Previous Council action:
None.
Recommen<:led motion:
That the transfer of $91,300, from Account No. 242-362-57361,
"Hidening of Highland Avenue, east of Boulder," for the
installation of street improvements on Del Rosa Avenue, west
side, from Eureka Street to 39th Street, be approved.
cc: John r"atzer, Jr., City Administrator
Warren Knudson, Dir. of Finance
Manuel Moreno, Publ ic Services Supt.
Peter Liu, Traffic Engineer
~r~~
Signature
Contact person:
Roger G. Hard9rave
Phone:
5025
FUNDING REQUIREMENTS:
Amount:
$91,300
Ward:
S"+,.. '- ~.,. (,,~...... + <r '- ~ ,.. '''' r'" '" ~ "'-
Source: Account No. 242-362-57361,
4
Supporting data attached: Staff Rep_ort
vlideninq Hiqhland Ave.>-yO Boulder Avenue ____
Finance:
~ I '-'--_ C-:' j, /--\.._
Council Notes:
75-0262
Agenda Item N~~ ,
CI'. IOF SAN BERNARD._~O - REQUl.iT FOR COUNCIL AC.ION
STAFF REPORT
SB 300 Funds have been allocated for the rehabilitation/resurfacing
of Del Rosa Avenue, from Eureka Street to 39th Street. Also, approval has
been given for installation of traffic channelization facilities at the
intersection of 39th Street.
The west side of Oel Rosa Avenue is not fully improved with curb
and gutter. A dirt berm has been erected in order to control the consider-
able volume of storm water drained in Del Rosa Avenue. Extensive maintenance
is required after every major storm to remove mud from the street paving
and repair damage to the dirt ditch.
Sidewalk has not been installed on the east side of Del Rosa Avenue.
Therefore, pedestrians have no safe area for walking along this portion of
Del Rosa Avenue.
The optimum arrangement would be to have curb and gutter installed
on the west side before the rehabilitation/resurfacing work, and channeliza-
tion, is done. This would allow for the street to be fully improved at
this time, and avoid creating a patch-work appearance when the work is done
in the future. Installation of these improvements would increase the level
of protection from flooding afforded to the properties on the west side of
the street, eliminate the high level of maintenance required, provide a
safe walking area, and improve the appearance of the street.
An amount of $125,000 was allocated in the 1985-86 Street Construction
Fund Budget for widening Highland Avenue, east of Boulder Avenue. This
widening will accommodate the additional traffic generated by a proposed de-
velopment. However, the widening has not been started, since the development
is still being processed. Funds for the improvements on Del Rosa Avenue
could be transferred from this amount, and replaced in the 1986-87 Budget,
if warranted.
The parcels on the west side of Del Rosa Avenue have been developed
with single family homes. These homes "back-up" to Del Rosa Avenue. For
this reason, there is no possibility of having these improvements installed
through the development approval process.
The preliminary estimate of cost for installing curb and gutter,
sidewalk, and fill-in street paving, is $91,300. This estimate is based
upon the work being done by a Contractor, in accordance with pl ans and
specifications prepared by the Engineering Division.