HomeMy WebLinkAbout19-Public Works
.
C 0
CITY OF SAN BERNARDINO -
Fa No. 6.1444-2 :>
REQUEST FOR COUNCIL ACTION
From:
ROGER G. HARDGRAVE
RF C'O - AD tollN. (Jflliject:
Public Works/Engineet'f1ig .
I?8S DEe 19 f:~ 2: 20
12/16/85
Approval of Change Order No. 6--
Contract for Construction of
Phase I-A of Seccombe Lake State
Urban Recreation Area, per Plan
No. 6403 -- Moulder Bros.
Dept:
Date:
Synopsis of Previous Council action:
08-08-84 -- Resol ution No. 84-319 adopted awarding a contract to
Moulder Brothers for the Base Bid and Alternate No.2, for
a total contract price of $3,201,000.00.
10-15-84 -- Change Order No. One approved adding two pedestrian
bridges, pavilion slab, Sixth Street improvements,
widening of Sierra Way, changed walkway light and
substituted Valcon valves and controllers at a new in-
crease in contract price of $330,642.75 from $3,201,000.00
to $3,351,642.75.
(continued on page 2)
Recommended motion:
That Change Order No. Six to the contract, with Moulder Brothers and
John H. Moulder, for the construction of Seccombe Lake Urban State
Recreation Area, in accordance with Plan No. 6403, be approved; to
authorize payment to the Contractor for the amount of $2,892.90
awarded by the arbitrators, relative to construction of a concrete
collar and removal of thicker than normal pavement, for an increase in
the contract price from $3,562,642.52 to $3,565,535.42.
cc: John Matzer Jr., City Administrator
Warren Knudson, Director of Finance
",l, Ro'''. 01,,,,,, of ""fi.1' C'7~ '
-V s1gnatur -
Roger G. Hardgrave
Phone:
5025
Contact person:
Supporting data attached: Staff Report & CCO #6 Ward: 1
FUNDING REOUIREMENTS: Amount: $2,892.90 Source: 1980 State
Acct #243-353-57515 I '
Presley Fishing Program, and Street Construction ~und/ Finance: ~..
Bond Act,
t2/~
Council Notes:
75-0262
Agenda Item No,
/Cf
1
.. .
Clfy'OF SAN BERNARDI'-b - REQU~T FOR COUNCIL ~ON
STAFF REPORT
The Contractor submitted a claim for extra work involved in
construction of a concrete collar and removal of thicker than normal
pavement. After the majority of the storm drain was installed across
Fifth Street, the Contractor determined that it would not meet the
existing overflow structure on the design grade. The remaining
portion of the storm drain was installed on a revised grade. A
concrete collar was required at the point the grade was changed.
Upon attempting to cut the pavement, the Contractor encountered a
layer of Portland Cement concrete pavement under the asphalt concrete.
A claim was submitted by the Contractor in the amount of $3,377.19 for
these two items of work. These claims were denied by staff because it
was felt the Contractor should have verified the elevations at both
ends of the storm drain before starting construction, and the contract
documents made no representation as to the type or thickness of the
pavement section.
These claims were submitted to arbitration,
contract documents. An award was made to
$2,692.00, and the $200.00 administrative fee.
Arbitration is attached for reference.
as provided in the
the Contractor for
A copy of the Award of
We recommend that Change Order No. Six be approved.
3
7580264
-
.
,-,
l."
o
'"j
v
:)
01-19-84 -- Change Order No. Two approved the expense for equipment
move-on and move-off charge, changing of curb grade on
Sierra Way between Sixth Steet and Seventh Street, after
curb forms had been set, and the elimination of a tire
ripper and warning signs in Parking Area No. One, at a net
increase to the contract price of $5,253.88, from
$3,531,642.75 to $3,536,896.63.
01-21-85 -- Change Order No. Three approved to authorize over
excavation; removal of railroad tracks on Sierra Way,
removal of curb and gutter at the corner of 5th and Sierra
Way and the elimination of a tire ripper and warning signs
for the YWCA parking lot; removal of a 12-inch storm drain
and manhole and replacement with 175 L.F. of 24-inch
corrugated steel pipe; the removal and replacement of a
curb depression in the YWCA parking lot; and the removal
and replacement of a driveway approach into the YWCA and
the construction of an adjacent stairway at a new increase
to the contract price of $34,253.78, from $3,536,896.63 to
$3,571,150.41.
05-13-85 -- Change Order No. Four approved to authorize various items
of work to be down-graded, in accordance wi th the letter
dated 4-25-85, from Moulder Bros., at a net decrease in
the contract price of $ll,075.79 from $3,571,150.41 to
$3,560,074.62.
07-15-85 -- Change Order NO. Five approved to authorize the
construction of ceramic tile for the counter top in the
concession building and 220-volt power to the lake aerator
vault, at a new increase to the contract price of
$2,567.90, from $3,560,074.62 to $3,562,642.52.
2
-
Plan No. 6403
:)
Date: December 16, 1985
File No. 6.,1444-2
~, ()C)
Project: See combe Lake Urban Recreation Area
ENGINEERING DIVISION
DEPARTMENT OF PUBLIC WORKS
CITY OF SAN BERNARDINO, CALIFORNIA
CONTRACT CHANGE ORDER NO. SIX
(Change necessitated because of ' field conditions)
To: Moulder Bros.
P.O. Box 3306
5ll Western Avenue
Glendale, CA. 9l201-0306
Gentlemen:
You are hereby authorized to place a Portland Cement Concrete Collar between two
36-inch reinforced concrete pipes in Fifth Street north of Sepulveda, Avenue; and
remove pavement of excessive thickness in Fifth Street' at the same location at an
increase cost in contract price of $2,892.90 as set by arbitration in Case No.
72 llO 0636 85. '
Total extra work cost added to contract.................$
2,892.90
Pre v 1 0 use 0 n t r act P r ; c e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 3,562 ,642.52
Amended Cost Pr1ce........................................$ 3,565,535.42
Additional time to complete contract due to change order$ 0
CONTRACTOR
CITY OF SAN BERNARDINO
By:
Titl e:
By:
ROGER G. HARDGRAVE
Director of Public Works
Accepted Date:
Approved Date:
-
-
-
/
,
') 0
AMERICAN ARBITRATION
ASSOCIA TION
o
443 Shatto Place, Los Angeles, California 90020,1781
(213) 383,6516
-i
:)
MAILING ADDRESS:
POST OFFICE BOX 57994 . LOS ANGELES, cA 90057-0994
ARBITRATION . FACT. FINDING . MEDIATION . ELECTION SERVICES . DISPUTE RESOLUTION TRAINING
Los Angel.' Region
JEARY l, MURASE
/lIRECTOR
JIoCOUELlNE DOWNS
DEPUTV DIRE.CTOR -
CASE ADMINlsrRA TlON
ROCCO M, SCANZA
OEPUTY DIRECTOR-
flEGIONAL DEVELOPMENT
November 25, 1985
72 EllO 0636 85
Moulder Bros., General Contractors
for Cllno Pipeline
-and-
City of San Bernardino
Moulder Bros., General Contractors
for Chino Pipeline
Attn: Duane Bartlett, Operations ~~nager
16341 Chino Corona Road
Chino, California 91710
City of San Bernardino
Attn: William Sabourin,
Assistant City Attorney
300 North "0" Street
San Bernardino, California' 92418
Gentlemen:
In accordance with the provisions of Section 45 of the Construction
Industry Arbitration Rules, enclosed to each of you are copies of the
Arbitrator's duly executed Award in'the above matter.
By copy of this letter, a copy of the Award is being sent to Arbitrator
Victor Hiceli, who is sincerely thanked for his services in this matter.
Si~".~5elY ,
.~.,-_..~-
''''~
' .
. . .' ~
C~-_..------=-
"., ,
", / .... ."# /-.,
I . '
M. L. Martindale
Awards Clerk
MLM/mr
Enc 1.
cc: Victor Miceli, Esq.
Ollices: Allanl.. 80$lon . Challoth' . ChlCeol,) . Cincmnall . CII)'l'I'..nd . 0..11.. . Denver. Detroit. Glude" CI1V, N.Y. H.rllord . K,lnus Clly . Los Angeles. M...m. . M,"".,tpul,.
New 8,unlwlck, N J. . Now 'YOlk . pr\tlad(llphl." . Phoen.1 0 pntsburgn . Sill' Dleyo . 5.." F,.ncaseo . 5".1118 . SyH1CuSe . Washington, 0 C . Wtlllll "'1.,n1. N Y
c
L
, ,
,
.'
"
-. .,~ ~
:~,.~"
~" _0 .
<:.-... ",
~_:
"
,. t
,
.~:~. ..::
.~.
/
t
/
....
"
,"
"
I
, "l
-
-
-
-
d\~"ir." L,. ., . -..'" :,' ,
" ,$~~~~i~r.' Ar~ration
...::r':f'-}.~<'~ . ~..: J:" -. . " ~." '
" it
,:'. ... ''', ;>'~;(:$,l~,~~,J
ti '; -'i""'I'I..J.'2___'_~t~);
A~~ociation\if~:;~~\~~~#;
. ". t.!.(J.;~4C - .,' kj
. . .j.~ t..)~ -<to,
o . .}. "(' .~.~....t',~A'!~
~-ijl~:i!i~'
1
In the Maller of lhe Arbilratioll between
Moulder Bros.. Ceneral Contractors
for Chino Pipeline
-and-
City of San Bernardino
CLkDlANT :
"and...
RESPONDENT :
CASE NUMBER:
72 110 0636 85
AWAnD OF AR8ITRATOR(S)
I, (Y{II.). TUfj UNDERSIGNED ARBITRATOR(S), h3vinc been' dc~ign3tcl.l in accordance with
d\c Arbiualion Agreement entered inlo by the abo\lc~namcd Pal1il:s.
and having been duly sworn and ~aving duly heard the proofs and allegations or the Panics. AWARD
aslollows:
(A) [(I\] RESPONDENT shall pay to CLADlANT th~ sum of ~ '>';Hl-~
[ ] CLAIMANT shall pay to RESPONDENT the s_ of
[ ] The claim of CLAIMANT against RES~ONDENT is denied.
[ J RESPONDENT'S counterclaim against CLAIlWIT is- denied.
(B) The administrative fees and expense. of the AMerican Arhitration Associa-
tion shall be borne:
J By the parties as incurred.
] Equally by the parties.
IV'l1 By R.espondent.
I J By ClaJ.naa.nt.
(C)
OTHER:
~ .....e /-,..-,-
').< ,..Ij,.... /Jcn.
r
~'/' 9i~
f'-
'.,
'.
Th.1s Award is"1n full settlement of all claims (and countercla:1Jns) submitted
by either party aga,1.nst the other in this aroltrat1on.
;
~~.
ARBITRATOR
VICTOR MICELI. ESQ.
t>^TEt>c Itl),'/fJ--
-ao..,