Loading...
HomeMy WebLinkAbout17-Public Works o 0 FO No, 1.0471 0 CITY OF SAN BERNARDINO,- REQUEST FOR COUNCIL ACTION From: Roger G, Hardgrave ftEC'lt. - ~OMIM~ OFSubject: Approval of Contract Change Order No, THIRTEEN -- Construction of New Tippecanoe Avenue Bridge over Santa Ana River, per Plan No. 6358 --- KASLER CORPORATION Dept: Publ ic Works/Engineerin~US DEe 19 ~'I, 2' 20 Date: 12-17-85 Synopsis of Previous Council action: 08-06-84 Plans approved and authorization granted to advertise for bids, 01-21-85 -- Resolution 85-20 adopted, awarding a contract to Kasler Corporation for construction of the Tippecanoe Avenue Bridge over the Santa Ana River, for the low bid price of $4,283,034.00, 10-07-85 -- Change Order No. One approved to authorize payment for removing and replacing material which prevented piles being driven at north abut- ment of the bridge at an increase in contract price of $9,701,00 from $4,283,034,00 to $4,292,735.00. 10-09-85 -- Change Order No. Two approved to authorize payment for construction and maintaining a detour through the construction area, at an in- crease in contract (C t' d 2 d ) on lnue on n page Recommended motion: That Change Order No. 13 to the contract with Kasler Corporation, for construction of the new Tippecanoe Avenue Bridge, in accordance with Plan No, 6358, be approved; to authorize Contractor to provide additional maintenance to the detour on Tippecanoe Avenue in the vicinity of San Bernardino Avenue on a Time and Material basis, at an estimated increase in the contract price of $4,300,00, from $4,317,645.00 to $4,321,945,00, cc: John Matzer, Jr" City Administrator Warren Knudson, Director of Finance tJA .:!:.JlJ~4< Roger G, Hard9rave Phone: 5025 Contact person: Ward: 1 Supporting data attached: Staff Report FUNDING REQUIREMENTS: Amount: $4 , 300 . 00 Source: Street Construction Fund Account No, 242-362-57339 "Ti ppecanoe Bridge AF-AD60(l) " Finance: IJ..,-C' Ie ~ Council Notes: 75-0262 Agenda Item No, /7 , , CI-R OF SAN BERNARD~O - REQU"T FOR COUNCIL Ad-ON STAFF REPORT The detour has been inundated by an almost continuous flow of excess irri9ation water from the east. As a result of this water flow, the pavement has deteriorated very rapidly. In order to provide an acceptable riding surface for the motorin9 public, the Contractor has been required to perform an excessive and inordinate amount of maintenance. Since the level of necessary maintenance was not stipulated in the contract documents, this effort constitutes extra work. Change Order No. 13 will authorize payment, up to $4,300.00, for the costs incurred by the Contractor on a time and material basis. The total estimated project cost, based upon the actual low bid price, contained an amount of $713,215 for contingencies, which can be used to finance the cost of the change order. We recommend that Change Order No. 13 be approved. SYNOPSIS OF PREVIOUS COUNCIL ACTION Continued: price of $10,700.00 from $4,292,735.00 to $4,303,435.00. 10-07-85 -- Change Order No. Seven approved to authorize payment for changing the type of material to be used in the construction of an apron at a culvert from asphalt to Portland Cement concrete, at an increase in the contract price of $290.00, from $4,303,435.00 to $4,303,725.00. 11-04-85 -- Change Order No. Eight approved to authorize the installation of a 4-inch pipe PVC conduit with pull rope at a net increase in contract price Of $1,200.00, from $4,303,725.00 to $4,304,925.00. 11-18-85 -- Change Order No. Nine approved to authorize funds to compensate the Contractor for "on-the-job" training of six trainees, at an increase in contract price not to exceed $4,800.00 from $4,304,925.00 to $4,309,725,00, 12-02-85 -- Change Order No. Ten approved to authorize the Contractor to con- struct a cross-9utter on the northside of San Bernardino Avenue at Riverside Drive at an increase in contract price of $540,00 from $4,309,725,00 to $4,310,265.00. 12-02-85 Change Order No. Eleven approved to authorize the Contractor to excavate unsuitable material to a maximum depth of four feet, dispose of the material and backfill with suitable material at an estimated increase in contract cost of $4,000.00 from $4,310,265.00 to $4,314,265,00. 12-02-85 -- Change Order No. Twelve approved to authorize the Contractor to break up P.C.C. surface found below the wearin9 surface on Tippecanoe Avenue on a Time & Material Basis (Force Account) at an estimated cost of $4,100.00 and to delete part of the scarifyin9 of A.C. at a credit of ($720.00) for a net increase in contract price of $3,380.00, from $4,314,265.00 to $4,317,645.00. 75.0264 - - - - - v.......,I, V,I, ."1'" J.....l...nlll'J\J.J.L1\V " C CONTRACT CIIAr~C?RD[R NO. 2 ROAD_Nl-Sndo-O--SBd ,,"'''"\ \.,J SUPPL. NO, :; slim ---L- OF -l- slims 1 F[DlRAl NO,(O) /IF-IID-60(l) 6'358 _ CONTRACT NO, \-oJ' T. K/lSr.R!L..CORPOrFtrON C.n"~tn' You (lfe hereby rJ;lt'ct~d 10 make tho hNein dClHril,..." dlOnOltl from tho plont and specification, or do III. following deKribed work nol included in tlul plan, and ,pe(iticu- lionl on flli. (o...lro<l, NOTE: This (hon,o order is nol effl'lcliva until (If'p,,,v,,d by ,he Enqinoor. Descriptiofl of work 10 be done, eU'fll<:Jh,' of ql/ontlties, ond pntt's 10 Or. paid. ~qreQl'Jlo 1>r.1wef'n odditional work 01 conho,1 price, oqrr.-ed I'm,t: ond force occounl. Unle" olhuwi\c I'ol'!d. ralel for renlal 01 equipment cover only such time 01 equipment il actually uled and no allowance will be mode for idle time. Chongo requested Ly Engine e r ' 1he 10$' percentage shown is the net accumulated in<:reo$Cl or decrease from the original quantity in II,e Engineer', Estimate 2. Extra Work at Force Accpunt, Maintain Detours (Supplement fundS) Estimated Cost $4,JOO.00 Estimated Cost Orecrease$ .rloc"." S 4.100.00 8y reoson of tllis orde, fhe lime of (ompletion will be odiustcd 0\ folloW1.: "PpfOYOt RKe_ecIdod, Dot. /2.. "l-Y5 I Submitt.d by. nglneer Dote ^rpro....d: Eng;,,"' by Dot. w., tI.. uod..ui'1....d conl,odcII, Itn... gi...OlHn..I....1 eom"lo,,,hOfl to .h" chn"UtI propo-'" end htlft.(,y oo'e". itlhi. ,""pelleR" npp,owoJ. Ihol_ ....,11 ,,,0.....1,, ..11.<1""""""" lu"".t. ..11 mo'",lOI" tll(~pl CU ",or o,h.,.,..;." t,. noted aho...., _oJ ,,,,,(,,.n,..n 1",..,.ell'lOlcono.y I", "'tI.wo." ntr..vo 'I>eul~d, u"IJ Will <><<'pIClI lulll'''l''me... Iht"h... 11,0 P,,(tllhfl.....t,l>o.... "((epled, Dote COf1t,extof K/lSLER COHPORATION " tille II.... (onlltKlof .I"" 1101 ti",.. O(c.".onco ollhi' ..,dol,I.., oltonf"""" dlrKfoct 10 th. ,o...."omenh ot Ih. II..Cllic:nlioncn to ",oOlej..", ....,11,1... o.J".od ....0,.. nnoJ t,hng 0 wIIII..n p,ot..1 wilh",lh, lime 11I.,.,n '.,et.Il..d. , ry;'" I>';'I-~ -'II /" -c o DATE: F'llE: ~~ -- J. , 'l.-)' 1 tJ ...) l.tJ<I~71' :; / , Contingency, Ual,mce (Ine This Changel $ 3x~, 77.(~"O CCO No s Jt , ~"O. 00 , INCR peeK' THIS CHANGE ORDER PROVIDES FOR a d dv't~ /-n..,zL '~~r~wtie.t;.(--t.v ;Q de tt"v .d?V ~U~ Citu 1. /Ja~ dkA-d-"v4.;~ tl6-6- J i ~./ ~4~ ,,?1t-~ ia~M. ~ tt>--tl-<J ~ . ~i 1~~ u-v.~~. ~:;ta,/ ~.d7<'~ ... ~ l;t~ pC.."vtU?l<-/ ~~ ~Ud ~1didl' ~ ~e;~ L~ tat, '''711 :t~, / ~hLttf~(dL-hJ uYI~Lu ~d U~v' < < v?f'UnW i<>-eA& ~1r~:la:<~ /1J(.O ;,{ -i,,~, , .;1 Jt.-d tH. 'e;# ~~ . ' - CCO DISCUSSED WITH: ESTIMATE OF COST TI-IIS CCO TOTAL TO DATE " Cor.stru::t1on Engineer 2. Stic:!ge Engine'" ~, FHWA Rop, YES NO 1I0ms $ Forco Account S Agreed Prl(".o S --- MJuslmonl $ - lolal , S ~ ,?C"Q.OO : .3,,(,7/ I.t't> ~ . ,'cdl!rnl S(!grCO<l.llon: .. federnl No. A fr"- ~W-t, 0 r; ) ,t)J.": vI ____lV. - tf.,??'o,/Jo S $ $ 7, .("30. /:?C; 2.0 I &- co. c' 0 '''" II, L. C' I . 0 l' Name N."", Nomo O:Sl. Prior Approval Oy: II O. 13sue &. ^pprO~l) Oy: . $..:-,,1. Funds Provhh~d S "'OU:S: ,. O"sclihll \\'h."It. \W1Y. lIow? 2'. Expl:lin .. tfl"tJ [xtcnsiom or 0 , ~ oo,nlClnl:. 3. '" how " Ch,ltgtl,\blu to n,leh Frdt',al !:nctlon, DAto 001.10 ~~ I Oz.J_( Zlt1.'1UV OI;S'!' 'N r l:NGINUJI - II