File No. 6.251-10
REQU..-,T FOR COUNCIL AC':JoN
--.,"
-
L,.:
Public Works/Engineering
November 21, 1985
Approval of Change
Subject:Contract with Mark
Facilities for New
Per Plan No. 6464
Order No. Eight
Cox Electric --
Central Library,
ROGER G. HARDGRAVE, Director
. From:
Date:
Synopsis of Previous Council action:
07/11/84 -- Resolution No. 84-248 adopted, awarding a contract to Mark
Cox Electric, Inc., and approving Change Order No. One, to
reduce the contract price by $126,524.00.
02/04/85 -- Change Order No. Two approved to authorize the Contract to
provide TV outlets, additional phone jack, deleted fixtures
in the skyl i ght, revised ceil i ng and securi ty wi ri ng at an
increase of $5,444.91 in the contract price, from
$495,798.00 to $501,242.91.
(continued page 2)
Recommended moti.on:
c
That Change Order No. Eight to the contract with Mark Cox Electric,
Inc., for construction of electrical facilities for the New Central
Library, in accordance with Plan No. 6464, be approved to authorize the
Contractor to rewire the chiller control panels to be in conformance
wi th the manufacturers recommendations and the Engineer's directives at
a net increase in contract price of $240.54, from $503,100.78 to
$503,341.32.
cc: John Hatzer Jr.. City Administrator
~~~-
Contact person: ROCler G. Hardqrave
Supporting data attached: Staff Report & C.C.O. No.8
Phone:
5025
1
Ward:
FUNDING REQUIREMENTS:
Amount: $240.54
Source: Bonds sold by RDA and Grant
throuClh State Librarian.
Finance:
eCil Notas:
1
75-0262
Agenda Item No/~
c
c
c
--
'C,.
J
o
o
Synopsis of Previous Council Action - continued from page 1)
Approval of Change Order No. Eight -- Contract with Mark Cox Electric --
Facilities for New Central Library, per Plan No. 6464
11/21/85
03/18/85 -- Change Order No. Three approved to authorize the Contractor
to delete TV outlets, added in C.C.O. No. Two, revised
existing lights, revised first floor lighting and power;
and added two low voltage relays, at a total decrease of
$175.62 in contract price from $501,242.91 to $501,067.29.
05/13/85 -- Change Order No. Five approved to authorize the contractor
to add a 2" conduit for irrigation sprinkler control wires,
at an increase in the contract price of $367.81 from
$501,067.29 to $501,435.10.
11/04/85 -- Change Order No. Six on Alenda approved to authorize the
Contractor to relocate temporary power; provide additional
wiring for elevator control; and relocate three thermostats,
at an increase in contract price of $661.75, from
$501,435.10 to $502,096.85.
11/04/85 -- Change Order No. Seven approved to authorize the Contractor
to install Halo Model #1176 track lights in place of Halo
Model #733-P track lights, at an increase in the contract
price of $1,003.93, from $502,096.85 to $503,100.78.
2
-
Ci~OF SAN BERNARDICO - REQUIOT FOR COUNCIL AC-:ON
/",.1."
\
~bH'"
c
c
75-0264
STAFF REPORT
Change Order No. Eight directs the Contractor to rewire the
chiller control panels to provide for a constant source of
power for the operation of compressor sump heaters and various
cycling actions of the chillers.
A copy of the memorandum from Bill Doran, Construction Manager,
dated November 20, 1985, is attached. In this memorandum, Mr.
Doran describes the work, and recommends that Change Order No.
Eight be approved.
We concur with the recommendation by Mr. Doran that this Change
Order be approved.
The Budget vs. Bid Analysis dated 12-6-84, showed an amount of
$6,138.00 for change orders in process and $5,000.00 for
estimated future change order costs. The net additional cost
for Change Order Nos. 2, 3, 5, 6 & 7 is $7,302.78. Change
Order No.4 was for no cost. Therefore, approval of Change
Order No. Eight will not invalidate the financial report dated
12-6-84.
3
-.~
c
c
c
--
'0
o
:)
. JDDI
10. DIFFENBAUGH, INC.
CONSTRUCTION MANAGERS
2375 Chicago Avenue, Riverside, Californi:l __ 92507
,.oJ
. (714) 684-2820
MEMORANDUM
DATE: November 20, 1985
TO: Mr~ Roger Hardgrave
City of San Bernardino
FROM: Bill Doran
SUBJECT: San Bernardino Central Library
Bid Package II 10 - Electrical
Change Order 118
Attached is subject change order.
The reasons for and explanation of this change is as follows:
File II
Description
RFQ 23
This compensates the contractor for costs incurred in the
rewiring bf the chiller control panels to provide for a constant
source of power for the operation of compressor sump heaters
and various cycling actions of the chiller.
This change was necessary in order- to provide for the proper
installation of the chiller, and was in addition to the basic wiring
shown on the plans.
We have reviewed the itemized costs associated with this item. and have found
them to be acceptable.
We recommend that you approve this change order .
cc:
Bill Post
Ole Hamblin
-Steve Whitney
Oscar Arnoni
Dan Flanigan
Don Rogers
Ledge
File
...... -......
...
-
)'. . -.1'.'1. .]1.
'it I
t;: It
I ., I
,. .....,.
CONSiRUCTION ~AGER'S 0
CHANGE ORDER
:)
CONTRACT for San Bernardino Central Library
Bid Package #10 - Electrical
TO: The Mark Cox Electric Inc.
I
DATE: September 25, 1985
CHANGE ORDER NO. 8
CONTRACT NO. 6464
160 North Rancho Avenue
San Bernardino. California 92410
Except .. modifi.d, .n t.rm. .nd condition. of the contr.ct rem.in unch.ng.d. Provide .11 I.bor, .quipm.nt
.nd m.t.ri.1 nec....ry to incorpor.t. into the Contr.d the fonowing ch.ng.s:
Description
Amount
File #
RFQ 23
Compensate Contractor for costs incurred In the
re-wiring of the chiller control panel to be in
conformance with the manufacturers recommendations.
and JDD directive.
ADD
$240.54
c
-
Accepted by
Contr.dor
! ~([::~ CO~
,...
. ,f
i/~?{) 6'>
c...
Recommend.d
by the Architect .
Recommended by
Construction M.n.ger
Approved by
Own.r
o
TItIe/' .-
.IJ\" -f-'./ \-
I .-
. I 1', f~' _ .J
0...
.
I
,....
/ . - r-
D_'. / "';'C -;.j,:>
Author.... $lgn.ture
T1tfo
-
INCREASE/DECREASE SCHEDULE TIME
Origin.1 Contr.ct ....
Prior Authoriz.d (X~ (OED) . .
T ot.1 Contr.ct Prior 10 this Chang.
Authorized Chang.. on this C.O.:
Addit~n . . $ 240.54
-u-
Deduction. . $
NET (Addition) (Deduction) ;
$ 621 322.00_
$ 119,221.22
$ 503.100. 78
The cumulativ. tot.1 of C.O:., including this on.,
. 1 Q ., under.. I .
IS 70>>~ or191n. contract price..
c
. . $.
240.54
BY
DAYS
Amount of Contract Auth.,..ized
induding this Ch.nge 8
Order No.
.' . $ 503,341.32
,....IM
.
.c
c
c
>
'"
~
...
-....
.......
=> '"
.......
~.....t'l ,.,
~c:~~
zc.n- ~
...e '"
u,....~..
........,
i",i~
->~...
e u...
IX~Os..
:I~ e
eig ~
...... '"
..
.c
u
~
..
..
...
'"
~
..
..
"',.
e
-,
'"
--
..~
'"
..'"
0:"
:o.c
eJ~
..
...
0:
&
<
.. -:~
..,.
"'0
0:"
_,,0.
....c 0.
_u...
-
o
(;;....0',... I =C;O~~-!CC;:;U)
......""... "'''''''...''' "'...'"
":."":.~~O~",:<<J"':"".. .~~"":
MON'-lID" \DO&nO-CD
_N;::;ID N- "";:N-:_
;;;
------
o
')
-~
'"
'"
'"
~..i
-...e
""
-
..
..
...
:0
-.;
0:
-
-
..
H~
-..
-.. 0.
N..
-...
c:u.,"lItO I 0\0 0 O\;i;"'" 1\0,....
"""''''''' "'..."'... ... N'"
N....&nO\OCl),...cg,... O\OCDCO
..~,;.~ I i'ioan,.).n I."'V:;
O\~~~ _,....f;;~2:gg}
...
.
-
!H
f8
""
...
...
~
'"
'"
...
-
'"
N
;;;
i
'"
~
~
in
'"
~
""
~
~~ ~
0:
0
'" .~
..
0 U 0:
.. 0
.. .. .~
.. e ..
j .. u ,.,
.. 0. - .. U
0. .. .. .. .. ... 0:
.. .. .... .. ... "'0 L.... -..
.. ~ :lot....&: OlO .... c: L. 0 0 ..'"
IlL ... L. :::J Ole..., .......IlL....::s ..'" V>
.... L. c~._.... III ""1 L. 0_ ....
., III U 0 tft_ >u... ell CII.. .. .. < ..
C .....c'^......=...c. .........., .00: ... ..
_ +' OI.I..:M:- -!: --.... c.... :00 !: '; It
"UI'IU "'~L&J ......1lLLt.._cn V>U
:0 .~
... ..
u ..
... ... '"
...
u~ II II '"
.~ .. C)-N~"CI' -
"'0. -NM..&n\O....COo\_____ .. .. '"
-:~
..,.
"0
"'..
-... 0.
_:00.
-......
...... ..... ..
OM_ I 10\ I I -J!- ;;0,....
C"')Q)tf') ,... N OOM
~"":....oo~oo~ _~~"!~
11')\0,.... I I.... I I \DClONII\O
-IQ ---co
- -
...
....".. ...............,.
gggJO'i~g:ef:::tgo~g
~~"':~o"":."":.~"':~'"':.~~~
O\!lNMIM~OO\NMII)&nM
CD..:2~ O\_""~~O\-:eg;
...
;~:;;~Iggg~~..g:!~
~"!.~~o~~~~":~~"':~
Q&nr.nCDIO.O........M,...M"lt
"'i:i:::l "'!2"'~~~ ~<e
...
;~~:O'~2g:g~gg~$
N",.tHDON\DOO'o\QOON \D
0";":.0,.0';0.0..";0";.0
"''''",N "''''...''''''..._'''...
"'IIlI'M - Nt") -N
...
c
c
.c
.
i
...
o
..
:I
..
...
CD
'"
o
z..
:::>...
...c:
..
...'"
oc
!
...
o
~
...
u
...
:z:
...
...
o
'" .
>-z"'
"OCD
C...",
.....-
!!liS
.......'"
....
.........
...... L
"'C"
U "
ii
c....
"'....
...0
u
....
:::>'"
o
'"
~
'"
'"
c
...
z
'"
E
...
S
'"
~
o
...
..
l"l
s:
N
lJl
~
......
0"
..
....
......
..
.....
...c:
eo
...'"
l"l
n
z-
~
: ; ~
~
...
c:
.."
.....
'"
c:c:
_0
c:.~
L...
.....
"'''
L
......
C:..
U
...u
..
..
>
c:
...
...
c:
I!
'"
..
...
..
...
'"
o
..
...
c:
"
...
....
o
..
...
L
"
o
..
'OJ
...
o
...
-0"'''''''1
ano ('1')0\ N
OONU')\D
........ ..
i~::l~3
,....NM_
~
~-
S(:;;~~ 1
II)NN_ I I
..;..;..;.o'f
"NID_
_Nt""lM
~
..
...
U L
f ~
..~ ro
"'c: c:
... 0 i
~~ c::
_ 0 0 UI '"
Q:z..,~;;lU
QuuUICLCl.'-I
A.~lU=)()(C
)l(a.....,I.",1.I.I1O
.... ...... +' ..
III.c fII ~"a =
e g ~ g~ g ~
I-u.cuum.....
...
....
l
o
u
~
o
o
o
o
'"
...
'"
ooo~
000
000
"'",0
;?jl"l:;;
..
..
..L
-"
......
...~
-...
.~ c:
....
>0.
"'.
...
..
......
c:..
"...
......
~'i
..u
...
C:L
....
-...
......
CD'"
'"
...
..
:::>
...
~
... .."
)( lilt .. IJ'
...",c:..",
C:OE
Q........ ..
W.c:..>.lU
......,."...,
c.... U":I
EcOIo.a.
_ a.._.c E
I- :I lU.... 0
.,......a:.....u
...
'"
'"
...
....
...
~l
L.~
1
..
..
L
"
...
:;;
..c:
.....
c:o.
".
...'"
.....
-..
......
.!2
4~
>..
c...
_L
....
......
0....
...c
...
L
..
L
...
::;
.
.......,
.....,)
...
...
c:
~
c:
...
c:
o
u
....
o
..
...
c:
..
Oi
CD
..
.c
...
..
..
N
-
~
:::>
...
c:
I.
.;
.,.
...
L
..
...
"
t
u
...
c:
..
..
-
..
.~
L
..
...
i
'"
o
o
...
o