Loading...
HomeMy WebLinkAboutS01-Public Works , C1Tr OF SAN BERNARDI.~ File rlo. 1.0422 - REQUF~T FOR COUNCIL AC~ION From: Roger G. Hardgrave Oept: Public Works/Engineering Subject: Approval - Change Order NO. SIX -- Construction of Box Culvert at 40th Street & Third Avenue. per Plan No. 6503 -- E. L. YEAGER CONSTRUCTION CO. Oa~: 12-09-85 Synopsis of Previous Council action: 08-06-84 Plans approved and authorization granted to advertise for bids. 01-21-85 ___ Resolution No. 85-28 adopted authorizing execution of Program Suppl. No. 39. 06-03-85 --- Resolution adopted authorizing execution of Consent to Common Use Agreement with the County. 06-17-85 Resolution adopted awarding a contract to E. L. Yeager Construction Co. for the low bid price of $558.661.25. 09-23-85 Change Order No. One approved to authorize the Contractor to delete Bid Item No. 17, Deck Seal of the contract at a reduction in contract price of $13,650, from $558,661.25 to $545,011.25. 11-04-85 -__ Change Order No. Two approved to authorize the reduction of Bid Item (Cant. on 2nd Pace) Recommended motion: That Change Order No. Six to the contract with E. L. Yeager Construction Company, Inc., for the construction of a Box Culvert at Fortieth Street and Devil Creek Channel. in accordance with Plan No. 6503; be approved; to authorize the Contractor to install ~uide markers and to extend guard railing on a time and materials basis, at an in- crease in contract price not to exceed $1,200.00, from $533,315.43 to $534,515.43. cc: John Matzer. Jr.. City Administrator Warren Knudson, Oir. of Finance (A~~~ Signatu re -- Phone: 5125 Ward: 5 Sou rce: Street Construction Fund Dr. /J t! /t: A Finance: , Contact person: Roger Hardgrave Supporting data attached: Sta ff Report FUNOING REQUIREMENTS: Amount: $1200.00 Account No. 242-362-57316 - Box Culvert 40th E/o Kendall Council Notes: 7$-.0262 Agenda Item No. ~-f . CIT?,- OF SAN BERNARDI~O - REQUE!;T FOR COUNCIL ACTION STAFF REPORT Ouring construction, it was discovered that an unprotected space occurred between the wing wall and barrier wall below the height of the barrier wall at the four corners of the box culvert. These spaces are large enough for a child to pass and possibly fall into the channel. The Contractor will fabricate and install rail protection in these areas on a time and materials basis (Force Account), not to exceed $630.00. After placing the striping on 40th Street, it was discovered that the white stripe and arrows that indicate the narrowing of the two east- bound traffic lanes into one traffic lane was not sufficiently visible to east-bound traffic approaching the box culvert due to the hump (vertical curve) over the box cul vert. To correct thi s potent i a 1 problem, fl exi b 1 e guide markers will be needed that can be seen at a greater distance by approaching traffic, at a price not to exceed $570.00. As both of these changes are safety features, we recommend the approval of Change Order No. Six. The contract was awarded for the low bid price of $558,661.25. Change Order No.6 will increase the contract amount to $534,515.43. URGENCY CLAUSE: This project is nearing completion and it is essential that these necessary additional items of work be authorized as soon as possible. SYNOPSIS OF PREVIOUS COUNCIL ACTION Cont.: No.7 and 26 (removal and reconstruction of wire rail revetment) 400 L.F., at a net decrease in contract price of $15,400, from $545,011.25 to $529,611.25. 11-04-85 Change Order No. Three approved to authorize the Contractor to increase the barrier wall in width 4 inches, from 8 to 12 inches on both ends of the box culvert at an increase of $476.00, from $529,611.25 to $530,087.25. 12-02-85 -- Change Order Four approved to authorize the Contractor to replace unsuitable material within the structure limits with suitable backfill at a net increase in the contract price of $2,278.18, from $530,087.25 to $532,365.43. 12-02-.85 -- Change Order No. Five approved to authorize the Contractor to extend the northeast wing wall vertically approximately one foot in height at an increase in the contract price not to exceed $950, from $532,365.43, to $533,315.43. 75-0Z64 .1r,,:n). ^omcy . v.!:~r""""11 ,0. OK~!)t CS.74~ /> CITY OF SAN BERNARDINO .. I . o DAYE: FILE: 12-16-85 1. 0422 -- "..) TO: Dan 'Stathu}'1a fOO.t. Wlll iam J. Post . Contin!lcncy OalanCll (Inc This Change)' C:CNo6 Rev No. _ Sup No $ S 1,200.00 INCR. 9EGa", THIS CHANGE ORDER PROVIDES FOR Fabricate and install guard railing between the wing wall and barrier wall below the top of the barrier wall at the four corners of the box. Culvert. An unprotected space large enough for a child to pass was not provided for by the plans. In order to provide protection in these areas, the Contractor must fabricate and install railing. This work will be done at force account not to exceed $630.00. The change order alsq provides for furnishing and placing eight Class I flexible type F guide markers, along the white stripe that merges traffic from two to one traffic lane. A vertical curve over the box' culvert precludes passenger cars from seeing the white stripe. This work will be done at force account not to exceed $570.00. ceo DISC.USSED WITH: ESTIMATE OF COST 'I1C..ovt:;tnction (nainecr . 2: Sr~SC Engineer ~ ftM'" Ilep. Dan Stachura THIS CCO TOTAL TO DATE Namo s( 24,061.82) $ .$ $ S( 24,061.82) YES X NO lIems S Forco Account S . Agreed PI leo $ AdJu!:olmcnl $ 1'01.>1 $. 1 ,nn nn Narna N:uno 1.200.00 M. !'rlor ^rrfOv.1 ny; k~. bsuo t.. Al1llrc;vu (ly: . D__Io 0..10 ~ Feder.,' St'9rc9.,tltMl: . Fedo..,' No. FAU ~1~R070( 1) 86.22 0/, ." .' $.noI. runds ",ovldl'd S ...('I[S: 1. Uu';e,lbn WI..". ~nlY. III'W" t.. 1~.'"i\lfI llr." 1:..1",,:.1<<'111'1 n, Un'"tn",uts ~: tlKtIN .... (:1t;"O~,.'bfll 10 .:.l(,h "';111:'", :iC"c~tlnnl 'A AI-..IJ....,.. .........1.._ . t." ,.,.,.... A.... .~ f,a.::m)LNJ 1.:NlflNi:uc .. " 0 '" 0 z ~ - Cl U 0:: :; <C .. z: 2. :0 .. 0:: .. UJ 0 CJ .. Z Z w <C ~ V') '" .... := 0 u " >- f- - U ',_u__.~ 'c ROAD___-1ia.lLCllllLert_aU.Qth Str;flet and ~il s Cree~ Chlillllel flDtRAl f:lO.(Sl- FAU M-4Q70( 1 ) 1"".,/ .' /' E. L. Yeager Construction Company, Inc. 10_________.__________.___4__..._..__________.._ _______. . . en,,1,",," Yo,", t.t. I,.,...t.y dlr.d.d ,>) tIlUS.. the h....ln d.lnlb.d d'lCmcn ho", ,f... "'ur,, c,"d spoclflcntiottt or do Ih.. follo;in9 d."~lh;:r;;;;k-;;OIj;;;i~~~d'I~.'IIo-'-I,I,"1) un IpKlliutlion, 0" thl. co",,.a~t. NOn. 'hi. th..nn. ord., I, ""~.!:!~'!~~~~~.J:'.'CrV"cJ L., th.. Gi ~~qinfl.r.__ _.._____ D"I\~,ipli"n [If ""0'11. ,(,.LI> d""", cll;m~I'" of q'lcmt:!:cl, ~Irl-J I"ic'" to I", ",,,;.1. ~";.lrl'!lal., I,........"" flde,alm",1 ....,..,Ie (01 (OIl"g[1 pr;.". .,'1,....., 1','":- ....., ,..,.., O<.lo~'I)I. U.,feH olh",wll. 'Iu'.,...., Hiles fo, rcn!~1 of C't""plIl.n' '''Vl'r (1M11' MJch lirn. .., ".,,,iloln'..,,, I, nctUl1l1y "...1 ~....I 1101111"""'\11'1'" \"11I I... ,""tf.. f", I.!I.. tin'.. C.l'''''1I. ,equ.ul.d by l!11t 1\1,t p.ru"'OQ. ,hown i, Ihe n.' QCun""lvl.,J incr~,. CoI' d"tte:n. hom Ih. cw!pin",l qUClnlhy In 'h.. bt",lll""'" htlmu'.. SIIEu-L_or_ ~1.___SIIEEl \ _" 65QL-____~---. CONTRACT NO Resident Engineer 1. Fabricate and install guard railing between the wing wall and barrier wall below the top of the barrier wall, at the four corners of the box culvert. Adjustment of compensation will be done at Force Account at an esti- mated cost of $630.00. Furnish and place eight class I flexible type F guide markers along white stripe that directs east-bound lane on 40th Street to merge into one lane as directed by the Engineer. Adjustment of compensation will be done at Force Account at an estimated cost of $570.00. f,timof.d Co,t .,1_.. $ 1,200.00 Decrea,. $ . 8y ,e-ason 0' 'hi. order the lim. of complelion will bfl odju,'"d 0' f"lIow,: NONE $"bmithod bYl Will iam ,J Post "".. " Approved, ci ty bSJille.t by ROQer G~_lJMd-9.J:.il.Y.~ ..Oate_ w~. Ihllt "ndt'U;\Inotd to"troclor. hnvo olvlt" t"rt'f"r (:,,,,hlololio,, '0 tit" t"unge prolx>"..d D"d I,"r..t.y onr.., If flail '''('()(I.olls ('I>,.rnvtl,l. lho' w" wlII/"l'Ivl',; 011 eq"uipllllm', f"r"hl, 011 "~(,,,.,l(lls. l'IHellt (I' ruu, olhuwll. L. nOI.d ut..ov.. c"d I-'orforn\ ull ..rviul nlluunl'J' for "th. work "h.;Jvlt .p.dlll"'. ~...d .....11 OCUI ulo ',,11 poym.llt Ih.r.for Ih. prkol shown above. , Accepted, 001. Con'ractOf' lIy." 1111.. If thf. Conlrof'tor tlOtl, not ,Ion ncc",,'nnt. of ,"" (Ill''''. 111. aflonlloo h ulroltd.d loth. 'flqulr.nlt.,." of the .p.dllcutlon. o. to pror..dh,. whl, 1'1. ard.r.'" wo,k (lnJ filing (.I ....,rlll.n 1',0t..1 within th. tin.. 111.,.ln "~tlfl.d.