, CI'IO OF SAN BERNARDO - REQUQT FOR COUNCIL A~ON
. From: Roger G. Hardgrave
--
~: Public Works/Engineering
Date: 12-09-85
Subject: Approval and Acceptance of l~ork --
Construction of Interior for NEW
CENTRAL LIBRARY, per Plan No. 6467
--BERRY CONSTRUCTION
Synopsis of Previous Council action:
02-04-85
-- Plans approved and authorization sranted to advertise for bids.
Report of bids received and Desion Development Team directed to present
a contract for at least $lTo"O<OO less than the low bid price of $1,785,328,
Resolution No. 84-417 adopted awarding a contract and approving deductive
Change Order No, One for a decrease of $181,351 in the low bid price from
$1,785,328 to $1,603,977.
Change Order No. Two approved authorizing work to correct various items
of work at a net increase in the contract price of $6,212 from $1,603,977
to $1,610,189.
03-07-85 -- Change Order No, Three approved authorizing deletion cf various items of
(Continued on 2nd Page)
08-06-84
10-01-84
10-15-85
Recommended motion:
c
That the work performed by the Contractor, in accordance with
Specification No. 6467 be approved and accepted; and that final
payment be authorized at the expiration of the lien period.
cc:
John Matzer, Jr., City Administrator
Wayne Overstreet, Public Blds. Supt.
Oftr~~
Signature
Contact person:
ROQer HardQrave
Phone:
5025
1
Supporting lIata attached: Sta ff Report
Ward:
FUNOING REQUIREMENTS:
Amount:
N/A
Source:
Finance:
ceil Notes:
75.0262
Agenda Item No \Z-- /&'
-
. CIO OF SAN BERNARDIC)o - REQUOT FOR COUNCIL Ac;)ON
c
STAFF REPORT
All work under the contract was satisfactorily completed as of
12-06-85.
The contract was awarded to 8erry Construction Company for the
low bid price of $1,603,977.00 (including deductive Change Order No. One
in the amount of $181,351.00. Change Orders Two through Seven authorized
a net increase in the contract price of $748.89, from $1,603,977.00 to
$1,604,725.89, which is slso the, actual final contract price.
A copy of the letter from the Architect, dated 11-06-85, is
attached for reference. This letter certifies that all work is 100%
complete.
We concur with the Architect's recommendation that the work be
approved and accepted, and that final payment be authorized at the end of
the lien period.
URGENCY CLAUSE
Since the work has been completed, it is necessary that the project be
approved and accepted as soon as possible, in order that final payment can
be made in a timely manner.
c
SYNOPSIS OF PREVIOUS COUNCIL ACTION Cont:
c
work and to correct problems with the plans at a net decrease in
the contract price of $6,838.93, from $1,610,189 to $1,603,350.07.
05-30-85 -- Change Order No. Four approved authorizing deletion of various
items of work and to correct problems with the plans, at a net
decrease in the contract price of $4,615.53, from $1,603,350.07
to $1,598.734.54.
08-05-85 -- Change Order No. Five approved authorizing deletion of various
items of work and to correct problems with the plans, at a net
decrease in the contract price of $2,252.64, from $1,598,734.54
to $1,596,481.90.
09-23-85 -- Change Order No. Six approved authorizing the Contractor to remove
a portion of the 3 decks (incorrectly installed by the concrete
contractor), and install a fiberglass membrane, at a net increase
in the contract price of $6,071.57 from $1,596,481.90 to $1,602,553.47.
11=04-85 -- Change Order No. Seven approved authorizing protection of drywall
work, replacement of accordian door, removal of debris, installation
of access hatch in restrooms and approval of a credit for substitu-
tion of skylight beam, at a net increase in the contract price of
$2,172.42, from $1,602,553,47 to $1,604,725.89.
75-0264
c
c
c
Li _
c
..
/
o
o
~
November 6, 1985
City of San Bernardino
Public Works/Engineering
300 North "0" Street, 4th Floor
San Bernardino, California 92418
Attention: William J~-SeniOr Field Engineer
Re: Central Library
Dear Mr. Post:
This letter is to certify that Bid Pack t 5,6,7,8,10,11
and 13 are 100% complete.
& ASSOCIATES
car A. Arnoni AI
roject Architect
cc: Bill Doran
J.D. Diffenbaugh
GREGORY VILLANUEVA
ARCHITaCTURE
A.I.A. &. ASBOCIA"ES
PLANNING
"DD '''VINE AV... ..UI,.. _,
".W~D"T ..ACH. CA. ......
.""'1 ..1......