Loading...
HomeMy WebLinkAbout31-Public Works . c 0 Qe No. 1.0422 hI~' CITY OF SAN BERNARDINO - REQUEST FOR COUNCIi:' ACTION From: Roger G. Hardgrave ftEC'D.-ADHIH. AIl:lject: Publ ic Works/Engineering \S85 !lO',! 2 \ HI 2: S 1 Approval - Change Order No. Four Construction of Box Culvert at 40th Street & Third Avenue, per Plan No. 6503 - E. L. Yeager Construction Co. Dept: Date: 11-21-85 Synopsis of Previous Council action: 08-06-84 Plans approved and authorization granted to advertise for bids. 01-21-85 Resolution No. 85-28 adopted authorizing execution of Program Supple- ment No. 39. 06-03-85 Resolution adopted authorizing execution of Consent to Common Use Agreement with the County. Resolution adopted awarding a contract to E.L. Yeager Construction Co. for the low bid price of $558,661.25. Change Order No. One approved to authorize the Contractor to delete Bid Item No. 17, Deck Seal of the contract at a reduction in contract price of $13,650 from $558,661.25 to $545,011.25. (Cont. on 2nd Page) 06-17-85 09-23-85 Recommended motion: That Change Order No. Four to the contract with E. L. Yeager Construction Company, Inc., for the construction of a Box Culvert at Fortieth Street and Devil Creek Channel, in accordance with Plan No. 6503, be approved; to authorize the Contractor to replace unsuitable material within the structure limits with suitable backfill, on a time and materials basis, at a net increase in the contract price of $2,278.18, from $530,087.25 to $532,355.43. cc: John Matzer, Jr., City Administrator \,arren Knudson, Director of Finance ~~~~~ Signature Contact person: Gene Klatt Phone: Supporting data attached: Staff Report Ward: 5125 5 FUNDING REQUIREMENTS: Amount: $2,278.18 Source: E/O Kenda 11 Dr. Account No, 242-362-57316--Box Culvert - 40th St./ Finance: Street Construction Fund /Je- e r--- Council Notes: 75-0262 Agenda Item No. ~ /. - - - . c C CITY OF SAN BBRNARDINO ,,, -....,; STAFF REPORT During construction approximately 800 cubic yards of unsuitable material (Broken Concrete) was discovered within the limits of the structure. The mat.erial of this area was to be used as structural backfill, after it had been excavated. Material was lrought in from an approved borrow site near the construction site on a time and materials basis (Force Account) at a net increase of $2,278.18. This increased the contract from $530,087.25 to $532,365.43. ~Ie recommend that C.C.O. No.4 be approved. SYNOPSIS OF PREVIOUS COUNCIL ACTION (Cont.) 11-04-85 -- Change Order No. Two approved to authorize the reduction of Bid Item 7 and 26 (removal and reconstruction of wire rail revetment) 400 L.F. at a net decrease in contract price of $15,400 from $545,011.25 to $529,611.25. 11-04-85 -- Change Order No. Three approved to authorize the Contractor to increase the barrier wall in width 4 inches, from 8 to 12 inches on both ends of the box culvert at an increase of $476.00, from $529,611.25 to $530,087.25. 75.0264 TO: F~' ~I;o Diln Statura William J. Post . Rcy No _ Sup No s 2,278.18 INCA. DECA. ConlinDcney Oalaneo (Ine This Changel $ 67,340.57 'THlS CHANGE ORDER PROVIDES FOR an approved borrow site at Force replacing unsuitable.material with material ~rom Account. During construction, approximately 800 cubic yards of broken concrete were removed within the limits of the structure. An approved borrow site was selected in a Flood Control Basin near the construction site, and structural backfill was replaced at Force Account. Force Account Cost was $2~278.18. . ceo DISCUSSED WITH: t: r~:fl;'tion engineer ~ s. ~>;c Engineer ~ n~.'i" He,... Dan Statura NO YES N..mo f~arno N;uno " M. f'rlor ^NlC'Ov;\1 fly: N.C. b$UO t. AflflfC;YU fly: 0."0 0,,10 s..o,..:. r'lt,-h I',()vhkd $ "Q~rs: 1. IhJ'icflhO WI,,'I. ~'hy. Illlw"' ? (:'1(111,,1111 11m [klnn:i1tlll'l {If I)ofnfllll.luls 3: thl'w "., Ch;tt{lu."\blll tu t:.lth ".;t!'!f;\' ::;(',~t1on. ..... .........1)....1.. .......1..... . t.. rAA" A,... . ESTIMATE OF COST 'THIS CCO TOTAL TO DATE Items $ $ (26,211.82) Force Account $ 2.278 18 $ ^greed Prleo $ S Mlu,l"",nl S $ Tol,l $ 2,278.18 $ (26,211.82) ftdC"f.,' $('!JfC9:ltl~': Fodor.,. No. .,(, '10 ,,(, IU'::,;Il~LNT I.'tH.i1NI:Lll