Loading...
HomeMy WebLinkAbout29-Public Works - -- . C C FQ No. 1.0471 ",fry :) CITY OF SAN BERNARDIN~,..~ .REQUEST FOR COuNCIL ACTION From: Roger G. Hardgrave ftEC'D':- At>>tllt~Pjrlpt: Isa) NOV 21 n 2: S2 Approval of Contract Change Order No. ELEVEN --Construction of New Tippecanoe Avenue Bridge Over Santa Ana River, per Plan No. 6358 ---KASLER CORPORATION Dept: Publ ic Works/Engineering Date: November 21, 1985 Synopsis of Previous Council action: 08-06-84 Plans approved and authorization granted to advertise for bids. 01-21-85 -- Resolution 85-20 adopted, awarding a contract to Kasler Corpora- tion for construction of the Tippecanoe Avenue Bridge over the Santa Ana River, for the low bid price of $4,283,034.00. 10-07-85 -- Change Order No. One approved to authorize payment for removing and replacing material which prevented piles being driven at north abutment of the bridge at an increase in contract price of $9,701.00, from $4,283,034.00 to $4,292,735.00. 10-07-85 -- Change Order No. Two approved to authorize payment for construction and maintaining a detour through the construction area, at an increase (Continued on 2nd Page) Recommended motion: That Change Order No. Eleven to the contract with Kasler Corporation, for construction of the new Tippecanoe Avenue Bridge, in accordance with Plan No. 6358, be approved; to authorize the Contractor to excavate unsuitable material to maximum depth of four feet, dispose of this material and backfill with suitable material on a "time and materials" basis (Force Account) at an esti- mated increase in contract cost of $4,000.00, from $4,310,265.00 to $4,314,265.00. cc: John Matzer, Jr., City Administrator Warren Knudson, Director of Finance (JZt, /:~ Signature ~ Contact person: Roger G. Hardgrave Staff Report Phone: 5025 Supporting data attached: Ward: 1 FUNDING REQUIREMENTS: Account No. 242-362-57339 Amount: $4,000.00 Source: Street Construction Fund "Tippecanoe Bridge AF-AD-60(l) Finance: OfIL t:" /c -r. , Council Notes: 75-0262 Agenda Item No.L'/. - CI1<; OF SAN BERNARDIQ) - REQUEOr FOR COUNCIL ACo,N STAFF REPORT During construction, unsuitable material was discovered below the new structural section on Tippecanoe Avenue. This material was found to a depth of four feet below the finish surface. In order to comply with the Standard Specification, the material below the structural section must have an "R" value of 70, or greater. A sample of the unsuitable material to be excavated indicated an "R" value of 48 and a sand equiva- lent of 4. Compensation for this Change Order will be on a "time and materials" basis (Force Account). The estimated increase in contract cost is $4,000.00. We recommend that Change Order No. El even be approved. SYNOPSIS OF PREVIOUS COUNCIL ACTION (Cont.) in contract price of $10,700.00, from $4,292,735.00 to $4,303,435.00. 10-07-85 -- Change Order No. Seven approved to authorize payment for changing the type of material to be used in the construction of an apron at a culvert from asphalt to Portland cement concrete, at an increase in the contract price of $290.00, from $4,303,435.00 to $4,303,725.00. 11-04-85 -- Change Order No. Eight approved to authorize the installa- tion of a 4-inch PVC conduit with pull rope at a net increase in contract price of $1,200.00 from $4,303,725.00 to $4,304,925.00. 11-18-85 -- Change Order No. Nine approved to authorize funds to compen- sate the Contractor for "on-the-job" training of six trainees, at an increase in contract price not to exceed $4,800.00, from $4,304,925.00 to $4,309,725.00. 12-02-85 -- Change Order No. Ten on the agenda to authorize the Contractor to construct a cross gutter on the north side of San Bernardino Avenue at Riverview Drive at an increase in contract price of $540.00, from $4,309,725.00 to $4,310,265.00. 75-0264 - -.. .1J;,C ^c,cncy V!::;Zmllllll ,~ Citt'C.)f IS. 74~ City of Siln BernarO- TO: Dan Stachura F'O.l . Carl J. Verner . ~I.o 11 Rcy No- Sup No s 4,000.00 INCA. DECR. nfiS CHANGE ORDER PROVIDES FOR .'""'\ '-' :J l>A T[!: fiLE: November 20, 1985 1. 0471 Contin!Jcncy Oal~nco lIne This Changcl $ 392,475.00 Removal of unsuitable material below plan structural section on Tippecanoe Avenue between station 10 + 52 and 12+ to a depth of four feet below finish surface, dispose of the material, and-backfill with material having R value in excess of 70. A sample of the native material in this area gave an R value of 48 and an S. E. of 4. . There will be no change in the plan structural section of 4" A.C. over 8" aggrega te ba se. Compensation will be at force account. 1800 C.Y. in the estimated volume of removal. CHJ Laboratory concurs with. this proposal. ceo DISCUSSED WITH: 1;C'.."lt"'l$l",='ion Engineer, ~ &-~~ engineer ~ f!,','( A. Ocp. YES NO 'bOll) Narna N.ln'\O t\se.. Jl,<< ^rrrov:l1 nV: ttQ.. bsua r~ AJlprC;YII Bv: 0.\10 00\10 ~. rUN, ",ovl,!l-d $ t..('ll(S: 1. Ul";c:dhn \'JI",t. Why. II"......' Po [Il,I',l'"1 tml t:klllll:d(lll" elt nOhHntc.lfll:l 3: [,'I()W .... (:h,ulIU.)bltl 10 I~.l(;h ,..;111:,.11 ~('c.llon. 'A ...11..........'1... 1'.....1..... " t.. (......... A.... ESTlM^"E OF COST THIS ceo TOTAL TO D^ TE Items $ $ 7,530.00 r~co Account $ 4,000 00 $ 12.500.00 Agreed Prlco $ .$ 11 ,201.00' /ldluolmcnl $ $ Toto' $ 4.000 00 $ 31.231.00 f~dcmt St'"gtC!1.lticHl: Fodc,O\( No, . AF-AO-6011 ) 95,21 II. '/, '. '1L::ltULN"t "'tJ\iINI.....H - c . CONlIlACT CIlANGORlJtR NO. 08-Sllclo-O-Sncl 11 o surrL. NO. :) SII(U ~or _..J__ slims ARM NO.IS) AF-AD-GoW ... CONIRACl I~O.. , oJ' 61')(1 KAliIJ<;R CQIlEQnflTION . To _",: . _____ Contln<'c,t You OfC hereby difedeeJ 10 mQ~e tho herein dt'\cribec.J chong'" f,om II.:: 1,llIns and spc(iltcotions or do .1._ following described WOII. hot indvded in the "lilli, and 'pec.flco- lions Con .hi. contract. "OU: Thi. (lion~f) (lfcfl)f is not .ffoctive until npfWovfld by It", rn'lin..,. Ol'K,iplion of wo,l.. ", L~ done. e~hnlqh' of (I,JQnlitie,. alld f'fi(f~\ 1<) be f'",joJ. ~NJr"'1nl~ l.etween oeMII;e",,,1 wOlk of COlltlflf.II',i((', oqr<<d price old loue account. Unle" otherwi\C \llJt~d. tuft:, for tenlal 01 equipment cover olOly ~u(l1lim~ 0\ equiplnOlI is octually us.cd alld 1\0 ollcwonce will he nlUJe for idle lime. (.hong. requested I,V eO, n Tin e e r tho '0)1 poruntago ~hown i$ tllft net aC(unltJloled increaWl or deere.'o$O Irom ,he original quantify in tho lnginccr', hlimote 1. Extra work at force 2.ccount: .On Tippecanoe Avenue between Sta.tions 10+52 and 12+ excavate unsuitable native material to a maximum depth of four feet below finish. surfe.ce, dispose of the unsui.tatrle material and backfill with material having an R value in excess of 70, all as directed by the Engineer, Estimated cost $4,000.00 ',' . btimoted Cost OetreaUl $ or Increo$c S 4.000.00 Ely r('O$on of thi$ order the timo of cC"mplclion will ~ Qdi\l~kd os 'ollows: adjustment l'/Z/ J. Verner, ReSl Ooho ) I ~ t ~ [/5 Sc"bmiUlldbyt nglneer Approvol Recommondlld, Ooho Appro....d, Engirt(ler by Oat. \V,. th, undo",o.>CIU (onr,u<.Ior, hc.... oi~e" (o<"lul c",,,,,.loml,on 10 Ih" ch{""Jn ~"op".....1 onJ Ilc:,..llr Cl<J'fC. ,'lhi, 11I0polOl" "l'p,c.W'd, 11'01_ w.ll wo~,de ClU"!U'I"lIent, IUlll"h 1l1llnllltl'lO!'. t.ccpt (II ",oy olh.'..,utl,. n",.d obo~, Clnd perfo,m ull ".....I(C'I M'(O\\UIY tv. Ih.e wotli. noo'fO '1"l:'C,I.cJ. (In.1 WIll u.:U'I.1 ol'lulll'ovn...nt'helelolllltl price, It.uwnub..we. Au.pl,d Oat. / /- t, - gs .. ~! &~~<etf II die COllhncl("l1 "",,,, ....~I lill" oce"I.IC"'(. 01110;1 o,d,r. hi5 ml...liun i, ducct..! fO If!., r.,,'"IOIIImOnl, 0111,. 'p.ulicu'KM' '" 10 "nK6ftd,,~ With 1110 oHf<lled wo,.. un" lil'''II'' wlill1ln prol." wilhlll tl>. f,m.th.l..ll u...~III.d, C(l"hCKI04' KASLEI~ CORPORAT10N 1;". ~~')~, ,f-4~ ~h,,<(J/~L