Loading...
HomeMy WebLinkAboutS04-Public Works Fil e No. 1. 0471 . elT'" OF SAN BERNARDI.~O - REQU~~T FOR COUNCIL AC"'ON From:ROGER G. HARDGRAVE, Director D Public Works/Engineering ept: 10-30-85 Date: Subject: Approval of Contract Change Order No. Nine -- Construction of New Tippecanoe Avenue Bridge Over Santa Ana River, per Plan No. 6358 -- KASLER CORPORATION Synopsis of Previous Council action: 08/06/84 Plans approved and authorization granted to advertise for bi d s. 01/21/85 -- Resolution 85-20 adopted, awarding a contract to Kasler Corporation for construction of the Tippecanoe Avenue Bridge over the Santa Ana River, for the low bid price of $4,283,034.00. . 10/07/85 -- Change Order No. One approved to authori ze payment for removing and replacing material which prevented piles being (over) Recommended motion: That Change Order No. Nine to the contract with Kasler Corporation, for construction of the new Tippecanoe Avenue Bridge, in accordance with Plan No. 6358, be approved; to authorize funds to compensate the contractor for "on-the-job" training of six trainees, at a cost not to exceed ($800.00 per trainee) at a net increase in the contract price of $4,800.00, from $4,304,925.00 to $4,309,725.00. cc: John Hatzer Jr., City Administrator Warren Knudson, Director of Finance ~ 4~V1 Signature '--- Contact person: Roger G. Hardgrave Phone: 5025 1 Supporting data attached: Staff Report FUNDING REQUIREMENTS: Amount:J4.800.00 Ward: Source: Street Construction Fund -- Account No. 242-362-57339 "Tippecanoe Bridge AF-AD-60(1lf'inance: /1/;; C? Jc~ ,. '---- Council Notes: 1 75-0:'02 , Agenda Item No, S~ " ~ \"....... ,-''''- ~,..., '- '-" ........' Synopsis of Previous Council Action: (continued) driven at north abutment of the contract price of $9,701.00 $4,292,735.00. 10/07/85 -- Change Order No. Two approved to authori ze payment for construction and maintaining a detour through the con s t rue t ion are a , a tan i n ere a s e i n con tor act p r ice 0 f $10,700.00 from $4,292,735.00 to $4,303,435.00. bridge at an increase in from $4,283,034.00 to 10/07/85 -- Change Order No. Seven approved to authorize payment for changing the type of material to be used in the construction of an apron at a culvert from asphalt to Portland cement concrete, at an incr-ease in the contract price of $290.00, from $4,303,435.00 to $4,303,725.00. 0 11/04/85 -- Change Order No. Eight on the agenda to authorize the installation of a 4-inch PVC conduit with pull rope at a net increase in contract price of $1,200.00 from $4,303,725.00 to $4,304,925.00. 2 ',CI?"V OF SAN BERNARDI~O - REQUFc;T FOR COUNCIL AC~.ION STAFF REPORT Section 6-2 "Federal Requirement Training", of the Special Provision, provides for reimbursement to the contractor for the hourly wage rate of $0.80 per hour, for on-the-job training for six trainees, not, to exceed 1,000 hours each. The total estimated project cost, based upon the actual low bid price, included an amount of $713,215.00 for contingencies, which can be used to finance the cost of this change order. . urgency Clause As the proj~c~ is in the construction phase, provlslons for payment must be made in a timely manner. 3 15..:0':04 .~ =-;c CITY OF SAN BERN/'HDlNO CONTRACT CHAN()llOER NO. 9 08~SBdo-O-SBd , SUPPL. NO. '....j - ROAD SUEET -L Of 1 SHEETS FEDERAL NO,(S) AF-AD-60(l) 6'318 _ CONTRACT NO, ~_. J' To KASLER CORPORATION Coot,odo, You ore hereby directed to make the herein doscribed chonge,; from the pions and spe<ificotions or do the following described work not included in the pions and spe<ifico- lions on this controd. NOTE: This chong_ ord.r is not effective until approved by the Engin",_ ~,iption of work to be done, estimate of quantities. and prices to be paid. Segregate between additional work at contract price, agreed price and force occount. Uoleu otherwise stated. ,otes for rental of equipment cover only w<h time os equipment is actually Vied and no allowance will be mode for idle lime. Chongoreques.edby En ineer The kDt percentOfile shown is the net accumulated increase or decrease from the original quantity in the Engineer', Estimate Provide funds for Federal Trainee program In accordance with the provisions of Section 6-2, "Federal requirement Training Special Provisions", reimburse the Contractor at the hourly rate of $0.80 for providing on-the-job training for 6 trainees. . Total payment for training each trainee shall not exceed $800.00. 'Estimate of_ cost ~4,800,oo . Esti~ Cost Decrease S I $ 4,800, 00 or ncreose Submlttoodl.y. .... nglneer /0-1- r'" , By reoson of thi, order the time of completion will be adjusted os follows; Approvol R",oll'lmended, .... Approved, EnginHr by .... We, tho vndeuionod confroctor. h~ve given (oleftJl comiderotion to Iho chOllQe plOpo~d ond hereby ooree, if Ihi, propou.1 it opprov<ed, thot _ will plovide all equipmenl, fun.i~ 011 mateffols, .uept 0\ moy otherwite be noied obove, ond pe:ffor~ all $ervice\ nee.uory tor the won. 000.." \P"<"ilicd, ond wdl occept 0'1 full payment therolor the prKe~ dlown olio..", ., c....,"".. KASLER CORPORATION' '"..~. :"t; If the Conll(l(l<,)r doli nol lion (lcuplonce 01 Ihil ord.., hil on.ntion II dire<.1ed to the requiremotlh of the Ipoc:ilication 0110 proc'eediog with tho oldared work and filing 0 written prote" within the time thfiOin lpecilied.