HomeMy WebLinkAboutS03-Public Works Fil e No.1. 0471 CITV OF SAN BERNARDl~O - REQUf'~T FOR COUNCIL AC"I'ION From: Roger G. Hardgrave Subject: Approva 1 of Contrac t Cha nge Ord er NO. EIGHT ---Construction of New Tippecanoe Avenue Bridge Over Santa Ana River, per Plan No. 6358 -- KASLER CORPORATION Dept: Public Harks/Engineering' Date: 10-31-85 Synopsis of Previous Council action: 08-06-84 Plans approved and authorization granted to advertise for bids. 01-21-85 Resolution 85-20 adopted, awarding a contract to Kasler Corpora- tion for construction of the Tippecanoe Avenue Bridge over the Santa Ana River, for the low bid ,price of $4,283,034.00. 10-07-85 Change Order No. One approved to authorize payment for removing and replacing material which prevented piles being driven at north abutment of the bridge, at an increase in contract price of $9,701.00 from $4,283,034.00 to $4,292,735.00 10-07-85 _n Change Order No . Two approved to authorize payment for con- structing and maintaining a detour through the construction area, at an increase in (t.2 d' ) con . on n page Recommended motion: That Change Order No. Eight to the contract with Kasl er Corporation, for construction of the new Tippecanoe Avenue Bridge, in accordance with Plan No. 6358, be approved; to authorize payment for installing a 4" P.V.C. conduit, with a 1/4" nylon pull rope, at the Gage Canal crossing, at a net increase in the contract price of $1,200.00, from $4,303,725.00 to $4,304,925.00. cc: John Matzer, Jr., City Admi ni strator Warren Knudson, Director,of Finance (J)-u, ~/~ , Signature Contact person: Roger G. Hardgrave Phone: 5025 Supporting data attached: Staff Report Ward: 1 FUNDING REQUIREMENTS: Account No. 242-362-57339 Amount: $1,200.00 Source: Street Construction Fund "T' B'd /AF-AD-60(l)" /.1 /? 1/. ./ lppecanoe rl ge Finance: 1/1/ .1- l._ .6 ~ Council Notes: 75.~:62 Agenda Item No, 5-3 CIT("" OF SAN BERNARD-C;<l - REQU~~T FOR COUtJCIL AC-.,ON STAFF REPORT c;' During construction, it was discovered that the contract did not provide provisions to compensate the Contractor for installing a four-inch P.V.C. conduit, with a 1/4 inch nylon pull rope that was shown on the plans. This item of work was shown on the plans, at the request of the City of Riverside, as a condition for granting the right to reconstruct Tippecanoe Avenue over the Gage Canal. We have reviewed the prices quoted by the Contractor and feel that they are fair and reasonabl e for the extra work involved. Therefore, we recommend that Change Order No. 8 be approved. Contract Change Orders No.3, 4, 5 and 6 are at no cost and do not adjust the contract price. ' . Th,e total estimated project cost, based upon the actual low bid price, included an amount of $713,215 for contingencies, which can be used to finance the cost of this change order. URGENCY CLAUSE This project is at a point in the construction that a delay would be directly related to th~ finish time. SYNOPSIS OF PREVIOUS COUNCIL ACTION (Cont.) contract price of $10,700.00, from $4,292,735.00 to $4,303,435.00. 10-07-85 --- Change Order No. Seven approved to authorize payment for changing the type of material to be used in the construction of an apron at a culvert, from asphalt to Portland cement concrete, at an increase in the contract price of $290.00, from $4,303,435.00 to $4,303,725.00. 7S.{l:64 'FGlRII'...-;..fJ "', .......' ..""'D CONTRACT CHANGE OHDrR " 08-SBdo-O-SBd NO. 8 SUPPL. NO. ~.. .,1' -...,I sltm -.l.- OF l' j sltms F1[){HAl NO,(S) AP-/lD-6o(J) , COt-/TRACT NO, 6158 T. K~,5Icl~R CORPQB.A'l'ION ("""0<10< . ......' You ore t'llH(~by dirK1ed to molo.e the horein deswhl~d chr.mges from tho plans and ipetificotioll1, or do the 'allowing deKribod work nol tndud~d in Ihe pions Dnd specifieo' 60fts on IIlis contract. "OlE: TI.i, thonqe ordor i, not .ffective unlil approved by the Enqineer. OetCripticm of work to L~ donr., eUimole of q\Junliliel, and pllCf':\ to ~ paid. S~grrootp. bP.twccn oddi,ioflol work at conlrocl price, agr,.~d price and force oc(ount. Unlen olht:f'W'ise sloted, rolos for rental of rquipmcnl (over only such lime os rquipment is oclually used ond no allowance will be mode for idle time. Chonge requested by i ~ i V8 r~:d de the Iosrpercenloge .shown is the not Q"umuloled increase or docroo\o from the originol quantily in the Engineer's blimole 1. Extra Work at Force Account: Furnish and install 4'" PVC conduit with in nylon pull rmpe at Gage C,anal Crossing shown on sheet 20 of the contract plans Estimated Cost $1, 200,00 . . . , Estimated Cost Decrease .s .rlner..oeS 1 ,200,00 8y r~osan of this order the time of completion will be adjusted os follows: $vbmitIed bYI No adjustment Z A-"tt..1/1L/ Carl J. Verner, Date Hesldent Englneer /0 -7-&7 Appfovol Recommended, Dol. Approwd, f~iMet by Date We, the ,.ndcu;gnod (oolrO(lor,l'O"'1II giv-on (Ofllllul c.<;:,..~"jIllHllioo IO.,hlll chnflQft p.apo,lII'tl and hl!(('hy nQret'l. il dill PIOI)()UI_1 i, (l""ro~d, thul wo will plo..ido all t'l"'I""(,I1I, I...,ni\h (Itlulnlolloh. ..nrl os "lay all.-orwilO be noled 000...... and pelloWI ull 1('I,-...i(('1 MC.OUOry 101 rile "'.'dlk ooove ,pt!(.lltld. oud ....111 OHlIpt as lull poymC'lIf Ihelelot tho PIKO.' ,howl1 "'00\"0. A,up',d,l>o', c...,...", KASLER CORPORATION a,~t lil~ A:i1d JL'TLL:~df:t. " Ifle C 0<; tOI dnol fI("lt ';Ull ou_phmc:. ollhi, o,der. his Ql1onlton 'I ditec..ed to ifnI ,.quiIOln<'lnh ol.ho Ipoc:.hc:o'ion 01 to plt'M N:'.I"'Q WIllI the O.dllflld W'Olt Gnd iii",,, 0 wulf.n plo..II....i'l.inth.......therolnlpfKili.d,