HomeMy WebLinkAbout27-Public Works , . i",.., $"'."" - Fi~NO. L0471 - lIeQUeST FOR COUNCIL ACTION ,"j CITY OF SAN BeRNARDINO From: Roger G. Hardgrave REC'O,-ADMIN. Sf'ri!'llt: Publ ic Works/Engineering 19a5 OCT -9 FH 2: 49 10-4-85 Approval of Contract Change Order NO. SEVEN -- Construction of New Tippecanoe Avenue 8ridge Over Santa Ana River, per Plan No. 6358 --- KASLER CORPORATION Dept: Dete: Synopsis of Previous Council action: 8-06-84 1-21-85 Plans approved and authorization granted to advertise for bids. Resolution 85-20 adopted, awarding a contract to Kasler Corpora- tion for construction of the Tippecanoe Avenue Bridge over the Santa Ana River, for the low bid price of $4,283,034.00. RBCommendBd moti.on: That Change Order No. Seven to the contract with Kasler Corporation, for construction of the new Tippecanoe Avenue Bridge, in accordance with Plan No. 6358, be approved; to authorize payment for changing the type of material to be used in the construction of an apron at a culvert from asphalt concrete to Portland Cement concrete, at an increase in the contract price of $290,00, from $4,303,435.00 to $4,303,725.00. cc: John Matzer, Jr., City Administrator Warren Knudson, Director of Finance Signature Contact person: Roger G. Hardgrave Phone: 5025 Supporting data attached: Staff Report Ward: 1 FUNDING REQUIREMENTS: Amount: $ 290.00 SourCB: Street Construction Fund -- A 242 362 57339 'T' B'd ,AF-AO-60(l}" Jj ccount No. - - ' 1 ppecanoe r1 ge Finance: V' .... Council Notes: 9.r-~ rel.",..1 F....JJ' 75-0262 Agenda Item NO--- Z .7 6fv OF SAN BBRNARrh;tO - RBQU~T FOR COUNCIL AC~N STAFF REPORT The Resident Engineer has recommended a change of material for the apron, at the end of a storm drain, from asphalt concrete (A.C.) to Portland Cement Concrete (P..C.C.). P..C.C.'s durability under a constant flow of water is much longer than that of A.C. This change will extend the life of the apron and decrease maintenance costs to the City, We have reviewed the prices quoted by the Contractor and feel that they are fair and reasonable for the extra work involved. Therefore, we recommend that Change Order No, 7 be approved. Contract Change Orders No.3, 4, 5 and 6 are at no cost and do not adjust the contract price. The total estimated project cost, based upon the actual low bid price, included an amount of $713,215 for contingencies. which can be used to finance the cost of this change order. 75-0264 - lOAD CONTRACT CHANGE ORDER NO, 08-SBdo-0-SDd "",", CITY '-' SAN BERN/oRDI"- 7 SUPPL. NO, SHEET -L Of -L SHEE1S .' \.... _ -. ",. .... RDPAL NO~SI /oF-/oD-60(1) CONTRACT NO. 6118 To KASLER CORPORATION C-- 'OIl.. hereby directed to ..... the herein detcribed chanQfl fram the pIaM and specifications or do the folkrMng dncribed work not included in the plant and IptCifica- tioM Oft Ihi\ contract. . NOTE: This chon9. order h not .ffedive until approved by the Eng........ Oncription of work to be done. estimote of quantities, and prices to be paid. 'SeQ'''QOte belWt:en odditKmol worlt at contract pIKe. ogfet'd pIKe ond force occount. ,,","s otherwi. stated. raNs'or rentai of equipment (Oft, only such time at equipment is octuony used ond no ollowonc:e Will t>>e mad. lor tdle time. ao-.......tedby an Bernardino Count Flood Control District the lost pel'<enloge shown it the net <<cumulated increose or dOCreoM from the Oftginal cp:dity in the Engineer" Estimate 1. Estmmate of imcreases and decreases in contract items at contract prices, Construct inlet apron at Culvert #7 shown on contract plans sheet 1410 with portland cement concrete 4 inches in depth in lieu of asphalt concrete) inches in depth. Increases Item 24 - Miscellaneous Concrete (Misc. Constr,) ) CY (1%)@ $180,00 = $540.00 (+1%) Decreases Item 21 - Asphalt Concrete (Type B) 5 Tons (0,1%) @ $)0.00 = $150,00 (-0.1%) '-.. Item 22 - Place Asphalt Concrete 20 SY (1%) @ $5.00 = Total decreases . . $100,00 (-1.0%) ;p250.00 &-.I Coot _$ ............ 290.00 adjustment - ? /;7/3'5 ~..... Resident Engineer - ApprowaIRI:~dl A......d.._.... - W., the un<Mr~ned c"Htkoctof. han Qi..-n cOfltM C.uniide,otlOn 10 the change ~ted ~.fter.by gg''', il th~ pr~ i, OfIP"JM,ItMJI_ ..,II pro..."", 011 .'1",~.I"'Il'U" all tft<JtoKds. ellCepI O! "'.)' OthefwiM be Mted~. ond perlo'm oM Mrftc.t'I....11OfJ f<< 1M ._k oboft specil..d. ond will OC(epI en fun Par-" thenlor the pftc;." shown ot-oI. ::z c-- KA SI,ER Mth. ContlO(Iot doft 1M \fgn O(t....-..I ""' .r.'," alienhoft.. ~ to the 'eqWemer... 01" tpKiliullion en to pnr<..d.ng with" order.d -Ii. Cltld lilong a Wli*n ,............ h... Ihefeeft ..-,1;'''.