HomeMy WebLinkAboutRS02-Public Works , C'li,;,' OF SAN BERNARDCo r;..;le No. 6.251-13, - REQUL)T FOR COUNCIL AC'..JoN From: Roger G. Hardgrave - Subject: Approval of Change Order No. SIX -- Construction of Interior for New Central Library, per Plan No. 6467 -- Berry Construction ~ Public Works/Engineering Date: September 18, 19B5 Synopsis of Previous Council action: OB-06-84 Plans approved and authorization granted to advertise for bids. 10-01-B4 Report of bids received and Design Development Team directed to present a contract for at least $170,000 less than the low bid price of $I,7B5,32B. Resolution No. 84-417 adopted awarding a contract and approving deductive Change Order No. One for a decrease of $IB1,351 in the low bid price from $l,785,32B to $1,603,977. 02-04-B5 -- Change Order No. Two approved authorizing work to correct various items of work at a net increase in the contract price of $6,212 from $1,603,977 to $1,610,189. 03-07-B5 -- Change Order No. Three approved authorizing deletion of work and to correct problems with the plans, at a net 10-15-85 various items of (Continued) Recommended motion: .--. i....- That Change Order No. Six to the contract with Berry Construction, Inc., for construction of interior for the New Central Library in accordance with Plan No. 6467, be approved; to authorize the contractor to remove a portion of the 3 concrete decks (incorrectly installed by the concrete contractor), and install a fiberglass membrane, at a net increase in the contract price of $6.071.57, from $1,596,582.07 to $1,602,653.64. I cc: John Matzer, Jr., City Administrator ~M (Jh,~~ Signature Contact person: Roqer HardQrave Staff Report & CCO No. Six Phone: 5025 1 Supporting data attached: Ward: FUNDING REQUIREMENTS: Amount: ($6,071.57) Source: Bonds Sol d by RDA and Grant through State Librarian Ceil Notes: Finance: 75-0262 Agenda Item No. {(;~ - - 'CIW'OF SAN BERNARDCO - REQUIL)r FOR COUNCIL AC'~N STAFF REPORT .1"'" '....... Change Order No.6 authorizes Berry Construction to remove a portion of the concrete deck for the 3 outside terraces in order to achieve proper drainage, and installation of a fiberglass waterproofing membrane. Berry Construction was directed by our Construction Manager to remove a portion of the concrete decks. These decks were poured by the concrete contractor, Maveric Construction, but they did not correct the problem in a timely manner. The cost of this corrective work is $3,671.57, which will be deducted from the final payment to Maveric Construction. A dimensional discrepancy was discovered in the plans during con- struction. This discrepancy necessitated the installation of a fiberglass membrane, as detailed in the attached letter of 9-12-B5 from W. F. Doran. The cost of this membrane is $2,400.00. Attached is a copy of the memorandum dated 6-2B-B5, from Bill Doran, recommending that Change Order No.6 be approved. We concur with this recommendation. SYNOPSIS OF PREVIOUS COUNCIL ACTION - Continued - , , ........ decrease in the contract price of $6,B3B.93, from $1,610,189 to $1,603,350.07. 05-30-B5 -- Change Order No. Four approved authorizing deletion of various items of work and to correct problems with the plans, at a net decrease in the contract price of $4,615.53, from $1,603,350.07 to $l,59B,734.54. 08-05-B5 -- Change Order No. Five approved authorizing deletion of various items of ,work and to correct problems with the plans, at a net decrease in the contract price of $2,252.64, from $1,598,734.54 to $1,596,481.90. ,-- ! ....... 75-0264 / 1..." - "- c -- "- o (Fl', :) ,) . t ; j r i 1,L-...._.~..; 3-D. DIFFENBAUGH, INC. __":.":~ " CONSTRUCTION MANAGERS 237.5 Chicago Avenue, Riverside, California 92.507 (714) 684-2820 MEMORANDUM DATE: June 28, 1985 TO: RogeJl. HMdgJulVe CUy 06 San BeJl.I1aIuLi.no FROM: lUU VOIUlYl SUBJECT: San Be/l.YlaIr.CUno CentJLal UblU1JLy lUd paekag e # 13, I nteM.olL6 Change OltdeJl. #6 Subject ehange 01LdeJl. -iA a.tta.ched along w.U:h eop.i.u 06 appUc.able bu.U.etin.6. The lte.a.6on and exp.eana.:ti.on 601t thU c.hange.u a4 60Uowo: RFQ. 18 -iA .to eompeYL6ate .the BP 13 eontlLactolt 601t.the eO.6t 06 Itemov-Utg a polLtio n 06 the eo nCILe..te deek at .the tVLJuleu. ThU deek wa.6 pOWl.ed to an -i.neoJVtect elevaU.o n by .the BP 3 eo ntlLactOlt and wUhout ltemecUa..e. wOltk .thu e. :teIVla.eu woul.d not dIta.in. The eO.6t 06 .tlU.t, wOltk w.Ue. be deducted 6ltom .the BP 3 eontlLactolL6 6.{.nai. payment. We have Itev-i..e.wed .the .i.tem-<.zed c.a.6.t6 and 60und them to be aeeeptable and .theJl.e601te Iteeommend that thU c.hange OItdeJl. be appltoved. I 4 ee: lUU PO.6t Steve W!U.:tney O.6c.M AworU. Ole Hamblen Von RogeM Ledge File / ~.."J.:.--~ t..,),.; I I " \;.- "--1../IC ,'., ~/ "Z'/'\. /'~)>- . \...;\ i::/ \.<:' ) i .- f' :-., "o~' .,~ I.' ',-. '-'~.,..- -': ":"--'J-':~~i;i ,<I ....... J ~ '. J \. " \ ,- "\ J " , , '.-..-,---" /.6k CM 108 - - l~ (-" .J1r..~. c..~ "1 I CONSTRUCTION MANAGER'S : CHANGE O~ER . ) CONTRACT for San Bernardino Centrn1 Library Bid Package #13. Interiors, Project #6467 TO: Berry Construction Co. t DATE: June 17, 1985 CHANGE ORDER NO. Six (6) CONTRACT NO. 10467 1921 W. 11th Street Upland. California 91786 Except as modified, al terms and conditions of the contract remain unchanged. Provide all labor, equipment and matarial necessary to incorporate into the Contract the following changes: RFQ 18 To compensate contractor for added costs incurred in removing concrete deck incorrectly installed by BP #3 contractor ' ADD $6,071.57 c ~ Acceptecl by Contractor Recommended by the Architect Recommended by Construction Manager Approved by Owner ~~ , - "l"o- ~s- 0... 2' i! ( Ti.t:/Jb Authoriad Sign.Me 0'" .,... The cumulative tot.1 of C.O:.. including this one, under is 10 % ~lirorigin.1 contr.ct price. Original Contr.ct .... Prior Authorized (~) (OED) . . T ctal Contr.ct Prior to this Ch.nge Authorized Ch.nges on this C.O.: Addition. . $ 6.071.57 Deduction. . $ NET (Addilion)'1"~ . . $ 1.785.328.00_____ $ r188.864.101 52.:596.481.90 - \.... INCREASE/DECREASE SCHEDULE TIME . $, 6,071.57 BY o DAYS Amount of Contr.ct Authorized including this Chan~e Order No. __ . . $_ 1.602,553.47. CIlA 106. ,- '- ",- '- r '- - - L :) ,.-. '-' ,:) JOD g. D. DiUe~buu9k, i~c. CONSTRUCTION MANAGERS . 2375 CHICAGO AVENUE . RIVERSIDE, CALIFORNIA 92507 . 714/584.2820 LICENSE NO 18180: September 12, 1985 Mr. Roger Hardgrave City of San Bernardino 300 N. "D" Street San Bernardino, California 92418 RE: San Bernardino Central Library BP #13 & BP #3 - Concrete removal at Terraces Dear Roger: Change order number 6 to Berry Construction includes $2,400.00 for the installation of a fiberglass membrane under the quarry tile on the three terraces. As we have noted before, there is some question as to whether or not this cost should be charged against the BP 3 contractor. To understand why this is the case, refer first to the BP 13 specif- ication section for the quarry tile to be used on the terraces. In paragraph 2.01 (A) the thickness of the tile is specified as 11/16". To this tile thickness add the following for each of the items required to complete the installation: ITEr1 SPEC. SECT./PARA. Quarry Tile 9330/2.01 (A) Mortar Set. Bed 9330/3.02 (D) (8) Waterproof Memb. 711012.01 (A) (1) Protection Board 7110/2.01 (A) (4) Total Thickness of Tile Installation THICKNESS 11/16" 1"+/-1/4" 1/8" 1/8" 2"+/-1/4" This 2" dimension arrived at above is the same as that shown at detail 28 on sheet A-35 of the architectural drawings. Deta i 1 15 on sheet S-10 of the structura 1 drawi ngs, ho\~ever, ca 11 s for 1-1/2" at the same location. This ~Ias the detail used by the BP 3 contractor. c G o , j . ,- '--' Compounding this problem, (the existence of the drawing discrepency was not recognized until later as is noted below) the BP 3 contractor left the terrace deck with a tamped finish (instead of that specified) which was too rough to accept the specified waterproofing. To allow the deck to be waterproofed, a topping finish was applied which reduced the depression provided for the tile by approximately 1/4". This left 1/4" for the mortar setting bed, 112" less than the minimum dimension required by the specification. When the tile installation began. the drawing discrepancy noted above was found and, additionally, it was discovered that the BP 3 contractor had failed to slope the terrace decks to drain. It was at this time that the decision was made to remove the high concrete at the terraces. At the conclusion of the removal work, a cost analysis (see attached from Berry Construction) was made of two possible methods to use for the waterproofing of the terraces, with the fiberglass membrane being the most economical (method B on attached). This is the method that was used. c The larger problem of drainage aside, and barring a different method of installing the tile that did not require a mortar bed, it is probable that approximately 1/2" would have to have been removed from the terraces in order to provide the proper thickness for the setting bed. If this removal work had been done it would have left a rough surface over which the specified membrane could not be applied and resort would have to be made to the fiberglass membrane, as demonstrated above. We feel that the use of the fiberglass membrane in lieu of that specified was the result of the discrepancy between the architectural and structural drawings and that to hold the BP 3 contractor responsible for this dimensional error would be unfair. We, therefore, recommend that the $2,400.00 provided for the installation of this membrane not be charged to the BP 3 contractor but be considered as one of those unayoidable expenses which accompany every project of this magnitude. SincereLY yours, .I . ~ W.F! Doran Project Engineer ... L. ~ L-- '~_ i r- '- cc: Bill Post Steve Whitney Oscar Arnoni Ole Hamblen Dan Flanigan Don Rogers Ledge File Imc c -- ""'\ ..J '-' ~ << << 1 .., ... ~ i ~ ... g8~ II> on '" - ~ ~ '" OClIC""+ '- .. ... on ...:~ ... ... :ill ..... ... on '" .. .., - ... c - '- i ... " ~ a II> .. ~ j; ~ .. ... o .. .. ... '" ...on Oil> '" 12'" ;s,; ...... ...15.. "::l~ r:: ... .. ...:!.i! v~c; ..~ '" '" !l o .. !:l .. ... o t; z ~ .. l5 f S '" g; fa .. on II> '" ... .. I ::l '" ... &I .. i5 t: '" .. IS z => ... ... o '" '" !5 o .. '" '" '" .. " on .., ... 'C: ~ .. .. .. "'... ~ ~'" y ~ e.8 ... '" .... ~'" z... '" ;! .. ~ ~ ... ~ fl:: U .. .... ~ g ..'" .. ~ ... ~ ... '" .. '" " :ii: u ~ - .. e .. " ~ .. .. .. .. .. '" ! .. " ~ y .. " " .. ... .. .. /? ...""''''......~ ... 0 '''''<<'H''' M ~ONII"l\OO'\ NO"''''';''' :::~~:=4. .., ... N"""'ao O'ICIOMCJ\ II"lNN..... rDrO.n.o'j".1. .N\D.-l T ~NMM ... ... I .. .. .. l':l '" i ... .. .. .. y .. -Ill & U J ... .. .. ~~~~ii~ ~U()U"'P,U eBe:&i~ a ~ ~ ~ >''0 ~ I::g~c::~e~ .-q,,)<8u~1-1 ~ '" ~ ... " g . on .., '" """"~ ~~~g ~:;:8~ '" "'.. .. ~ ~ .. ..." ,D.. ..... ...'" "'0 !o- :l .. "'''' !~ :J y ~ .. .. ~ ..... :~ i ... .. ~ ..~ ...~ ... .:l B. ~ ~-; .. .. 0' fa :U'" 1-4-..1.. ... $.c ., ... II ~~:!~~ f-Ic:lo"'s. ~~~;:~ "~..:lu .. .. ::l ... II ll. ... .. H .. ... .. .. ~ .c .. .. ~ N ... .... ... .. => .. .. ~ .. " .. ... '" .B ~ ... irll .. ~ ~ B. ... " $ ~'" .... ~ ,D.. .. It :;:I... .... ::: .;a .... /?~ .. ~ .. it B '" '" ~ .. .. .... .. ... .. ~ .. .. '" '" .. .. .. ,D ... .. << c UDEVEUlPMENT AGENCY oQu CITY OF SAN ~INO CITY tINUY ACTUAL EXPENDITUUS DlOUCH AUGUST 16. 1985 ~) r-- ...... ACTUAL EXPENDI'1'tlR.ES TO DlTE: Construction Contracts Maverlc Construction Baumgarten Plumbing Bucltner/Wibon Sm-Val Ella. Challenge Ena. Mark COlt Electric Berry Construction Dorst , Dryden Dover Elevator Metcoe Specialties lliverdde CoDIIt Winegardner HaBcmry Architect Villanueva . $ 693.482 61.511 442.871 347.858 94.008 472,373 1.386,961 150.698 66.924 84,411 222,390 237.582 $4,261.068 284.159 289,348 37.914 19.981 59,026 588 117.509 44.626 5.936 ~,O02.646 CODstruction Manager "..... J.D. Diffenbaugh "'- City Eltpenses BUilding and Safety-Fees CHJ Eng.-Inspection City Finance-Admin Costs,Site Survey, Street Cut Fees, Street Plans So Cal EdisOll-Temporary Pover Bond Eltpense In8urance Total Eltpendlturee to Date ,- , \,... 0 c...., C -. ....) '-' ,....-.. I "- 8 oG 0 '" oGCIO~"""''''' i ~j ~ N ." co :aN ""'''''C'''l lj I ~+~+~+ ."1."'~0~ . i'N "" '" ......t ""..too N ~ '" "".. ..t .. N..t..tClOCIO"'N..tClO.O..t .... '" 00 CIO..t....""O....CIOoG....N......t oG "" <'i Q . ""OOOOO"''''''''oG''''''. = ..t f ~ - . . . . . . . . . . . ~ ,.,....N,.....N"\rOOIrON.... ..t . .... ....oG.<'i........"'~""oGNOO oG 00 00 oG. .N..t N N N N ~ . . I ..t .. .. lIQ ~ '" ~ ... ;r;"" 000 ~ 0 ....... ~.~.~~.~.~OT ~ ~ ~..t ... .....C"'l....ON,....o\O.N....,....,.... I + >0 . ~ OGO(J\(I")NOC'l'l.........."',....C")N i' - . . - -.... - . ... ~"'oG oG.....tOO ""........."'.......'" tJ ;;ij..t N..t NN""..t N ..t Jl ..t '" lIQO~ - ... .. o-l;1 ~ '-' ~=~ ...~ t; tJ~~ .. ..O.O.~. O~f '" 00 ""...00..."'...00......;::0....... "" ... i5 '" .,.H.,"....N....cnO. ...."rt) ..t '" I>l - - - - - - - . - .. - . ~ 0:1 tJ o\CO...."".,,(I")....,....O,....,.,.... ... .... tJ ... 0\\0\0\00\0\""....\0,........0\,.... 00 00 i 0 ... ...'" "'N""..t N "" N N ~ . . ..t .. - ~ ... i .~..O.O.OO.T 00 ~ ; ""....00..t"''''00'''....0......00 00'" W'\C"),........N....O\,...."ClO.....COC"') N:::I" - - . . . . . . . -. . .0'" I ....O...N.....t"'OOOOON...N '" U 0\0 lrO"O\O100\"",.... 0\0\ N ......... ""'......P"t ""tool"'.... N ..... N:::IU . . 'jUt ..t ... lIQ - "" - '- ~ 8 8 800 oo! :l "'c:1 c:I.. t'c:1 U ...... "'UUc:lO :::I u... ..U...O... .. ...e~ c:I Z.::lt:!lt c:I.....8 ~Oc:loou:i!:::IUO .. Pot ..... c:I U ...., ~ 8 c:I ~ !!p1>l r;j ~ ~ to = tJ tJu:aQu c:I&QUU ....... 00 ".., ..t "" ~"~'01il8" "I>l'll "'el:t'~ :L>........~ ~!1l1 ...U....UIIU ~~i~ !~~&&~! = ~ ~~ ~.. ..:0- il ~ ...c1 ~~ )1 ... 8:::: ..Q ... U . e9 ~... 8 tJ ~ ... ... ~ '" ~ tJ - \- ,-- '"-, ....~-- '- ~ '- ,"""" ...; ,-.. --- llEDEVELOPMENT AGENCY or THE CITY or SAN IIE1UfAll.DlNO 1I0ND PROCEEDS CENTRAL LIBIARY ISSUE or 1983 Bond Issue 1983 $6.790.000 Leas: Cash Deposited with P18cal Alent Discount Accrued Interest $1,637.220 203.700 ( 53,751> 1,787,169 5.002.831 Sub Total Costs of Issuance 340,547 Net Proceeds 4.662.2~~ .,,,..... ...) . : ./ '/ ,..... '-' t.) \.~ ~ '.' '--:J ..., .' . ~ -. ~~ ' ~Nm\l't\,::.a'" ;,/ , , -' - ~A:f-{S. I . '0 '-" .. \. .,I SECURITY PACIFIC NATIONAL BANK HEAD OFFICE . TRUST DEPARTMENT . CORPORATE TRUST ADMINISTAATION PIYISION 333 SOUTH HOPE STREET, LOS ANGELES. CALIFORNIA MAILING ADDRESS: P. O. BOX 30376. TERMINAL ANNEX. LOS ANGELES, CALIFORNIA 10030 March 20, 1984 . Sandy Iowder Redeveloptent 1\qer'cy of the City of San BernardiJxl City Hall 300 N:>rth 0 Street, Roan 320 San Bernardino, CA 92418 Dear Sandy, I've enclosed copies of our paid fee bill for your Central Library Bond issue. -- "- Below is a breakdown of all the issuance costs paid by lie fran Bond proceeds: - '- PAYEE AM:XJNl' Jamas Warren Beebe A Law Corporatioo $ 28,420.38 Miller , Schroeder M.mi.cipals, Inc. California Debt Advisory Ccmn:i.ssion $135,800.00 $ 1,697.50 $167,978.20 J\MBl\C Security Pacific National Bank $ 6,650.50 ~ ~c;>\ c,. ~., ",.. . -, , .,.. ~ ~.'~ ~-