HomeMy WebLinkAboutRS01-Public Works . f;1'(~~ OF SAN BERNARDI(""1) File No. 6.251-3 - REQUIIi....T FOR COUNCIL ACryN . From: Roger G. Hardgrave Public Works/Engineering Subject: Approval and Acceptance of Work, -- Contract with r~averic Construction- Concrete for New Central Library, per Plan No. 6457 t.......,: Date: September 18, 19B5 Synopsis of Previous Council action: 05-21-84 -- Change Order No.1 approved to authorize the Contractor to close the ends of pipe piles for an increase in the contract price of $B,250.00, from $632,123.00 to $640,373.00. OB-06-84 -- Change Order No.2 approved to authorize the Contractor to install 6 mil visqueen vapor barrier, provide temporary water, and change waterproofing, for an increase of $3,581.45 in the contract price, from $640,373.00 to $643,954.45. 12-03-B4 -- Change Orders No.3, 4, 5, 6 & 7 approved to authorize payment of $10,419.22, $660.00, $5,797.1B, $6,961.53 and $7,229.00 respectively, for various items of extra work, for a total increase in the contract price of $31,066.93, from $643,954.45 to $675,021.38. (Continued) Recommended motion: - , That the work performed by the Contractor, in accordance with Specifications No. 6457, be approved and accepted; and that final payment be authorized, less the back charge of $3,671.57. '- cc: John Matzer, Jr., City Administrator Ralph Prince, City Attorney Maveric Construction {k_P'#~~ Signature Contact person: Roger G. Hardgrave Phone: 5025 Supporting data attached: Staff Report Ward: 1 FUNDING REQUIREMENTS: Amount: N/ A Source: Bonds sold by RDA and Grant through State Librarian Finance: GI-rlcil Notes: " '- 75-0262 Agenda Item No. RS~I . Clk OF SAN BERNARDI~O - REQUM FOR COUNCIL AC~N /-,,-;0,. STAFF REPORT '-' All work under this contract was satisfactorily completed as of 7-18-B5. The contract was awarded to Maveric Construction for the low bid price of $632,123.00. The contract price was increased to $699,553.94 by contract Change Orders No.1 - 13. The actual final contract price is $695,882.37, due to the reduction of $3,671.57 for work performed by Berry Construction. It was discovered that the concrete deck of the 3 outside terraces had not been constructed to the design grades and, therefore, would not drain properly. Maveric Construction was notified to correct the problem, but failed to do so in a timely manner. In order to avoid delaying the project, our Construction Manager ordered Berry Construction, the interior contractor, to correct the problem. Berry Construction has billed us in the amount of $3,671.57 for this work. Therefore, this amount will be deducted from the final payment to Maveric Construction. We recommend that the work be approved and accepted, and that the final payment, less the back charge of $3,671.57 to Berry Construction, be authorized. c SYNOPSIS OF PREVIOUS COUNCIL ACTION: (Cont.) 03-07-85 -- Change Orders No. B, 9 & 10 approved to authorize payment of $2,228.96, $4,454.02 and $502.00 respectively, for various .items of extra work, for a total increase in the contract price of $7,IB4.98, from $675,021.28 to $682,206.36. 04-01-B5 Minutes of meeting of Council Library Ad Hoc Committee received and fil ed. 05-13-85 -- Change Order No. 11 approved to authorize payment for correction of problems with miscellaneous metal, perimeter angles and openings; add overhead and profit excluded in Change Order No. 7; form opening and install anchor bolts in restroom stem walls and delete stair concrete at a net increase in the contract price of $13,051.00, from $682,206.36 to $695,257.36. 06-17-B5 -- Change Order No. 13 approved to authorize payment for various items of work identified by the Council Ad Hoc Committee of March 7, 1985, and for temporary water provided by the con- tractor at a net increase in contract price of $4,269.58, from $695,257.36 to $699,553.94. -. , \".... 75-0264