HomeMy WebLinkAboutRS27-Public Works ',. File No. 7.3714 - REQUOTFOR COUNCIL AcOioN I CI10 OF SAN BERNARDOO ROGER G. HARDGRAVE From: 811: Public Works/Engineering Subject: Approval of Change Order No. Or Approval and Acceptance of Work -- Construction of Street Improvements on 6th and "E" Streets, per Plan No. 6642 -- Riverside Construction Company 8-8-85 Date: Synopsis of Previous Council ~ion: 02-04-85 Plans approved and Director of Public Works/City Engineer authorized to advertise for bids. 03-18-85 -- Resolution No. 85-112 adopted awarding a contract to Riverside Construction Inc.. for the low bid price of $91,552.00. Recommended motion: tW ~~: ~q~<E {DJ REDE\lELOP CITY OF S~E~~~G[NCY OF THE ~AI/OfNO, CA That Change Order No. One to the contract w-it h Riverside Construction Inc.. for Construction of Street Improvernl1nts on 6th Street. from "F" Street to "E" Street. and on "E" S~ree~. from 6th Street south 435 feet. in acordance with Plan No. 6642, be approved to authorize the installation of an interconnect cable with drain wire in a 1 1/2 inch PVC at an increase in the contract price not to exceed $2.875.00. from $91.552.00 to $94,427.00; and that the work performed by the contractor, in accordance with Specification No. 6642. be approved and accepted. and that final payment be authorized at the expiration of the lien period. . cc: John Matzer Jr., City Administrator ~ J'~~ Signature Contact person: ROQer G. HardQrave Phone: 5025 Supporting llata attached: Sta ff Report & C. C. 111 Ward: 1 FUNDING REQUIREMENTS: Amount: $2.875.00 Source: CD8G Fund Finance: 'eCiI Notes: 1 I?S-27 A!lenda Item No 75-0262 . -~. . :CI'f:Y OF SAN BERNARDI~O - REQU~T FOR COUNCIL Ac:3ION . STAFF REPORT All work under this contract has been satisfactorily completed. The contract was awarded for the low bid price of $91,552.00. The actual final contract price is $93.959.80. due to the increase authorized by Change Order No. One. and some final quantities being greater than the estimated quantities in the bid documents. We recommend that the work be accepted and final payment authorized. The traffic signal interconnect cable along Sixth Street was unavoidably destroyed by the Contractor during removal of existing improvements. In order to retain the capability of providing progression for traffic on Sixth Street, it was necessary that this conduit with interconnect cables be replaced. ' The Contractor agreed to perform the work on a time and materials basis. as provided in Section 3-3. -EXTRA WORK-, of the Standard Specifi cati ons. We also recommend that Change Order No. One be approved. " . . 2 75.0264 ..oject: Improvements o~ixth Street Om "F" Street to "E. S1rreet Date: 5/Q5 I Plan No: 6642 . File No: 7.3714 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. 1 (Change necessitated because of field conditions) To: Riverside Construction. Inc. 111 North Main Street Riverside, CA. 92501 Gentl emen: . You are hereby authorized and directed to install a 1 1/2" diameter, PVC. Schedule 40 conduit and a shielded two conductor. interconnect cable with drain wire in the existing street lighting trench on the south side of Sixth Street between "EN and "F" Streets on a "Time and Material. basis per Section 3-3.2 .Payment" of the Sta.!!.~!.rd Specifications for Publ ic Works Construction at a cost nl)'tto exceed $2.~75.00. ~, Total extra work. cost added to contract not to exceed..~..... $ 2,875.00 Previous Contract Price...................................... $91.552.00 Amended Cost Price.......................~.................~. $94.427.00 Additional time to complete contract due to change order..... 0 CONTRACTOR 'RIVERSIDEd'ONSTRUC]Kf.1 CO# By: /"Az-~<" /74,,_ ~ / ., ~ ---- Title: 'f;' V~ ,- CITY OF SAN BERNARDINO --- By: Roger G. Hardgrave Director of Public Wor~s/City Engineer e Accepted Date: ~~ ft~- , ,Approved Date: '-