HomeMy WebLinkAboutR05-Public Works
I.CI~ OF SAN BERNARD~O
ROGER G. HARDGRAVE
From:
e:
File No. 6.251-14
- REQUFST FOR COUNCIL A(,~ION
PUBLIC WORKS/ENGINEERING
Approval of Change Order
~'.' sl!bi~:~ f! ~J ~ f!fiJ,. ~wo -- Construction of
( ~ _?, " ,,- Ibn-Slte Work for New Central
r.. I .
\ .,' ':I"" lL~brar~, per Plan No. 6468
..k 1...0.' Rlverslde Construction Ce.
8-9-85
Date:
Synopsis of Previous Council action:
r\EDj:'\t~' {;~~-~(Pl "C';"- Y U' J jr
ClfY Of SAN BERi,ARJINO: CA -
Recommended motion:
02-04-85 -- Plans for construction of on-site work for New Central
Library approved, and Director of Public Works/City
Engineer authorized to advertise for bids.
03-18-85 -- Resolution No. 84-113 adopted awarding a contract to
Riverside Construction. Inc.. for the low.bid price of
$293,000.00. .
03-18-85 -- Resolution No. 85-113 adopted directing the DeSign
Development Team to meet with Riverside Construction
Company and attempt to identify cost savings that would
reduce the contract below the budgeted amount of
S?711,/i/iQ 00
(continued page two)
.
That Change Order No. Two to the contract with Riverside
Construction, Inc. for construction of on-site ~ork for the New
Central Library. in accordance with Plan No. 6457. be approved to
authorize payment for various items of work, at an increase in
contract price of $7.420.00 from $285,325.00 to $292,745.00.
cc: John Matzer Jr.. City Administrator
/~
/Jtet SI~'M' ~
-
Contact person:
Roger G. Hardgrave
Staff Report and Resolution
Phone:
5025
1
Supporting t1ata attached:
Ward:
FUNDING REQUIREMENTS: Amount:
Grant through State librarian
$7,420.00
Source: Bonds sold by RDA and
Finance:
ttnCil Notes:
1
75.0262
Agenda itpm rB. S
o
'.
.
.
o
o
o
Synopsis of Previous Council Action (Continued from page I)
08-19-85
Change Order No. One approved to authorize the
deletion of various items of work, at a reduction in
the contract price of $7.675.00. from $293.000.00 to
$285.325.00.
2
~ ~
/..,.~
/tC.: OF SAN BERNARD~O - REQU~T FOR COUNCIL AQlON
--
STAFF REPORT
.
.
.
75-0264
Change Order No. Two authorizes additional fill for the parking lot
a,rea. cons'truc ti on of concre te founda ti on for the cannons and war
memorial, and a change in the point of connection for the
irrigation system. Attached is a copy of the memorandum from Bill
Doran. Construction Manager. dated August 7, 1985. stating the
reasons for these changes.
Mr. Bill Doran recommends this change order be approved.
We concur with the recommendation from the Construction Manager.
3
~J!'.b."91'
'.
TO
.;
Utc.
c>
o
o
MEMORANDUM
DATE.
August 7. 1985
Bill Post .
City of San BernardIno
COPIES TO .
FRO"-
, BII I Doran
SUBJECT
San BernardIno Central LIbrary
Bid Pack 114 - Sltework
Change Order 12
Subject Change Order Is attached along with copIes of applIcable bulletins;
the reasons for and explanations of these changes are as follows:
File I
RFQII
.
.
Description
This Is to compensate the contractor for the cost of
Importing and placIng 534 cy of fill material required to
-brIng the sIte to final grade. The unIt price of SIGley
for this work was established at bid time and was
Incorporated Into the contract as the amount to be paid for
ell Imported material.
When the sltework package was actually put out fqr bId.
ell prospectIve bidders were Instructed toassum~ that the
cut and fill would balance as origInally engineered and to
quote a unit prIce for Imported material and a unit prIce
for any exported material. This approach was taken to,
evold any delay or unnecessary expense to the project that
mIght arIse out of a claim for extra work due to en
unbalanced condition.
That the site did not actually balance Is due to several
factors. the most significant of which are listed below:
I. When the earthwork quantities were orglnally
calCUlated, an eight Inch (8") paving section was assumed
(Refer to Note 2, Sheet C-3).
After actual soIl testing however. the total section was
revised to seven Inches over the majority of the paved
area, thus, requiring additional fill.
August 7, 1985
BII I Post
Page Two '
> /
'.
File I
.
RFQ 15
RFQ 16
o
o
o
Description
2. During the reconstruction of Sixth Street, the curb
elevation was raised two Inches. This required additional
fill In the front lawn areas to provide the correct slope
for drainage to the sidewalk.
3. During the course of construction, soil was lost to
SUbsidence. ~Iearlng and demolition and other work.
4. General construction tolerances such as earth shrinkage,
which are difficult to predict exactly, make earthwork
quantities subject to some error.
Given that the limited area of the library site would not
provide an area for disposing of, or obtaining additional
fill material and that no site will exactly balance for the
reasons above, the unit prices were Included In the bid to
provide a speedy and equitable solution to this problem.
The quantity of 534 cy was computed from a truck coun-/-.}
I ,. _','
verified by Ledge and Ole Hamblen. "~I
Thls,ls to compensate the contractor for the cost of
provIdIng concrete monuments for several dedication
placques adjacent to the war memorial. the sidewalks around
the placques and the foundations for the bronze canon.
This Is the cost for changing the point of connection for
the water service. This Is per Bulletin 12.
We have revIewed these Items and the associated costs and have fou~d them
to be acceptable. We, therefore. recommend approval of this change order.
WFD:mm
Attachment
Cop les to: ,
.
Steve Whitney
Oscar Arnonl
Ole Hamblen
Dan Flanigan
Don Rogers
Ledge
File
u
CONSTRUCTION ~NAGER'S ' 0
CHANGE ORDER
o
U' I,
'T
i ,. t I.
~\;.;6" .
\;-,. ,"< '. '
CONTRACT for San Bernard:[nn Central Library
Bid Package 14 - Siteworll' . ,I
TO:
Riverside Construction Co.
111 North Main Street
Riverside, CA 92501
DATE: July 17, 1985
CHANGE ORDER NO. 2
CONTRACT NO. ,6468
Except es modified. en terms end conditions of the contrect remein unchenged. Provide ell lebor. equipment
and ma~eriel necessary to incorporete into the Contract the following chenges:
File ,
Descr!ption
Amount
RFQ 1
Import 534 Cy of fill material. Pricing per
unit price of $lO/cy established by contract
Add 5,340;00
RFQ 5
Construct cannon fou~dation and walks
adjacent to war memorial
Add 1.650.00
RFQ 6
Change point of connection for water
service per,bulletin ~2
Add 430.00
.
.
Accepted by
Contractor
Recommended
by the Architect
Recommended by
Construction Manager
Approved by
Owner
Totlo
00" ~~1.)'
~
./ ,:,' -~~ fJ20J. e;..16/,JctR.
O.t.
&:: r- ~S-
Authoriltd Signa",,-
lhle
Dolo
.is
o " over original contract price.
Original Contract ....
Prior Authorized fAOOI (OED) . .
Total Contract Prior to this Change
Authorized Chenges on this C.O.:
Addition . . $ 7,420.00
Deduction. . $ -0-
NET (Addition) fOi1IIlil>1fdi>} . .
$ 293,000.00
$ ( 7.675.00)
$ (?R~ 1?'> (1(1)
The cumulative total of C.O:s. including this one.
INCREASE/DECREASE SCHEDULE TIME
. $. 7,420.00
BY.
o
DAYS
Amount of Contract Authorizod
including this C~enge
Order No.
. . $ 292,745.00
.J
~.
.. ..
. .
~
"
! ~
i ~
:;
.
.
~ ~j
f~
~~tt
~ ~j
tl ~~
UI <II'"
; ~~;
~ ~:>
... "'...
UI -.I'"
!::. Q)~
o
o
~t~=~~m~~~.WN~ ~i!
i~~ii~i[~II!li I
,.::;~...a ",nog.e!" ~ ...
...11.. ,nil II ... :; 03
~ ):. .. ~ 9
"'8 ~ ~
~ 9
...
8
t"
~:;;~",ll;!il...~", l:ltt",
CDwcowasoi:CD,mOlolUlo
S:~~~f:li~~~os:i'lu.~
\D..a~C!S....aZSZ50asf...a.~...
~
...
~
l!!
t"
!l!ls: ~......... ...~t
.......IHll!l~i8,l!:~Ull!l
8:i:!~~i:'Pl~~~O~bu.~
\I)...t):S:...,DnsZ5~ I C\...~.....
1:'
.
J
~
t"
tg aI....."" 0\ ~...a:; \D~ f: to CD
WCllc.nW~\DOOWIWNo;\D
~~~~~~~~~~~~~~
.DlII.II.DOIl DQlIIDr
!t
'"
~
al
~
i~...a~""I.'C"I~~UI
"""............... ... .........
~'i!l!~i)Qoosoof;(g~
UlG\l!SO....I$. 1\0' .....wo
.......'i'-CII'ii"CI ...., .IID
~
;:!
!!'
~
t"
NUl ...~W,... ~O\.
1Il111. ~~;:j~g;1Il, ...:n::f
:'~OS;'''''~:'':''O~u.:''W
tiN I otl~Z:S2n:. 25~e~
- ------
"..... N
....W....WO....a "'W O\"'WI-
...WO....O)W .........,OW
S~~S;;"!l!;"l!:O~ojlR
-eeC!Se!e~~~I...a.e"'!
"'1~fi2
"s.
~
Ii.
a ~
If!1
.~"I!lQ
l! ~lil!!i
::UI~~
:!' ~f::
i I
* ~U~ 1
... loa &' ..
tcI'R ~-
ltU
..
... &' ...
::Ra-
I '"
..
..
... ~~I~
iil~
!t
..
o