HomeMy WebLinkAboutR04-Public Works ciCI OF SAN BERNARDOO 007"7 T - R~QU~~I-FOR COUNCIL 5V Ac:JION 1": ..., fJt: ROGER G. HARDGRAVE PUBLIC WORKS/ENGINEERING 8-2-85 Subject: Approval of Change Order No. One -- Construction of On-Site Work for New Central Library. per Plan No. 6468. Riverside Construction Co. Date: Synopsis of Previous Council action: 02-04-85 -- Plans for construction of on-site work for New Central Library approved. and Director of Public Works/City Engineer authorized to advertise for bids. 03-18-85 -- Resolution No. 84-113 adopted awarding a contract to Riverside Construction, Inc.. for the low bid price of $293,000.00. 03-18-85 -- Resolution No. 85-113 adopted directing the Design Development Team to meet with Riverside Construction Company and attempt to identify cost savings that would reduce the contract below the b g amount of Recommended motion: 1:'1(' . 'I" ,', !'l1S' -- (~ iJ. t: REDEVfLOPA : oJ CITY OF SA~E~~~f};I[:~,~F rH~ That Change Order No. One to the contract with ~ive-'rlS:lide Constructi on. Inc., for constructi on of on-si te work for the New Central Library. in accordance with Plan No. 6457, be approved to authorize the deletion of various items of work. at a reduction in the contract price of $7.675.00. from $293,000.00 to $285,325.00. . cc: John Matzer Jr., City Administrator fA~~ Contact person: Roger G. Hardgrave Phone: 5025 Supporting llata attached: Staff Report and Resolution FUNDING REQUIREMENTS: Amount: ($7.675.00) Grant through State Librarian Ward: 1 Source: Bonds sold by RDA and Finance: e\'Cil Notes: 1 7!J-0262 Agenda ItelO No ~ '/ ,.0 OF SAN BERNARDQO - REQUOT FOR COUNCIL AcOlON . STAFF REPORT Resolution.No. 84-113 directed the Design Development Team to' meet with the low bidder in an effort to identify additional cost savings that would reduce the low bid contract price of $293.000.00 below the budgeted amount of $278,669.00. A reduction of $7.675.00 has been identified. This reduction can be achieved by deleting masonry sign walls,' ($1.800.00); reducing the size of north bridge from 13'-0. to 8'-0., ($575.00); deleting the quarry tile at the entrance to finish concrete. ($5.000.00) and removing proposed shrubs for the memorial ($300.00). These reductions and deletions to the contract are recommended by the Construction Manager in the attached letter from Bill Doran of J. D. Diffenbaugh. We concur with their recommendation. The Budget vs Bid Analysis. dated 12-6-84. was based upon a budgeted amount of $278.669.00 for on-site work, and showed a total overrun of $577,204.00. This reduction of $7.675.00 will revise the overrun to $569.529.00. . . 2 7!:l-0264 . I ;;.,1( ) ..Ii ~1 ~> o o I~ 0 . J.D. DIFFEtf3AOOH. lte. CONSTRJCTION MANAGERS 2375 Chicago Avenue. RIverside, California 92507 (714) 684-2820 tEJ<<lRAN)tJM DATE: 6/19/85 FROM: Roller Hardgrave CIty of San Bernardino Bill Doran TO: SUBJECT: San BernardIno Central LIbrary BId Package 114, Site Work Change Order 11 . Subject change order Is attached. this change order returns to the CIty the value of several Items (see exhibit "An) deleted to' effect a savIngs In cost. We have reviewed the associated costs and found them to be acceptable ~nd therefore recommend.that this change Qrder be approved. WFD/ph Attachment ~ cc:" Bill Post Steve Wh Itney Oscar Arnon I Ole Hamblen Don Rogers Ledge File . CONSTRUCTIO~AGER"S o o CHANGE ORDER DATE: 4-29-85 CHANGE ORDER NO. CONTRACT NO. CONTRACT for San Bernardino Central Library BP#14. Sitework TO: Riverside Construction Co. 111 No. Main Street Riverside. CA 92501 One r 11 6468 Except .. moclif"..d, .1 t...... .nd conditiOM of the contr.ct rem.in unch.ng.d. .nd ....t.ri.l nece...ry to incorpor.te into tho Contr.ct tho foDowing chonge.. Provide .11 I.bor, equipment SEE ATTACHED EXHIBIT "A" RECEIVED MAY 'i 1985 . J.D. ()lff[NBAU~!i.INC. . AccepIed by ConfT.ctor Recommended by the Architect Recommended by Con.truction M...g.. Approved by Own.r _f_~ .L:d - ~, ,.~~ 7j4- ~~yO I V 1"'\ Do..s\\s\e:s \ \ __50...- ntlo - ;. % over origina' contract price. Origin.1 Contr.ct . . . . Prior Authoriz.d (ADD) (OED) . . Tot.1 Contrect Prior to this Ch.nge Authorized Ch.nge. on this C.O.: Addition . . $ -0- Deduction. . $ 7,675.00 NET (Addifion) (Deduction) . . $ $ $ 293,000.00 -0- 293,000 The cumulotive tot.1 of C.O:.. including this one, . INCREASE/DECREASE SCHEDULE TIME . $. 7,575.0U 8Y OAYS Amount of Contr.ct Authorized including thi. Ch.nge 32 - 1 . . $..2l:l5, :>.0;) Order No. , . . . o San e.rnardlno Central library Change Order II BPl14, Sltework EXHIBIT RAR 1. Delete masonry sign walls. 2. Reduce size of 'north bridge from 13'0" to 8'0". 3. Delete the quarry tIle at entrance, finish concrete with rock salt. same as other walks. 4. &lsleta the eJeJ38sed ag!!lf'sgate Q9Rsrete !It freAt 8RtrsAse BAd have salt flRlsR t,ps S8me as ett:l9r~... 5. Memorial: remove proposed shrubs TOTAl o DEDUCT DEDUCT DEDUCT OCDI:/OT DEDUCT April 29, 1985 [ l,800.0Ql 575.00 [ .~. 5,000.00 [ $, HI9J [ 2,8883 _[ 300J 7,675.00 o - . O~~/' tl ,~c' ,/.;r . ~ . . CD .. . . I ~ " ... ! Ifl ! ~~a ~ ~j S! ~t: ... .. c,n t.)Q) ; ~~ A. Q)W !: ~! o o ttt=~~m~~~.ww~ 'i! ~lii!~i~~~I~i~ ~ ~R~ig ~il~a! : ... ll-~I=o. :\' ~!f !f I ~ !f !f .. !:l;.....l!llll~"...Cl\ I:lttl!l ",e:o ..lISo~"""',,'" 8: ~ i:li:! e: i1 i:! ~"lil 0 8: ~ 8: ~ lIO...alSts....a!HSo I............ 1!' ... ~ III ... .. il12 ... "I~ I.. .. 'rI rt_ W ..w... w m~~ t~"e~~~~81~~ml!l ~Re ~~~~~~~~~~~~~~. ~ 1!' J ~ ... ..:.. "'...... ""'lG \D .....\0 0\ ..... \D 0\ Wi ...IllUl...tl"'o&......... III ~~~~b~~~~~~t~~ .......... .... !t .. ~ ;;I UI ~ 1::... t: . ^ "'... mUl...,5NI....II...,G\Ut """".. .. .. .. .. ... .. .. .. "'l'll!"'lI!lR00 !'loo...::!.. llla;~c:l::SllSl .;)l. ,l:llZl!! '"""'Pi-... ..., .... 1!' ~ !!' ~ '" t" ..UI ...UI...... lil$" ~~I~~;jcfg;;SIW\Q~~ :..w~oo";"Sr.l~:'oilu.:'w t:iNI~b:~~O::,~~e~ .. - ------ -- Ct,,"" ...""'.... ~... ......o~lil... ...$1.t..~... ~~~~~~~~~~~~~! .. I ;:; "o..~ ........ e Co ~ .. ~ff~ ira "'fIle " o K B. . o. f ~ l?l~i l{fi<Jl!l .~ "J!l P. i"'!il:'j :!i~ !f> E: i I i