Loading...
HomeMy WebLinkAboutR10-Public Works ^_ ~_ F:!.~. 6.251-13 n CfIn" OF SAN BERNARDINO - REQUWST FOR COUNCIL ACTION From: 9ept: ROGER G. HARDGRAVE Subject: Approval of Change Order No. Five -- Construction of Interior for New Central Library. per Plan No. 6467 -- Berry Construction Date: Public Works/Engineering July 15. 1985 Synopsis of Previous Council action: 08-06-84 Plans approved and authorization granted to advertise for bi ds. 10-01-84 -- Report of bids received and Design Development Team directed to present a contract for at least $170.000 less than the low bid price of $1.785.328. 10-15-84 -- Resolution No. 84-417 adopted awarding a contract and approving deductive Change Order No. One for a decrease of $181.351 i.n the low bid price from $1.785.328 to $1.603.977. (continued pag~ ?I Recommended motion: o That Change Order No. Five. to the contract with Berry Construction. Inc.. for construction of interior for the New Central Library. in accordance with Plan No. 6467. be approved; to authorize deletion of various items of work and to correct problems with the plans. at a net decrease in the contract price of $2.252.64 from $1.598,734.54 to $1.596.481.90. cc: John Matzer Jr.. City Administrator .~L/~ Signature Contact person: Roger G. Hardgrave Phone: Supporting data attached: Staff Report & C.C.O. No. Five Ward: 5025 1 FUNDING REQUIREMENTS: Amount: $2,252.64 D..c~...r.... Grant through State Librarian Source: Bonds sold by RDA and Finance: iJ....... C,/(' .A' Cncil Notes: 1 P.. 7 p.,; /'~"" Aoenda Item Nn_n / U 75-0262 o o o c o o o 02-04-85 -- Change Order No. Two approved authorizing work to correct various items of work at a new increase in the contract price of $6.212 from $1.603.977 to $1.610.189. 03-07-85 -- Change Order No. Three approved authorizing deletion of various items of work and to correct problems with the plans. at a new decrease in the contract price of $6.838.93. from $1.610,189 to $1.603.350.07. 05-30-85 -- Change Order No. Four approved authorizing deletion of various items of work and to correct problems with plans. at a net decrease in the contract price of $4.615.53. from $1.603.350.07 to $1.598.734.54. . 2 COy OF SAN BERNARA.O - REQQST FOR COUNCIL ABION c STAFF REPORT Change Order No. Five incorporates 12 items that will delete certain items of work and correct problems discovered with the plans during construction. An $8.000 credit is being realized on this change order due to deletion of the interior signage. This item of work is being deleted from the interior contract. since it is felt that it could be done better by a separate informal contract. Therefore. this is not a real savings of $8.000.00 which means the actual net cost of Change Order No. 5 is an increase in the contract price of $5.747.36. A copy of the memorandum Manager. dated 6-14-85. is Rogers describes each ite~ Order No. Five be approved. from Mr. Don Rogers, Construction attached. In this memorandum. Mr. of work. and recommends that Change c '" . c 3 75-0264 '.0.. " c o o 0" o J.D. DIFFENBAUGH. INC. CONSTRUCTION MANAGERS 2375 ChIcago Avenue, RIversIde, CalIfornIa 92507 (714) 684-2820 te4OfWI)!JM ~. .._*- .. -~',,:-, '" TO: Roger Hardgrave City of San BernardIno B" I Doran FROM: SUBJECT: " , . . , San BernardIno Central Library BId Package 113, Interiors Change Order 15 . .' .....;'", '../ .-.(\-:... . -\ \ ,;" N.,.~' Subject change order Is attached along wIth copIes of applIcable bulletIns. The reasons and explanatIons for the changes are 8S follows: RFQ 11 returns to the CIty the value of the InterIor slgnage that was deleted from BP 113 per bulletIn 140. RFQ 12 returns to the CIty 6he value of the.cove strip for the cove carpet base and substItutes a 90 base. This Is per bulletIn 139. RFQ 15 Is to compensate contractor for added costs that were Incurred when It became necessary to float the terrace deck concrete Installed by BP 13 smooth prior to waterproofing. RFQ 16 Is to compensate contractor for costs Incurred In pouring concrete Into the blockout surroundIng the hydraulIc ram of the elevator. RFQ 17 returns to the CIty the value of the sheet vInyl that was deleted durIng the review of submIttal 152. RFQ 19 Is to compensate the contractor for addItIonal costs Incurred In InstallIng Unlstrut under the beam that was to receIve the foldIng partItion. The existIng beam was too narrow to receive the partItIon track. RFQ 20 Is to compensate the contractor for addItIonal costs Incurred by removIng portIons of the concrete floor to Install rlxon door hInges. RFQ 21 Is to compensate the contractor for additIonal costs. Incur~ed as a result of lowerIng the ceIlIng 1-1/2" In order to clear other equIpment InstallatIons. .. 'c:> Roger Hardgrave BP#13, Interiors Change Order 115 o 2 o 6-19-85 o o RFQ 22 Is to compensate contractor for the cost of repairing damage to a wall caused by skylight contractor. A separate change order will be Issued to the skylight contractor deducting this amount from their final payment. RFQ 23 Is to compensate contractor for the cost of adding a 20 gauge galvanIzed coping at the parapet walls In the terrace areas and painting same, RFQ 25 Is to compensate contractor for the cost of adding five metal shelving units per bulletin 119. We have reviewed the ItemIzed costs and found them to be acceptable and therefore recommend that this change order be approved. WFD/ph CCI Bill Post Steve Wh Itney Oscar Arnonl Ole Hamblen Don Rogers Ledge File c . c CONSTRUCTIO~AGER'S 0 CHANGE ORDER o CONTRACT for Bid Package San Bernardino Central Library #13, Interiors. Project #6467 TO: Berry Construction .Co. 1921 W. 11th Street Upland, California 91786 DATE: June 17, 1985 CHANGE ORDER NO. Five (5) CONTRACT NO. 10467 Except as modifiad, aD terms end Conc/itiOlll of the contract remain unchanged. Provide all lobor, equipment ond moteriol necessary to incorporote into the Confroct the following changes: AS PER ATTACHED EXHIBIT "A". DATED 6-14-85 ADD $7.747.36 DEDUCT $[10.000.00] c ..--1-\;'~:,;' f>>. 6<)" -".. 'c" t.:, :...- ...., " ~ .v-.....~ . ".' /" $Y - <s 1...../ '.__ '-. ! '.,-- !., . ,- -/ " . ",",.-"'\,..- :? i 10 I"., 'JU"ln,:., \:':';J~l r. ; '--, , (.. > . J- I \ \ .. ~ ,.- . . !..... '...:.:~. .J J-11. \l/,/ , ,; " "i....,_ ~../)>.\. '''.-1 './TC\\H ._..I.--~ TOTAL DEDUCT $ (2,252.Jr7T &t/ Accepted by Controctor R_ded by tl.e Architect Recommended by Construction Monoger r;:;. "1 :r-<- ?~- C'":.::::i" $I I -- tD-'Zo~S:s ..... /:?;2<YJ ",e-NG Approv.d by Owner _'aod _ TItIo ..... $ 1.785.328.00 $ 1186.593.46J $ 1,598.734.54 . $. [2.252.64] The cumulative toto' of C.O.'s, including this one, 11 under is " eMilr original contract price. Original Contract . . . . Prior Authori..d (lWCl){DED) . . Total Contract Prior to this Change Authorized Changes on this C.O.: Addition . . $ 7,747.36 Deduction. . $ 10,000. UO NET ~ (D.duction) . . o INCREASE/DECREASE SCHEDULE TIME BY -0- OAYS Amount of Contract Autl.orixod including this Change 1 596 481 90 5 ' . . Order No. . . $ c. 106 0" o o c San Bernardino Central Library Bid Package 113, InterIors Change Order 15 EXHIBIT ."," RFQ 11 Delete Interior ~Ianage Bulletin 131 ~ 'tU In Its entirety per RFQ 12 Delete cant strip for cove base RFQ 15 To compensate contractor for costs Incurred In floating terrace areas smooth RFQ 16 To compensate contractor for costs Incurred In pouring concrete In elevator shaft blockouts RFQ 17 Delete sheet vinyl per submittal No. 52 c RFQ 19 To compensate contractor for additional costs Incurred In Installing un I-strut under beam for folding partition RFQ 20 To compensate contractor for added costs Incurred In breaking out concrete for Rlxon floor hinges RFQ 21 To compensate contractor for added costs Incurred In lowering ceiling 1-1/2" RFQ 22 To compensate contractor for added costs Incurred In repairing damage to wall caused by skylight contractor RFQ 23 To compensate contractor for labor and materials used In Installing 20 gauge coping on terrace walls per Bulletin 128 RFQ 24 FurnIsh and Install ceiling access per BulletIn 126 c RFQ 25 Add addItional shelving per Bulletin 119 o June 14, 1985 Page 1 ~ $[8,OOO.00J DEDUCT [I,OOO.OOJ ADD ADD 796.27 167.25 ~ [I,OOO.OOJ ADD ADD ADD ADD ADD N.C. 143.78 1,679.64 1,578.00 595.00 1,600.61 0.00 . ADD 1,186.81 TOTAl $[2,252.64J o. o o 00 o ( ( s.- I >-1 J r GREGORY VILLANUEVA AlA & ASSOCIATES, INC. ARCHITECTURI! 'jPi..ANNINO :a3O N..D.t!lT___.-T,eu~ A04 -.aN ~.CA. -.01 ....C"7'M,J......'M4 . I :a4DO IRVIN. ~.......... ..., ......wPCIAT .............. CA. ~ tt ~17'II..14'77 ' CENTRAL LIBRARY TO: J.D. DIF"FENBAUCH, INC. Project No. -BP #13 . 555 West Sixth Street San Bernardino, California 921110 Bullelin No. 40 ;. ATTN: Ledge Ledgerwood Dale 64/26/85 By Oscar A. Arnoni, AIA Reason: ...."'Project Architect Contract documents are hereby revised and/or clarified to'lndicate 'the '.. '.'.:i following changes. This is not an authorization to proceed.wlth'thl!rwor.k ,. " I;, ..'. outlined below. but rather a request for review and proposal as per' '..\ ".;"'() Article 5-2 of the General Conditions. This shall be reviewed as ,for. : . '.". .;;' .. , coordination, time and cost effects to the contract. .'" .'"." ' .\. ,j ...;! c DRAWINGS ISSUED: DWG.. DATE REVISED DELTA Refer to Sheet AID, North Elevation. Delete Library Signage Furnish and install at same place the number 555 .(size: 8 n) .' .' ! ~.....'t~. f .', \ \.'" RECEIVED MAY 1 1985 J.D. D1fFEN(\.lllGH INe . o Distribution: " ':'1 Roger Hardgrave - City of S.B. (1) Don Rogers .,..JDD (1) ,:,.. Steve Whitney - City Library (1) Ledge.;: ,.,.....;.JDD ,(1)' ..", '''''''.''1 Ole Hamblen - City of S. B. (1) Contractor" - ;(3) ".... ,,,'. " ,,1 Note: If drawings are issued, contractor will be given one'( 1) sepia .nd I. U" . ".;..,.<1 two III bluelines. I I '0 (0 0 ( GREGORY VILLANUEVA AlA & ASSOCIATES, INC. ARCHITECTURI!!. <PLANNING 330 No. -a-sTREET, -..nw 4D4 aAN~. CA. -.m I7"'MJ_.8'M4 a4CJO IRVINE AVfl., 8Uf"IW .., ~ ~.a04. c.tt.. . a '.. 1'7"141"711.-'\4'77 0" >c....~ 5./.I-J o CENTRAL LIBRARY TO: J.O. DIFFENBAUCH. INC. Project No. ;BP H3. . . ,. 555 West Sixth Street Son Bernardino, California 92410 Bulletin No.. . 39 ATTN: Ledge Ledgerwood .00 Ie , . .04/26/85 By Oscar A. Arnoni, AlA Reason: Project Architect Contract documents are hereby revised and/or clarified talndicate the ',.: ,., following changes. This is not an authorization to prOceed with the work '.., , , outlined below, but rather a request for review and proposal a!; per. ,'.' .'..' "." Article 5-2 of the General Conditions. This shall be reviewed as for'..~ '. .. ".'.. ", coordination, time and cost effects to the contract.' .'.... DRAWINGS ISSUED: . . '. I, ~I '. j;: () DWG.# DATE REVISED DELTA :,.. "- ."" Refer to Sheet A29, Detail 22 1. Delete cov~ carpet base Use detail sho~ below: with wood cove support. L :ALUN.,'n~IA\.~ :c.Afo~" \ ..._....._M__~......_ RECEIVED MAY 1 '1985 --. I.D. OlffENBAUGH tNe Distribution: 1=>e''''. ~" . o Roger Hardgrave - City of S.B. (I), Don Rogers -JDD .(1)' Steve Whitney - City Library P) Ledge" ,:, ~JDD (.lL Ole Hamblen - City of S. B. (1) Contractor: - (3) " . '; Note: If drawings are issued. contractor will be given one (1) sepia alld two (2) blue lines.:.' " " .0 C"" 0 0 ( 0 GREGORY VILLANUEVA AlA & ASSOCIATES, INC. ARCHITECTURI! PLANNING :a:.a N. -0- .-n::a..T, III.ItTW .-04 aAN ~. CA. --...a1 I'7"'MJ _........ :1400 It:IVII\a AVIl.......~ .81 ~ .......cH.CA... r a 1'714)'78..147"7 o CENTRAL LIBRARY TO: J.D. DIFFENBAUCH, INC. Project No. BP #13 555 West Sixth Street Son Ber"ordino, Colifomio 921110 Bulle Ii" No. 19 ATTN: Doug Allison Dole 1/04/85 By Oscar A. Arnoni AlA Reason: Project Archi teet Contract documents are hereby revised and/or clarified to Indicate the following chaoges. This is not an authorization to proceed with the work outlined below. but rather a request for review and proposal as per Article 5-2 of the General Conditions. This shall be reviewed as for coordination, time and cost effects to the contract. DRAWINGS ISSUED: c DWG.' DATE REVISED DELTA Refer to Sheet A3 1. Install cabinets at room 127 according to sheet 17A, in lieu of sheet A3. Distribution: . o Roger Hardgrave - City of S.B. (1) ..roon Rogers - JDD (1) Steve Whitney - City Library (1) Ledge - JDD (1) Ole Hamblen - City of S.B. (1) Contractor - (3) Note: If drawings are issued. contractor will be given one (1) sepia and two (2) bluelines. -0 ( o o ( o o cr @-. ~ E]CtS"T1NG7 t.1G1'4t. SHf:l.V1N6i lINri / f,a.OftA1'tlO (~- I"'VJII~) f . I ~[ODICAL 27 STACKS ?' J.J6Ul t"IeTAL. St"AV/N47 5" """'2."1 \ /' c 'HffWI1>lfr 5'( ~~IN4l PlA'06f. \ @-. r~1A L. . fU<. PLAN <;I-/OUJIN6] ~ Vlf.JGf l-aATION I--J EY<! @ . c '\iREGORY VILLANUEVA A.IA & ASSOCIATES ARCHITECTURE -[ rIG IN~ [' RING-PLANNING 3400 IRVINF AVE. In1 NEWPORT BEACH. CA. 92660 'A/ZTI~ fU.. ff4W fHWlIa.l1r ~ rUfiLVIN4 L<<A1/ON . C&.iTRAL.- u f?~'{ f'P ~ J> P'l7I: : I. 07.f~ o o ~ J I ~ I!Ei Iii.... ... WI I ! ~ i - o o o ! . ., l -, l!.... i~ii~iii~~~~i~ ~ON";I';;'; ~m~o~. ~C"irllt=::I'-'> N.... ....SN....~...t .. - ------ - UU~~~~~~~~n iii..; I :.ifi~~ii I..H ;a:",ll: .... .......... IliCll .:; ell! .. .,IICS .11" III lil!:l;;j' I I , IlRl::li!Qi I 1 N~~COOOo~m~~~o ~JJ!I :~~I I I I 'N~~:~' GIIIlIII ."""11..,... ~~ai~~~~~a~~u ';!i.N..;,..;moriN..;.nvii "'..::lll: "'~"'lII111"'''''l<::Cll .:; .s ~ ! -lilt!.. ~ &I.. .... . ~~$~~~~~ss,~~~ ~!~I ~~d.,~t~~~d~ci~ ~~m ~~~ .... ~~...t MN a, ~ .. .:; ~:l;~"" IlI!cQ!a....SH1J;:... I N.,.,$C~~~~::l~~N$ ~llili~'fi:i~~!i~sii~ ~"'(t'J .... NM ..eN at ! .. .:; ] ] it B ~ ~! i : I ;I~E j!~Ji J ~dhiUd!i!~ Uil O....Nt')"'" ....NC")...II"l\Qr--CDO\.-t...........t.... i~ 5 i~ wi eN e .. .. ~ ~ III i i .... ~ .. ::: .... ~ lil i ~ ~ i ~~ ~ ~~ ~ ~ i Iii. o .1! l .! ;e ~ . II .. .. ~ s