Subject: Approval of Change Order No. Five --
Contract with Mark Cox Electric
Facilities, for New Central Library,
per Plan No. 6464
.
Roger G. Hardgrave
Date: 4-26-85
Synopsis of Previous Council action:
07-11-84 ___ Resolution No. 84-248 adopted, awarding a contract to Mark Cox Electric,
Inc., and approving Change Order No. One, to reduce the contract price
by $126,524.00.
02-04-85 ___ Change Order No. Two approved to authorize the Contract to provide TV
outlets, additional phone jack, deleted fixtures in the skylight, revised
ceiling and security wiring at an increase of $5,444.91 in the contract
price, from $495,798.00 to $501,242.91.
3-18-85 ___ Change Order No. Three approved to authorize the Contractor to delete TV
outlets, added in C.C.O. No. Two, revised existing lights, revised, first
floor lighting and power; and added two low voltage relays, at a total
decrease of $175.62 in contract price from $501,242.91 to $501,067.29.
I
.,
Recommended motion:
o
That Change Order No. Five to the contract with Mark Cox
Electric, Inc., for construction of electrical facilities for
the New Central Library in accordance with Plan No. 6464, be
approved; to authorize the Contractor to add a 2" conduit for
irrigation sprinkler control wires, at an increase in the
contract price of $367.81, from $501,067.29 to $501,435.10.
cc:
John Hatzer, Jr., City Admin.
~ 1!.:./l~-
FUNDING REQUIREMENTS:
Staff Report & C.C.O. No.5
$367 .81
Ward:
5025
1
Contact person:
Roger G. Hardgrave
Phone:
Supporting data attached:
Amount:
Source:
Bonds sold by RDA and
Grant through State Librarian
Finance:
Oneil Notes:
75-0262
~~A-- s:/;')/{'-
Agenda Item No. =- ",''i<Lj
,
. CI1'9 OF .SAN BERNARDIA - REQUEC FOR COUNCIL AC1QN
c
STAFF REPORT
Change Order No. Five directs the Contractor to install a 2" conduit
for the irrigation sprinkler control wire at an increase in contract price of
$367.81. This conduit was necessary to allow conductors from the irrigation
valves to be connected to the controller located inside the building. Since
the landscaping and irrigation plans were not completed when the electrical
package was bid, this conduit was not shown.
A copy of the memorandum from Don Rogers, Construction Manager, dated
February 24, 1985, is attached. In this memorandum, Mr. Rogers describes
each item of work, and recommends that Change Order No. Five be approved.
We concur with the recommendation by Mr. Rogers that this Change
Order be approved.
The Budget vs. Bid Analysis dated 12-6-84 showed an amount of $6,138
for change orders in process and $5,000 for estimated future change order
costs. The net additional cost for Change Orders No.2 and 3 is $5,269.29,
since Change Order No.4 was for no cost. Therefore, approval of Change
Order No. Five will not invalidate the financial report dated 12-6-84.
C>
o
75-0264
;.---0
o
c
c
~'"
...
o
JOO
o
MEMORANDUM
DATE:
TO:
Roger Hardgrave
City of San Bernardino
Don Rogers
San Bernardino Central Library
Bid Package #10, Electrical
.'.
\.
(--;
,
"'h
, IT.e~
~ Ie
u8r'
l,Ji.:.
-\
i
,
\
, '
\",
/ ..
FROM:
SUBJECT:
.".) "
Attached is change order #5 with signatures for your approval. As we discussed,
we have cancelled all items except the conduit for irrigation controller.
RFQ #l is to add 2" conduit for irrigation sprinkler control wires. The
controller is located in the mechanical equipment room. We instructed Cox
Electrical to install a conduit in and below the concrete slab and footings
to be used as a raceway for the controller wires. This had to be done back
in August of 1984. Without this, the controller would have had to be
located outside the building which would have been subject to vandalism.
'We recommend that this change be approved. If you need any further
information and/or backup, please contact us.
DR/ph
Attachment
cc: Steve Whitney
Oscar Arnoni
Ole Hamblen
Ledge
File
CM 108
,
~~I
CONSTRUCTION OmAGER'S 0
CHANGE ORDER
o
CONTRACT for San Bernardino Central Library BPlfl0. ElectrIcal
TO:
DATE: 4/2/85
CHANGE ORDER NO. 5 (Five)
CONTRACT NO. 6464
Mark Cox Electric, Inc.
160 N. Rancho
San Bernardino. CA 92410
Exc.pt .. modifi.d, .n t.rm. .nd ConditiOM of the contr.ct r.m.in unch.ng.d. Provide .11 I.bor, .quipm.nt
.nd m.t.ri.1 nec....ry to incorpor.t. into the Contr.ct the following ch.ng.s:
RFQ#l Add 2" conduit for irrigation sprinkler control
wires
ADD
and patch A. C. pavin a 0
install GT co .. orner alley adjacent
gs. per bulletin 1115.
.-.aD
Rre", .A.dEl II ea. type OD lights at ":J8V MBM8vial mith
tin.a alaLia 8B I!Al Bkaat E:. 1
.WB
RfQ,17 Add Iigl:1ts foF' i ea......emt'y SigAl B!l JIleF' IlwlletlFl '1'1
_"D9
o
RECEIVED
APR 11 1985
TOTAL
J.D. D1FFENBAUGH,INC.
$367.81
"10\0
2,1&2.82
~~~i. 88
~~~. 88
$'3~.{~,
$1'.'3'.11
Acc.phd by
Contr.ctor
Recommended
by the Architect
. :Recomm..,decl by .
.Con.truction .M....g.. -.. ,- ~ "-
Approved by
Owner .
Author.., $I11M"-
-
-
Th. cumuletive tot.1 of C.O.'., including this on.,
is 17 "llf~~igin.' contr.ct pric..
Origi...1 Contr.ct ....
Prior Authoriz.d (lUll.) (OED) . .
T ot.1 Contr.ct Prior to this Ch.ng.
Authorized Chenges on this,G~$]:'o.1
Addition . . $~
Deduction. . $ - 0-
NET (Addition) (l!l~) . .
o
INCREASE/DECREASE SCHEDULE TIME
IV
-0-
Amount of Contr.ct Authorized
including this Ch.ng.
Ord.r No. 5
DAYS
eM 106
$ 622.322.00
$-1J21.254.711
$ 501.067.29
'3(,.']. e. ,
$. H. _3_. 83
. . $
~501 4'35.10
tl[~I:9J.1J
o
o
C)
()
i
~~ ~
G~~i
l!l"'a
y....."O
"'....
~g!;::..
;tl#i
;2 ..
",ill J
!
:;,J~ jj
~ :a
~
.
J
...
· E"
.. ~
.....!
~II...
~d#~
'"
CD
'"
...
..
~
... I
......
_IIQO.w
~ oJ
.
..
'g
<l
.!l
~
..
~..
!o...
....
..'"
~~...
~rJ a
...
~~::
.. 0 .
.. t...
31#~
~~~I
o
- - -------
O\O\N""IN""ONCOOO~O
C1DO\ClDCO ClOOC)..'Hr\,...o.....O
o\COIOIOOU'\O\CO....,...oooo
~';";"I,^Q .;.;oc.
.-4....0\10 N.... ONI""'l.........
.... .-I'""'....
~ ~
...
"""----- -
00100 I 0003'1"'11::1 I 00\
"",coOCO ",,00 ""',... U'\IO
N....NO\O,...,...CO ....OOC")IO
';.oN~ I ";oOQN';'; I so.
cr"OlOOlO 0\10........00 10
"",ION ... C"'I"",-I ~N
...
...
... ... .
~ ~~
QOC") I I I I I ca"oolllO I
..,CDCD CDCD~O~
Nt"'tOOOQOOO\coC'l"lU'\O\O
.. .. .. .. .. .. .. ..
II\QOQ I I I I I NO....U'\r-t I
,..pi" N ....CD
... ...
~ ~~
...
. . .. .........
08..,01000CDNOOCD'"
o NeD CJ\,...ONNOONIO
Q .-tCJ\O,...,...CO.-tf"'t.....,.\IC'.HD
.. .. .... ..................
0\ GO N .... .... GO CH" N C..HI.III".....
00........\0 o\lO,...IONO\f"'tCOIO
"'lON """....'" "('II
...
...
...
.-4""'''''10 1 00 8 U'\,......,. 0.... 0\
."'..,... 00 N...CDO.....
NU'\....O\Ctoo .,.......0"\0
O~.,;.;IO..;O.;.:,,;,.:,,;.,;
CDCIOOC") O'lQO""U'\NO ICIO
....IOC"'I ... f"t........ ....N
...
...
CD '" '"
.. 00 ..
~::-. ::a:~
..."........., !ooo,...ooro.O\
~U'\~:gON~g::~gg~:s
.. .. .... ..................
Ou."'....CO I CO'" 0 CIO NO Q.,,'IC!O
COCOCON \Cl..,.....o\O\CD....t""....
.......tf) ....t Nt"1 '"'iN
...
...
:::1
;::
"
.
.!
g
..
g t:
... II g
~ ~ ..
. 0 ~
...t "
I .. ':l :: ...
" .. ...- ... U!o....
.. ~~.....!Po .. ..00
... .. B".::l~ .. .....:a
..Cltlo.::l.l!gt:1..t..
....!.........II~II=...........
;;:It:,,u~S~!:i~~~.!l;;:l
O.-tNC'l't-4"
....NC"'t....""-a,...COO\.......-t.-t.-t
o
S~~ ~
NCD ..,
o 0
.~ ..
CD.., .
~N '"
~~ ~
... -
..
'"
'"
o
N
CD
..
.
...
~
...
:il
i
N
~
...
o
;:l
o
~
...
'"
o
.
...
:il
'"
o
:;
..,
o
.
...
~~~
"'..,
CDN
.., .
... ...
~
::I
.....
~!
~~
~8
my
o
p.
'"
N
N
o
..
::l
-...
a
ia
101
~
CD
...
o