Loading...
HomeMy WebLinkAboutR01-Public Works CI"O OF SAN BERNARDOO File No. 6.251-2 - REQUIQT FOR COUNCIL AC()oN ", From: ~t: Roger G. Hardgrave Public Works/Engineering Subject: Approval of Change Order No. One -- Construction of Structural Steel, for new Central Library, per Plan No. 6456 -- Buckner-Wilson Fabricators Date: 4- 26- 85 Synopsis of Previous Council action: 1-09-84 --- Plans approved and authorization granted to advertise for bids. 2-20-84 --- Resolution No. 84-64 adopted awarding a contract for $448,000 to Buckner-Wilson Fabricators for construction of structural steel for the new Central Library in Pioneer Park. Recommended motion: o That Change Order No. One to the contract with Buckner- Wilson Fabricators, for construction of structural steel for the New Central Library, in accordance with Plan No. 6456, be approved, to authorize payment for additional miscellaneous steel, 51 hours of additional detailing time, and delete the main stairs, at a net increase to the contract price of $5,655.41, from $448,000.00 to $453,655.41. cc: John Hatzer, Jr., City Administrator ~~~ Signature Contact person: Roger G Hardgravp Phone: 5025 Supporting data attached: Sta ff Report & CCO # One Ward: 1 FUNDING REQUIREMENTS: Amount: $5.655.41 Source: Bonds sold bv RDA and Grant through State Librarian Oncil Notes: Finance: 75-0262 C:!fJ I'-~/; V 6-S 't!- Agenda Item No ~/l ..., 1- Cli=f 'OF SAN BERNARDgO - REQUQT FOR COUNCIL ACQON o STAFF REPORT eous at a Change Order No. One will authorize payment for additional miscellan- steel, 51 hours of additional detailing time, and delete the main stairs, net increase in contract price of $5,655.41. Attached is a copy of the memorandum from Don Rogers, Construction Manager, dated 12-7-84 stating the reasons for this change. Mr. Don Rogers recommends this change order be approved. We concur with his recommendation. The Budget vs. Bid Analysis, dated 12-6-84, included an amount of $5,655 for Change Order No. One. Approval of this change order will not invalidate the financial report prepared in December, 1984. c c 75-0264 ,0' o o () Jon o o MEMORANDUM DATE: 12-7-84 TO: Roger Hardgrave City of San Bernardino FROM: Dou!} Allison SUBJECT: San Bernardino Central Library BP#2, Structural Steel Change Order #1 Subject change order with original signatures is attached. The reasons and explanations of the changes are as follows: RFQ,l is the addition of miscellaneous steel items per drawings revised April 30, 1984. Some of these items include the addition of a roof screen around the chiller units on the roof. The addition of a sky- light and additional drop-in beams on the high roof as well as some additional framing members are included. This change order includes all material, detailing, fabrication and installation of these items. A copy of Buckner-Wilson's price quote is attached for your reference. 'RFQ'2 is for fifty-one (51) hours of additional detailing time. This detailing time was necessary due to three sets of revision drawings being issued which corrected dimensions and which required the detailer to review and change all of his drawings, as necessary. RFQ,. is to delete the main stairs from BP#2. The quote for the stairs was higher than expected, and we thought we could get a better price by Including it in BP#13. Interior. There was a $10,000 allowance in the base bid for the main stairs. The contractor completed the detailing on the stairs at a cost of $2,970. We received an additional credit of $27.65 for bonds and insurance and, therefore, have a credit of $7,057.65. We will offer the shop drawings to Berry Construction for their subcontractor's use if they will provide a reasonable credit for these drawings. We have reviewed the itemized costs and have found them to be acceptable and, therefore, recommend this change order be approved. If you need any further backup or information, our files are available for y. ruse. Doug Ilson Project Engineer cc: Steve Whitney Oscar Arnoni eM 16>de Hamblen, Ledge J J.AIFFENBAUGH. Oc. 2375 Chicago Avenue Riverside, California 92507 (71111 825-6323 CONSTRUCTION MANAGERS o CHANGE ORDER ((,0.) Contrect Chenge Order No. One (1) Contrector Buckner-Wilson Fabricators Dete 10-19-84 San Bernardino Central Library Contrect BP#2, Structural Steel, Proj. #6456 I Except es modified, ell terms end conditions of the contrect remein unchanged. A description of the modification autl1or. iud by this Chenge Order to the above project follows: RFQ,' Additional miscellaneous steel added per drawings revised April 30. 1984. ADD $11,219.96 RFQfl2 Fifty-One hours of additional detailing tir,1e due to revisions in the plans. RFQM Deletion of the main stair.s. ADD DEDUCT TOTAL 1,1193.10 [7,057.65] $ 5.655.111 o INCREASE/DECREASE SCHEDULE TIME BY -0- DAYS FOR THE ABOVE WORK (DEDUCT) 0 (ADD) 1!9 TH1: SUM OF $5.655.41 -, (~ i. II I. . .,....- President ~ rA ..' . Recommended by Construction Manager .~.. ..-. _ ILSON FABRIC JORS S;...'u... I nOI'7; SigMture -:.., s;..:i~ \~ \); ~" Approved by Owner A~iaed Sitntt",. 1hlo Do" The cumulative total of C.O:., including this one, i. 1 '-* over original contract price. .- .---- - . O. 0 CONTRACT NO. BUDGET UNIT NO. SUB.OBJECT NO. FUND NO. .lOB NO. "'MOUNT Of' CONT'" ------------ ------------ -------------- ----------- ------------- $448,000.00 c AREA INVOLVEO: RA NO. ________________________ JOB C.O. NO"'-------------------- RFQ NO.1, 2 & 4 ---- eM 108 o C) c .0 ~ ~~ ~ I~~i l!l"'" ........0 ....... ~g!'ll.. ~ tl ~~ ;2 .. ;;! I '" .. . .. i ~ :n!Q~ ~.:lI:II ..... i ~ ... . .. .. ..~.. "e.! .....11... ~t5~~ '" '" '" .... .. .. ... 1 ........ _.0'" ~ .I . .. ... " .... u ~ ~ .. .... 10'" ...... ... .... .......... ~.1 ~ ... .. .. ..~.. ::.e.! ........... oi~~ ~i~1 o "',.... ------- ""O\N'" I N....ONCDOOC'l')O CDO\CDCD CDOOC"tG\,..,.O,...O G\CDIoOIoOO...."'QO,..,,...OQOQ ,; ~.. I ..nQ ~ ';00"; ......,"".0 rot... ON............ .... .... .... .... ~ ~ .... ------ ...... 00"'010003"'010'" C"tCDOCD 0\00 C'l').... ....10 N...NO\O.....,...CO "001"1\0 ..r::,; I cr;oOON";'; I so. O\IrOCOIO o\1O,....,...,QO "" ....ION ... "'....f"'4 ION o .... .... ... ... . ..... .......... QOt"'t I I I I I CO,....OOCD I C'l')CDCD CIOCO""O,.... N....OOaQOoO\COC"'l....O\O .. .. .. .......... II"lCDC) I I I I I NO".".... I ....." N ,..tea .... .... ~ ~~ .... . . .. II........." Os"'O I 000.....00"'''' o NCD O\,....ONNOON\O o ptO\c...,,...ao......,,..........,1O .. .. .... .................. O\CONC'l') I C"HD0 O\NC'l').,."".... ca"'C'11O o\lO,....IONO\....COIO "'lON .... "'10 .....C'\I o .... .... .... ...........""1008............0..."" ..."'....... 00 ......"'8....... N.......",QOQ CD".... ....10 O~.,;,;IO.,;O..;.;rri,.:,.;.; CDCDQt") O\CO,........NO 1010 ....1OC"t .... "'........ ~N .... .... '" '" '" "COol"; r4 ....'" ",,": << <<<<<< <<<<<< << ~~;s:: I !~g~J::;gg::::: N"'....100NIOCo\IOQQNIO .. .. .... .................. O....,....COICO....OCDNOOC'l"lCD C1DCDCDN ""...."O\O\CD"""..... ........C") .... NC"') '1N .... .... I 8 ... 8 t: .. II ~ .... ... . 0 .. ...t u l!. .. ':l :l ... " " ..... ... U!PEklol .t ~t'''i'::I'S 'C.:lll;~0 ......"a....... ..'" ..:II ....UO.....N~':aU....... ...1Jl!.......II~~:J........... ;;jt:c:s::!~ill~Hl!:iwli!~~;;j O..tNM. ....NC"J....It"lIO,...CDO\.........t....... o !~~ ~ "'... ... ..... '" ~~ ~ .... .... ... '" '" o .. '" ... o ... .... ..... ... ~ o ;'i .. ~ .... o ::1 o ... .... '" o ... .... ~ '" o ... ... ... ... .... ......~ ...... "!.'" "'... "'... "'!,.. ... .... ... U .... e :l:l' 0'" .... "'8 ril... o ... '" .. .. o ... :::l o ... .... --.. ~ ~ "" ... ... S