Loading...
HomeMy WebLinkAbout20-Public Works File No. 6.1''4n-2 CITY' OF SAN BERNARDIH" - REQUE~'" FOR COUNCIL ACT'''N From: Roger G. Hardgrave Approval of Change Order No, Four -- Subject: Contract for Construction of Phase I-A of Seccombe Lake State Urban Recreation Area, per Plan No, 6403 -- Moulder Brothers Dept: Publ ic Works/Engineering' Date: 4- 26- 85 Synopsis of Previous Council action: 08-08-84 ---Resolution No. 84-319 adopted awarding a contract to Moulder Brothers for the Base Bid and Alternate No.2, for a total contract price of $3, 201,000,00, 10-15-84 -- Change Order No. One approved adding two pedestrian bridges, pavilion slab, Sixth Street improvements, widening of Sierra Way, changed walkway lights and substituted Valcon valves and controllers at a new increase in contract price of $330,642,75 from $3,201,000.00 to $3,531,642,75. 11-19-84 -- Change Order No, Two approved the expense for equipment move-on and move-off charges, changing of curb grade on Sierra Way between Sixth Street and Seventh Street, after curb forms had been set, and the (Continued on 2nd page) Recommen':led motion: That Change Order No, Four to the contract with Moulder Brothers and John H, Moulder for the construction of Seccombe Lake Urban State Recreation Area, in accordance with Plan No. 6403, be approved, to authorize various items of work to be downgraded, in accordance with the letter dated 4-25-85 from Moulder Brothers, at a net decrease in the contract price of $11,075.79, from $3,571,150.41 to $3,560,074.62. cc: John Matzer, Jr., City Administrator Warren Knudson, Director of Finance Annie Ramos, Dir, of Parks, Rec, & Community Services ~~d~ Signature Roger G. Hardgrave Phone: 5025 Contact person: Supporting data attached: Staff Report & CCO #4 Ward: 1 FUNDING REQUIREMENTS: Amount:($ll ,075.79) Source: 1980 State Bond Act. .__Finance: ..~~ ~~ --t ----- Presley Fishing Program, and Street Construction Fund Council Notes: 75-0262 Agenda Item No, 20 f ctrY OF SAN BERNARDtt40 - REQ~T FOR COUNCIL AerllON STAFF REPORT Change Order No. Four deletes various items of work, downsizes and eliminates various items of landscaping and adds and corrects other items of work discovered during construction. A copy of the letter from the Contractor dated 4-25-85 explaining each item of work is attached. These changes have been reviewed with representatives from the Department of Parks, Recreation and Community Services, and they are in con- currence, We have reviewed the credits and additional costs, and feel they are fair and reasonable, Therefore" we recommend that Change Order No. Four be approved. SYNOPSIS OF PREVIOUS COUNCIL ACTION (Continued): elimination of tire rippers and warning signs in Parking Area No. One, at a net increase to the contract price of $5,253.88, from $3,531,642.75 to $3,536,896,63. 1-21-85: Change Order No. Three approved to authorize over excavation; removal of railroad tracks on Sierra Way, removal of curb and gutter at the corner of 5th and Sierra Way and the elimination of a tire ripper and warning signs for the YWCA parking lot; removal of a 12-inch storm drain and manhole and replacement with 175 L,F. of 24-inch corrugated steel pipe; the removal and replacement of a curb depression in the YWCA parking lot; and the removal and replacement of a driveway approach into the YWCA and the construction of an adjacent stairway at a net increase to the contract price of $34,253.78 from $3,536,896,63 to $3,571,150.41. 75-0264 . Project: Rccrcution Arcu - Phusc I-A Plan ~: " . 6403 ua1.c: 4-2b-H~ ........ File No. 6.1444-2 '-" , " ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. 4 (Change necessitated because of field conditions) TO: Moulder Brothers P. O. Box 3306 Glendale, CA 91201-0306 Gentlemen: YQU are hereby authorized and directed to perform the additional work, delete items of work and downgrade landscaping as described in your letter of April 25, 1985, at a net decrease in contract price of ($11,075.79). Total extra work cost added to contract .....,.......................$ (11,075.79) Previous Contract Price .........................~...................$ 3.571.150.41 . A"Ilendcd Cost Price ........................ .......................... .$~560,074. 62 : Additiona:l: :ti:meto c~lJ1i>iet,c conhact due to, change order............ -0- . CONTRACTOR: ., . CITY OF SAN BERNARDINO: By: Title: 8y: ROGER G. HKRDC~[^vr- Director of Publ ic Works/Ci ty En<Jr. Accepted Date: ^pproved Dule: . . '. ~..~ "" . ,GENERAL CONTRACTORS' LANDSCAPE CONTRACTORS . mDul~Wlr Bres.511 WESTERN AVE., PO BOX 3306, GLENDALE, CA 91201-0306' (81ll) ;',10-9600 ......."'.' .,.,,", Attention: Roger G. Hardgrave Reference: Seccombe Lake State _Urban Recreation Area Phase IA, Project Number 6403 , J/PR < '10", "'~;,' .~ 1,' - - - , -~ '/ /~~'~'~-/l-':':T ,,' \ ..,:.- ..~....;..~......... April 25, 1985 City of San Bernardino 300 North "D" Street San Bernardino, CA 92418 Gentlemen: Per your direction, Moulder Bros. submits the following breakdown for various credits and additions requested to date: 1. DELETE GALVANIZED STUCCO SCREED: MATERIALS 3500 If Sc reed@' . 11 _~isc. Fasteners @ L.S. Materials Subtotal Sales Tax (6J,%) MATERIAL TOTAL LABOR TO INSTALL $ $ $ 385.00 80.00 465.00 30.23 495.23 24 hrs. Carpenter @ 29.53 LABOR TOTAL ITEM 1 TOTAL CREDIT $ 708.72 $ 708.72 <<$ 1.203.95>> 2. DOWNSIZE BAUHINIA TREES CREDIT -.-'. .... 20 ea. 36" Box Bauhinia @ 450.00 _ :- TOTAL CREDIT .o....-*~-'._ . <$ 9,000.00> <$ 9,000.00> ADDITIONS 5 ea. 20" Box Bauhinia, isntalled @ 310.00 15 ea. 24" Box Bauhinia, installed @ 190.00 TOTAL ADDITIONS ITEM 2 NET CREDIT $ 1,600.00 2,850.00 $ 4,450.00 <<$ 4.550.00> continued.. . Subcontractor Quote -Rock & I~aterscape<<$ ITEM 4 TOTAL CREDIT' <<$ DELETE PARKING LOT STRIPING CREDIT ....' '0.,-.'" """ Page Two April 25, 1985 Mr. Roger Hardgrave 3. REDUCED REPAIR PAVING AT FIFTH CRED IT Subcontractor Quote (Fischer) ITEM 3 TOTAL CREDIT 4. CHANGE FROM ANCHOR BOLTS TO "RAMSEr ANCHORS" CREDIT FOR LINER AT BULKHEAD WALL 5. -~" Subcontractor Quote (Schaeffers) ITEM 5 TOTAL CREDIT 6. DOWNSIZE PLATANUS TREES CREDIT <$ 2,500.00> <<$ 2,500.00> 579.00> 579.00>> <$ <<$ 400.00> 400.00>> 6 ea. 60" Box Platanus @ 1,800.00 <$ 10,800.00> ADDITIONS 5 ea. 48" Box Platanus @ 680.00 1 ea. 54" Box Platanus @ 1,700.00 TOTAL ADDITIONS ITEM 6 TOTAL CREDIT _.11', .__.. 7. DOWNSIZE ULMUS TREES __,,,..~REDIT , $ 3,400.00 1,700.00 $ 5,100.00 <<$ 5,700.00>> 2 ea. 60" Ulmus Parvifolia @ 1,800 <$. 3,600.00> , ADDITIONS 2 ea. 54" Ulmus Parvifolia @ 1,700 $ 3,400.00 ITEM 7 TOTAL CREDIT <<$ 200.00>> continued.. . . \,.., ......', ,~ I Page Three April 25, 1985 Mr. Roger Hardgrave 8. DELETE CHORISTIA AT SIXTH STREET CREDIT 3 ea. 48" Box Chorista @ 680.00 ITEM 8 TOTAL CREDIT ($2,040.00) ~04'0-.-oO) 9. DELETE 78' OF MASONRY WALL LANDSCAPING AND IRRIGATION AT MARTIN ADOBE CREDIT Per letter of 2-4-85 ITEM 9 TOTAL CREOIT ($4,556.12) ($4,556.12) 10. DELETE WHEELCHAIR RAMP AT SIXTH AND SIERRA WAY CREDIT 250 s.f. Concrete @ 1.40s.f. ITEM 10 TOTAL CREDIT 11. DELETE SEAL COAT AT YWCA PARKING LOT AND SIXTH STREET CUL-DE-SAC CREDIT ($ 350.00) n 350.00) Subcontractor's Quote (Matich) ITEM 11 TOTAL CREDIT 12. COMPACTION RE-TESTING (CHJ) A.C. PAVING RE-TESTING (CHJ) ITEM 12 TOTAL CREDIT 13. DELETE SINK IN CONCESSION BUILDING ($2,085.00) ($2,085.00) ($1,017 .50) ($l,12ILOO) ($2,145.50) Subcontractor quote (M.C. Const.) ($ 326.50) n 326.50 r "" Pa ge Four April 25, 1985 ~r. Roger Hardgrave "J SUMMARY OF CREDITS 1. DELETE STUCCO SCREEN 2. DOWNSIZE BAUHINIA TREES 3. REDUCE 5TH ST PAVING 4. RAMSET LAKE LINING 5. DELETE STRIPING 6. DOWNSIZE PLATANUS TREES 7. DOWNSIZE ULMUS TREES 8. DELETE CHORISIA TREES 9. DELETE WALL AT ADOBE 10. DELETE WHEELCHAIR RAMP 11. DELETE SLURRY SEAL 12. A.C. AND COMPACTION RETESTING 13. DELETE SINK TOTAL: ....,,/ ($1,203.95) ($4,550.00) ($2,5.6U.00) ($ 579.00) ($ 400.00) ($5,700.00) ($ 200.00) ($2,040.00) ($4,556.12) ($ 350.00) ($2,085.00) ($2,145.50) ($ 326.50) (26,686.07) _I / In addition to the above credits, the following items of extra work have been completed at the direction of the City: A. ADD CONDUIT LIGHTS AT BRIDGE Subcontractor Quote (Paige) Moulder Bros. Mark-up (5%) Subtota 1 : Bonds and Insurance (1%) ITEM A TOTAL COST B. ADD INBEDDED STEEL FOR PAVILLION Materials Sales Tax (6J,%) Subtotal LABOR 16 hrs. Iron Worker @ 31.00 Subtota 1 EQUIPMENT 8 hrs. Truck @ $10.00 Subtota 1 Subtotal, all above Moulder Bros. Mark-up 5% Subtotal Bonds and Insurance 1% ITEM B TOTAL COST $ $ $ 212.30 10.62 222.92 2.23 225.15 $ 4,390.45 285.38 $ 4,675.83 $ 496.00 $496.00, $ $ 80.00 80.00 $5,251.83 787.77 $6,039.60 60.40 $6,100.00 .;:..:. '..' .... .... .,.' . . ".4. -. --. ... - - - Page Fi ve April 25, Mr. Roger 1985 Hardgrave C. ADD STUCCO AT PUMP AND ELECTRICAL STATIONS Subcontractor Quote (Riverside) Moulder Bros. Mark-up (5%) Subtota 1 Bonds and Insurance (1%) D. ADD CUSTOM COLOR TO ALL SITE STUCCO AREAS E. Subcontractor Quote (Riverside) Moulder Bros. Mark-up (5%) Subtotal Bonds and Insurance (1%) TOTAL, ITEM II ADD RETAINING WALL AND RELOCATE GATE AT YWCA Per letter of February 7, 1985 Relocate Fencing and Gate LABOR S Hrs. Labor @ 24.68/hr 4 Hrs. Operating Engineer @ 29.60/hr Subtotal Labor Moulder Bros. Markup 20% Subtotal Bonds & Insurance 1% TOTAL LABOR EQUIPMENT 4 Hrs. Skip Loader @ 15.00 4 Hrs. Truck @ 10.00 ,. ' SUBTOTAL EQUIP. Moulder Bros. Mark-up 15% Subtota 1 .- - Bonds & Insurance 1% ',,;-=,>; .="- . TOTAL EQUI P~'ENT TOTAL ITE~ E F. Lower gas lines at YMCA Subcontractors quote (M.C. Const) Moulder Bros. Mark-up (5%) Subtotal Bonds and Insurance (1%) TOTAL ITEM F . & $ 1,200.00 60.00 $ 1,260.00 12.60 $ 1,272.60 $ 2,000.00 100.00 $ 2,100.00 21. 00 $ 2,121.00 $ 3,700.00 $ 197.44 118.40 $ 315.84 63.17 $ 379.01 3.79 $ 382.80 $ 60.00 40.00 $ 100.00 15.00 $ 115.00 1.15 $ 116.15 $ 4,198.95 $ 192 . 00 9.60 $ 201. 60 2.02 $ 203.62 ( ...." ,. ~ ,. Page Six April 25, 1985 Mr. Roger Hardgrave G. PLASTER AND PAINT CONCESSION 8UILDING INTERIOR Subcontractors Quote (M.C. Construction) Moulder Bros. Mark-up (5%) Tota 1 Items $ 1,272.00 63,60 $ 1,335.60 13.36 $ 1,348.96 Subtotal Bonds and Insurance (1%) SUMMARY: COMPLETED EXTRA WORK A. Conduits at Bridge B. Imbedded items at Pavilion C. Stucco at Equipment enclosures D. Custon Stucco Color E. YWCA Retaining Wall and Gate F. Lower Gas Line at YWCA G. Plaster and Epoxy Paint $ 225.15 6,100.00 1,272.60 2,121.00 4,198,95 203.62 1,348.96 $15,470.28 In addition to the above Extra Work Moulder Bros. has been requested to perform the following item of work. H. SUBSTITUTE I-GALLON SHRUBS FOR BULBS AND ANNUALS CREDIT 2000 ea. 4" Annuals, Installed @ 1.10 200 ea. Asst. Bulbs, installed @ 1.05 ITEM H TOTAL CREDIT ($ 2,200,00) ( 210.00) ($ 2,410,00) ADDITIONS 550 ea. I-gal Pyracathna @ 4.00/ea. 7e ea. I-gal Juniper @ 4.DO/ea. $ 2,200.00 300.00 $ 2,500.00 $ 90.00 NET ADD, ITEM H SUMMARY: PROPOSED EXTRA WORK Substitute Ground Cover TOTAL SUMMARY OF ADDITIONS AND CREDITS TOTAL CREDITS TO DATE EXTRA WORK COMPLETED TO DATE EXTRA WORK PROPOSED TO DATE $ $ 90.00 90.00 -1, ($26,63'6.07) 15,470,28 90.00 ($11 ,J..2S.79) ( Ii . I'>. 7'1 ) I i.' )4/?c,/:' .. \. -- '-.c;" Page Seven April 25, 1985 Mr. Roger Hardgrave Please review the preceding pages with the Landscape Architect. With your approval please issue appropriate Change Orders to authorize this work. Respectfully submitted, Ke 11 y F. Du e Project Man ger KFD/cb -'~.- .... -:--~~:..._-