Loading...
HomeMy WebLinkAbout19-Public Works Clh OF SAN BERNARDhtO .. File No. 1.0425 - REQUWT FOR COUNCIL AC1ioN Public Works/Engineering :-.r: c ,-SlI~jllF:t:,: . ,. Approval of Contract Change Orders 1 & 2 -- Contract for Modification of Traffic Signall on 5th St. & 9th St., per Pl an No. 6392 -- Paul Gardner Corp. ROGER G. HARDGRAVE From: Dept: 4/16/85 Date: Synopsis of Previous Council action: 12-3-84 -- Resolution No. 84-515 adopted awarding a contract to Paul Gardner Corporation for Modification of Traffic Signals on Fi fth Street, from "H" Street to Sierra Way, and on Ninth Street, from "H" Street to Waterman Avenue, in accordance with Plan No. 6392, for the low bid price of $219,363.00. Recommended motion: 1. That Change Order No.1, to the contract with Paul Gardner Corporation, for the Modernization of Traffic Signals on Fifth Street, from "H" Street to Sierra Way and on Ninth Street, from "H" Street to Waterman Avenue, in accordance with Plan No. 6392, to authorize maintaining existing traffic signals and lighting systems in effective operation and replacing existing materials found to be unsatisfactory with new materials, for an estimated contract increase of $4,000.00, be approved, and c c: John Matzer Jr., (continued, see page 2) City Administrator~ ~~ , - Dire c tor - F i na n ce Signature Warren Knudson, Contact person: Rngpr r, Herngrevp Phone: 5025 FUNDING REQUIREMENTS: Staff Report Amount: $6,269 00 Ward: 1 & 2 Supporting data attached: Source: Street Construction Fund. Finance: f./.... C P Arrnlmt No. 4?-5l0-425 Council Notes: /Cf. l. ........ ",-,..,I 2. That Change Order No. 2 to the contract with Paul Gardner Corporation, for the Modernization of Traffic Signals on Fifth Street, from "H" Street to Sierra Way, and on Ninth Street, from "H" Street to Waterman Avenue, in accordance with Plan No. 6392, to authorize addlng all equipment necessary to provide left turn indications for traffic turning left from Ninth Street at Waterman Avenue, at a total contract increase of $2,269.00, be approved. 2 ctrv OF SAN BERNAR~O - REQU~T FOR COUNCIL Ac-JlON STAFF REPORT Contract Change Order No. 1 will authori ze the Contractor to maintain existing traffic signal and lighting systems in effective operation and to replace existing materials, required to be relocated and found to be unsatisfactory, with new materials, in accordance with the Standard Specifications. Payment will be made by force account, as the exact amount of labor and material s required cannot be determined prior to the work being done. This is a change order required when using the California Department of Transportation, Standard Specifications. The estimated cost of this change order is $4,000.00. Contract Change Order No.2 will authorize the Contractor to furnish and install all equipment necessary to provide left turn traffic phases 1 and 5 at the intersection of Ninth Street and Waterman Avenue. This will provide left turn indications for traffic turning left from Ninth Street. The plans provide for left turn indications for the traffic turning left from Waterman Avenue. This change order is needed as traffic volumes have increased since this project was designed. Residents of the community have submitted petitions for the left turn signals. This change should be incorporated at this time, so that the publ ic will have to adapt to only one change in the signal phasing. The total cost of this change order is $2,269.00. The total estimated project cost based upon the actual low bid price, included an amount of $10,637.00 for contingencies, which can be used to finance the cost of these change orders. These change orders have been prepared pursuant to the State Standard Specifications. The contract price will be adjusted from $219,363 to $225,632 by these change orders. We recommend Contract Change Orders No. 1 and 2 be approved. 3 75-0264 II 0 . F r I'~ a ~ I i . N A ~ D I N o ~ CONTIlACT C"^N~" onUtR NO. Traffic Signals",' F'ifth HES-OOOS (139) 1 surrl. NO..__ RtV. ,NO. Stree~ ,nd Ninth . ",;' St. snru 1 or..) 1 t. CONI.ACT "0 6392 HOIW Ho.CS) C I T Y ~ Paul Gardner Corporation .,.. ~. ~.,.h. dir...... ... fttn". th. h...... ~.... ,h--en ._ .... ~,_. .... 'p.dll..ft'~, Of d. ,h. 'ollo.ln_ d.N..'..... ...,,, ";;....;;,:;;.;:ri:.-ih....~: ............... _ 'hh ...",......... NOI!, thi, ..,...". .141.. It ".. "'hdl,,. ~~~':.'!",_.tI ..., 1h. _ Ci ~ r....:.....,.. O.tC,i...._ .f ........ t.. I.. d_... t"U....os... .f .........j.jr.. n.... fl.i..... t" .... po;.., ~.''''.'IU'. 1.........._ ...ltlill",,"..1 __II to, ......._. li,.~.. ..."...... rcr'.:o ...... .~ M.eun', U..I." .,h.,w". I'n...i. rul., ,_ ._t" of .""......_. t<t.., _I. _lit li...o ut .....i....._. I, ne._II. ...... """ ,.. ull.........ne ....1" ,... _t,.. ,.. . - C............,..tM... Enafneer 'h. "'.. ...."....... ...... h th_ .... _..__6..... 1_,_.. ... ...-...... ft.... Ih. .wIll_vi CI....",iW? I.. .... t"ul_', b'I_.... ESTIMATE OF WORK BY FORCE ACCOUNT --- Maintain existing traffic signal and lighting systems in effective operation in accordance with the provisions of Section 86-1.05 of the Standard Specification. Replace existing materials, required to be relocated and found to be unsatisfactory, with new material in accordance with the provisions of Section 86-7.02 of the Standard Specifications. Force account payment will be in accordance with Section 9-1.03 of the Standard Specifications. . 4,000 ........ eo.. _ ,....... S Do_I ." ... __ton 0' ."h ~cf., th. ,I.... 0' ....,.1"';0" ...;11 h. odiv".... en 'oUa..,,, No adjust'ment "- ,:.-' ..........." ill,. , City of San ,Bernardino, Dean Balcom t( ..... 11'/ 1:/~/R" _ , . ,..,...., I Ci t y r.,:..., ~. --- - W.. .h.. .......,.:\11...,' (.....'oc,_. hn.. vi.... '0<'.'..1 1..,.,;.1....._ to .f,. ,h.nnv. pt......,1 nnd h.,.I., DU'... If ,hI. r'.........1 h n....,o....,. .hll' _. _i1I,_ .11 .~Vi,......fI'. '..,..;,h 1111 .......';nll.. ....... ., ,...., o.h.,_i,. It. _I.d .bo.., ...... p.,'.''''' ..II ,.",.11'1' ..ec.."...., ..., 'h. ...... .....,... .,..,U,..I, _4 _It .. ..t.I, ".,_.., ,h.,.,., 'h. ...1... h~_.:"".'~.. PAuL 6iltJr?f)lJL~ Cvr7pm~7/\J;J " 'I ''II l"- pfl2'S ",- " ,h. Co..hu,to, du., "... .Iu'" ""..r'Coft(. 0' 11.1, ~~..,. 1.1, ,......1.... It .11,.,1... In 'h. '.q",I,.,..."., 0' tho ,.,.cllI(II'"'''' tI. '0 p,...., ...h .". Old..... ..,.. an" '1IIng .. wtlll... ",.t... wllh'" th. 11_ ,h.,.I" ..-cUl.... . II 0 i F I's l A a ~ i : Ii R · N A .Jt D I N o CONTIl^CT ClI^NCE OIlO[R NO. , . , surrl. NO.. RI:V. NO. \....-AlI Tra~~"'" ~19"~'r , , t"f'th 1 6392 , 1 r '" Ninth St. '~nd , C:::tt""Pf" , Stl[U o fiNIAl IIO.(S! "'rc:_!",nnc:: ",q,' CONTIACT 110 . C I T y ,__ . D:'II' _G..a rttna, r rnrpn,.A tf OI'L- . _____c.... ,.. ~. ~."h, ..r"u..d .., .....Ia. .h. .....&.. d.....b.. choftCu h_ the pl.", -.41 ,,,.clllu.n_. ., d. th. I.n._I... ".K.lbed "".,11 ".. 'It,."c1.... ... ,h. pa-, ............._. n.. thh ,_~_.. NOl!; tl\it c......... 0..1.. h ..0', e'hulvo ""In ~I:'!'ov.d ." 1".. Ci ~ ["..;"..,.. D.",.ip.i_ .f ....0... '" ... c1...... 1''';......, .f q..,,,..:'l.,. ....~ ,,,i,.. t. ... ",.:.1. :'...tr.',u'. 1...,,,"_ n.I.li,lo,,",d we,,, t.. ,o.."Gt" I"i.., ..."f...... ,..''':- ...... ...... CM'OVII'. U.II." ..he....". ,'a'e.i. rul.. .., ."...oe .f ..."'..."".... ......, ...1, AW" f".." ... .....ip"'_. ., n.,vun, 11II.... _.A ... uU......,,"',. will ... ........ ,.. ,= tiMe. C........ ,..'I.,....... . . .''''. ."... ...c_.... ......... .. .h~Ag.lJJ"IIO~J:.. 1M''''. ., ,,'"'..,. h... ah. W'IIIft" 4t.....i.., IflI Ut. t"..I...-.. (............ ADJUSTMENT QI COMPENSATION AT AGREED PRICE . Ad~ all equipment necessary to provide left turn traffic phases 1 and 5 at the intersection of Ninth Street and Waterman Avenue. This will provide left turn indications for traffic turning left from Nfnth Street. This change adds four (4) 12", 3 section. signal faces having red. yellow and green arrows. The mast arm signals will have a M AS m 0 u n tin g. Two (2) B" s i g n a 1 s e c t i on s will be de 1 e te d. The controller shall have sensor units. load switches & any auxiliary equi~ment needed to operate the additional 2 phases. The total increased cost shall be $2.269. full compensation fo~ this change. ' This sum constitutes .. . 2,269 . II'" .... Cod _.$ _ ......... s .., ._ton 0' ,,,;. ~d.,. .h. .1",. .. c."'P"tigo.. will h. .diu.'.... ., '..11._" No ad ustment . Mooltt04 ...,. City of San.Bernardino. 4 /~ /~t;" , Dean Balcom - . . A..,...... , ci ty [.0:.0-..., tit We. .h. '''''''''':0''.'' """',.el." hc... 01..." c.,.I..1 CD..,i.I.,.fi_ to .1.. .h"..o. ",oJ'O..d ...nd "...1." 00"', If ,M. ,..........1 I. "1',,,....1. ,h,,' .... .111,-" .11 .."...pro....... '.......h nil .....,.,i..lI. ......, I' ,nu, .'her....... ar. ".,.d ..,..... c..... peet."" ..U ,.,.,Ie.. n...."ar' ,.. ,h. ..... u""'.' ......,..... ~ wul - ..." ul',,"n.,h...I_ , p,le., ,h...... .....,.. ... .,.- '/ '" C.......... L PAUL 61f1"DAJe{' ('r)fl{Jbfltl7/DrJ \fICeT f't.'C"S 1111- If Ih. C..nh..,to. .lu.. '"11' .1,,"' ..c,.,..re.n.. 0' ..11,1. uhl.,. 1.1. "U.nthq I, ,11".1..1 Iv ,l.. I.quh.rn.,," n' .h. ..,.,1I1e1\11..n. .'It .. "....... !With'''. ..d..... ",.,k If:''' .m". . w.IIf." ...01.., with'" Ih. U..... Ih.,.I" ...."'11.....