HomeMy WebLinkAboutR09-Public Works
, CI-R OF SAN BERNARD-'b - REQUEOr FOR CO~~~IL ~~~N
r;:
Dept:
ROGER G. HARDGRAVE
Subject: Approva 1 of Change Order No. Two __
Contract with San-Val Engineering for
HVAC for New Central Library per Plan
No. 6463
Public Works/Engineering
Date: April 8, 1985
Synopsis of Previous Council action:
5-21-85 Resolution No. 84-187 adopted, awarding a contract to San-Val
Engineering, Inc., for the low bid price of $369,128, comprised
of the Base Bid, plus additive alternates No.'s 1 and 3.
Recommended motion:
o
That Change Order No. -two to the contract with San-Val Engineering, Inc., for
construction of the HVAC for the New Central Library, in accordance with Plan
No. 6463 be approved; to authorize a $1,639.02 increase to the contract from
$369,128 to $370,767.02 for changing the ceiling diffusers and relocating air
intakes in the atrium.
cc: John Matzer, Jr., City Administrator
Glenda Sau1, Executive Director - RDA
OJz,...~.l12~
Contact person: ROGER G. HARDGRAVE
Phone: 5025
Supporting data attached:
Ward:
1
FUNDING REQUIREMENTS:
Amount: $1,639.02
Source: Bonds sold by RDA and Grant
through State Libraries
OCil Notes:
Finance:
75-0262
Agenda Item No
/(9
'c1T9 OF SAN BERNARDIQ - REQUEC FOR COUNCIL AC'JQN
o
STAFF REPORT
The plans direct the installation of drywall diffusers in the ceiling. These
diffusers are not compatible with the suspended ceiling specified, so an alternate
type will have to be used. Change Order No. Two will direct the Contractor to
furnish and install Krueger Model #4200 diffusers in lieu of Krueger MOdel #2100
units.
Some conflicts were discovered during construction between ductwork and structural
beams. This change order will also relocate some air intakes in the atrium to
resolve these conflicts.
o
Attached is a copy of the memorandum from Mr. Don Rogers, Construction Manager,
dated 3-13-85. In this memorandum Mr. Rogers recommends that Change Order No. Two
be approved. We concur with this recommendation.
The Budget vs. Bid Analysis, dated 12-6-84, included an amount of $20,000.00 for
estimated future change orders. Of this amount, $5,000.00 was listed under Bid
Package No.9, HVAC. Therefore, approval of this Change Order, for an increase in
cost of $1,639.02 will not invalidate the Financial Report, dated 12-10-84, that
was presented at the Council Meeting of 12-17-84.
Resolution No. 84-187 awarded a contract for the Base Bid, plus Additive Alternates
No. 1 and 3, for a total bid price of $369,128.00. However, the contract referred
only to the Base Bid. Change Order No. One was issued to authorize the inclusion
of Additive Alternates No.1 and 3, as approved by Resolution No. 84-187 in awarding
contract.
c
75-0264
o
o
o
o
.f.D. DIFFENBAUGH. INC.
CONSTRtx:T I ON MANAGERS
o
2375 Chicago Avenue, RIversIde, CalifornIa 92507
(714) 684-2820
MEKlIWOUM
DATE: ~~rch 13, 1985
TO:
Roger Hardgrave
CIty of San Bernardino
FROM:
SUBJECT:
Don Rogers
San BernardIno Centra"
BP19, HVAC
Change Order 12
1I brary
.-
I', '-.
I," -
~-_.,
'7
r,MIIRE'
1\.
Subject change order Is attached wIth orIgInal sIgnatures.
,
~:->" -/' !
, .
~"':"'J"""";
0- ':.; \
. .' .....
.-
The reasons and explanatIons for the changes are as follows:
, BulletIn 15 Is to change dIffusers from Krueger 12100 serIes (for drywall) to
Krueger dIffusers for 2X2 lay-In panels for T-Bar ceIlIng usIng Krueger Model
0'4200, perforated supply grills and Model 14290 return grills. 080's are not
provIded ~Ith S.V. grills. Ductwork to have volume dampers. This change Is
necessary because the drywall diffusers were specIfied and would not work well
with a suspended ceiling system. To offset thIs additIonal cost, the architect
has agreed to change the ceilIng system from a "Flnellne" to a type "T-Bar"
ceIlIng system. ThIs wIll generate a $4,700 deductIve change order to BP113,
InterIors.
BulletIn 18 Is to revIse locat'lon of geothermal lInes. ThIs Is to accommodate' the
water department request whIch Is at no cost to the City.
BulletIn 110 15 to relocate air Intakes In atrIum.
conflIct between ductwork and steel beams. We are
bulletIn 110 and San-Val prIcIng wIth back-up.
ThIs Is to elImInate a
attachIng, for your reference,
We have reviewed the Itemized costs and have found them to be acceptable and,
therefore, recommend this change order be approved.
~ou need any further back-up
'l/ ~ftn' ~
on Rogers tJ.
Project Manag r f .
Attachments
or Informat~on, our files are avaIlable for your use.
C Iph
ee: Steve WhItney : Oscar Arnonl : Ole Hamblen : Ledge Ledgerwood
'.
~E
J.AIFFENDAUCH. QC.
2375 Chicago Avenue
RIverside, California 92507
" (7111) 825-6323
CONSTRUCTION MANACERS
o
CHANGE ORDER (C.O.)
Contreet CMnge Order No. Two {2\
Contreetor San-Val EnQineerlnQ
Dete 2-28-85
San Bernardino Central Library
Contrect BP#9. HVAC. Proi. #61163
Except es modified. en terms end conditions o,f the contrect remain unchenged. A description of the modification euthor.
bd by this Chenge Order to the ebove project follows:
Bulletin # 5 Change ceiling diffusers from Krueger #2100
series (for drywall) to Krueger diffusers for
2X2 lay-in panels for T-Bar ceiling using
Krueger Model #11200, perforated supply grills
and Model #4290 retur-n grills. OBD's are not
provided with. . ,4v grills. Ductwork to have
volume dampers. $,.', 1::>',," '.
Bulletin' 8 Revise location of geothermal lines.
Bulletin "0 Relocate air intakes In atrIum.
ADD $1,2118.13
N.C.
ADD 390.89
TOTAL $1,639.02
o
: INCREASE/DECREASE SCHEDULE TIME BY -0- DAYS
FOR THE ABOVE WORK (DEDUCT) 0 (ADD) ag THE SUM OF $ 1,639.02
Accepted by
Contrector SA N- V A L ENGI NEER I NG , I NCs;.......
,;Ite PRESIDENT
..... 3-6-85
Recommended
by the Architect
Recommended by
Construction Menager
Approved by
Owner
'~ r-.- -Q,...~ \"'"
~~
~r. C~Sc M \.:4....0""'- T;rIC~t\
[Q/lIo..\'-.... ~ ~ ~{)s;.+~~
~~~s
~~~
\
AuthorIHd Sill\tture
,....
.....
The cumuletive totel of C.O.'s, induding this one. is
2 % over original contrect price.
._,. - - - "
CONTRACT NO. BUDGET UNIT NO. eUe-OBJECT NO. ruND NO. .I0Il NO. AMOUNT OF CONTRACT
fI"I'\ 6q63 ----------- ------------ ---------. 83-2 $363,1160
-
AREA INVOLVED:
RRNO.
---------------------
JOB C.O. NO.----________________ RFQ NO. _________________
CM."