HomeMy WebLinkAboutR09-Public Works , CI-R OF SAN BERNARD-'b - REQUEOr FOR CO~~~IL ~~~N r;: Dept: ROGER G. HARDGRAVE Subject: Approva 1 of Change Order No. Two __ Contract with San-Val Engineering for HVAC for New Central Library per Plan No. 6463 Public Works/Engineering Date: April 8, 1985 Synopsis of Previous Council action: 5-21-85 Resolution No. 84-187 adopted, awarding a contract to San-Val Engineering, Inc., for the low bid price of $369,128, comprised of the Base Bid, plus additive alternates No.'s 1 and 3. Recommended motion: o That Change Order No. -two to the contract with San-Val Engineering, Inc., for construction of the HVAC for the New Central Library, in accordance with Plan No. 6463 be approved; to authorize a $1,639.02 increase to the contract from $369,128 to $370,767.02 for changing the ceiling diffusers and relocating air intakes in the atrium. cc: John Matzer, Jr., City Administrator Glenda Sau1, Executive Director - RDA OJz,...~.l12~ Contact person: ROGER G. HARDGRAVE Phone: 5025 Supporting data attached: Ward: 1 FUNDING REQUIREMENTS: Amount: $1,639.02 Source: Bonds sold by RDA and Grant through State Libraries OCil Notes: Finance: 75-0262 Agenda Item No /(9 'c1T9 OF SAN BERNARDIQ - REQUEC FOR COUNCIL AC'JQN o STAFF REPORT The plans direct the installation of drywall diffusers in the ceiling. These diffusers are not compatible with the suspended ceiling specified, so an alternate type will have to be used. Change Order No. Two will direct the Contractor to furnish and install Krueger Model #4200 diffusers in lieu of Krueger MOdel #2100 units. Some conflicts were discovered during construction between ductwork and structural beams. This change order will also relocate some air intakes in the atrium to resolve these conflicts. o Attached is a copy of the memorandum from Mr. Don Rogers, Construction Manager, dated 3-13-85. In this memorandum Mr. Rogers recommends that Change Order No. Two be approved. We concur with this recommendation. The Budget vs. Bid Analysis, dated 12-6-84, included an amount of $20,000.00 for estimated future change orders. Of this amount, $5,000.00 was listed under Bid Package No.9, HVAC. Therefore, approval of this Change Order, for an increase in cost of $1,639.02 will not invalidate the Financial Report, dated 12-10-84, that was presented at the Council Meeting of 12-17-84. Resolution No. 84-187 awarded a contract for the Base Bid, plus Additive Alternates No. 1 and 3, for a total bid price of $369,128.00. However, the contract referred only to the Base Bid. Change Order No. One was issued to authorize the inclusion of Additive Alternates No.1 and 3, as approved by Resolution No. 84-187 in awarding contract. c 75-0264 o o o o .f.D. DIFFENBAUGH. INC. CONSTRtx:T I ON MANAGERS o 2375 Chicago Avenue, RIversIde, CalifornIa 92507 (714) 684-2820 MEKlIWOUM DATE: ~~rch 13, 1985 TO: Roger Hardgrave CIty of San Bernardino FROM: SUBJECT: Don Rogers San BernardIno Centra" BP19, HVAC Change Order 12 1I brary .- I', '-. I," - ~-_., '7 r,MIIRE' 1\. Subject change order Is attached wIth orIgInal sIgnatures. , ~:->" -/' ! , . ~"':"'J""""; 0- ':.; \ . .' ..... .- The reasons and explanatIons for the changes are as follows: , BulletIn 15 Is to change dIffusers from Krueger 12100 serIes (for drywall) to Krueger dIffusers for 2X2 lay-In panels for T-Bar ceIlIng usIng Krueger Model 0'4200, perforated supply grills and Model 14290 return grills. 080's are not provIded ~Ith S.V. grills. Ductwork to have volume dampers. This change Is necessary because the drywall diffusers were specIfied and would not work well with a suspended ceiling system. To offset thIs additIonal cost, the architect has agreed to change the ceilIng system from a "Flnellne" to a type "T-Bar" ceIlIng system. ThIs wIll generate a $4,700 deductIve change order to BP113, InterIors. BulletIn 18 Is to revIse locat'lon of geothermal lInes. ThIs Is to accommodate' the water department request whIch Is at no cost to the City. BulletIn 110 15 to relocate air Intakes In atrIum. conflIct between ductwork and steel beams. We are bulletIn 110 and San-Val prIcIng wIth back-up. ThIs Is to elImInate a attachIng, for your reference, We have reviewed the Itemized costs and have found them to be acceptable and, therefore, recommend this change order be approved. ~ou need any further back-up 'l/ ~ftn' ~ on Rogers tJ. Project Manag r f . Attachments or Informat~on, our files are avaIlable for your use. C Iph ee: Steve WhItney : Oscar Arnonl : Ole Hamblen : Ledge Ledgerwood '. ~E J.AIFFENDAUCH. QC. 2375 Chicago Avenue RIverside, California 92507 " (7111) 825-6323 CONSTRUCTION MANACERS o CHANGE ORDER (C.O.) Contreet CMnge Order No. Two {2\ Contreetor San-Val EnQineerlnQ Dete 2-28-85 San Bernardino Central Library Contrect BP#9. HVAC. Proi. #61163 Except es modified. en terms end conditions o,f the contrect remain unchenged. A description of the modification euthor. bd by this Chenge Order to the ebove project follows: Bulletin # 5 Change ceiling diffusers from Krueger #2100 series (for drywall) to Krueger diffusers for 2X2 lay-in panels for T-Bar ceiling using Krueger Model #11200, perforated supply grills and Model #4290 retur-n grills. OBD's are not provided with. . ,4v grills. Ductwork to have volume dampers. $,.', 1::>',," '. Bulletin' 8 Revise location of geothermal lines. Bulletin "0 Relocate air intakes In atrIum. ADD $1,2118.13 N.C. ADD 390.89 TOTAL $1,639.02 o : INCREASE/DECREASE SCHEDULE TIME BY -0- DAYS FOR THE ABOVE WORK (DEDUCT) 0 (ADD) ag THE SUM OF $ 1,639.02 Accepted by Contrector SA N- V A L ENGI NEER I NG , I NCs;....... ,;Ite PRESIDENT ..... 3-6-85 Recommended by the Architect Recommended by Construction Menager Approved by Owner '~ r-.- -Q,...~ \"'" ~~ ~r. C~Sc M \.:4....0""'- T;rIC~t\ [Q/lIo..\'-.... ~ ~ ~{)s;.+~~ ~~~s ~~~ \ AuthorIHd Sill\tture ,.... ..... The cumuletive totel of C.O.'s, induding this one. is 2 % over original contrect price. ._,. - - - " CONTRACT NO. BUDGET UNIT NO. eUe-OBJECT NO. ruND NO. .I0Il NO. AMOUNT OF CONTRACT fI"I'\ 6q63 ----------- ------------ ---------. 83-2 $363,1160 - AREA INVOLVED: RRNO. --------------------- JOB C.O. NO.----________________ RFQ NO. _________________ CM."