Loading...
HomeMy WebLinkAboutS07-Public Works File No. tO~4 CIT~F SAN BERNARDINO - REQUE~ FOR COUNCIL ACT~N . . r I Dept Public Works/Engineering Subject: Tra ffi c Sa fety Improvements -- 40th Street corridor, between Valencia and Del Rosa Avenue From: ROGER G. HARDGRAVE Date: February 14, 1985 Synopsis of Previous Council action: None Recommended motion: That the traffic safety improvements Items #1 through #5, for the 40th Street corridor, be approved'and authorize the amount of $11,500 to be transferred from Account 42-510-410 (Im~rovements - Major Streets) for this expenditure. cc: John Matzer Jr" City Administrator Manuel Moreno, Director - Public Services Wayne Overstreet, Superintendent - Public Buildings Warren Knudson, Director - Finance ~/ltll ,A /th(j~(~ Signature Contact person: Peter H, Liu Phone: S??fi Supporting t1ata attached: Staff ReDort Ward: 4 FUNDING REOUIREMENTS: Amount: $11.500 Source: 4?-S10-410 Finance: ?)~J c>~ ~. Council Notes: Agenda Item No. $,.1 7S.0262 . CITOOF SAN BERNARDll'O - REQUC=:C1 FOR COUNCIL AC:>ON . STAFF REPORT .. '. A neighborhood meeting, requested by the 40th Street Homeowners' Association, lias conducted by the City Council Office on Monday night (2-11-85) at the Grace Baptist Church, located at 1333 - 39th Street. The main purpose of the meeting was to discuss the traffic safety concerns on the 40th Street corridor which starts at Valencia Avenue in ~n easterly direction, through Mountain Avenue and 39th Street, ending at Del Rosa Avenue. A total of 39 traffic accidents have occurred along this corridor in the past three years, Statistics show that annual traffic accidents were doubled in 1983 and tripled in 1984 by comparison with the 1982 base year, Approximately 15 accidents were reported in the vicinity between Conejo Avenue and Sonora Street as 40th Street transitioning to ~ountain Avenue through two consecutive sharr curves, Two of these accidents were fatal. Improvements recommended by the Engineering Division are listed below: Cost Estimate 1. Sandblasting Existing Stripes 2. Centerline & edgeline striping w/reflective markers ' 3. Reloca~ing existing flashing beacon 4. Establishing speed zones; installing signs and guard rail 5. Erecting 6 additional street lights on existing Edison Poles $ 3,000,00 4,000,00 2,500,00 2,000,00 Sub- Tota 1 $11 ,500.00 Additional major improvements identified at the meeting include the foll owir,g: 6. Removing existing flood control wall 3,000.00 along the west side of Mountain Ave, (by Contractor) 7. Building 3-ft. block wall @ 1,000 L.F. 18,000.00 (by Contractor) 8, Road widening & A,C, paving 1,500,00 Sub-Total 22,500,00 TOTAL ESTIMATED COST ------ 34,000,00 URGENCY CLAUSE The improvements need to be made as soon as possible. n.~~64