HomeMy WebLinkAbout1981-010 Authorizing Execution of Agreement for Professional Services to Design Proposed Storm Drain in Electric Ave Betw 44th and McQuiddy Basin1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. �?I— /O
RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION
OF AN AGREEMENT FOR PROFESSIONAL SERVICES TO DESIGN THE PROPOSED STORM DRAIN
IN ELECTRIC AVENUE, BETWEEN 44TH STREET AND McQUIDDY BASIN.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
BERNARDINO AS FOLLOWS:
SECTION 1. The Mayor of the City of San Bernardino is hereby
authorized and directed to execute on behalf of said City an agreement with
C M ENGINEERING ASSOCIATES
for professional services to develop the final construction plans,
specifications and estimate; and design the storm drain in Electric Avenue,
between 44th Street and Mcnuiddy Basin.
I HEREBY CERTIFY that the foregoing resolution !Nas duly adopted
by the Mayor and Common Council of the City of San Bernardino at a
meeting thereof, held on the �_' day of
19810., by the following vote, to wit:
AYES: �...,r.� ..� �� •� � ���...�_,.._ � ,� �
L�'
NAYS: I.
ABSENT: SSG'
City Clerk
The foregoing resolution is hereby approved this day of
1
F ,
v
Approved as to form:
Cass .#27A
12/80
ENGINEERING SERVICES AGREEMENT
FOR
STORM DRAIN IMPROVEMENT, McQUIDDY BASIN
TO 44th STREET
IN
THE CITY OF SAN BERNARDINO AND COUNTY OF SAN BERNARDINO
CALIFORNIA
This AGREEMENT, made and entered into this, 7/11,
day of 19 p/ �, by and between the CITY OF
SAN BERNAi-LDINO hose address is City Hall, 300 North "D" Street, San
Bernardino, California 92418, Attention: Public Works Director, hereinafter
referred to as "CITY" and C M ENGINEERING ASSOCIATES, A California
Corporation, P.O. Box 6087, San Bernardino, CAlifornia 92412, hereinafter
referred to as "ENGINEER":
WITNESSETH:
WHEREAS, CITY intends to design and construct a storm drain
extending from McQuiddy Basin to 44th Street in Electric Avenue; and
WHEREAS, CITY desires to employ ENGINEER to furnish engi-
neering services for the proposed storm drain improvement, hereinafter refer-
red to as the "PROJECT"; and
WHEREAS, ENGINEER accepts said employment to furnish said
engineering services for the PROJECT: and
NOW, THEREFORE, in consideration of the foregoing and the
mutual covenants and promises hereinafter contained, the parties agree as
follows:
-1-
SECTION I: BASIC SERVICES OF THE ENGINEER
In performing the work under this phase of this Agreement, the
Engineer shall:
A. Investigate the most feasible plan and routing for the Project to
minimize impact on future storm drain projects.
B. Acquire recorded drawings of existing utilities to locate underground
and surface improvements.
C . Prepare construction plans, specifications, and other supporting
documents necessary for construction of Project.
D. Provide professional advice and consultation to the City as to best
means satisfactory to accomplish the Project and aid the City in
resolution of any conflicts in construction contract documents.
SECTION II: RESPONSIBILITIES OF CITY
A. Provide the Engineer full information as to the requirements for
the Project.
B . Obtain access to and make all provisions for the Engineer to enter
upon public and private lands as required in the performance of the
Engineer's work under this Agreement.
C. Obtain, with the Engineer's assistance, approval of all governmental
authorities having jurisdiction over the Project Improvement and
such approvals and consents from such other individuals or bodies
as may be necessary for completion of the Project.
-2-
SECTION III SCHEDULE FOR COMPLETION
A. Engineer will endeavor to have all design work on the Project
completed on or before January 15, 1981.
SECTION IV COMPENSATION TO ENGINEER
The Engineer shall receive a total fee of Eighteen Thousand Five
Hundred Dollars ($18,500.00) for the work described under Section I of
this Agreement of which 95% of the total fee will be paid within 60 days
of the completion of the plans and specifications and the remaining 51/6 after
completion of construction of the Project.
IN WITNESS WHEREOF, the parties hereto have executed this Agree-
ment on the day first above written in the City of San Bernardino.
APPROVED AS TO FORM:
CIl
Im
C M ENGINEERING ASSOCIATES
BY: f�1
Isla
Executive Vice President