Loading...
HomeMy WebLinkAbout06-10-2020 Special Meeting Agenda Packet CITY OF SAN BERNARDINO AGENDA F OR THE S PECIAL M EETING OF THE M AYOR AND C ITY C OUNCIL OF THE C ITY OF S AN B ERNARDINO, M AYOR AND C ITY C OUNCIL OF THE C ITY OF S AN B ERNARDINO A CTING AS THE S UCCESSOR A GENCY TO THE R EDEVELOPMENT A GENCY, M AYOR AND C ITY C OUNCIL OF THE C ITY OF S AN B ERNARDINO A CTING AS THE S UCCESSOR H OUSING A GENCY TO THE R EDEVELOPMENT A GENCY, AND M AYOR AND C ITY C OUNCIL OF THE C ITY OF S AN B ERNARDINO A CTING AS THE H OUSING A UTHORITY WEDNESDAY, JUNE 10, 2020 5:30 PM OPEN SESSION W EB-C ONFERENCE V IA Z OOM S AN B ERNARDINO, CA 92410 WWW.SBCITY.ORG IMPORTANT COVID-19 NOTICE IN AN EFFORT TO PROTECT PUBLIC HEALTH AND PREVENT THE SPREAD OF COVID-19 (CORONAVIRUS) AND TO ENABLE APPROPRIATE SOCIAL DISTANCING, THE CLOSED SESSION PUBLIC COMMENT WILL NOT BE OPEN TO PUBLIC ATTENDANCE. THE CITY OF SAN BERNARDINO ENCOURAGES THE PUBLIC TO VIEW THE PUBLIC COMMENT ON TELEVISION OR ONLINE. THE MEETING IS BROADCAST LIVE ON TIME WARNER CHANNEL 3 OR CHARTER SPECTRUM CHANNEL 3 AND LIVE STREAMED ONLINE AT http://sanbernardinocityca.iqm2.com/Citizens/Detail_Meeting.aspx?ID=2904 MEMBERS OF THE PUBLIC WHO WISH TO COMMENT ON MATTERS ONLY LISTED ON THE AGENDA BEFORE THE MAYOR & CITY COUNCIL MAY PARTICIPATE IN THE FOLLOWING WAYS: (1) COMMENTS AND CONTACT INFORMATION CAN BE EMAILED TO publiccomments@SBCity.Org BY 4:00 P.M. THE DAY OF THE SCHEDULED MEETING TO BE INCLUDED IN THE WRITTEN RECORD; (2) CALLING 909-384-5128, LEAVING A RECORDED MESSAGE, BY 4:00 P.M. THE DAY OF THE SCHEDULED MEETING, NOT TO EXCEED THREE MINUTES, WHICH WILL THEN BE PLAYED DURING THE PUBLIC COMMENT SECTION OF THE AGENDA ***ITEMS THAT ARE SUBMITTED TO BE PART OF THE MEETING RECORD CAN BE FOUND USING THE LINK BELOW OR SELECTING CITY CLERK OFFICE DOCUMENTS, COUNCIL AGENDAS, CURRENT YEAR, AND MEETING DATE. IF YOU HAVE ANY QUESTIONS PLEASE -384-5002. http://edocs.sbcity.org/WebLink/Browse.aspx?id=4077563&dbid=0&repo=SB Special Meeting Agenda June 10, 2020 John Valdivia Theodore Sanchez James Mulvihill M AYOR M AYOR P RO-T EM, W ARD 1 C OUNCIL M EMBER, W ARD 7 Sandra Ibarra Teri Ledoux C OUNCIL M EMBER, W ARD 2 C ITY M ANAGER Juan Figueroa Sonia Carvalho C OUNCIL M EMBER, W ARD 3 C ITY A TTORNEY Fred Shorett Genoveva Rocha C OUNCIL M EMBER, W ARD 4 A CTING C ITY C LERK Henry Nickel C OUNCIL M EMBER, W ARD 5 Bessine L. Richard C OUNCIL M EMBER, W ARD 6 Welcome to a meeting of the Mayor and City Council of the City of San Bernardino. o going to www.sbcity.org. CALL TO ORDER Attendee Name Present Absent Late Arrived Mayor Pro-Tem, Ward 1 Theodore Sanchez Council Member, Ward 2 Sandra Ibarra Council Member, Ward 3 Juan Figueroa Council Member, Ward 4 Fred Shorett Council Member, Ward 5 Henry Nickel Council Member, Ward 6 Bessine L. Richard Council Member, Ward 7 James Mulvihill Mayor John Valdivia Acting City Clerk Genoveva Rocha City Attorney Sonia Carvalho City Manager Teri Ledoux Mayor and City Council of the City of San Bernardino Page 2 Printed 6/5/2020 Special Meeting Agenda June 10, 2020 5:30 P.M. INVOCATION AND PLEDGE OF ALLEGIANCE PUBLIC COMMENTS FOR ITEMS LISTED ON THE AGENDA STAFF REPORT 1. Presentation of FY 2020/21 Capital Improvement Program Recommendation That the Mayor and City Council receive a presentation of the FY 2020/21 Proposed Capital Improvement Program (CIP) Budget and provide staff direction. ADJOURNMENT The next joint regular meeting of the Mayor and City Council and the Mayor and City Council Acting as the Successor Agency to the Redevelopment Agency will be held on Wednesday, June 17, 2020 via web-conference. Closed Session will begin at 5:30 p.m. and Open Session will begin at 7:00 p.m. CERTIFICATION OF POSTING AGENDA I, Genoveva Rocha, CMC, Acting City Clerk for the City of San Bernardino, California, hereby certify that the agenda for the June 10, 2020 Special Meeting of the Mayor and City Council and the Mayor and City Council acting as the Successor Agency to the Redevelopment Agency was at the San Bernardino Public Library located at 555 West 6th Street, San Bernardino, California, I declare under the penalty of perjury that the foregoing is true and correct. ___________________________________ Genoveva Rocha, CMC Acting City Clerk Mayor and City Council of the City of San Bernardino Page 3 Printed 6/5/2020 Special Meeting Agenda June 10, 2020 NOTICE: NOTICE OF A SPECIAL MEETING OF THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO DATE: June 5, 2020 SUJECT: Special Meeting on Wednesday, June 10, 2020 NOTICE IS HEREBY GIVEN that the Mayor of the City of San Bernardino has called a Special Meeting to be held on Wednesday, June 10, 2020, via web- conference. Open Session will begin at 5:30 p.m. Said meeting shall be for the purpose of considering the following: STAFF REPORT 1. Presentation of Fiscal Year 2020/21 Capital Improvement Program Recommendation That the Mayor and City Council receive a presentation of the FY 2020/21 Proposed Capital Improvement Program (CIP) Budget and provide staff direction. ADJOURNMENT The next Joint Regular Meeting of the Mayor and City Council and the Mayor and City Council Acting as the Successor Agency to the Redevelopment Agency will be held on Wednesday, June 17, 2020, via web-conference. Closed Session will begin at 5:30 p.m. and Open Session will begin at 7:00 p.m. Mayor and City Council of the City of San Bernardino Page 4 Printed 6/5/2020 1 Staff Report City of San Bernardino Request for Council Action Date: June 10, 2020 To: Honorable Mayor and City Council Members From: Teri Ledoux, City Manager Subject: FY 2020/21 Capital Improvement Program Recommendation That the Mayor and City Council receive a presentation of the FY 2020/21 Proposed Capital Improvement Program (CIP) Budget and provide staff direction. Background Staff has developed the Proposed FY 2020/21 CIP budget and Five-Year CIP plan based on prioritization of projects, available funding, and restrictions on use of funding sources. Capital improvements substantially affect the economic vitality and quality of life in the community. By definition, a capital improvement requires a major initial investment, a significant and ongoing financial commitment, and ultimately, replacement. Major capital improvements can often be complex projects requiring several years of strategic planning, design, and funding before construction begins. lenges over the last decade or more have resulted in a significant backlog of capital needs that have deteriorated the quality of infrastructure and adversely affect economic development efforts and community investment. Adding to the financial challenges in FY2020/21 CIP planning are the unknown fiscal impacts of revenue reductions that may be experienced due to the current COVID-19 pandemic. While preparing this CIP, staff has made every effort to include conservative revenue projections for CIP project funding sources based on information provided by our economic advisors and agencies that administer the source funding, impacts of COVID- 19 on various revenues may impact our ability to move forward with certain projects. Staff continues all efforts to seek out grants for projects, leverage projects with non- General Funds and/or restricted funds, and to invest in capital projects that result in reduced operating costs. Despite the completion of many projects in FY 2019/20, the nce and overall funding gap for capital projects continues to grow with each passing fiscal year. Staff estimates that the deferred maintenance remains at over $195 million for City facility needs and near $210 million for preservation, improvement and replacement of City streets. In addition to these deferred maintenance items, staff has included a list of unfunded projects that have been identified via requests submitted by the Mayor, City Council and City Department Heads some, but not all of which, are included on the draft facilities assessment. This Packet Pg. 5 Page 1 1 6775 and will continue to be updated as staff works towards development of a comprehensive list of all outstanding capital improvement needs for the City. The FY 2020/21 Proposed CIP, in the context of available resources, recommends $19.6M for FY 2020/21. Over the course of five years (FY 2020/21 through FY 2024/25) the City anticipates investing a total of $44.6M in our infrastructure. This does not include any funds that will be carried over from FY 2019/20 into FY 2020/21. Discussion Proposed CIP Expenditures Proposed CIP expenditures are categorized into the following categories: Streets, Traffic Controls, Storm Drains, Parks and Buildings. The largest investment for FY 2020/21 is in the category of Streets. At $11.6 million, over 59% of all proposed projects are in this category. In the past, the General Fund has been the primary source for CIP projects related to City facilities. Given the ongoing challenges facing the General Fund in the upcoming year, no recommendations are included for that category in this proposed CIP. CIP proposed expenditures by category for FY 2020/21 as are follows: Please note: Included within the Proposed FY 2020/21 CIP document is a section that provides an update of all projects budgeted in FY 2019/20. Available Funding Sources: The largest source of funding ($4.5 million) proposed for use in FY 2020/21 is the Regional Circulation Fee Fund. This fund is a Development Impact Fee (DIF) fund that Packet Pg. 6 Page 2 1 6775 generates revenues as fees are collected based on the impact a development will have on the City. In addition, almost $3.7 million in SB-1 funding, and $2.4 million in Measure I funds are programmed to support projects in the proposed FY 2020/21 CIP. Most sources used to fund CIP projects, like DIF funds and grants, are restricted to specific purposes. The Overview section of the CIP document provides descriptions of the various funding sources proposed for use. Not included in the Proposed CIP at this time is use of the remaining proceeds from the 2010 Series A and B tax allocation bonds (TABs). As reported to the Mayor and th Council on January 15 2020, there are $3 million in proceeds available from the 2010 A Series TABs which are primarily for use in the downtown area of the City, but a portion may also be used in the Northwest Redevelopment Project Area. $135,078 is currently available in 2010 B Series TABs proceeds, with another $945,545 available upon completion of the final ROPS (recognized obligation payment schedule). Proceeds from the 2010 B Series TABs are exclusively for use in the Northwest Project Area. Staff will return to Council with options for utilizing these one-time funds. 2020-2025 Key Strategic Targets and Goals Packet Pg. 7 Page 3 1 6775 The preparation of the annual CIP is consistent with Goal No 1. Financial Stability by supporting Key Target 1.b - Implement, maintain, and update a fiscal accountability plan; Key Target No. 1.c. - Create a framework for spending decisions; Key Target No.1.d - Create an asset management plan. The proposed projects also align with the Mayor and City Counc support the backbone infrastructure needs for existing and future business and housing projects within the City. res Fiscal Impact There is no fiscal impact from the presentation of the FY 2020/21 Proposed CIP Budget. If approved, the Proposed FY 2020/21 CIP Budget will allocate $19.6 million to various CIP projects throughout the City. Once the CIP is approved, individual projects will be presented to the Mayor and City Council for award of contracts before any work begins. Conclusion After reviewing this report and attachments, and at the conclusion of the FY 2020/21 Proposed Budget presentation, staff requests that the Mayor and Council provide further direction. Staff will incorporate any modifications resulting from this meeting of the Mayor and Council into the final FY 2020/21 Capital Improvement Program Budget. th A public hearing has been set for June 24 2020 for final adoption of both the FY 2020/21 Operating Budget and FY 2020/21 CIP. Ward: Citywide Synopsis of Previous Council Actions: June 3, 2019 Mayor and City Council approved Resolution 2020-115 approving the revised FY2019/20 Measure I 5YR CIP (MICIP). These revisions are reflected in the proposed City of San Bernardino FY20-21 Capital Improvement Plan Packet Pg. 8 Page 4 1.a DDDDD Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 9 369 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 10 370 1.a City of San Bernardino FY2020/21Proposed Capital Improvement Plan Table of Contents Overview373 Transmittal Letter373 CIP Narrative Overview377 CIP Summaries387 Buildings395 Parks403 Storm Drains413 Streets423 Traffic Controls441 Unfunded461 Status of Prior Year Projects465 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 11 371 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 12 372 1.a DJUZ!DJUZ!DJUZ!DJUZ!DJUZ!DJUZ!DJUZ!DJUZ!DJUZ! USBOTNJUUBM! MFUUFS Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 13 373 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 14 374 1.a Office of the City Manager | Teri Ledoux, City Manager June 10, 2020 Honorable Mayor, Council Members, and the Citizens of San Bernardino: This transmittal letter accompanies the proposed Fiscal Year (FY) 2020/21 Budget and Five-Year Plan for the City’s Capital Improvement Program (CIP). This document guides the City in the planning and scheduling of infrastructure improvement projects over the next five years. The combined FY 2020/21 Proposed Capital funding request is $19.6 million. This is a decrease of $8.69 million, or 30.7%, as compared to the FY 2019/20 Adopted Capital Budget of $28.3 million. The overall FY 2020-21 to FY 2024-25 CIP represents $44.6 million dollars. Each year, the City’s CIP represents a series of challenges and difficult decisions required to adequately fund the City’s growing infrastructure needs to the level residents expect. InFY 2020/21, these challenges are magnified as the City anticipates reductions in revenues due to the impacts of the COVID-19 pandemic. In addition to General Fund impacts, these reductions in revenues will be experienced to various extents in Gas Tax, SB1, and Measure I funding. This CIP document takes into account these expected reductions. Projects proposed for the FY 2020/21 have taken into consideration potential sources of available funding, project eligibility for use of restricted funding sources, and potential financing opportunities. Projects are evaluated and prioritized using criteria including the protection of public health and safety, adherence to legal requirements, environmental quality, level of public support, return on investment and alignment with the Strategic Key Targets of the Mayor and City Council. The City’s ongoing financial challenges have continued to result in a significant backlog of capital needs that have deteriorated the quality of infrastructure and adversely affect economic development efforts and community investment. While the City continues its efforts to seek out grants for projects, leverage projects with non-General Funds and/or restricted funds and invest in capital projects that result in reduced operating costs, the City’s backlog of maintenance and overall funding gap for capital projects continues to grow with each passing fiscal year. Staff estimates that the deferred maintenance of City facilities is over $195 million and deferred maintenance of street related infrastructure is conservatively estimated at $210 million. FY 2020/21 Proposed CIP Expenditures Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) The largest capital funding investment for FY 2020/21 is in the category of Streets. At $11.6 million, the streets category represents 59% of all proposed projects. In the past, the General Fund has been the primary source for CIP projects related to City facilities. Given the ongoing challenges facing the General Fund in the upcoming year, no recommendations are included for that category in this proposed CIP. CIP proposed expenditures for FY2020/21 by category as are follows: Packet Pg. 15 375 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 16 376 1.a DJQ!DJQ!DJQ!DJQ!DJQ!DJQ!DJQ! Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 17 377 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 18 378 1.a Overview of FY 2020/2021 Proposed CIP This Overview Section of the FY 2020/2021 Proposed Capital Improvement Plan (CIP) contains the following: Overview of the CIP Document Descriptions of Project Statuses Discussion of Available Resources Discussion of Project Categories Overview of the CIP Document The City of San Bernardino develops its Five-Year Capital Improvement Program (CIP) consistent with the 2020-2025 Key Strategic Targets and Goals established by the Mayor and City Council. Capital improvements substantially affect the economic vitality and quality of life in the community. By definition, a capital improvement requires a major initial investment, a significant and ongoing financial commitment, and ultimately, replacement. Major capital improvements can often be complex projects requiring several years of strategic planning, design, and funding before construction begins. This CIP is a five-year program designed within the context of the Mayor and City CouncilÓs goals and objectives, that links the planning of capital improvements to realistic, reliable funding sources. This ensures that the planning and implementation of such projects are balanced within available resources. Careful long-term planning and budgeting is required so cyclical downturns or unforeseen financial emergencies do not curtail planned maintenance and necessary replacement. Projects included in the CIP are based on an assessment of community needs, Mayor and City Council priorities and available funding. Capital projects relate to new construction, major improvements or rehabilitation of assets, or acquisition of a structure. Infrastructure projects generally relate to the long-term renovation and replacement of the CityÓs existing physical assets like streets, sewers, water lines, roof replacements, and heating and air conditioning ventilation systems replacement. Special projects generally include one-time projects that are designed to address a specific community need or problem. Although the CIP Budget document is developed in conjunction with the annual operating budget, it is submitted separately in order to provide more detailed information. The document itself is a cooperative effort among City staff responsible for their respective projects. Project Planning & Budgeting Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Each year, the CityÓs CIP represents a series of challenges and difficult decisions required to adequately fund the CityÓs growing infrastructure needs to the level residents expect. In FY 2020/21, these challenges are magnified as the City anticipates reductions in revenues due to the impacts of the COVID-19 pandemic. In addition to Packet Pg. 19 379 1.a Overview of FY 2020/2021 Proposed CIP General Fund impacts, these reductions in revenues will be experienced to various extents in Gas Tax, SB1, and Measure I funding. This CIP document takes into account these expected reductions. The CityÓs financial challenges have resulted in a significant backlog of capital needs that have deteriorated the quality of infrastructure and adversely affect economic development efforts and community investment. While the City continues its efforts to seek out grants for projects, leverage projects with non-General Funds and/or restricted funds and invest in capital projects that result in reduced operating costs, the CityÓs backlog of maintenance and overall funding gap for capital projects continues to grow with each passing fiscal year. Project Statuses CIP projects are reviewed and updated annually. Consideration is given to potential sources of funding, financing opportunities, and the value of the project using criteria including the protection of public health and safety, adherence to legal requirements, environmental quality, level of public support, return on investment, availability of financing, and relationship to Mayor and City Council Goals and Objectives. This document provides progress status updates on projects approved in the 2019/20 CIP, as well as introduces new projects. Throughout the CIP you will notice that each project is labeled as New or Ongoing. A new project is one that has not previously received funding in recent years. An ongoing project is one that has been included and funded in a recent CIP. Of the ongoing projects there are three potential categories, 1. The project was funded in the 2019/20 CIP and has been completed, 2. The project was funded in the 2019/20 CIP but was not fully completed and will be included as a carryover, and, 3. The project was included in the 2019/20 CIP for a certain phase of the project (i.e. design), and the project now needs additional funds for the subsequent phases (i.e. construction). The latter category may also require funding to be carried over from a previous phase. In all cases, carryovers will come before the Mayor and City Council for approval, and are only requested by staff if sufficient funding is still leftover in the budget. The amounts needed for carryover projects are not included in the totals for FY 2020/21 in any of the summaries, only new projects or new allocations for ongoing projects. This is a Five-Year CIP, meaning that staff has projected out the funding for these projects over time. It is important to note that the approval of this document appropriates funding for FY 2020/21 only, and not for the following 5 years. Each year, as staff receives more information on the priorities of the Mayor and City Council, as well as the Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) available funding, a new CIP will be presented for approval. Packet Pg. 20 380 1.a Overview of FY 2020/2021 Proposed CIP Available Resources The CityÓs funding sources for Capital Improvement Projects includes a wide variety of sources. For FY 2020/21, CIP Funding is comprised of the following: The General Fund is the only unrestricted source, but typically does not have significant resources to contribute toward capital projects needs after funding the CityÓs operating needs. A number of other sources, though restricted as to use of funds, are available and can be used to complete needed capital improvements. These include: 1. Community Development Block Grant (CDBG) 2. Local Circulation Development Impact Fee Fund 3. Half-Cent Sales Tax Î Local Fund (Measure I) 4. Regional Circulation Development Impact Fee Fund Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 5. Road Repair & Accountability Act Gas Tax Î (SB-1) 6. Storm Drain Development Impact Fee Fund 7. Animal Shelter Improvement Fund 8. Public Use Facilities Fund Packet Pg. 21 381 1.a Overview of FY 2020/2021 Proposed CIP 9. Cultural Development Fund 10. Quimby Parkland Fund 11. Public Improvement Fund 12. Highway Safety Improvement Program (HSIP Grant) The section below gives a brief description of the possible funding sources noted above: 1. Community Development Block Grant (CDBG) The primary objective of this program is to develop viable urban communities by providing decent housing, a suitable living environment and expanding economic opportunities, principally for persons of low and moderate income. This may be achieved through the elimination of blight and detrimental living conditions; conservation and expansion of housing stock; improved public services; and improved use of land. All public facilities, except for Ðbuilding for the general conduct of governmentÑ (i.e. City Halls) are eligible. 2. Local Circulation Fee Fund This fund accounts for the local circulation systems fee imposed on new residential, commercial, and industrial development to fund the cost of streets, signals, and bridges. Circulation system projects that, when constructed, will improve traffic circulation generally within the boundaries of the City of San Bernardino. An Example would be a traffic signal at the intersection of two arterials 3. Half-Cent Sales Tax Î Local Funds (Measure I) CityÓs share of a County-wide one-half cent (1/2) sales tax measure approved by voters to provide funding for street maintenance and construction projects. 4. Regional Circulation Fee Fund Circulation system projects that, when constructed, will improve circulation on a regional basis, (i.e. drivers from other nearby cities will also benefit from the improvements.) Examples would include freeway interchanges and access/egress ramps, major thoroughfares that travel through numerous other municipal agencies and major railroad grade separations. 5. Road Repair & Accountability Act Gas Tax Î (SB-1) RMRA revenue is earmarked for local streets and roads maintenance and rehabilitation and other eligible uses, including complete streets projects, traffic signals, and drainage improvements. 6. Storm Drain Construction Fund Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) New Developments are required to pay a fee based upon area for construction of storm drains. This fund is used for CIP Projects in the Storm Drain category. 7. Animal Shelter Improvement Fund Packet Pg. 22 382 1.a Overview of FY 2020/2021 Proposed CIP The Animal Shelter Improvement Fund has been in place since Fiscal Year 2010/11. The San Bernardino Animal Shelter previously contracted shelter services with various surrounding cities. Each city paid to the City of San Bernardino a monthly fee to cover the cost of housing animals from the respective cities. A portion of the monthly fee, 15%, was set aside into a Deposit account to be used solely for the purpose of making improvements to the Animal Shelter facility. 8. Public Use Facilities Fund This fund is used for the construction and maintenance of community centers for classes, meetings, and general public use. 9. Cultural Development Fund A cultural development construction tax is imposed on the privilege of New Construction or Reconstruction as defined in Municipal Code Section 15.57.020 Subsections C and D. Such tax shall be equal to one-half (1/2) of one (1) percent of the Construction Cost. The funds derived from this tax shall be allocated to cultural development activities in the City or such other uses as the Mayor and City Council may direct. 10. Quimby/DIF Quimby Act is also a DIF Fund and is collected by development and is used in the Parks improvements that are not connected by Parks and Open Space Collections. 11. Public Improvement Fund Funding provided by the San Manuel Band of Mission Indians for various selected projects offset impacts to the City. 12. Highway Safety Improvement Program (HSIP Grant) The Highway Safety Improvement Program (HSIP), codified as Section 148 of Title 23, United States Code (23 U.S.C. §148) is one of the core federal-aid programs in the new federal surface transportation act, Fixing America's Surface Transportation Act (FAST), which was signed into law on December 4, 2015. The purpose of the HSIP program is to achieve a significant reduction in traffic fatalities and serious injuries on all public roads, including non-State-owned public roads and roads on tribal land. The total Five-Year CIP proposed for consideration by the Mayor and City Council is $44,620,323; of that total, the portion allocated to FY 2020/21 is $19,602,740. Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 23 383 1.a Overview of FY 2020/2021 Proposed CIP Project Categories TotalUseofCIPFUNDSForFY2020/21 $19,602,740 Parks, StormDrains, 2,756,000 950,000 Traffic Controls, 2,977,800 Streets, 11,628,940 Buildings, 1,290,000 The CIP document is broken up into categories for the type of project. Types of projects include Buildings, Landfill, Parks, Storm Drains, Streets, and Traffic Controls. Buildings There are no Building projects proposed for FY 2020/21. Typically, these are projects funded by the general fund. Landfill This section reflects projects needed at the CityÓs closed sanitary landfill in the southern end of the community. Various federally required activities are required to occur as the City monitors the post-closure period of the landfill. Projects required to be completed at the landfill are funded by the residual fund balance of the former refuse operation. Parks and Recreation Parks and Recreation projects are primarily funded by Park Development Fees or CDBG funds. The funds may be used to pay for developing new or rehabilitating existing neighborhood or community parks, recreational facilities and restrooms, game courts and fields, lighting, and playground equipment. The purpose is to secure the optimal level of recreational use and sustainability of parks in the long-term plan. Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Operating costs that arise from these projects are primarily funded by the General Fund. Storm Drains Projects in this section may include projects to increase system capacity, replace aging or obsolete systems, and meet new regulatory requirements. General Fund revenue, Packet Pg. 24 384 1.a Overview of FY 2020/2021 Proposed CIP development fees, and National Pollution Discharge Elimination System (NPDES) revenue may be used to fund the cost of projects in this section. Streets and Traffic Signals A well planned and maintained transportation infrastructure is a critical component for ensuring a safe, livable community, balancing housing and jobs, and supporting economic development. While San Bernardino has a robust street system and transportation infrastructure, regional and local development and the passage of time continue to strain capacity and increase maintenance needs. Long range planning related to traffic and transportation programs and active involvement in countywide planning efforts are critical. Effective planning allows the City to undertake a coordinated traffic and transportation capital projects program and to position itself to compete strongly for outside specialized discretionary funding as it becomes available. Projects detailed in this section may include efforts to extend and widen streets, street resurfacing, construction of curbs, gutters, sidewalks, handicapped ramps, and bikeways; right-of-way acquisition; and street lighting systems as well as new traffic signals; traffic striping; and replacing aging or obsolete traffic control systems. Projects in this section may be funded by development fees, Federal and state aid, State Gas Tax, Measure I funds, and CDBG Funds. Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 25 385 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 26 386 1.a DJQ!DJQ!DJQ!DJQ!DJQ!DJQ!DJQ! Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 27 387 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 28 388 1.a CapitalBudgetSummary Theprojected5YearCapitalImprovementProgramExpendituresaresummarizedbyCategorybelow: CategoryFY2020/21FY2021/22FY2022/23FY2023/24FY2024/25Total Buildings1,290,0001,290,000 Streets11,628,9408,091,1261,776,057750,00022,246,123 Parks2,756,0002,756,000 StormDrains950,0005,850,000650,000650,000650,0008,750,000 TrafficControls2,977,8003,927,8002,672,6009,578,200 GrandTotal19,602,74017,868,9265,098,6571,400,000650,00044,620,323 Theprojected5YearCapitalImprovementProgramExpendituresaresummarizedbyFundbelow: FundFY2020/21FY2021/22FY2022/23FY2023/24FY2024/25Total CDBG2,671,0002,671,000 LocalCirculationDIF300,0001,250,0001,550,000 MeasureI2,378,9401,283,123501,0574,163,120 RegionalCirculationDIF4,550,0006,808,0031,275,000750,00013,383,003 SB13,700,0003,700,000 StormDrainDIF950,0005,850,000650,000650,000650,0008,750,000 AnimalShelterImprovement75,00075,000 PublicUseFacilities300,000300,000 CulturalDevelopmentFund1,000,0001,000,000 QuimbyParklandFund500,000500,000 PublicImprovementFund500,000500,000 HSIPGrant2,677,8002,677,8002,672,6008,028,200 GrandTotal19,602,74017,868,9265,098,6571,400,000650,00044,620,323 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 29 389 1.a CapitalBudgetSummary TheFY202021ProposedBudgetissummarizedbyprojectandfundbelow: StormTrafficGrand FundDescriptionBuildingsStreetsParksDrainsControlsTotal CDBG665,000500,0001,506,0002,671,000 LocalCirculationDIF300,000300,000 MeasureI2,378,9402,378,940 RegionalCirculationDIF4,550,0004,550,000 SB13,700,0003,700,000 StormDrainDIF950,000950,000 AnimalShelterImprovement75,00075,000 PublicUseFacilities300,000300,000 CulturalDevelopmentFund250,000750,0001,000,000 QuimbyParklandFund500,000500,000 PublicImprovementFund500,000500,000 HSIPGrant2,677,8002,677,800 GrandTotal1,290,00011,628,9402,756,000950,0002,977,80019,602,740 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 30 390 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a Total 75,000 75,000 35,00035,00040,00065,00060,00035,00035,00035,00035,00050,000 665,000506,000500,000250,000250,000250,000250,000250,000250,000460,000165,000500,000500,000 500,000 4,758,800 1,000,000 2,671,0001,000,000 3,269,400 8,028,2001,550,000 1,636,2692,026,851 4,163,120 Packet Pg. 31 2024/25 FY 2023/24 FY 2022/23 501,057 501,057 1,582,8001,089,800 2,672,600 FY FY 65,00060,000 2021/22 250,000250,000460,000165,000749,272533,851 1,588,0001,089,800 2,677,8001,250,0001,283,123 FY 75,00035,00035,00035,00035,00050,000 75,000 35,00035,00040,000 2020/21 665,000506,000500,000 500,000250,000250,000250,000250,000 300,000 385,940500,000 500,000 1,000,000 1,000,000 1,588,0001,089,8001,493,000 2,671,0002,677,8002,378,940 Fund by on Drive Program Street Way RosaShow H Signalized Intersections 11 Bernardino 49 Del s/o lightingSeal) Dr. Upgrade at to ft. San OrangeUpgrade Upgrade 3 PhasePhase and Upgrade of Vanderbilt Improvement to Signalized Signal 1100 Upgrade to Lincoln Signal City Signal Avenue Phase Ave (Annual) Street to 224 UpgradesSignal Detection Arrowhead Ave parking D Capital (Annual) (Slurry/Crack St.Street on Traffic Signal to to Locations H Traffic Traffic Zone Upgrade ImprovementsUpgradeCentral Traffic Year Center ValenciaRialto ImprovementsImprovements Six Ave. Systems Macy (TMC) Improvements Traffic avid from Street Repairs Street Park Street Five PanelBlvd. Upgrades GF Upgrades Signal Hardware Replacement 215 CenterCenter DilemmaI WalnutBackup Center Rialto 21st Rehabilitation & Highland Community Center Signal Traffic Center and Concrete Interconnect, and and Redland of Interconnect,Interconnect, Arrowhead Electrical Interconnect, Stabilization Battery Ave AveAve. Equipment and AdvancedCity AveAve. and Parkway SeniorStreetInterconnect,Interconnect, Neighborhood Senior CommunityCommunity Heights Ave. AnnualPavement Various Street K Arterials Slope Shelter ManagementSignal with Lane Hill andStreet VernonVernon StreetStreetStreet op Project EnchantoUpgradeVariousImplementIntersections AnimalPlaygroundNicholsonCitywideEnchantoDelmann5thPerrisBaselineHighlandTrafficMillMillWatermanTippecanoe9th6thHuntsMt.Mt.WatermanTrafficUniversityCoCitywideKendall # 870087018760 8776875387618767 8665875480178756875887558759861187158716871787188719872087628763876487657651724086747306 Project Ongoing OngoingNew ExistingNewNewNewOngoingNewNewNewNewNewOngoingOngoingOngoingOngoingOngoingOngoingOngoingNewNewNewNewOngoingOngoingOngoingOngoingNew #StatusNW Total 454455445 399401446428 407411438401408409410447448449450451452453456457458459460431434439 Total e u Fund Total F Fund Total DIF DIF DIFDIFDIFDIFDIFDIFDIFDIFDIFDIFDIFDIFDIF Improvement Improv DIF Improvement I Total III Development Total DevelopmentDevelopmentDevelopmentDevelopment Shelter Shelter I Improvement Improvement DescriptionPage Development Circulation Circulation CirculationCirculationCirculationCirculationCirculationCirculationCirculationCirculationCirculationCirculationCirculation CirculationCirculation Shelter GrantGrant Grant Improvement Total Circulation Grant HSIPHSIPLocal Animal Animal CDBG CDBG HSIPLocal Local CDBGCDBGCDBG Cultural CulturalCulturalCulturalCulturalLocalLocalLocalLocalLocalLocalLocalLocalLocalLocalLocalLocal Measure MeasureMeasureMeasure Public Public FundingAnimalCDBGCulturalHSIPLocalMeasurePublic 391 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a Total 300,000500,000 500,000 775,000200,000750,000 300,000 1,750,0003,700,0002,500,0003,300,000 3,608,0035,450,0001,800,000 3,700,000 2,000,000 8,750,000 13,383,00344,620,323 Packet Pg. 32 2024/25 500,000 150,000 650,000650,000 FY 2023/24 750,000 750,000 500,000150,000 650,000 1,400,000 FY 25,00025,000 2022/23 500,000150,000 650,000 1,225,000 1,275,0005,098,657 FY FY 25,000 2021/22 500,000200,000150,000 3,000,000 3,583,0031,425,0001,775,000 6,808,003 2,000,000 5,850,000 17,868,926 FY 2020/21 750,000500,000 300,000 300,000 500,000 500,000 150,000300,000 950,000 2,050,0001,750,000 4,550,000 3,700,000 3,700,000 19,602,740 Fund by Program Road St. Avenue Bernardino Street Baseline San Electric 3Parkdale to of Improvement to 40th to Creek to St. City Phase Street Street Capital (SB1) Warm Drive Study 40th at 16th Year 1 from Johnson Impact Kendall Five Upgrade Replacement Phase Drain from from Upgrades Rehabilitation Replacement Drain Roof Replacement Drainage Storm I Annual Extension BridgeStorm Area Equipment Widening Bridge Widening View Theater Pavement Track Drain Street Street Street Vernon StreetVernon Project 2ndCitywideStorm CaliforniaPlaygroundStateMt.40th"H"VerdemontMountainTMDLSMt. # 7841 724571217160787287698672 876886658773877087728771 Project Ongoing NewNewOngoingOngoingOngoingOngoingNewOngoingNewNewNewNew #StatusNW 433 427429430432435417 400407418419420421 F FFFF Total Total DIF DI DIDIDIDI DIF TotalFund Fund Fund Total DIF DIFDIFDIFDIFDIF Facilities Facilities DIF Circulation Circulation CirculationCirculationCirculationCirculation Facilities Parkland Parkland Circulation UseDrain UseDrainDrainDrainDrainDrain DescriptionPage Parkland Total Drain Use 1 1 Total 1 Public PublicRegional SB SB Storm Storm Quimby Quimby Regional RegionalRegionalRegionalRegionalStormStormStormStorm FundingPublicQuimbyRegionalSBStormGrand 392 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a 75,00035,00035,00040,000 750,000 300,000665,000250,000250,000250,000250,000200,000500,000775,000500,000500,000250,000250,000460,000165,000 Total 1,006,0001,000,000 2,756,000 2,500,0002,000,0003,300,000 8,750,000 3,608,0035,450,0001,800,0001,636,2691,750,0002,026,8513,700,000 1,290,000 22,246,123 Packet Pg. 33 2024/25 150,000 500,000 650,000 FY 2023/24 150,000750,000 500,000 650,000750,000 FY 25,00025,000 2022/23 150,000 500,000 650,000 501,057 1,225,000 1,776,057 FY 25,000 FY 500,000200,000150,000749,272250,000250,000165,000 533,851460,000 2,000,0003,000,000 5,850,000 3,583,0031,425,0001,775,000 8,091,126 2021/22 75,00035,00035,000 40,000 FY 300,000665,000250,000250,000250,000250,000500,000150,000300,000500,000385,940750,000500,000500,000 950,000 1,006,0001,000,000 2,756,000 2,050,0001,750,0001,493,0003,700,000 1,290,000 2020/21 11,628,940 Category by e t e d Driv w Program Bernardino . RoaStree g St Way Avenu RosaSho t H San 11 . of Del s/o lightin Seal) Stree Dr e to ft. Baseline s k Electric Orange City 3Parkdale PhasePhase s and to Vanderbilt to 40th to Improvement to s s 1100Cree Upgrad to Lincoln to St. ) y Avenue Phase eAve e to Upgrade Street Street Ave parking (Annual) Capital (SB1(Slurry/Crack StreetWarmSt. StudDrive Signal 40th s s Location H at 16th t e Upgrad Upgrad ImprovementCentral Center ValenciaRialto ImprovementsImprovements Six 1 s from Macy (TMC) Improvement Johnson Traffic from Impact Repair Kendall Park Panel Upgrade Upgrades Signal Upgrad Replacement 215 Phase Drain CenterCenter fromI Center from Upgrade RehabilitationRehabilitation & Replacemen Drain RoofHighland Replacement Community Center DrainageTraffic Center Concrete Interconnect, Stormof Interconnect, Interconnect, Arrowhead Electrical I Interconnect, Stabilization Annual Extension Ave StormBridge Area Equipment Widening City Ave Bridge and ParkwayWidening SeniorStreet Neighborhood View TheaterSenior CommunityCommunity Heights Ave. PavementAnnualPavement Street Track K Slope Shelter Management Drain with Hill Street Street StreetandStreet VernonVernonStreet Street op AnimalPlaygroundDelmannStormVerdemontTMDLSMt.StateKendall40thUniversity"H"CoCitywideBaselineHighlandTrafficMillMillWatermanTippecanoe CaliforniaEnchantoEnchanto5thPerrisNicholsonMountainMt.2ndCitywideCitywide #Project 8776866587588672877387728771724587677160724078728674876980178760876186118715871687178718 8768875387568755875987548770712178417306 NW Project ExistingNewNewOngoingNewNewNewOngoingNewOngoingOngoingOngoingOngoingOngoingNewNewOngoingOngoingOngoingOngoingOngoing NewNewNewNewNewNewNewOngoingOngoingNewOngoing #Status 399407408417418420421427428430431432434438445446447448449450451 400401401409410411419429433435439 Page sssssss Total Drains Controls Total Parks ControlControlControlControlControlControlControl DrainsDrainsDrainsDrainsDrains Total Drains Total Storm Traffic BuildingsStreets BuildingsBuildingsBuildingsBuildingsParksParksParksParksParksStormStormStormStormStormStreetsStreetsStreetsStreetsStreetsStreetsStreetsStreetsStreetsStreetsStreetsTrafficTrafficTrafficTrafficTrafficT rafficTraffic Category BuildingsParksStormStreets 393 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a 65,00060,00035,00035,00035,00035,00050,000 Total 4,758,8003,269,400 9,578,200 44,620,323 Packet Pg. 34 2024/25 650,000 FY 2023/24 1,400,000 FY 2022/23 1,582,8001,089,800 5,098,657 2,672,600 FY 65,00060,000 FY 1,588,0001,089,800 3,927,800 2021/22 17,868,926 35,00035,00035,00035,00050,000 FY 1,588,000 2,977,800 2020/21 19,602,740 Category Various by on Intersections1,089,800 Program Bernardino e Signalized e e San Intersections e 49 of Upgrad at d Upgrad Upgrad City Upgrad t Improvement Signalized Signal Signal Signal (Annual) Stree 224 Signal Detection Arrowhea D Capital onTraffic to to Traffic Traffic Zone Traffic Ave. Systems avid Street Street Street Blvd. GF Hardware Dilemma WalnutBackup Rialto 21st Signal and and and Redland Battery AveAve. and Advanced Ave. Interconnect,Interconnect, Various Signal Lane VernonVernon StreetStreet 9th6thImplementHuntsMt.Mt.WatermanTraffic UpgradeArterials #Project 87198720870187628763876487657651 8700 NW Project OngoingOngoing OngoingOngoingNewNewNewNewOngoing #Status 452453455456457458459460 454 Page sssssss ControlsControls ControlControlControlControlControlControlControl Controls Total Traffic Traffic TrafficTrafficTrafficTrafficTrafficTrafficTraffic Category TrafficTotalGrand 394 1.a DJQ!DJQ!DJQ!DJQ!DJQ!DJQ!DJQ! CVJMEJOHT Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 35 395 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 36 396 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a Total 75,000 300,000665,000250,000 1,290,000 Packet Pg. 37 2024/25 FY 2023/24 FY 2022/23 FY 2021/22 FY 75,000 2020/21 300,000 1,290,000 FY Buildings 1665,0001250,000 Program PhasePhase Bernardino 2020/21 San FY e of City Improvement Upgrad ImprovementsImprovements Panel Upgrade Capital CenterCenter Roof Electrical Theater CommunityCommunity Shelter Project AnimalCaliforniaEnchantoEnchanto # 8776876887538756 NW Project ExistingNewNewNew #Status 399400401401 Page Total Buildings BuildingsBuildingsBuildingsBuildings Category Buildings 397 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 38 398 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name GB20- 001 Department Public Animal Shelter Electrical Works Panel Upgrade Ward 3 CIP Type Buildings Project Location 333 Chandler Pl Project Category Ongoing Total Project Cost$94,400 Prior Year Funding$19,400 Remaining Needed$75,000 Project No. PROJECT DESCRIPTION Based on the evaluation of the current condition of San Bernardino Animal Shelter, electrical panels need to be upgraded to bring it to the latest building code. Design is in progress and will be completed in FY 19/20. Construction is schedule to be in FY 20/21. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Animal $19,400 $75,000 $0 $0 $0 $0 $94,400 Shelter Improve. (124) Totals $19,400 $75,000 $0$0 $0 $0 $94,400 PROJECT STATUS UPDATE Design will be completed in FY 19/20 and construction will be scheduled for FY20/21. Consistency: This project is consistent with Key Target No. 1d: Minimize risk and litigation exposure and No. 1e: Create an asset management plan. This project will perform the necessary upgrades to improve and preserve this City asset and reduce potential risk and ligation exposure by eliminating potential electrical issues. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 39 399 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name GB21- 001 Department Public California Theater Roof Works Upgrade Ward 1 CIP Type Buildings th Project Location 562 W 4 Street Project Category New Total Project Cost$300,000 Prior Year Funding N/A Remaining Needed$300,000 Project No. PROJECT DESCRIPTION th Scope of project is to replace roof at California Theater located at 562 W 4 Street in San Bernardino California. This Project was highly prioritized by the Facilities Assessment Report that was completed in December 2019. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Public Use $0 $300,000$0 $0 $0 $0 $300,000 Facilities (266) Totals $0 $300,000 $0$0 $0 $0 $300,000 PROJECT STATUS UPDATE This is a new project and scheduled to start in FY 20/21. Consistency:This project is consistent with Key Target No. 1a: Secure a long-term revenue source and No. 1e: Create an asset management plan. This project will contribute to financial stability by maintaining a historic City asset that has potential to serve as long- term revenue generator and reduce potential risk and ligation exposure by improving safety of the existing facility. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance reduced Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Project Manager: Saba Engineer Packet Pg. 40 400 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name GB21- 002 Department Public Encanto Works Community Center Ward Improvements 6 CIP Type Buildings th Project Location 1180 W 9 Street Project Category New Total Project Cost$915,000 Prior Year Funding N/A Remaining Needed$915,000 Project No. PROJECT DESCRIPTION Scope of project is to upgrade existing old heating, ventilation and air conditioning (HVAC) th system at 9th Street Community Center located at 1180 W 9 Street in San Bernardino California. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Cultural $0 $250,000$0 $0 $0 $0 $250,000 Devlop. Fund (247) CDBG (119)$0 $665,000 $0$0 $0 $0 $665,000 Totals $0 $915,000 $0$0 $0 $0 $915,000 PROJECT STATUS UPDATE This is a new project and scheduled to start in FY 20/21. Consistency:This project is consistent with Key Target No. 1a: Secure a long-term revenue source. This project will contribute to financial stability by performing the necessary upgrades in order to continue generating long-term revenue at this facility and reduce potential risk and ligation exposure by improving safety of the existing facility. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance reduced Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Project Manager: Saba Engineer Packet Pg. 41 401 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 42 402 1.a DJQ!DJQ!DJQ!DJQ!DJQ!DJQ!DJQ! QBSLT Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 43 403 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 44 404 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a 250,000250,000250,000 1,006,0001,000,000 2,756,0002,756,000 Total Packet Pg. 45 2024/25 FY 2023/24 FY 2022/23 FY 2021/22 FY Parks 250,000250,000 250,000 2020/21 1,006,0001,000,000 2,756,0002,756,000 FY Program Bernardino San of lighting Improvement City 3 and Phase Capital Upgrades parking Improvements Center Park Upgrades Upgrades Replacement Community Center Center Equipment Senior Neighborhood Senior Heights Hill Street Project PlaygroundDelmann5thPerrisNicholson # 86658758875587598754 Project W NewNewNewNewNew #Status 407408409410411 Page Total Total Parks ParksParksParksParks Parks Category ParksGrand 405 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 46 406 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name PR21- 001 Department Public Playground Equipment Works Replacement –Phase3 Ward 1,5 &6 CIP Type Parks Project Location 1466 Marshall Bl., Project Category New 1571 Morgan Rd, 191 W 2nd St & 1367 N California St. Total Project Cost $1,006,000 Prior Year Funding $0 Remaining Needed$1,006,000 Project No.8665 PROJECT DESCRIPTION This is Phase 3 of 5 phases. Phase 3 (FY 20/21) will replace the playground equipment at Meadowbrook, Anne Shirrel, Blair Park (2 locations) and Hudson park sites. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total CDBG (119)$0 $506,000$0 $0 $0 $0 $500,000 Quimby $0 $500,000 $0 $0 $0 $0 $506,000 Parkland Fund (269) Totals $0 $1,006,000 $0$0 $0 $0 $1,006,000 ECT STATUS UPDATE PROJ is a new project and scheduled to start in FY 20/21. This Consistency: This project is consistent with Key Target No. 1e: Create an asset management plan and 1d: Minimize risk and liability exposure. Completion of these projects will provide new recreational features, improve existing neighborhood and community parks, enhance the value of City park assets and reduce the potential risk and liability exposure due to playground equipment needing to be replaced. Forecasted Project Completion Date: June 2021 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Packet Pg. 47 407 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name PR 21-003 Department Public Delmann HeightsWorks Community Center Upgrades Ward 6 CIP Type Parks Project Location 2969 N. Flores. Project Category New Total Project Cost $250,000 Prior Year Funding $0 Remaining Needed$250,000 Project No. PROJECT DESCRIPTION Scope of this project is to provide improvements at Delmann Heights Community Center including new painting and flooring of the building. The project was highly recommended by the Parks and Recreation Department, the paint and flooring have been damaged and in need for replacement. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25Estimated Source Year Projected Projected Projected Projected Projected Project Funding Total Cultural $0 $250,000 $0 $0 $0 $0 $250,000 Develop Fund (247) Totals $0 $250,000 $0 $0 $0 $0 $250,000 PROJECT STATUS UPDATE This is a new project and scheduled to start in FY 20/21. Consistency: This project is consistent with Key Target No. 1c: Create a framework for spending decisions, and 2a: Develop and implement a community engagement plan. This project will engage the community to help decide features within the park, enabling the City to appropriate funding according to resident input. Forecasted Project Completion Date: June 2021 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Packet Pg. 48 408 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name PR 21-004 Department Public 5th Street Senior Center Works Upgrades Ward 1 CIP Type Parks th Project Location 600 W 5 Street. Project Category New Total Project Cost$250,000 Prior Year Funding$0 Remaining Needed$250,000 Project No. PROJECT DESCRIPTION th This project is to provide improvements at 5 Street Community Center to address deferred maintenance at the center. The scope of this project includes repainting the facility and installing new flooring in the building. The project is a priority for, and highly recommended by, the Parks and Recreation Department. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25Estimated Source Year Projected Projected Projected Projected Projected Project Funding Total Cultural $0 $250,000 $0 $0 $0 $0 $250,000 Develop Fund (247) Totals $0 $250,000 $0 $0 $0 $0 $250,000 PROJECT STATUS UPDATE This is a new project and scheduled to start in FY 20/21. Consistency: This project is consistent with Key Target No. 1d: Minimize risk and litigation exposure and 2a: Develop and implement a community engagement plan. This project will contribute to decreasing the risk and liability associated with senior centers, due to deferred maintenance and also engage the community by ensuring the facility is available as a safe and attractive facility for seniors to gather. Forecasted Project Completion Date: June 2021 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Packet Pg. 49 409 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name PR 21-005 Department Public Perris HillSenior Center Works Upgrades Ward 2 CIP Type Parks st Project Location 780 E 21 Street Project Category New Total Project Cost$250,000 Prior Year Funding$0 Remaining Needed$250,000 Project No. PROJECT DESCRIPTION Scope of this project is to provide improvements at Perris Hill Senior Center including paving parking lot and providing new parking lot lighting. The project was highly recommended by the Parks and Recreation Department. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25Estimated Source Year Projected Projected Projected Projected Projected Project Funding Total Cultural $0 $250,000 $0 $0 $0 $0 $250,000 Develop Fund (247) Totals $0 $250,000 $0 $0 $0 $0 $250,000 PROJECT STATUS UPDATE This is a new project and scheduled to start in FY 20/21. Consistency: This project is consistent with Key Target No. 1d: Minimize risk and litigation exposure. This project will decrease risk and liability by improving travel surfaces and providing appropriate lighting for the public’s safety when gathering at the senior center. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 50 410 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name PR 21-006 Department Public Nicholson Neighborhood Works Park Improvements Ward 6 CIP Type Parks Project Location 737 W 2nd Street Project Category New Total Project Cost$1,150,000 Prior Year Funding$150,000 Remaining Needed$1,000,000 Project No. PROJECT DESCRIPTION Scope of this project is to convert the existing park site in a to Miracle League Park; a regional complex with a very large rubberized ball field for children and adults with physical disabilities. The facility will also have a playground with multiple pieces of playground equipment, each one being handicap accessible. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Year Projected Projected Projected Projected Projected Project Funding Total CDBG $ 0 $1,000,000 $0 $0 $0 $0 $1,000,000 (119) Insurance $150,000 $0 $0 $0 $0 $0 $ 150,000 Claim Totals $150,000 $1,000,000 $0 $0 $0 $0 $1,150,000 ECT STATUS UPDATE PROJ This is a new project and scheduled to start in FY 20/21. Consistency: This project is consistent with Key Target No. 1d: Minimize risk and liability exposure and 1e: Create an asset management plan. Completion of this project will improve the park asset by providing new ADA accessible recreational features and reduce the potential risk and liability exposure due to playground equipment needing to be replaced. Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Packet Pg. 51 411 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 52 412 1.a DJQ!DJQ!DJQ!DJQ!DJQ!DJQ!DJQ! TUPSN!! ESBJOT Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 53 413 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 54 414 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a Total 200,000750,000 2,500,0002,000,0003,300,000 8,750,000 8,750,000 Packet Pg. 55 500,000150,000 650,000650,000 2024/25 FY 500,000150,000 650,000 650,000 2023/24 FY 500,000150,000 650,000650,000 2022/23 FY 500,000200,000150,000 2021/22 2,000,0003,000,000 5,850,000 5,850,000 FY Drain 2020/21 500,000150,000300,000 950,000950,000 FY Storm St. BernardinoProgram San of Parkdale to City St. y Improvement Stud 40th Capital from Impact Drain Upgrades Drain Drainage Storm I Annual Storm Area View Track Drain Vernon Project StormVerdemontMountainTMDLSMt. t 86728773877087728771 Projec W OngoingNewNewNewNew #Status 417420 418419421 Page Total Drains DrainsDrainsDrainsDrainsDrains Total Drains Storm StormStormStormStormStorm Category StormGrand 415 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 56 416 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SD19- 002 Department Public Storm Drain Annual Works Upgrades Ward All CIP Type Storm Drain Project Location Citywide Project Category New Total Project Cost $500,000(Annual)Prior Year Funding $666,094 Remaining Needed$2,500,000 (Annual) Project No.8672 PROJECT DESCRIPTION City-wide upgrading existing storm drain system. Citywide Storm Drain System needs constant maintenance, repair and upgrades in order to have proper drainage. This project will upgrade system annually. This project is an annual project over five (5) years. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Storm $666,094 $500,000$500,000 $500,000 $500,000 $500,000$3,166,094 Drain DIF (248) Totals $666,094$500,000 $500,000$500,000 $500,000 $500,000 $3,166,094 PROJECT STATUS UPDATE This is an annual project over five years and will begin and be completed by the end of each fiscal year. Consistency: This project is consistent with Key Target No. 1d: Minimize risk and litigation exposure by addressing deferred storm drain infrastructure and improving conveyance of storm water to mitigate flooding throughout the City. Forecasted Project Completion Date: June 2025 On-going Operating & Maintenance Impact: Maintenance reduced Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Project Manager: Saba Engineer Packet Pg. 57 417 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SD20-001 Department Public Verdemont Area Works Drainage Impact Study Ward 5 CIP Type Storm Drain Project Location Verdemont Spring Trails Project Category New Total Project Cost $200,000 Prior Year Funding $0 Remaining Needed$200,000 Project No. PROJECT DESCRIPTION Spring Trail Development will bring about 300 to 400 homes constructed north of the Verdemont Area. This area is in the process of being annexed into the City boundaries. The scope of work for this project is to study the storm drain impact on the Verdemont area if the area is annexed and the homes are constructed. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Storm $0 $0 $200,000 $0 $0 $0$200,000 Drain DIF (248) Totals $0 $0 $0 $0 $0 $0 $200,000 PROJECT STATUS UPDATE This is a new project which has not been started Consistency: This project is consistent with Key Target No. 1a: Secure a long-term revenue source and No. 1d. Minimize risk and litigation exposure. This project will evaluate risks and infrastructure needs related to development of effective storm drain infrastructure and will contribute to the City’s objective of seeking and securing revenue generating projects and development. Forecasted Project Completion Date: June 2022 On-going Operating & Maintenance Impact: Maintenance reduced Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Project Manager: Saba Engineer Packet Pg. 58 418 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SD20-002 Department Public Mountain View Storm Works Drain from 40th Street to Parkdale Street Ward 4,7 CIP Type Storm Drain th Project Location Mountain View b/w 40 Project Category New Street & Parkdale Street Total Project Cost $2,000,000 Prior Year Funding $0 Remaining Needed$2,000,000 Project No. PROJECT DESCRIPTION Installation of County of San Bernardino Flood Control District Comprehensive Storm Drain Plan Project No. 7-B22 along Mountain View Avenue between 40th Street and Parkdale Street. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Storm $0 $0 $2,000,000 $0 $0 $0 $2,000,000 Drain DIF (248) Totals $0 $0 $2,000,000 $0 $0 $0 $2,000,000 PROJECT STATUS UPDATE This is a new project which has not been started Consistency: This project is consistent with Key Target No. 1d: Minimize risk and litigation exposure. This project will assist in reducing the City’s exposure to potential risk and litigation by addressing deferred storm drain infrastructure maintenance. Forecasted Project Completion Date: June 2022 On-going Operating & Maintenance Impact: Maintenance reduced Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Project Manager: Saba Engineer Packet Pg. 59 419 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SD21- 001 Department Public TMDLS - Track IWorks Ward All CIP Type Storm Drain Project Location Citywide Project Category New Total Project Cost $750,000 Prior Year Funding $0 Remaining Needed$750,000 Project No. PROJECT DESCRIPTION Install full capture devices Citywide in storm drain infrastructure as an approved best management practice (BMP) to comply with State Water Code Section 13383 and Total Maximum Daily Loads (TMDLs) which prohibit trash from entering storm water systems. This project is an annual project over five (5) years. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Storm $0 $150,000$150,000 $150,000 $150,000 $150,000$750,000 Drain DIF (248) Totals $0$150,000 $150,000$150,000 $150,000 $150,000 $750,000 PROJECT STATUS UPDATE This is an annual project over five years and will begin and be completed by the end of each fiscal year. Consistency: This project is consistent with Key Target No. 1d: Minimize risk and litigation exposure. This project will ensure compliance with the State Water Code. Forecasted Project Completion Date: June 2025 On-going Operating & Maintenance Impact: Maintenance reduced Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Project Manager: Saba Engineer Packet Pg. 60 420 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project NameSD20-003DepartmentPublic Mt. Vernon Storm DrainWorks Ward6CIP TypeStorm Drain Project LocationMt. Vernonb/w16th St. Project CategoryNew to Highland Ave. Total Project Cost$3,300,000Prior Year Funding$0 Remaining Needed$3,300,000Project No.8771 PROJECT DESCRIPTION Installation of County of San Bernardino Flood Control District Comprehensive Storm Drain Plan Project No. 7-D13 along Mt. Vernon Avenue from 16th Street to Highland Avenue. PROJECT FUNDING AND EXPENDITURE DETAIL FundingPrior Year FY 20/21FY 21/22FY22/23FY 23/24FY 24/25Estimated SourceFundingProjectedProjectedProjectedProjectedProjectedProject Total Storm$0$300,000$3,000,000$0$0$0$3,300,000 Drain DIF (248) Totals$0$300,000$3,000,000$0$0$0$3,300,000 PROJECT STATUS UPDATE This is a new project which has not been started Consistency: This project is consistent with Key Target No. 1a: Secure a long-term revenuesource and 1d: Minimize risk and litigation exposure. This project will assist in also ensures an ongoing revenue source with routine maintenance and repair of the storm drain system. Forecasted Project Completion Date:June2022 On-going Operating & Maintenance Impact:Maintenance reduced Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Project Manager:Saba Engineer Packet Pg. 61 421 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 62 422 1.a DJQ!DJQ!DJQ!DJQ!DJQ!DJQ!DJQ! TUSFFUT Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 63 423 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 64 424 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a 500,000775,000500,000500,000 3,608,0035,450,0001,800,0001,750,0002,026,8513,700,000 1,636,269 22,246,12322,246,123 Total Packet Pg. 65 2024/25 FY 750,000 750,000750,000 2023/24 FY 25,000 25,000 501,057 2022/23 1,225,000 1,776,0571,776,057 FY 25,000 749,272533,851 2021/22 3,583,0031,425,0001,775,000 8,091,1268,091,126 FY 500,000385,940750,000500,000500,000 2020/21 1,750,0001,493,0003,700,000 2,050,000 11,628,94011,628,940 FY Streets Program Bernardino RoadStreet Avenue H San s/o of Seal) Street ft. Baseline Electric City to Improvement to 40th Creek 1100 to Street Street Capital (SB1)(Slurry/Crack Street Warm Drive Locations H at 16th Six 1 Improvements Johnson from Repairs Kendall 215 Phase from I from RehabilitationRehabilitation & Replacement Highland Replacement Concrete of Stabilization Extension Bridge Widening City Bridge Widening Parkway PavementAnnualPavement Slope with Street Street Street Vernon Street op 40th2ndCoCitywideCitywideCitywide StateKendallMt.University"H" #Project 7160867480177306 7245876771217240787278418769 NW Project OngoingOngoingOngoingNewOngoingOngoing OngoingNewOngoingOngoingOngoing #Status 427428430433434435438439 429431432 Page Total Total Streets StreetsStreetsStreetsStreetsStreetsStreetsStreetsStreetsStreetsStreetsStreets Category StreetsGrand 425 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 66 426 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SS04-009 Department Public State Street Extension Works Phase 1 Baseline to TH 16Street Ward 1,6 CIP Type Streets Project Location State Street Project Category Ongoing Total Project Cost $5,321,065 Prior Year Funding $1,713,062 Remaining Needed$3,608,003 Project No.7245 PROJECT DESCRIPTION This is Phase 1 of 4 phases. This phase consists of extending State Street as a four4 lane th highway from 16 Street to Baseline Street. The existing traffic signal at Baseline Street and State Street will be modified to add a fourth leg. The remaining phases will extend th State Street as follows; Phase 2 – Baseline Street to 9 Street; Phase 3 – Foothill TH Boulevard to Ranch Avenue; Phase 4 – 9 Street to Foothill Boulevard. The City approved a contract with Engineering Resources of Southern California (ERSC) at a cost of $204,533 to prepare the environmental document and design the improvements. That work is approximately 60% completed. ERSC work will include right of way engineering; however, a separate consultant will be retained for right-of-way acquisition. Right of way acquisition is expected to begin in 2020 and be completed by 2021. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Regional $1,713,062 $0$3,583,003 $25,000 $0 $0 $5,321,065 Circulation DIF (264) Totals $1,713,062 $0$3,583,003 $25,000 $0 $0 $5,321,065 PROJECT STATUS UPDATE Environmental iscompleted. Design is 90% completed. Right-of way acquisition is in progress. Construction will begin early 2021 and be completed by the end of 2021. Consistency:This project is consistent with Key Target No. 1e. Create an asset management plan as it moves the City forward in addressing deferred street maintenance. Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Forecasted Project Completion Date: December 2021 On-going Operating & Maintenance Impact: Maintenance will increase Project Manager: Saba Engineer Packet Pg. 67 427 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project NameSS20-013DepartmentPublic Kendall Drive Slope Works Stabilization Rehabilitation Ward4,5CIP TypeStreets Project LocationKendall DriveProject CategoryNew Total Project Cost$500,000Prior Year Funding$0 Remaining Needed$500,000Project No. PROJECT DESCRIPTION Kendall Drive Slope in the vicinity of 670 Kendall Drive is not stable, failing and is a safety hazard. Soil investigation will be conducted to have slope stabilization plan which will be implemented to eliminate unsafe condition in the area. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated SourceYearProjectedProjectedProjectedProjectedProjectedProject FundingTotal Public $0$500,00$0$0$0$0$500,000 Improvement Fund (246) Totals$0$500,00$0$0$0$0$500,000 PROJECT STATUS UPDATE This is a new project that has not started yet. Consistency:This project is consistent with Key Target No. 1d:Minimize risk and litigation exposure. This project will mitigate the potential exposure to risk and litigation by stabilizing failing slope. Forecasted Project Completion Date:June 2021 On-going Operating & Maintenance Impact:Maintenancereduced Project Manager:Saba Engineer Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 68 428 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SS04-012 Department Public Mt. Vernon Bridge Works Replacement Ward 1,3 CIP Type Streets Project Location Mt. Vernon Bridge Project Category Ongoing Total Project Cost$6,585,513 Prior Year Funding$1,135,513 Remaining Needed$5,450,000 Project No. 7121 PROJECT DESCRIPTION This project will consist of removal and reconstruction of the Mt. Vernon Bridge over the BNSF Railyard, BNSF Intermodal facilities and Metrolink Tracks. In 2016, the City contracted with SBCTA to provide Project Management. The bridge is located on Mt. Vernon Avenue between 2nd Street and 5th Street (Foothill Boulevard). PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Regional $1,135,513 $2,050,000$1,425,000 $1,225,000 $750,000$0 $6,585,513 Circulation DIF (264) Totals $1,135,513 $2,050,000$1,425,000 $1,225,000 $750,000$0 $6,585,513 NOTE: SBCTA is handling all the reimbursement under the Highway Bridge Program and the Major Street Measure I program. The amounts proposed in this budget are post-reimbursement. PROJECT STATUS UPDATE City of San Bernardino, SBCTA, and BNSF have signed the Construction and Maintenance Agreement. Right-of-way acquisition is expected to be completed by December2020. SBCTA is expected to start demolition of the existing bridge in late2020. Reconstruction of the bridge is expected to be completed by late 2022/early 2023. Consistency:This project is consistent with Key Target No. 1d: Minimize Risk and Litigation Exposure. Replacement of the Mt. Vernon Bridge will eliminate a critically outdated asset and replace it with bridge infrastructure that meets current community needs and will be constructed with the latest safety features and provide a long-term transportation feature for the City to support the north and south bound community travel Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Forecasted Project Completion Date: June 2023 On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Packet Pg. 69 429 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SS04-014 Department Public TH 40Street Widening Works from Johnson to Electric Avenue Ward 4 CIP Type Streets th Project Location 40 Street Project Category Ongoing Total Project Cost $4,572,308 Prior Year Funding $2,772,308 Remaining Needed$1,800,000 Project No.7160 PROJECT DESCRIPTION TH This project will widen 40Street from 2 to 4 lanes from Johnson to Electric Avenue including upgrade of the existing traffic signal at Electric Avenue. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Regional $2,772,308 $0 $1,775,000 $25,000 $0 $0 $4,358,179 Circulation DIF (264) Totals $2,772,308 $0 $1,775,000 $0 $0 $0 $4,358,179 PROJECT STATUS UPDATE Design has been 90% completed. Right of way acquisition is in progress and will be followed by undergrounding of the overhead lines under Rule 20-A. Undergrounding will be accomplished by Southern California Edison Company at no cost to the City. Construction on the road widening is expected to begin in 2021 and be completed by 2022. Consistency: This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by improving traffic flow and reducing circulation delay in the Project area. Forecasted Project Completion Date: June 2022 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Packet Pg. 70 430 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SS04-019 Department Public University/215 Works Interchange Improvements Ward 5,6 CIP Type Streets Project Location University/215 Project Category Ongoing Total Project Cost $2,039,582 Prior Year Funding $403,313 Remaining Needed$1,636,269 Project No.7240 PROJECT DESCRIPTION This project consists of improving traffic flow through the interchange at University Parkway and I-215 by installing a Divergent Diamond Interchange (DDI). PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Measure I $403,313 $385,940 $749,272$501,057 $0 $0 $2,039,582 (129) Totals $403,313 $385,940 $749,272$501,057 $0 $0 $2,039,582 PROJECT STATUS UPDATE The Project Approval and Environmental Document (PAED) are approved. Construction is expected to be completed in early 2022 and the project closed by June 2022. Consistency:This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by improving traffic flow and reducing circulation delay in the Project area. Forecasted Project Completion Date: June 2022 On-going Operating & Maintenance Impact: Maintenance reduced Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Project Manager: Saba Engineer Packet Pg. 71 431 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SS04- 152 Department Public “H” Street Widening from Works th Kendall to 40 Street Ward 4 CIP Type Streets Project Location H Street Kendall to 40th. Project Category Ongoing Total Project Cost$2,144,360 Prior Year Funding 1,369,360 Remaining Needed$775,000 Project No.7872 PROJECT DESCRIPTION TH This project involves widening and improving “H” Street between Kendall and 40 Street PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Regional $1,369,360$750,000 $25,000 $0 $0 $0 $2,144,360 Circulation DIF (264) Totals 1,369,360 $750,000 $25,000 $0 $0 $0 $2,144,360 PROJECT STATUS UPDATE This is an ongoing project and scheduled to continue in FY 20/21. Consistency:This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by increasing available travel lanes, improving traffic flow and reducing circulation delay in the project area. Forecasted Project Completion Date: June 2022 On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 72 432 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SS13-001 Department Public ND 2Street Bridge Works Replacement at Warm Creek Ward 4 CIP Type Streets ND Project Location 2 Street Bridge Project Category Ongoing Total Project Cost $4,003,179 Prior Year Funding $2,253,179 Remaining Needed$1,750,000 Project No. 7841 PROJECT DESCRIPTION ND This project involves the replacement of existing bridge at 2 Street over Warm Creek, ND located on 2 Street between Arrowhead Avenue and Sierra Way. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Regional $2,253,179 $1,750,000 $0 $0 $0$0 $4,003,179 Circulation DIF (264) Totals $2,253,179 $1,750,000 $0 $0 $0 $0 $4,003,179 PROJECT STATUS UPDATE This is an ongoing project and scheduled to continue in FY 20/21. Consistency:This project is consistent with Key Target No 1e: Create an asset management plan. The project supports this key target by securing replacing the 2nd Street Bridge, which is part of the City’s current asset inventory. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 73 433 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SS19-002 CO-OP w/ Department Public Highland – Six Joint Works Projects Ward 1,4 CIP Type Streets Project Location Various Project Category Ongoing Total Project Cost$2,186,582 Prior Year Funding$159,731 Remaining Needed$2,026,851 Project No.8674 PROJECT DESCRIPTION This project includes construction of sidewalk, curb ramps, bike lanes, installation of street lights and pavement rehabilitation at 7 locations where the two cities have shared jurisdiction. Highland will be the lead agency for the project. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total CDBG $159,731$1,493,000$533,851$0 $0 $0 $2,186,582 (119) Totals $159,731$1,493,000$533,851$0 $0 $0 $2,186,582 PROJECT STATUS UPDATE Highland expects to complete construction of Item 1 by June 30, 2019. The other projects will be completed in the fiscal years in which they are funded. Consistency:This project is consistent with Key Target No. 1d: Minimize risk and litigation exposure. This project will mitigate the potential exposure to risk and litigation by improving pathways of travel for cyclers. Forecasted Project Completion Date: June 2022 On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 74 434 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SS21-001 Department Public Citywide Pavement Works Rehabilitation (SB1) Ward All CIP Type Streets Project Location Citywide Project Category New Total Project Cost$3,700,000 Prior Year Funding$0 Remaining Needed$3,700,000 Project No. PROJECT DESCRIPTION This project consists of citywidepavement rehabilitation. Accessibility improvement will be installed or upgraded as part of the project. The project is funded through SB1 funding. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total SB-1 (125) $0$3,700,000$0 $0 $0 $0 $3,700,000 Totals $0 $3,700,000$0 $0 $0 $0 $3,700,000 PROJECT STATUS UPDATE This is a new project and will be completed in FE 20/21 Consistency:This project is consistent with Key Target No. 1d: Minimize risk and litigation exposure. This project will mitigate the potential exposure to risk and litigation by addressing deferred maintenance needs at multiple City roads ways and by construction ADA compliant curb ramps for safe path of pedestrian travel. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 75 435 1.a City of San Bernardino SB1 Proposed Project List FY 2020-21 Ward Street Project Description Limits EstimateProject d Useful Timeline Life (years) rd 1 3 Street 3”-5” mill and AC overlay, Sierra Way 20-30October roadway widening for to D Street 2020- bicycle lanes, installation April 2021 of curb and gutter, parkway strip, sidewalk, ADA-compliant curb ramps, drainage improvements, striping and signage improvements th 2 16 Street 3”-5” mill and AC overlay, Sierra Way 4 October roadway widening for to Waterman 2020- bicycle lanes, installation Avenue April 2021 of curb and gutter, parkway strip, sidewalk, ADA-compliant curb ramps, drainage improvements, striping and signage improvements 3 Rancho 3”-5” mill and AC overlay, Rialto 3 October Avenueroadway widening for Avenue to 2020- bicycle lanes, installation Foothill Blvd. April 2021 of curb and gutter, parkway strip, sidewalk, ADA-compliant curb ramps, drainage improvements, striping and signage improvements 4 Highland 3”-5” mill and AC overlay, Palm 6 October Avenueroadway widening for Avenue to 2020- bicycle lanes, installation Frontage April 2021 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) of curb and gutter, Road parkway strip, sidewalk, ADA-compliant curb ramps, drainage Packet Pg. 76 436 1.a improvements, striping and signage improvements 5 Northpark 3”-5” mill and AC overlay, Devil 5 October Blvd. roadway widening for Canyon 2020- bicycle lanes, installation Levee Road April 2021 of curb and gutter, to Little parkway strip, sidewalk, Mountain ADA-compliant curb ramps, drainage improvements, striping and signage improvements 6 Industrial 3”-5” mill and AC overlay, Palm 6 October Parkway roadway widening for Avenue to 2020- bicycle lanes, installation Lexington April 2021 of curb and gutter, Way parkway strip, sidewalk, ADA-compliant curb ramps, drainage improvements, striping and signage improvements 7 Arrowhead 3”-5” mill and AC overlay, Highland 8 October Avenueroadway widening for Avenue to 2020- th bicycle lanes, installation 30 Street April 2021 of curb and gutter, parkway strip, sidewalk, ADA-compliant curb ramps, drainage improvements, striping and signage improvements Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 77 437 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SS-D Department Public Citywide Annual Works Concrete Repairs Ward All CIP Type Streets Project Location Various Project Category Ongoing Total Project Cost$1,142,797 Prior Year Funding$642,797 Remaining Needed$500,000 Project No.8017 PROJECT DESCRIPTION Construct missing sidewalk and Disabled Access Improvements at street intersections to provide ADA Access ramps to sidewalks as required by State/Federal guidelines PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total CDBG $642,797 $500,000 $0 $0 $0 $0 $1,142,797 (119) Totals $642,797 $500,000 $0 $0 $0 $0 $1,142,797 PROJECT STATUS UPDATE This is an annual project and will be completed every fiscal year by June 30. Consistency:This project is consistent with Key Target No. 1d: Minimize risk and litigation exposure. This project will mitigate the potential exposure to risk and litigation by constructing missing sidewalk and ADA improvements at street intersections to improve pathways of pedestrian travel. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 78 438 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name SS-D Department Public Citywide Pavement Works Rehabilitation (Slurry/Crack seal) Ward All CIP Type Streets Project Location Various Project Category Ongoing Total Project Cost $1,000,000 Prior Year Funding $500,000 Remaining Needed$500,000 Project No.7306 PROJECT DESCRIPTION Crack filling and Slurry Sealing at various citywide locations. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Measure I $500,000$500,000 $0 $0 $0 $0 $1,000,000 (129) Totals $500,000 $500,000 $0 $0 $0 $0 $1,000,000 PROJECT STATUS UPDATE This will be completed by June 30, 2021 Consistency:This project is consistent with Key Target No. 1e. Create an asset management plan. The project will address deferred street maintenance needs identified in the pavement management plan. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance reduced Project Manager: Saba Engineer Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 79 439 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 80 440 1.a DJQ!DJQ!DJQ!DJQ!DJQ!DJQ!DJQ! USBGGJD!! DPOUSPMT Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 81 441 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 82 442 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a Total 35,00035,00040,00065,00060,00035,00035,00035,00035,00050,000 250,000250,000460,000 165,000 3,269,400 4,758,800 9,578,2009,578,200 Packet Pg. 83 2024/25 FY 2023/24 FY 2022/23 1,089,800 1,582,800 2,672,6002,672,600 FY 65,00060,000 250,000250,000460,000 165,000 2021/22 1,089,800 1,588,000 3,927,8003,927,800 FY 35,00040,00035,00035,00035,00035,00050,000 2020/21 1,089,800 1,588,000 2,977,8002,977,800 FY Control Drive35,000 Traffic Way Rosa Show Signalized Intersections 49 Bernardino Del Program Dr. Upgrade at to San Upgrade Orange Upgrade Upgrade Vanderbilt of to Signalized Signal Upgrade to Lincoln Signal Signal Avenue Ave City (Annual) Street to 224 Signal Detection Arrowhead Ave D (Annual) St. onTraffic Signal Improvement to to Traffic Traffic Zone UpgradeCentral Traffic Rialto Valencia Ave. Systems Macy (TMC) Traffic avid Street Street Capital Street Blvd. GF Signal Hardware Dilemma WalnutBackup Center Rialto 21st Signal Traffic and Interconnect, and and Redland Interconnect, Interconnect, Arrowhead Interconnect, Battery Ave AveAve. and Advanced AveArterialsAve. and StreetInterconnect,Interconnect, Ave. Various Street K ManagementSignal Lane andStreet VernonVernon StreetStreet Various Project BaselineHighlandTrafficMillMillWatermanTippecanoe9th6thUpgradeonImplementIntersectionsHuntsMt.Mt.WatermanTraffic 8760876186118715871687178718871987208700870187628763876487657651 # NW Project NewOngoingOngoing NewOngoingOngoingOngoingOngoingOngoingOngoingOngoingNewNewNewNewOngoing #Status 445448449450460 446447451452453454455456457458459 Page Total Controls ControlsControlsControls ControlsControlsControlsControlsControlsControlsControlsControlsControlsControlsControlsControlsControls Controls Total Traffic Traffic TrafficTraffic TrafficTrafficTrafficTraffic TrafficTrafficTrafficTrafficTrafficTrafficTrafficTrafficTraffic Category TrafficGrand 443 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 84 444 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project NameTC21-006DepartmentPublic Baseline Street Works Interconnect, Valencia Avenue to Del Rosa Drive Ward1,2CIP TypeTraffic Controls Project LocationAlong Baseline Street Project CategoryNew from Valencia Avenue to Del Rosa Drive. Total Project Cost$50,000Prior Year Funding$0 Remaining Needed$50,000Project No.8760 PROJECT DESCRIPTION This project will construct traffic signal interconnect along Baseline Street from Valencia Avenue to Del Rosa Drive. PROJECT FUNDING AND EXPENDITURE DETAIL FundingPrior Year FY 20/21FY 21/22FY22/23FY 23/24FY 24/25Estimated SourceFundingProjectedProjectedProjectedProjectedProjectedProject Total Local$0$35,000$0$0$0$0$35,000 Circulation DIF(263) Totals$0$35,000$0$0$0$0$35,000 PROJECT STATUS UPDATE This is a new project andscheduled to start in FY 20/21. Consistency:This project is consistent with Key Target No. 1d:Minimize risk and litigation exposure. This project will mitigate the potential exposure to risk and litigation by improving traffic controland pathways of travel. Forecasted Project Completion Date:June2021 On-going Operating & Maintenance Impact:Maintenance equal Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Project Manager:Azzam Jabsheh Packet Pg. 85 445 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project NameTC21-005DepartmentPublic Highland Ave. Works Interconnect, Macy St. to Lincoln Dr. Ward2,6CIP TypeTraffic Controls Project LocationAlong Highland Ave.Project CategoryNew fromMacy St. to Lincoln Dr. Total Project Cost$50,000Prior Year Funding$0 Remaining Needed$50,000Project No.8761 PROJECT DESCRIPTION This project will construct traffic signal interconnect alongHighland Avenue from Macy Streetto Lincoln Drive. PROJECT FUNDING AND EXPENDITURE DETAIL FundingPrior Year FY 20/21FY 21/22FY22/23FY 23/24FY 24/25Estimated SourceFundingProjectedProjectedProjectedProjectedProjectedProject Total Local$0$35,000$0$0$0$0$35,000 Circulation DIF(263) Totals$0$35,000$0$0$0$0$35,000 PROJECT STATUS UPDATE This is a new project andscheduled to start in FY 20/21. Consistency:This project is consistent with Key Target No. 1d:Minimize risk and litigation exposure. This project will mitigate the potential exposure to risk and litigation by improving traffic controland pathways of travel. Forecasted Project Completion Date:June2021 On-going Operating & Maintenance Impact:Maintenance equal Project Manager:Azzam Jabsheh Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 86 446 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC17- 003 Department Public Traffic Management Works Center (TMC) (Annual) Ward All CIP Type Traffic Controls Project Location Citywide Project Category Ongoing Total Project Cost $40,000 Prior Year Funding $40,000 Remaining Needed$40,000 Project No.8611 PROJECT DESCRIPTION The City operates and maintains 287 city-owned traffic signals in addition to 14 other signals shared with other adjacent agencies. This project is the next phase to maintain the existing computer and wall monitor display system including QuicNet quarterly maintenance, and technical support by software provider. This may require the purchase of new communication equipment annually to keep up the TMC to current standards in the City. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24FY 24/25 Estimate Source Funding Projected Projected Projected Projected Projected d Project Total Local $0 $40,000$0 $0$0 $0$40,000 Circulation DIF (263) Totals $0$40,000 $0 $0$0 $0 $40,000 ECT STATUS UPDATE PROJ This is an ongoing project to maintain the TMC. Project started in FY 2017/18 with initial phase equipment installation. This will be completed by the end of fiscal year 20/21. Consistency:This project is consistent with Key Target No. 1d: Minimize risk and litigation exposure. This project will mitigate the potential exposure to risk and litigation by improving staffs ability to monitor traffic signals and traffic control operation. Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance may increase Project Manager: Azzam Jabsheh Packet Pg. 87 447 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC20-001 Department Public Mill and K Street Traffic Works Signal Upgrade Ward 3 CIP Type Traffic Controls Project Location Mill Street and K Street Project Category Ongoing Total Project Cost $285,000 Prior Year Funding $35,000 Remaining Needed$250,000 Project No.8715 PROJECT DESCRIPTION This project will upgrade the existing traffic signal at the intersection of Mill and K Street. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Local $35,000$0 $250,000 $0 $0 $0$285,000 Circulation DIF (263) Totals $35,000 $0 $250,000$0 $0 $0 $285,000 PROJECT STATUS UPDATE Design is in progress. Construction will be completed by June 2021. Consistency:This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by improving traffic signal functionality and reducing circulation delay in the Project area. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance equal Project Manager: Azzam Jabsheh Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 88 448 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC20-002 Department Public Mill Street and Works Arrowhead Ave Traffic signal Upgrade Ward 1,3 CIP Type Traffic Controls Project Location Mill Street and Project Category Ongoing Arrowhead Avenue Total Project Cost $285,000 Prior Year Funding $35,000 Remaining Needed$250,000 Project No.8716 PROJECT DESCRIPTION This project will upgrade the existing traffic signal at the intersection of Mill Street and Arrowhead Avenue. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Local $35,000 $0 $250,000 $0$0 $0 $285,000 Circulation DIF (263) Totals $35,000 $0 $250,000$0$0 $0 $285,000 PROJECT STATUS UPDATE Design is in progress. Construction will be completed by June 2021. Consistency:This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by improving signal functionality and traffic circulation in the Project area. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance equal Project Manager: Azzam Jabsheh Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 89 449 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC20-003 Department Public Waterman Ave Works Interconnect, Rialto Ave to Vanderbilt Way Ward 1,3 CIP Type Traffic Controls Project Location Along Waterman Ave Project Category Ongoing from Rialto Ave to Vanderbilt Way Total Project Cost $550,000 Prior Year Funding $90,000 Remaining Needed$460,000 Project No.8717 PROJECT DESCRIPTION This project will construct traffic signal interconnect along Waterman Ave Rialto Avenue to Vanderbilt Way. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Local $90,000 $0 $460,000 $0 $0 $0 $550,000 Circulation DIF (263) Totals $90,000 $0 $460,000$0 $0 $0 $550,000 PROJECT STATUS UPDATE Design is in progress. Construction will be completed by June 2021. Consistency:This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by improving signal functionality and traffic circulation in the Project area. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance equal Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Project Manager: Azzam Jabsheh Packet Pg. 90 450 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC20-004 Department Public Tippecanoe Ave Works Interconnect, Central Ave to Orange Show Road Ward 1,3 CIP Type Traffic Controls Project Location Along Tippecanoe Ave Project Category Ongoing from , Central Ave to Orange Show Road Total Project Cost $200,000 Prior Year Funding $35,000 Remaining Needed$165,000 Project No.8718 PROJECT DESCRIPTION This project will construct traffic signal interconnect Along Tippecanoe Ave from, Central Ave to Orange Show Road. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Local $35,000 $0 $165,000 $0 $0 $0$200,000 Circulation DIF (263) Totals $90,000 $0$165,000 $0 $0 $0 $200,000 PROJECT STATUS UPDATE Design is in progress. Construction will be completed by June 2021. Consistency:This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by improving signal functionality and traffic circulation in the Project area. Forecasted Project Completion Date: June 2021 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) On-going Operating & Maintenance Impact: Maintenance equal Project Manager: Azzam Jabsheh Packet Pg. 91 451 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC20-005 Department Public 9th St Interconnect, G St Works to Arrowhead Ward 1,2 CIP Type Traffic Controls Project Location Along 9th St from G St Project Category Ongoing to Arrowhead Ave Total Project Cost $80,000 Prior Year Funding $15,000 Remaining Needed$65,000 Project No.8719 PROJECT DESCRIPTION This project will construct traffic signal interconnect along 9th Street from G Streetto Arrowhead Avenue. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Local $15,000 $0 $65,000 $0 $0 $0 $80,000 Circulation DIF (263) Totals $15,000 $0 $65,000 $0 $0 $0 $80,000 PROJECT STATUS UPDATE Design is in progress. Construction will be completed by June 2021. Consistency:This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by improving signal functionality and traffic circulation in the Project area. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance equal Project Manager: Azzam Jabsheh Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 92 452 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC20-006 Department Public 6th St Interconnect, F St Works to D St Ward 1 CIP Type Traffic Controls Project Location Along 6th St from F St. Project Category Ongoing to D St. Total Project Cost $285,000 Prior Year Funding $225,000 Remaining Needed$60,000 Project No.8720 PROJECT DESCRIPTION This project will construct traffic signal interconnect along 6th Street from F Street to D Street. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Local $225,000 $0 $60,000 $0 $0 $0 $285,000 Circulation DIF (263) Totals $225,000 $0 $60,000 $0 $0 $0 $285,000 PROJECT STATUS UPDATE Design is in progress. Construction will be completed by June 2021. Consistency:This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by improving signal functionality and traffic circulation in the Project area. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance equal Project Manager: Azzam Jabsheh Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 93 453 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC20-007 Department Public Upgrade Various Signal Works Hardware on 224 Signalized Intersections on Various Arterials Ward All CIP Type Traffic Controls Project Location Citywide Project Category Ongoing Total Project Cost $5,478,843 Prior Year Funding $720,043 Remaining Needed$4,758,800 Project No.8700 PROJECT DESCRIPTION The project will upgrade various signal hardware components, including traffic signal heads, push buttons, and pedestrian signal heads on two hundred twenty-four (224) signalized intersections on various arterial in the City of San Bernardino. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total HSIP Grant $720,043 $1,588,000 $1,588,000 $1,582,800 $0 $0 $5,478,843 (123) Totals $720,043 $1,588,000 $1,588,000 $1,582,800 $0 $0 $5,478,843 PROJECT STATUS UPDATE Design is in progressand be completed in 2020. Construction will be completed by December 2023. Consistency:This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by improving traffic signal functionality and reducing circulation delay in the Project area. Forecasted Project Completion Date: December 2023 On-going Operating & Maintenance Impact: Maintenance equal Project Manager: Azzam Jabsheh Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 94 454 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC20-008 Department Public Implement Advanced Works Dilemma Zone Detection at 49 Signalized Intersections Ward All CIP Type Traffic Controls Project Location Citywide Project Category Ongoing Total Project Cost $4,321,193 Prior Year Funding $1,051,793 Remaining Needed$3,269,400 Project No.8701 PROJECT DESCRIPTION The project will implement advanced dilemma zone detection at 49 signalized intersections within three roadway corridors. Mt. Vernon Avenue from Highland Avenue to Johnston Street, Baseline Street from Del Rosa Avenue to California Street and Highland Avenue from Medical Center Drive to Victoria Avenue. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25Estimated Source Funding Projected Projected Projected Projected Projected Project Total HSIP $1,051,793 $1,089,800 $$1,089,800$1,089,800 $0 $0 $4,321,193 Grant (123) Totals $1,051,793 $1,089,800 $1,089,800 $1,089,800 $0 $0 $4,321,193 PROJECT STATUS UPDATE Design is in progressand be completed in 2020. Construction will be completed by December 2023. Consistency:This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project is will contribute to enhance motorist safety by improving signal functionality and traffic flow in the project area. Forecasted Project Completion Date: December 2023 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) On-going Operating & Maintenance Impact: Maintenance equal Project Manager: Azzam Jabsheh Packet Pg. 95 455 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC21-001 Department Public Hunts Laneand Redland Works Blvd Traffic signal Upgrade Ward 2 CIP Type Traffic Controls Project Location Hunts Lane and Redland Project Category New Blvd Total Project Cost $35,000 Prior Year Funding $0 Remaining Needed$35,000 Project No. PROJECT DESCRIPTION This project will upgrade the existing traffic signal at the intersection of Hunts Lane and Redland Boulevard. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Local $0 $35,000 $0 $0 $0 $0 $35,000 Circulation DIF (263) Totals $0$0 $0 $0 $0 $0 $35,000 PROJECT STATUS UPDATE This is a new project and scheduled to start in FY 20/21. Consistency: This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by improving signal functionality and traffic circulation in the Project area. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance equal Project Manager: Azzam Jabsheh Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 96 456 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC21-002 Department Public Mt. Vernon and Rialto Works Avenue Traffic signal Upgrade Ward 1,3 CIP Type Traffic Controls Project Location Mt. Vernon Ave. and Project Category New Rialto Avenue Total Project Cost $35,000 Prior Year Funding $0 Remaining Needed$35,000 Project No. PROJECT DESCRIPTION This project will upgrade the existing traffic signal at the intersection of Mt. Vernon Avenue and Rialto Avenue. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Local $0 $35,000 $0 $0 $0 $0 $35,000 Circulation DIF (263) Totals $0$35,000 $0 $0 $0 $0 $35,000 PROJECT STATUS UPDATE This is a new project and scheduled to start in FY 20/21. Consistency:This project is consistent with Key Target No. 1d: Minimize risk and litigation exposure. This project will mitigate the potential exposure to risk and litigation by improving traffic controland circulation flow in the project area.. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance equal Project Manager: Azzam Jabsheh Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 97 457 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC21-003 Department Public Mt. VernonAve.and Works Walnut Avenue Traffic Signal Upgrade Ward 3 CIP Type Traffic Controls Project Location Mt. Vernon Avenue and Project Category New Walnut Avenue Traffic Total Project Cost $35,000 Prior Year Funding $0 Remaining Needed$35,000 Project No. PROJECT DESCRIPTION This project will upgrade the existing traffic signal at the intersection of Mt. Vernon Avenue and Walnut Avenue Traffic. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Local $0 $35,000 $0 $0 $0 $0 $35,000 Circulation DIF (263) Totals $0 $35,000 $0 $0 $0 $0 $35,000 PROJECT STATUS UPDATE This is a new project and scheduled to start in FY 20/21. Consistency:This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by improving traffic signal functionality and reducing circulation delay in the project area. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance equal Project Manager: Azzam Jabsheh Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 98 458 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC21-004 Department Public WatermanAvenueand Works st 21 Street Traffic Signal Upgrade Ward 3 CIP Type Traffic Controls Project Location Waterman Avenue and Project Category New st 21 Street Total Project Cost $35,000 Prior Year Funding $0 Remaining Needed$35,000 Project No. PROJECT DESCRIPTION This project will upgrade the existing traffic signal at the intersection of Waterman Avenue st and 21 Street. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24 FY 24/25 Estimated Source Funding Projected Projected Projected Projected Projected Project Total Local $0 $35,000 $0 $0 $0 $0 $35,000 Circulation DIF (263) Totals $0 $35,000 $0 $0 $0 $0 $35,000 PROJECT STATUS UPDATE This is a new project and scheduled to start in FY 20/21. Consistency:This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by improving traffic signal functionality and reducing circulation delay in the project area. Forecasted Project Completion Date: June 2021 On-going Operating & Maintenance Impact: Maintenance equal Project Manager: Azzam Jabsheh Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 99 459 1.a CITY OF SAN BERNARDINO PROJECT INFORMATION SHEET Project Name TC-B Department Public Traffic Signal Battery Works Backup Systems (Annual) Ward All CIP Type Traffic Controls Project Location Citywide Project Category Ongoing Total Project Cost$50,000 Prior Year Funding$0 Remaining Needed$50,000 Project No.7651 PROJECT DESCRIPTION This project will install or replace battery backup system at each of the 283 traffic signals city-wide. This will insure battery power available in case of power failure. Battery Backup System is designed to provide hours of uninterrupted power through weather outages and other disturbances, providing safety for drivers and law enforcement officials under hazardous conditions. UPS unites and/or Batteries requirements will be identified annually and a purchase order will be opened to purchase and install the identified traffic signal BBS locations. PROJECT FUNDING AND EXPENDITURE DETAIL Funding Prior Year FY 20/21 FY 21/22 FY22/23 FY 23/24FY 24/25Estimated Source Funding Projected Projected Projected Projected Projected Project Total Local $0 $50,000 $0 $0$0 $0 $50,000 Circulation DIF (263) Totals $0 $50,000 $0 $0$0 $0 $50,000 PROJECT STATUS UPDATE This is an annual project that will be completed by the end of each fiscal year. Consistency: This project is consistent with Key Target No 1d: Minimize risk and litigation exposure. This project will contribute to enhanced motorist safety by ensuring that Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) signalized intersections remain functional in the event power is lost. Forecasted Project Completion Date: June 2025 On-going Operating & Maintenance Impact: Maintenance may increase Project Manager: Azzam Jabsheh Packet Pg. 100 460 1.a DJQ!DJQ!DJQ!DJQ!DJQ!DJQ!DJQ! Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 101 461 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 102 462 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a 20,000 350,000500,000250,000250,000800,000500,000250,000150,000350,000200,000800,000300,000335,000800,000600,000225,000125,000 600,000750,000250,000315,000 Total 1,000,0003,000,0003,500,0005,500,0002,000,0003,000,0002,500,000 1,200,0002,000,0001,200,0003,300,0005,000,0001,200,000 15,000,000 62,000,000 Packet Pg. 103 FY 500,000 1,000,0001,000,000 10,000,000 2024/2025 FY 500,000 1,000,0001,000,000 1,000,000 2023/2024 20,000 FY 600,000750,000500,000 3,500,0005,500,0003,000,000 2,000,0001,000,0001,000,0001,000,000 1,000,000 2022/2023 FY 350,000 500,000 1,200,000 1,000,0001,000,000 1,000,000 54,000,000 2021/2022 FY 300,000800,000200,000300,000335,000800,000600,000225,000125,000 250,000500,000315,000 500,000250,000250,000800,000500,000250,000150,000350,000200,000 3,000,0005,000,000 1,200,0001,000,000 1,000,0003,000,000 2020/2021 31st to Street Dr t S tView Curtis e Street2,000,000 of Av to t Stree end Lynwood Ave Street Stree t Mountain Parkdale Rosena H from Gould West S t to to to to to Hardt Stree and from Ave to Ave Tippecanoe 9th Street Street 2 yAve E Avenue Street, Hill, Street from replacemen panels) Stud 40th Phase1 Phase from ) Project 14th CC)Tippecanoe Gifford solar ((Tippecanoe Perris Improvements Street, fromto ofTippecanoe Drive Impact Coulston St from ) from )+B19th renovationsKitchen from B equipment Replacement A) Drain (fromto replacement ( t from C ) StructureStructure ( Kendall (disposeirrigation HVAC BDrain Roof Baseline T.I Landscape Center ( Hernandez,Drainage T.I (Wildwood) filter Street Projec Storm Demo/rebuild Hudson repairs C) along ( from MechanicalElevatorsADAStructuralParkingParking Rehabilitation Storm Area PoolRehabilitation RoofingVine Software Yard Improvements CenterCenter Rehabilitation Senior Center View Blair,median Rehabilitation Ave fields St fencing: Replacementcontrolled Bldg. Rehabilitation Building City St from Demo/rebuild RestroomMedian III: Campos Street St Street Hernandez StreetStreetStreetStreetStreetStreetStreet Access Vernon Hall EEEEEEEStreetStreet Yard Valencia RudyNicholson5thBaseballPublicPhaseSecurityRemote9thVerdemontMountainMt. RubenGalaxy201ConventionConvention201201201201201202AssessmentPWCityFacilitiesADARaisedRepaveCooleyGouldHardtDavidsonStreet,CoulstonCurtis Source Funding UnfundedUnfundedUnfundedUnfundedUnfundedUnfundedUnfundedUnfundedUnfundedUnfundedUnfundedUnfundedUnfunded DrainsDrainsDrains DRAINS ParksParksParksParksParksParksParksParksParks PARKS StreetsUnfundedStreetsUnfundedStreetsUnfundedStreetsUnfundedStreetsUnfundedStreetsUnfunded StreetsUnfundedStreetsUnfundedStreetsUnfunded Streets BuildingsUnfundedBuildingsUnfundedBuildingsUnfundedBuildingsUnfundedBuildingsUnfundedBuildingsUnfundedBuildingsUnfundedBuildingsUnfundedBuildingsUnfundedBuildingsUnfundedBuildingsUnfundedBuildingsUnf undedBuildingsUnfundedBuildingsUnfundedBuildingsUnfunded STREETS Category BUILDINGS StormStormStorm STORM 463 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a 135,000165,000400,000125,000750,000300,000325,000315,000335,000225,000215,000235,000300,000600,000 225,000300,000 Total 1,000,0001,750,0001,000,0001,250,0002,500,0002,500,0003,750,0004,250,0001,750,000 144,820,000 Packet Pg. 104 FY 350,000250,000500,000500,000750,000 14,850,000 2024/2025 FY 350,000250,000500,000500,000750,000 5,850,000 2023/2024 FY 350,000250,000500,000500,000750,000 22,220,000 2022/2023 FY 350,000250,000500,000500,000750,000 61,400,000 2021/2022 FY 135,000165,000125,000750,000300,000325,000315,000335,000225,000215,000235,000300,000350,000250,000500,000600,000500,000750,000 400,000225,000300,000 1,000,0001,000,0001,750,000 4,250,000 39,500,000 2020/2021 to Ave e Verde (Annual) Grant Av e Avenue t Mesa from t y S Avenu Lincoln Stree from Wa to Assessment HParkdale Baseline Avenue Street, St, St to Walnut and FWY Sierra and Parkdale to 11th to t Gould to street Hillcrest to Gilbert Fairview toStreet Luminaries to street to Street E to Street St 210/215 30th street LED Street Project Mill 10th Mill e gto Street Street n from to Arrowhead Street from 30th Replacemen Arrowhead I e between from Coulston Mill from Spruce and from from rang from Poles sweepin avenue Geneviev Baseline from from from Locations Conversion End on street Rehabilitatio cameras Down E street from Rialto Rehabilitation Rehabilitation shooting Light lights Rehabilitation Rehabilitation Various Rehabilitation Hill Lane filter/drainage from Knock Rehabilitation RehabilitationAvenuesigns Northern Rehabilitation Avenue Streetrange Avenue BetweenRoad Rehabilitation Rehabilitationlights/add street toStreet AveRehabilitation TreeHill Street Street Repair Light Perris Way Ave Street Street Station Ave parking Street Street GrapeAcacia ElmAvenueRanchoVirginiaBaseline34thParksideSierraJMainHighlandGrantKBunkerBridgeBaselineReplaceNoReplaceCitywideStreetshootingDemoCNG Source Funding Unfunded TOTAL CONTROLS ControlsUnfundedControlsUnfundedControlsUnfundedControlsUnfundedControlsUnfundedControlsUnfunded UNFUNDED PoliceUnfundedPoliceUnfunded StreetsUnfundedStreetsUnfundedStreetsUnfundedStreetsUnfundedStreetsUnfundedStreetsUnfundedPepperStreetsUnfundedStreetsUnfundedStreetsUnfundedStreetsUnfundedStreetsUnfundedStreetsUnfundedStreetsUnfund edStreetsUnfunded StreetsUnfundedStreetsUnfunded NPDES POLICE Category TrafficTrafficTrafficTrafficTrafficTraffic TRAFFIC 464 1.a DJQ!DJQ!DJQ!DJQ!DJQ!DJQ!DJQ! Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 105 465 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 106 466 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a Packet Pg. 107 467 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a Packet Pg. 108 468 Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) 1.a Packet Pg. 109 469 1.a Attachment: FN.Attachment 1.FY 2020-21 Proposed CIP (6775 : FY 2020/21 Capital Improvement Program) Packet Pg. 110 470