Loading...
HomeMy WebLinkAboutRES 2020-067 List of Projects - Road Repair & Accountability Act of 2017RESOLUTION NO.2020-67 RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO, CALIFORNIA, ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2020/21 TO BE FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 in order to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must adopt a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City will receive an estimated $3,634,245 in RMRA funding in Fiscal Year 20/21 from SB 1; and WHEREAS, this is the third year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, and increased access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City has undergone a robust public process to ensure public input into our community's transportation priorities (the project list); and WHEREAS, the City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high -priority and cost-effective projects that also meet the communities priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate over 800 miles of road and add active transportation infrastructure throughout the City this year and hundreds of similar projects into the future; and WHEREAS, the 2019 California Statewide Local Streets and Roads Needs Assessment found that the City's streets and roads are in an "at -risk" condition and this revenue will help us increase the overall quality of our road system; and Resolution No. 2020-67 April 15, 2020 Page 1 of 5 WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety and complete streets infrastructure and use of cutting -edge technology, materials, and practices, will have significant positive co - benefits statewide. BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. The above recitals are true and correct and are incorporated herein by this reference. SECTION 2. The following projects may utilize fiscal year 2020/2021 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues Ward Street Project Description Limits Estimated Project Useful Life Timeline ►ears) 1 3" Street 3"-5" mill and AC overlay, Sierra Way to 20-30 October roadway widening for D Street 2020- April bicycle lanes, installation of 2021 curb and gutter, parkway strip, sidewalk, ADA- compliant curb ramps, drainage improvements, striping and signage improvements 2 16` Street 3"-5" mill and AC overlay, Sierra Way to 4 October roadway widening for Waterman 2020- April bicycle lanes, installation of Avenue 2021 curb and gutter, parkway strip, sidewalk, ADA- compliant curb ramps, drainage improvements, striping and signage improvements 3 Rancho 3"-5" mill and AC overlay, Rialto Avenue 3 October Avenue roadway widening for to Foothill 2020- April bicycle lanes, installation of Blvd. 2021 curb and gutter, parkway strip, sidewalk, ADA- compliant curb ramps, drainage improvements, striping and signage Resolution No. 2020-67 April 15, 2020 Page 2 of 5 improvements 4 Highland 3"-5" mill and AC overlay, Palm Avenue 6 October Avenue roadway widening for to Frontage 2020- April bicycle lanes, installation of Road 2021 curb and gutter, parkway strip, sidewalk, ADA- compliant curb ramps, drainage improvements, striping and signage improvements 5 Northpark 3"-5" mill and AC overlay, Devil Canyon 5 October Blvd. roadway widening for Levee Road to 2020- April bicycle lanes, installation of Little 2021 curb and gutter, parkway Mountain strip, sidewalk, ADA- compliant curb ramps, drainage improvements, striping and signage improvements 6 Industrial 3"-5" mill and AC overlay, Palm Avenue 6 October Parkway roadway widening for to Lexington 2020- April bicycle lanes, installation of Way 2021 curb and gutter, parkway strip, sidewalk, ADA- compliant curb ramps, drainage improvements, striping and signage improvements 7 Arrowhead 3"-5" mill and AC overlay, Highland 8 October Avenue roadway widening for Avenue to 2020- April bicycle lanes, installation of 30t' Street 2021 curb and gutter, parkway strip, sidewalk, ADA- compliant curb ramps, drainage improvements, striping and signage improvements SECTION 3. That the City Council finds this Resolution is not subject to the California Environmental Quality Act (CEQA) in that the activity is covered by the general rule that CEQA applies only to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty, as in this case, that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. The above projects will each be subject to CEQA review. Resolution No. 2020-67 April 15, 2020 Page 3 of 5 SECTION 4. Severability. If any provision of this Resolution or the application thereof to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications, and to this end the provisions of this Resolution are declared to be severable. SECTION 5. Effective Date. This Resolu shall becon ffective immediately. APPROVED and ADOPTED by the C' ou ' and L d by the Mayor and attested by the Acting City Clerk this 15'h day of April .lohn Valdivia, Mayor City of San Bernardino enoveva Rocha, CMC, Acting City Clerk Approved as to form: 'IV Sonia Carvalho, City Attorney Resolution No. 2020-67 April 15, 2020 Page 4 of 5 CERTIFICATION STATE OF CALIFORNIA) COUNTY OF SAN BERNARDINO) ss CITY OF SAN BERNARDINO ) I, Genoveva Rocha, CMC, Acting City Clerk, hereby certify that the attached is a true copy of Resolution No. 2020-67, adopted at a regular meeting held on the 15t' day of April 2020 by the following vote: Council Members: AYES NAYS ABSTAIN ABSENT SANCHEZ X IBARRA X FIGUEROA X SHORETT X NICKEL X RICHARD X MULVIHILL X WITNESS my hand and official seal of the City of n Bernardino this 16' d• of April 2020. r Genoveva Rocha, CMC, Acting City Clerk Resolution No. 2020-67 April 15, 2020 Page 5 of 5 CITY OF SAN BERNARDINO FLOCATION MAP -PROPOSED PROJECT LIST SB1 PROPOSED PROJECT LIST FY 2020-21 Foothill fiy � ';� stud W 5��`f" W4th St BMSP-San Bemareinu ?ta:: I W soov ew It W Ritbitu . ® 2020 Mivosoft Corporation ® 2020 HEREbo ^Lj 500 0 500 1000 1500 SCALE: 1 "=500' CITY OF SAN BERNARDINO LOCATION MAP - PROPOSED PROJECT LIST SB1 PROPOSED PROJECT LIST FY 2020-21 .OE.h 2BIh St , HCi1H�A a e 2YEest I MOUNTAIN � #s°s SCR t� s i, SOX A"Xk Aye Ata C I AVaritic Aw War St - 207f� Microsoft Corporatic�l DAERE �* tr g 1000 0 1000 2000 3000 SCALE: 1"=1000' CITY OF SAN BERNARDINO LOCATION MAP - PROPOSED PROJECT LIST SB1 PROPOSED PROJECT LIST FY 2020-21 IWO 16-S, 5ti CalllomW State UnivdrsirySon Sunwdm oee 4 UNIVERSITY n 9'�r � aoa ram, � ,v e e Ave w 48A Sti �� Ey. 0 2020 Microsoft Corporation 0 V20 HERE b b"nq 1000 0 1000 2000 3000 SCALE: 1' =1000' CITY OF SAN BERNARDINO LOCATION MAP -PROPOSED PROJECT LIST S61 PROPOSED PROJECT LIST FY 2020-21 r I .IV tQ6 dab a off`' v a� Aft'e--tie AZ ® 2020 Mhaosoft C"'Iton ® 2020 HERE fkbfq 1000 0 1000 2000 3000 SCALE: 1' =1000' CITY OF SAN BERNARDINO LOCATION MAP — PROPOSED PROJECT LIST SB1 PROPOSED PROJECT LIST FY 2020-21 w 3Qgt st w 30th st 218 �• nlmd or w Z �216 d w 29th A W Zgtb Q O 2 F a s W 28th st 2 W 2sth st K W d14under Avg x w 37t[15i z t W 36th st W 2sw st w2sthst a c 2 w 24th st t c w 24th st j w 23ri st W i$rd St W K34r&w4 Ave W w M[ghiand Arse Y wtur st a e 2 3 t 76 �_K6E 3 Z K F 2Bth 31 E AlcxanQerAve w 27th si E 77a St �i s xstb st a y z r a 2kd St d� E 02=M rmft Corp=tjcn O2.MHERE tJ 800 0 800 1600 2400 SCALE:1'=800'