HomeMy WebLinkAboutRES 2020-067 List of Projects - Road Repair & Accountability Act of 2017RESOLUTION NO.2020-67
RESOLUTION OF THE MAYOR AND CITY COUNCIL OF
THE CITY OF SAN BERNARDINO, CALIFORNIA,
ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR
2020/21 TO BE FUNDED BY SENATE BILL 1: THE ROAD
REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor
in April 2017 in order to address the significant multi -modal transportation funding shortfalls
statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure
the residents of our City are aware of the projects proposed for funding in our community and
which projects have been completed each fiscal year; and
WHEREAS, the City must adopt a list of all projects proposed to receive funding from
the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution,
which must include a description and the location of each proposed project, a proposed schedule
for the project's completion, and the estimated useful life of the improvement; and
WHEREAS, the City will receive an estimated $3,634,245 in RMRA funding in Fiscal
Year 20/21 from SB 1; and
WHEREAS, this is the third year in which the City is receiving SB 1 funding and will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, and increased access and mobility options for the traveling public that would not
have otherwise been possible without SB 1; and
WHEREAS, the City has undergone a robust public process to ensure public input into
our community's transportation priorities (the project list); and
WHEREAS, the City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high -priority and cost-effective projects that
also meet the communities priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate over
800 miles of road and add active transportation infrastructure throughout the City this year and
hundreds of similar projects into the future; and
WHEREAS, the 2019 California Statewide Local Streets and Roads Needs Assessment
found that the City's streets and roads are in an "at -risk" condition and this revenue will help us
increase the overall quality of our road system; and
Resolution No. 2020-67
April 15, 2020
Page 1 of 5
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety and complete streets infrastructure
and use of cutting -edge technology, materials, and practices, will have significant positive co -
benefits statewide.
BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF
SAN BERNARDINO AS FOLLOWS:
SECTION 1. The above recitals are true and correct and are incorporated herein by this
reference.
SECTION 2. The following projects may utilize fiscal year 2020/2021 Road
Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these
projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State
our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues
Ward
Street
Project Description
Limits
Estimated
Project
Useful Life
Timeline
►ears)
1
3" Street
3"-5" mill and AC overlay,
Sierra Way to
20-30
October
roadway widening for
D Street
2020- April
bicycle lanes, installation of
2021
curb and gutter, parkway
strip, sidewalk, ADA-
compliant curb ramps,
drainage improvements,
striping and signage
improvements
2
16` Street
3"-5" mill and AC overlay,
Sierra Way to
4
October
roadway widening for
Waterman
2020- April
bicycle lanes, installation of
Avenue
2021
curb and gutter, parkway
strip, sidewalk, ADA-
compliant curb ramps,
drainage improvements,
striping and signage
improvements
3
Rancho
3"-5" mill and AC overlay,
Rialto Avenue
3
October
Avenue
roadway widening for
to Foothill
2020- April
bicycle lanes, installation of
Blvd.
2021
curb and gutter, parkway
strip, sidewalk, ADA-
compliant curb ramps,
drainage improvements,
striping and signage
Resolution No. 2020-67
April 15, 2020
Page 2 of 5
improvements
4
Highland
3"-5" mill and AC overlay,
Palm Avenue
6
October
Avenue
roadway widening for
to Frontage
2020- April
bicycle lanes, installation of
Road
2021
curb and gutter, parkway
strip, sidewalk, ADA-
compliant curb ramps,
drainage improvements,
striping and signage
improvements
5
Northpark
3"-5" mill and AC overlay,
Devil Canyon
5
October
Blvd.
roadway widening for
Levee Road to
2020- April
bicycle lanes, installation of
Little
2021
curb and gutter, parkway
Mountain
strip, sidewalk, ADA-
compliant curb ramps,
drainage improvements,
striping and signage
improvements
6
Industrial
3"-5" mill and AC overlay,
Palm Avenue
6
October
Parkway
roadway widening for
to Lexington
2020- April
bicycle lanes, installation of
Way
2021
curb and gutter, parkway
strip, sidewalk, ADA-
compliant curb ramps,
drainage improvements,
striping and signage
improvements
7
Arrowhead
3"-5" mill and AC overlay,
Highland
8
October
Avenue
roadway widening for
Avenue to
2020- April
bicycle lanes, installation of
30t' Street
2021
curb and gutter, parkway
strip, sidewalk, ADA-
compliant curb ramps,
drainage improvements,
striping and signage
improvements
SECTION 3. That the City Council finds this Resolution is not subject to the California
Environmental Quality Act (CEQA) in that the activity is covered by the general rule that CEQA
applies only to projects which have the potential for causing a significant effect on the
environment. Where it can be seen with certainty, as in this case, that there is no possibility that
the activity in question may have a significant effect on the environment, the activity is not
subject to CEQA. The above projects will each be subject to CEQA review.
Resolution No. 2020-67
April 15, 2020
Page 3 of 5
SECTION 4. Severability. If any provision of this Resolution or the application thereof
to any person or circumstance is held invalid, such invalidity shall not affect other provisions or
applications, and to this end the provisions of this Resolution are declared to be severable.
SECTION 5. Effective Date. This Resolu shall becon ffective immediately.
APPROVED and ADOPTED by the C' ou ' and L d by the Mayor and attested
by the Acting City Clerk this 15'h day of April
.lohn Valdivia, Mayor
City of San Bernardino
enoveva Rocha, CMC, Acting City Clerk
Approved as to form:
'IV Sonia Carvalho, City Attorney
Resolution No. 2020-67
April 15, 2020
Page 4 of 5
CERTIFICATION
STATE OF CALIFORNIA)
COUNTY OF SAN BERNARDINO) ss
CITY OF SAN BERNARDINO )
I, Genoveva Rocha, CMC, Acting City Clerk, hereby certify that the attached is a true
copy of Resolution No. 2020-67, adopted at a regular meeting held on the 15t' day of April 2020
by the following vote:
Council Members:
AYES NAYS ABSTAIN ABSENT
SANCHEZ
X
IBARRA
X
FIGUEROA
X
SHORETT
X
NICKEL
X
RICHARD
X
MULVIHILL
X
WITNESS my hand and official seal of the City of n Bernardino this 16' d• of April 2020.
r
Genoveva Rocha, CMC, Acting City Clerk
Resolution No. 2020-67
April 15, 2020
Page 5 of 5
CITY OF SAN BERNARDINO
FLOCATION MAP -PROPOSED PROJECT LIST
SB1 PROPOSED PROJECT LIST FY 2020-21
Foothill fiy � ';� stud W 5��`f"
W4th St
BMSP-San Bemareinu
?ta::
I
W soov ew It W Ritbitu .
® 2020 Mivosoft Corporation ® 2020 HEREbo ^Lj
500 0 500 1000 1500
SCALE: 1 "=500'
CITY OF SAN BERNARDINO
LOCATION MAP - PROPOSED PROJECT LIST
SB1 PROPOSED PROJECT LIST FY 2020-21
.OE.h
2BIh St
,
HCi1H�A
a
e
2YEest I
MOUNTAIN � #s°s
SCR t� s i,
SOX
A"Xk Aye
Ata
C
I
AVaritic Aw
War St -
207f� Microsoft Corporatic�l DAERE �* tr g
1000 0 1000 2000 3000
SCALE: 1"=1000'
CITY OF SAN BERNARDINO
LOCATION MAP - PROPOSED PROJECT LIST
SB1 PROPOSED PROJECT LIST FY 2020-21
IWO
16-S,
5ti
CalllomW State UnivdrsirySon Sunwdm
oee
4 UNIVERSITY
n 9'�r � aoa ram, � ,v
e e Ave w 48A Sti
�� Ey. 0 2020 Microsoft Corporation 0 V20 HERE b b"nq
1000 0 1000 2000 3000
SCALE: 1' =1000'
CITY OF SAN BERNARDINO
LOCATION MAP -PROPOSED PROJECT LIST
S61 PROPOSED PROJECT LIST FY 2020-21
r
I
.IV
tQ6
dab
a
off`'
v
a�
Aft'e--tie AZ ® 2020 Mhaosoft C"'Iton ® 2020 HERE fkbfq
1000 0 1000 2000 3000
SCALE: 1' =1000'
CITY OF SAN BERNARDINO
LOCATION MAP — PROPOSED PROJECT LIST
SB1 PROPOSED PROJECT LIST FY 2020-21
w 3Qgt st w 30th st
218 �•
nlmd or
w
Z
�216
d
w 29th A
W Zgtb Q
O
2 F
a
s
W 28th st
2
W 2sth st
K
W d14under Avg
x
w 37t[15i
z
t
W 36th st
W 2sw st
w2sthst a
c
2
w 24th st
t c
w 24th st j
w 23ri st
W i$rd St
W K34r&w4 Ave W w M[ghiand Arse
Y
wtur st a
e
2
3
t
76
�_K6E
3
Z
K
F 2Bth 31
E AlcxanQerAve
w 27th si
E 77a St
�i
s xstb st
a
y
z
r
a 2kd St
d� E
02=M rmft Corp=tjcn O2.MHERE tJ
800 0 800 1600 2400
SCALE:1'=800'