HomeMy WebLinkAboutItem No. 05 - PH - Regarding Fee Adjustments for Various City Departments
Page 1
Public Hearing
City of San Bernardino
Request for Council Action
Date: May 6, 2020
To: Honorable Mayor and City Council Members
From: Teri Ledoux, City Manager
Subject: Public Hearing Regarding Fee Adjustments for Various City
Departments
Recommendation
That the Mayor and City Council of the City of San Bernardino, California, conduct a
Public Hearing regarding fee adjustments for various City Departments.
Background
In November 2014, as the City was drafting what would eventually b ecome the “Plan of
Adjustment” to exit bankruptcy, the City simultaneously began a review of its User Fees.
The last time User Fees were updated in a comprehensive manner was in 2008
(building and safety fees) and 2009 (other various departmental fees). User Fees are
charges to customers that receive a specific benefit (for example: plan reviews, facility
rentals, recreation classes, etc.) versus services that are of broad benefit to the entire
community (for example: police services). As required by Article XIIIC, Section 1 of the
State Constitution, User Fees charged cannot exceed the reasonable estimated cost to
provide the services.
Preparing a comprehensive review of the City’s User Fees required a specialized
financial study to properly evaluate staff time and other costs required to perform the
various city services. Accordingly, the City contracted with Revenue and Cost
Specialists (RCS) in November 2014 to prepare a cost allocation plan and cost of
services study to determine if the City was adequately covering its allowable costs.
With a high level of turnover in the Finance Department during the years ensuing the
bankruptcy filing (since 2014 there have been five (5) interim and/or permanent Finance
Directors) the study unfortunately stalled. After a series of stops and starts, the contract
with RCS was amended in November of 2016 and a draft study was completed in
October 2018; however, staffing turnover within all City departments caused delays,
resulting in an outdated study.
In December 2019, the City amended the agreement with RCS to update the
information and since that time city staff and RCS have worked diligently together to
complete this study. If approved, the recommendations are conservatively expected to
generate approximately $967,400 in additional revenue in Fiscal Year 2020/21.
6719
Page 2
Discussion
The purpose of this study is to determine if the City is adequately covering its costs for
specific government services or products provided directly to the payer and not provided
to those not charged; these fees are categorized as “User Fees”. Over one -hundred
and sixty (160) fees have been evaluated.
Attachment 1, prepared by City staff , summarizes in one document the consultant’s
findings as well as adjustments recommended by staff. A lso included on Attachment 1
is the consultant’s calculation of possible additional revenue and City staff’s revenue
projections for FY 2020/21.
Some things to keep in mind when reviewing the fee adjustment recommendations
(Attachment 1):
It is important to remember that the consultant’s primary responsibility is to
determine the costs of providing specific services. But the City must determine the
appropriate level of cost recovery. For certain programs, significant increases to
achieve 100% cost recovery are not feasible, for example Animal Control, and Parks
and Recreation programs. Determining the level of cost recovery in these areas is
not strictly a mathematical calculation. Rather, cost recovery levels in these areas
reflect a municipality’s specific situation: demographics, public safety, market
conditions and community values and priorities.
Within the departmental sections of this report, where applicable, this is discussed in
greater detail. Staff strived to find a balance between c ost recovery and
subsidization of programs however Council input on these decisions is encouraged.
The study conducted by RCS utilized FY 2019/20 salary and benefit data in
estimating costs. However, the consultant based revenue projections on levels of
activity occurring in FY 2018/19. City staff has adjusted these projections in a
conservative manner given the economic downturn that is currently occurring. The
economic impacts of shutdowns related to COVID -19 are not fully known; with this in
mind, and the fact that fees will not be effective until late July, staff has lowered the
consultant’s projections in most cases by 20%.
User Fees can only capture the City’s cost to provide specific services. Because of
budget reductions through the years, operating costs in many areas are low and
therefore close to 100% cost recovery. Should the City enhance services that are
funded with fees, the improvements could be captured in a future fee update. For
example, the addition of staffing in Community and Economic Development could
improve service to the development community and in turn the costs could be
captured in updated fees.
Included with Attachment 1 is a comparison of select fees with surrounding or similar
agencies. For development related fees, comparisons were made based on
hypothetical projects. Caution should be used when comparisons are made to other
agencies as only the cost to provide the service can be charged. There are many
6719
Page 3
reasons why comparisons can vary widely among agencies i ncluding: population,
staffing levels, technology, operating budget, agency policy decisions, and age of an
agency’s most current study. Within Attachment 1, the comparison is labeled as
Exhibit “E”.
Attachment 2 is the service cost study prepared by RCS to evaluate staff time and other
costs required to perform the various services.
Preparation of this study required the input of staff throughout all City departments.
Staff provided RCS with estimates of time required to perform tasks, and numerous
meetings and interviews between City staff and the consultants were conducted to
get the most accurate information possible.
RCS evaluated the cost of services and cost recovery at both the individual level and
the program level. In most cases, staff time and materials dedicated to a specific
individual service were reviewed. RCS developed a cost allocation plan to calculate
the average fully burdened rate of all budget positions. The rate includes general
city overhead as well as departmental overhead.
In some instances, a programmatic approach to evaluate costs versus recovery was
used. With this approach, the total program costs and the total program revenue
from the aggregated related fees to a specific program are evaluated. This method
of evaluating costs is particularly useful in areas such as building and safety, where
there are a myriad of fees calculations based on valuation schedules and type of
structure.
While the majority of fees are recommended to be raised, there are also down ward
adjustments to fees. This is a result of changes in process over the past ten years
since the last study was completed. Changes in technology, laws, staffing levels
and deployment, etc. over the years contribute to the realignment of costs.
Penalties charged for parking violations set forth in the City of San Bernardino’s
Municipal Code or in the California Vehicle Code are not included in this study and
are covered under Resolution 2013-188.
Development Impact Fees (DIF) are not considered User Fees and are established
and administered under other legal requirements; therefore , they are not included in
this study.
Fees by Department:
Extensive detail is provided in Attachments 1 & 2 for the User Fees that were reviewed.
In the departmental sections below items that require additional explanation are
discussed, for instance fees without a recommendation of 100% cost recovery.
6719
Page 4
Department
Estimated
Additional
Revenue
FY 2020-21
Library 500$
City Manager 6,000$
Finance 14,500$
City Attorney 16,800$
Parks & Recreation 23,600$
City Clerk 24,200$
Police 63,100$
Animal Control 80,000$
Public Works 355,100$
Community & Economic Development 383,600$
Total 967,400$
Estimated Additional Fee Revenue by Department
Library
Similar to Animal Control and Parks and Recreation, the Library cannot be fully
sustained with fees. Current fees cover approximately 2.3% of operational costs.
Operating a public library can be considered a service that provides economic, cultural
“quality of life” benefits to the community and offers some residents an opportunity to
have access to materials they otherwise could not afford. Raising fees too sharply may
cause a decrease in participation. The Library Board recently approved a fee schedule
that has been incorporated into this study.
Parks and Recreation
Included in Attachment 1 is Exhibit “C” which provides a detailed listing of various Parks
and Recreation fees along with recommendations for increases. Similar to the Library,
Parks and Recreation User Fees cover approximately 4% of total Parks and Recreation
costs (not including grant funded programs). The current fee structure takes into
account affordability for its citizenry and the general benefits for the City at large in
having Parks and Recreation amenities and programs available to its residents. In
some cases fees were doubled, which sounds extreme, but many of the fees are in the
$1 to $3 range. Fees were adjusted with this same structure in mind, with the goal of
keeping up with inflation rather than achieving 100% cost recovery and making
participation in the programs cost prohibitive.
Police Department
Police Services are considered a public-benefit service. However, there are fees that
cover services for specific customers. For example, providing a copy of a police report,
or processing a 2nd hand dealer/pawnshop license. In those cases 100% cost recovery
has been recommended.
In the case of the Alarm Permit program, there is a balance between cost recovery and
the desire to modify behavior. 100% cost recovery would have almost quadrupled the
6719
Page 5
annual residential alarm permit fee. Staff is recommending keeping the annual permit
fee at a lower rate than recommended by RCS, and instead increasing fees for
responses to false alarms. Permit holders will not be charged for false alarm fees until
the 3rd incident within a 12 month period and fees after the 2nd offense are considerably
lower for permit holders compared to non-permitted alarm owners. Attachment 1 details
the specifics.
The San Bernardino Police Department provides police services for various events and
venues throughout the year. The department charges a straight overtime rate, plus a
4.95% benefit rate for police services. This rate recovers the labor costs but does not
recover the overhead costs associated with the labor. Police department staff
conducted a detailed analysis of costs related to proving this service as well as
comparing practices with other law enforcement agencies in the area. Accordingly, a
recommendation has also been included in the study to assess a 20% overhead rate to
actual officer’s overtime rate.
Animal Control
Animal Control is considered a public safety function augmented by User Fees. Based
on the FY 2019/20 adopted budget, fees pay for about 12% of the operation’s cost.
100% cost recovery would not be feasible. There is a balance to recovering costs but
encouraging compliance and adoptions. Comparisons to surrounding agencies are
useful when reviewing fees in this particular area because residents have many pet
adoption options. Additionally, if fees are too prohibitive, then compliance may drop,
and public safety could be impacted.
The Police Department recently completed a comprehensive study of fees and
comparisons to surrounding agencies. The study is included with Attachment 1 and is
labeled as Exhibit “D”. Staff recommends implementing the results of the Police
Departments study. Because the level to subsidize Animal Control operations is a
policy decision, the consultants did not recommend specific fees but provided guidance
in developing fee proposals.
Public Works
Public Works is a large operation with many divisions that serve the public at large
(street maintenance, parks maintenance) as well as City departments (fleet and facilities
management). Engineering and Cemetery are funded in part with User Fees. 100%
cost recovery has been recommended for fees in both these areas. These fees have
lagged behind costs over the past ten years since the last study was completed.
Community and Economic Development (CED)
Building and Safety Fees are based in part on the valuation of a project. It is common
practice for cities to utilize the International Building Code’s (IBC) schedule of building
construction values when calculating fees. While the City utilizes this schedule, it hasn’t
updated the version in use since 2008. Staff recommendation is to update this
schedule semi-annually when updated versions are released. Fully burdened hourly
rates for staff were also updated. Because there are numerous combinations of fees in
the Building and Safety division based on various schedules, both the current and
6719
Page 6
proposed fee tables have been included as separate Exhibits “A” & “B” to Attachment 1.
RCS has also included these updated schedules in their report (appendices C & D).
Recognizing their importance as stakeholders in the City’s economic development, the
CED Director reached out to the Baldy View Chapter of the Building Industry
Association for comment and input. The City has received some input from members of
the development community that indicates fees higher than proposed would be
acceptable in return for enhanced service. As discussed earlier in this report, the City
can only capture its actual costs. Should the City make a determination to enhance
service delivery within the Building and Safety division, the fee study should be updated
to reflect these changes.
Also included in the fee study is the creation of a General Plan Maintenance Fee of 2%
to be assessed on all Community Development Fees. The purposed of the fee is to set
aside funds for maintenance and updating of the General Plan. The revenue generated
from this fee, estimated at $40,000 in FY 2020/21, is to be segregated from General
Fund operating revenues. Fees collected from the existing Technology fee of 2% are to
also be segregated from General Fund operating revenues.
Next Steps
Staff will return to the Mayor and City Council on May 20, 2020 with resolutions
incorporating fee recommendations approved by the Mayor and Council at the May 6,
2020 meeting.
2020-2025 Key Strategic Targets and Goals
Approving the recommended fee adjustments aligns with Key Target No.1 Financial
Stability by covering, to the extent allowable and feasible, the City’s costs for providing
various services.
Fiscal Impact
The financial impact to the City is an increase of $967,400 in revenue to the General
Fund in FY 2020/21.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino
California hold a public hearing to consider adjustments to various City fees, and direct
staff to prepare the necessary resolutions to effectuate the approved recommendations
of the fee study.
Attachments
Attachment 1 City Review and Summary of Consultant Study
Attachment 2 RCS Cost of Service Study
Ward: All
Synopsis of Previous Council Actions:
Resolution 2009-161 Amending Resolution 2009-122 (Master Fee Resolution)
6719
Page 7
Resolution 2009-122 Establishing a Master Fee Resolution
Resolution 2008-277 Updating Building Permit and Plan Review Fees
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0005CD‐BLDG+SAFETYBUILDING ISSUANCE FEE To process an application for a building permit. This is not a plan check or inspection.$40 ‐ 1st permit$10 ‐ each additional permit on the same applicaƟon$60 ‐ 1st permit$10 ‐ each additional permit on the same application↑64.8% 100.0% $ 108,500 FULL COST RECOVERY $ 86,800 Building Issuance Fee is a flat fee based on time, not valuation. A large portion of these fees collected will be for residential projects which are expected to be impacted by COVID‐19 shutdown. Lowered estimate by 20% for economic downturn and expected implementation of August 1, 2020S‐0010CD‐BLDG+SAFETYBUILDING PLAN CHECK To review plans for construcƟon.75% of building fee for SFD and duplex buildings95% of building fee for commercial, industrial and multi‐family buildings$94.15 per hour for plan review of small projects75% of building fee for SFD and duplex buildings95% of building fee for commercial, industrial and mulƟ‐family buildings$122.37 per hour for plan review of small projects↑71.4% 100.0% $ ‐ FULL COST RECOVERY $ ‐ See Exhibit A for detail on current fees and Exhibit B for detail on proposed fees. Building Plan Check Fees are based on a percentage of the Building Permit Fee. Building Permit Fees are based in large part on project valuation. Hourly rates have been updated. Additionally, the ICC table used for building valuation data will be updated twice a year. These two changes will increase fees but with project values varying widely, and the current economic situation, it would not be prudent to increase revenue A & BS‐0020CD‐BLDG+SAFETYBUILDING INSPECTION To inspect building, electrical, plumbing and mechanical construction to insure that it is in conformance with approved plans and the various construction codes.Various Fees per the Building Codes IBC valuation schedule from2006. Hourly rate $94.45Updated IBC schedule to 2020 and update annually. Hourly rate $118.33↑101.8% 100.0% $ ‐ FULL COST RECOVERY $ ‐ See Exhibit A for detail on current fees and Exhibit B for detail on proposed fees. Building Permit fees are based in large part on project valuation. Hourly rates have been updated. Additionally, the ICC table used for building valuation data will be updated twice a year. These two changes will increase fees but with project values varying widely, and the current economic situation, it would not be prudent to increase revenue projections at this point. A & B1 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0022CD‐BLDG+SAFETYSPECIAL BUILDING INSPECTIONTo perform a special inspection at the request of the applicant.$380 Minimum for the 1st 4 hours plus $95 for each additional hour$595 for the 1st 4 hours plus $105 for each add'l hour↑63.6% 100.0% $ 6,500 FULL COST RECOVERY $ 5,800 Increased cost may offset some activity while still generating additional revenue. Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0025CD‐BLDG+SAFETYCERTIFICATE OF OCCUPANCYTo review a construction project to insure that it has received all required inspections and met all conditions of approval, including those conditions of other $475.08 ‐ as a separate application (of which $100 was for Fire Review)$133.62 ‐ if included on the building permit (Deleted as All Fire)$500↑74.7% 100.0% $ 3,800 FULL COST RECOVERY $ 3,000 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0030CD‐LAND DEV.TEMPORARY CERTIFICATE OF OCCUPANCYTo issue a Temporary C.of O. good for one (1) month.$467.34 $500↑93.1% 100.0% $ 300 FULL COST RECOVERY $ 200 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0201CD‐PLANNINGAMENDMENT TO CONDITIONS‐ADM.REV.To review a request to amend the conditions of approval for a development that was originally approved by the Development Services Director.$583 $575↓101.4% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Based on study, fee lowered; staff time increased in other areas and was reduced here. Fee revenue from reduction is estimated to be less than $100S‐0203CD‐PLANNINGAMENDMENT TO CONDITIONS‐PLN.COMM.To review a request to amend the conditions of approval for a development that was originally approved by the Planning Commission.$2,550 $4,070 plus the estimated cost of noticing and publishing as estimated by City staff.↑62.6% 100.0% $ 3,000 FULL COST RECOVERY $ 2,400 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.2 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0205CD‐PLANNINGAMENDMENT TO CONDITIONS‐D/ERCTo review a request to amend the conditions of approval for a development that was originally approved by the Development/Environmental Review Committee.$822 $2,890↑28.5% 100.0% $ 3,500 FULL COST RECOVERY $ 2,800 Demand may decrease when full cost recovery is implemented, but overall additional revenue generation. Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0208CD‐PLANNINGANTENNA DEVELOPMENT PERMIT‐ADM.REV.To review an application for the placement of an antenna or other telecommunication device that requires Director Review according to the $2,938 Staff recommends deleting this fee as antennas are covered using a CUP or a development permit.DELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff recommends deleting this fee as antennas are covered using a CUP or a development permit. No revenue being collected currently.S‐0211CD‐PLANNINGAPPEAL TO MAYOR & COUNCILTo appeal a project to the Mayor and Council that was denied by the Planning Commission.$177 ‐ Non‐Applicant, City Resident (10% Recovery)$1,766 ‐ All others$2,850 plus the estimated cost of noticing and publishing as estimated by City staff. $285 ‐Non Applicant, City Resident↑62.0% 100.0% $ 1,100 FULL COST RECOVERY $ 900 Cost recovery didn't include overhead previously. Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0213CD‐PLANNINGAPPEAL TO THE PLANNING COMMISSIONTo appeal a project to the Planning Commission that was denied by the D/ERC or the Community Development Director.$278 ‐ Non‐Applicant, City Resident (10%)$2,772 ‐ All others$4,295 plus the estimated cost of noticing and publishing as estimated by City staff. $430 ‐Non‐Applicant City Staff↑64.5% 100.0% $ 3,000 FULL COST RECOVERY $ 2,400 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0216CD‐PLANNINGCUP‐MINOR USE PMT/ALCOHOLTo prepare a conditional use permit for a minor use or for the sale of alcohol in an existing building.$3,605 $4,625 plus the estimated cost of noticing and publishing as estimated by City staff.↑78.0% 100.0% $ 10,200 FULL COST RECOVERY $ 8,100 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.3 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0217CD‐PLANNINGCONDITIONAL USE PERMIT To review a request for a conditional use permit for conditional uses.$7,133 ‐ CUP for Commercial/Industrial (#10; $71,330)$2,809 ‐ CUP for Condo, PRD, HMOD (#30; $84,270)$5,555 plus the estimated cost of noticing and publishing as estimated by City staff.↑70.0% 100.0% $ 66,600 FULL COST RECOVERY $ 53,200 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0219CD‐PLANNINGCUP REVISION To review a request to modify an existing conditional use permit.$2,113 $3,780 plus the estimated cost of noticing and publishing as estimated by City staff.↑55.9% 100.0% $ 8,300 FULL COST RECOVERY $ 6,600 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0222CD‐PLANNINGDESIGN REVIEW To review the design of a proposed development.Full Consultant Cost Staff recommends deleting this service as service time is included with Conditional Use Permit, Development Permit or Temporary Use PermitDELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff recommends deleting this service as service time is included with Conditional Use Permit, Development Permit or Temporary Use Permit. Not currently collecting this fee.S‐0224CD‐PLANNINGDEVELOPMENT AGMT OR AMENDMENTTo prepare or amend a development agreement which sets out the City's and the developer's obligations for a proposed development. Typically used where a developer prefers to construct an improvement in‐lieu of paying development impact fees.Direct Cost Recovery Fee Actual Cost based on the "Fully‐Burdened" hourly rate of City staff plus consultant costs including 10% contract administrative overhead and all other costs charged against an initial deposit as determined by staff.↑100.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increasedS‐0227CD‐PLANNINGDEVELOPMENT CODE/ZONING MAP AMEND.To process a request to amend the development code or the zoning map at the request of, and for the benefit of, a developer.$6,960 plus full consultant cost$9,925 plus any consultant cost including 10% contract administrative overhead, plus the estimated cost of noticing and publishing as estimated by City staff.↑70.1% 100.0% $ 14,800 FULL COST RECOVERY $ 11,800 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.4 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0230CD‐PLANNINGDEV.PMT‐DIRECTOR REVIEWTo review a development that can be approved by the Community Development Director.$1,000 $ 1,965.00 ↑50.9% 100.0% $ 48,300 FULL COST RECOVERY $ 38,600 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0233CD‐PLANNINGDEV.PMT‐D/ERC REVIEW To review a development that can be approved by the Development/Environmental Review Committee.$6,438 0 to 5 Acres ‐ $6,810 plus the estimated cost of noticing and publishing as esƟmated by City Staff.> than 5 Acres ‐ $11,905 plus the estimated cost of noticing and publishing as estimated by City Staff.↑75.7% 100.0% $ 31,000 FULL COST RECOVERY $ 24,800 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0235CD‐PLANNINGDEV.PMT‐PLANNING COMMISSION REVIEWTo review the following types of projects: 12 or more residential units, a cell tower taller than 75 feet, a conditional use permit, tentative tract map where the development requires a Planning Commission public hearing.$6,720 ‐ 0 to 5 Acres (#10; $67,200)$6,720 ‐ Greater than 5 Acres (#5, $33,600)0 to 5 Acres ‐ $8,040 plus the estimated cost of noticing and publishing as esƟmated by City Staff.> than 5 Acres ‐ $15,455 plus the estimated cost of noticing and publishing as estimated by City Staff.↑63.9% 100.0% $ 56,800 FULL COST RECOVERY $ 45,400 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0238CD‐PLANNINGDEV.PMT‐MAYOR/COUNCIL REVIEWTo review a residential project in a commercial zone where a Public Hearing by the Mayor & Council is required for approval.$7,288 Staff recommends deleting this service as it is no longer used.DELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff recommends fee be deleted as it is no longer used and revenue is not collectedS‐0241CD‐PLANNINGENVIRONMENTAL (INITIAL) STUDYTo review a proposed development and determine that it has no impact on the environment or that the impact can be mitigated and the mitigation monitored.$3,273 Actual Cost based on the "Fully‐Burdened" hourly rate of City staff plus consultant costs including 10% contract administrative overhead and all other costs, including noticing & publishing, charged against an initial deposit ↑100.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increased5 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0244CD‐PLANNINGENVIRONMENTAL IMPACT REPORTTo prepare an environmental impact report on a proposed development to comply with the California Environmental Quality Act (CEQA).Direct Cost Recovery Fee plus full consultant costActual Cost based on the "Fully‐Burdened" hourly rate of City staff plus consultant costs including 10% contract administrative overhead and all other costs, including noticing & publishing, charged against an initial deposit ↑100.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increasedS‐0246CD‐PLANNINGEXTENSION OF TIME To process a time extension for a permit that requires the review of the Development/Environmental Review Committee or Planning Commission or Mayor $3,922 ‐ CUP & Development Permit (#2; $7,844)$4,768 ‐ Tentative Tract Map (#10; $47,680)$1,860 plus the estimated cost of noticing and publishing as estimated by City staff.↓248.8% 100.0% $ (33,200) FULL COST RECOVERY $ (33,200)Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐0251CD‐PLANNINGFENCE/WALL PERMIT To review plans and inspect a fence or wall that is not part of another application.$56 $60↑90.8% 100.0% $ 700 FULL COST RECOVERY $ 500 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0257CD‐PLANNINGGENERAL PLAN AMENDMENT (TEXT/MAP)To review and process an application to make an amendment to the City's General Plan text or map at the request of, and for the benefit of, a developer. Only additional costs as always done in conjunction with Dev.Code Amend. or other primary applicationDirect Cost Recovery Fee ($1,500 Deposit treated as actual cost)$3,570 plus consultant costs including 10% contract administrative overhead and all other costs, including noticing & publishing, charged against an initial deposit determined by staff.↑42.0% 100.0% $ 8,300 FULL COST RECOVERY $ 6,600 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.6 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0259CD‐PLANNINGHISTORIC PRESERVATION PROJECTTo prepare a report on whether an existing building has historic significance and, if so, how changes to the building can be made that preserve its historic significance.Direct Cost Recovery Fee ($815 deposit plus consultant cost)Actual Cost based on the "Fully‐Burdened" hourly rate of City staff plus consultant costs including 10% contract administrative overhead and all other costs charged against an initial deposit determined by staff.↑100.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increasedS‐0262CD‐PLANNINGHOME OCCUPATION PERMITTo review a request to operate a business in a residential zone to insure that can be operated safely and that it will not impact neighbors.$268 $145↓186.5% 100.0% $ (37,300) FULL COST RECOVERY $ (37,300)Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐0264CD‐PLANNINGLETTER OF ZONING & GEN.PLAN CONSISTTo prepare a letter at the request of a realtor or lender confirming that a particular use of a property is permitted by the Zoning Code and/or in conformance with the City's General Plan. Also known as a rebuild letter.$450 $245↓182.7% 100.0% $ (10,200) FULL COST RECOVERY $ (10,200)Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐0266CD‐PLANNINGPLANNING LOT LINE ADJUSTMENTTo review a lot line application to check for building setbacks, zoning, general plan conformance and development standards. See S‐0454 for the Public Works Engineering review.$477 $1.255↑38.0% 100.0% $ 7,800 FULL COST RECOVERY $ 6,200 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.7 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0268CD‐PLANNINGMINOR EXCEPTION Staff approval of a minor variance (exception) to the Zoning Ordinance based on criteria that establishes the minimal impact of the variance.$288 ‐ Concurrent with another applicaƟon$268 ‐ Owner‐Occupied single‐family residence$792 ‐ Other105↓280.0% 100.0% $ (700) FULL COST RECOVERY $ ‐ Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐0270CD‐PLANNINGMISC.ENVIRONMENTAL REPORT REVIEWDirect Cost Recovery Fee ($245 Deposit) plus Full Consultant Cost ($327 Deposit)Staff recommends deleting this fee as the service is not performed.DELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff recommends deleting this fee as the service is not performed.S‐0271CD‐PLANNINGMINOR MODIFICATION/REVISIONTo review a request to make a minor change, as defined in the Zoning Ordinance, in a development's use permit or conditions of approval where the change can be approved $561 $380 plus the estimated cost of noticing and publishing as estimated by City staff.↓148.1% 100.0% $ (1,800) FULL COST RECOVERY $ (1,800)Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐0273CD‐PLANNINGPHASING PLAN REVIEW To review a phasing plan.$823 ‐ If not part of original project review$514 ‐ D/ERC review applicaƟon (DP)$536 ‐ Planning Comm.Application (CUP/DP/SUB)Staff recommends deleting this fee as the service is not being performed.DELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff recommends deleting this fee as the service is not performed.S‐0275CD‐PLANNINGPLANNING COMMISSION INTERPRETATIONTo prepare an interpretation of the General Plan at the request of a developer where the interpretation is required for a particular $1,119 Staff recommends deleting this fee as the service is not being performed.DELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff recommends deleting this fee as the service is not performed.8 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0277CD‐PLANNINGPUBLIC CONVENIENCE/ NECESSITY LETTERTo make a Public Convenience or Necessity (PCN) determination as may be required by the State of California for the issuance of an Alcoholic Beverage Control License.$636 $2,740 plus the estimated cost of noticing and publishing as estimated by City staff.↑23.2% 100.0% $ 31,600 FULL COST RECOVERY $ 25,200 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0279CD‐PLANNINGPRE‐APPLICATION REVIEW‐D/ERC REVIEWTo review a proposed project by the Development/Environmental Review Committee at the request of a developer before he/she submits a formal application.$2,424 $3,440↑70.5% 100.0% $ 25,400 FULL COST RECOVERY $ 20,300 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0280CD‐PLANNINGRECONSIDERATION BY THE PLAN.COMM.To process a request for the Planning Commission to reconsider a previously denied development in‐lieu of appealing to the Mayor and Common Council.$506 $2,670 plus the estimated cost of noticing and publishing as estimated by City staff.↑18.9% 100.0% $ 2,200 FULL COST RECOVERY $ 1,700 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0282CD‐PLANNINGSIGN PERMIT‐REGULAR To review a proposed sign for compliance with the Sign Ordinance.$182 $80↓221.2% 100.0% $ (10,000) FULL COST RECOVERY $ (10,000)Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐0283CD‐PLANNINGSIGN PERMIT‐REQUIRING CUPTo review and approve a sign permit subject to a conditional use permit which restricts the use in perpetuity to the approved uses.$3,858 Staff recommends deleting this fee as it is handled as two separate processes.DELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff recommends deleting this fee as it is handled as two separate processes.9 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0284CD‐PLANNINGSIGN PERMIT‐TEMPORARY To review a request to hang a temporary sign or banner to insure that it meets the requirements of the Sign Ordinance which limits its use to 60‐days.$111 $80↓134.9% 100.0% $ (1,400) FULL COST RECOVERY $ (1,400)Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐0286CD‐PLANNINGSIGN PROGRAM To review a signage program for a commercial development.$610 10 or less tenant spaces ‐ $490Greater than 10 tenant spaces ‐ Actual Cost based on the "Fully‐Burdened" hourly rate of City staff plus consultant costs including 10% contract administrative overhead and all other costs charged against an initial deposit determined by staff.↑124.5% 100.0% $ (1,200) FULL COST RECOVERY $ (1,200)Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐0288CD‐PLANNINGSPECIFIC PLAN/AMENDMENTTo prepare or amend a specific plan which regulates land use in a specific area of the City in a more detailed manner that the City‐wide Zoning Ordinance at the request of a developer or as a condition to approving a development.Direct Cost Recovery Fee plus full consultant costActual Cost based on the "Fully‐Burdened" hourly rate of City staff plus consultant costs including 10% contract administrative overhead and all other costs, including noticing & publishing, charged against an initial deposit determined by staff.↑100.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increasedS‐0291CD‐PLANNINGTEMPORARY USE/SPECIAL EVENT PERMITTo review an application for a temporary use permit such as a pumpkin lot, parking lot sale, etc. or for a special event.$82.86 ‐ Temporary Use Permit (#55; $4,557)$420 ‐ Special Event Permit (Director Review) (#22; $9,240)$730 ‐ Special Event Permit (Planning Commission review)$315 Temporary Use Permit; $1,230‐ Special Events Permit (Director Review) $0 ‐ Special Event Permit (Planning Commission review) ‐ Staff recommends deleting this service as it is not used.↑31.1% 100.0% $ 30,500 FULL COST RECOVERY $ 24,400 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.10 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0293CD‐PLANNINGTENTATIVE PARCEL MAP To process an application for the subdivision of land into four or fewer lots for residential, commercial or industrial development.$4,262 plus $65 per parcel$5,170 plus the estimated cost of noticing & publishing as estimated by City staff.↑86.2% 100.0% $ 7,100 FULL COST RECOVERY $ 5,600 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0295CD‐PLANNINGTENTATIVE TRACT MAP (SFR/CONDO/PRD)To process a proposed tract map (5 or more lots) to assure that it complies with City requirements and standards.$7,561 plus $65 per lot or dwelling unit$6,850 plus $25 per lot and the estimated cost of noticing & publishing as estimated by City staff.↓118.4% 100.0% $ (6,600) FULL COST RECOVERY $ (6,600)Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increasedS‐0297CD‐PLANNINGTENTATIVE MAP REVISION‐TRACT/PARCELTo process a request to revise a previously approved tentative parcel or tract map.$2,113 $4,125plus the estimated cost of noticing and publishing as estimated by City staff.↑51.2% 100.0% $ 6,000 FULL COST RECOVERY $ 4,800 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0301CD‐PLANNINGTREE REMOVAL PERMIT To process an application for removing 5 or more, 3" or greater diameter trunk, mature trees.$506 $180↓227.3% 100.0% $ (600) FULL COST RECOVERY $ (600)Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐0303CD‐PLANNINGVARIANCE‐REGULAR To process an application for a variance from the Zoning Code$322 ‐ Single‐family residence (12% Recovery)$2,724 ‐ All others$2,065 plus the estimated cost of noticing and publishing as estimated by City staff. $250 Single Family Residence↑131.9% 100.0% $ (700) FULL COST RECOVERY $ (700)Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐0304CD‐PLANNINGVARIANCE WITH ANOTHER APPLICATIONTo process a variance that is submitted as part of another application. This represents the incremental cost of $910 $990 plus the estimated cost of noticing and publishing as estimated by City staff.↑91.8% 100.0% $ 200 FULL COST RECOVERY $ 200 No change to RCS estimate, increase minimal.11 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0306CD‐PLANNINGVESTING TENTATIVE MAP To process an application for vesting rights in a tentative map.Direct Cost Recovery Fee plus full consultant cost"Fully‐Burdened" hourly rate of City staff plus consultant costs including 10% City administrative overhead and all other costs, including noticing & publishing, charged against an initial deposit ↑100.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increasedS‐0308CD‐PLANNINGZONING FORM To prepare a written verification of zoning at the request of an applicant.$22 Staff recommends deleting this service as it is handled by S‐0264.DELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff recommends deleting this service as it is handled by S‐0264.S‐0309CD‐PLANNINGZONING VERIFICATION REVIEWTo verify that an applicant for a City business license will be operating in the correct zone for that business.$37 $55↑68.0% 100.0% $ 31,300 FULL COST RECOVERY $ 25,000 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0315CD‐PLANNINGGENERAL PLAN MAINTENANCETo recover a portion of the cost of the periodic update to the City's General Plan which benefits all development in the City.None 2% added to all Community Development fees. This would split the cost with the general taxpayer. This fee is to be reserved for the major general plan updates that are required every 10 to 15 years.NEW 0.0% 100.0% $ 50,000 NEW/SURCHARGE $ 40,000 To develop set‐aside fund for general plan update every 15 to 20 years/ Note: special purpose reserve, not for general budget useS‐0322CDTECHNOLOGY MAINTENANCE AND UPGRADESTo recover a portion of the cost of upgrading the permit system which is estimated at $700,0002% added to all Community Development fees. This would split the cost with the general taxpayer. This fee is to be reserved for the major permit system upgrades and 2% added to all Community Development fees. This would split the cost with the general taxpayer. This fee is to be reserved for the major permit system upgrades and maintenance‐‐0.0% 100.0% $ ‐ SURCHARGE $ ‐ To develop set‐aside fund for upgrading and maintaining permit system. Note: special purpose reserve, not for general budget useS‐0326CDARCHIVE FEES To cover the cost of archiving current development materials*$1.00 per permit or application * $2.00/sheet for Plans * $0.25 /page *$1.25 per permit or application * $3.15/sheet for Plans * $0.35/page Documents‐‐70.0% 100.0% $ 2,000 FULL COST RECOVERY $ 1,600 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.12 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0441PW‐LAND DEV.FINAL/PARCEL MAP REVIEWTo perform a final map check on a development and record the documents. Includes a Reversion to Acreage as a single lot Final Map. Confirm conformity with State Subdivision Map Act & City Ordinances.$2,210 ‐ Base Fee $55 ‐ Per Lot Fee $135 ‐ Each additional Review $404 ‐ Final Map ConƟnuance $97 ‐ Certificate of Correction per Hour$5,195 ‐ Base Fee $275 ‐ Per Lot Fee $270 ‐ Each additional Review $0 ‐ Final Map Continuance ‐ Staff recommends deleting as not used. $185 ‐ Certificate of Correction per Hour↑42.1% 100.0% $ 3,400 FULL COST RECOVERY $ 2,700 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0445PW‐LAND DEV.ON‐SITE IMPROVEMENT PLAN CHECKPlan check on‐site precise site plans for conformance with City Ordinances for paved parking areas, ADA accessibility, drainage, NPDES stds, sewer utilities, on‐site lighting, wall locations/elevations, trash enclosures and accessible paths of travel.2% of engineer's cost estimate for on‐site improvements$3,585 ‐ 1st Sheet, plus$1,515‐ Each Additional Sheet, plus $265 ‐ if the project is over $25K in estimated cost $605 ‐ Additional Plan Check (minimum 4 hours) plus $150 for each hour over four(Note: Sheets with only standards & conditions are not counted.)↑100.6% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Change in methodology should not impact overall revenue, just more equitable distribution of charges13 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0447PW‐LAND DEV.GRADING PLAN CHECK FEE To review a grading plan for compliance with City Ordinances and State Codes. Review grading bonds if required. Review drainage and erosion control measures to be used.Cubic Yards: <= 50 ‐ No Fee 51 to 100 ‐ $15.00 101 to 1,000 ‐ $22.50 1,001 to 10,000 ‐ $30.00 10,001 to 100,000 ‐ $30.00 plus $15.00 for each 10K CY > 10,000 100,001 to 200,000 ‐ $165.00 plus $9.00 for each 10K CY > 100,000 200,001 and up ‐ $255.00 plus $4.50 for each 10K CY > 200,000$390 for all plans with more than 50 Cubic Yards↑41.5% 100.0% $ 1,100 FULL COST RECOVERY $ 800 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0452CD‐LAND DEV.REVIEW‐CERTIFICATE OF COMPLIANCETo review a lot to determine if it is in conformity with the State Subdivision Map Act and City Ordinances, If it is, issue a Certificate of Compliance which allows future construction permits on $828 $1,370↑60.3% 100.0% $ 500 FULL COST RECOVERY $ 400 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0453PW‐LAND DEV.REVIEW‐LOT MERGER To process an application to merge multiple lots into one new lot.$828 $1,300↑63.6% 100.0% $ 8,100 FULL COST RECOVERY $ 6,400 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0454PW‐LAND DEV.REVIEW‐LOT LINE ADJSTMTTo review the adjustment of the lot line between two parcels.$414 ‐ SFR Occupancy (#3; $1,242)$828 ‐ Com'l/Ind'l (#3; $2,484)$1,590↑39.1% 100.0% $ 5,800 FULL COST RECOVERY $ 4,600 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.14 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0463PW‐LAND DEV.ON‐SITE CONSTRUCTION INSPECTIONTo provide field inspection of on‐site improvements including sewers, storm drains, parking areas, accessibility per ADA requirements, curbs, planters, Water Quality Control Plan features, erosion controls and finish grade.3% of Estimated Construction CostFee Based on Engineer's Estimate of Construction Cost: $0 to $1 Million ‐ 3.4% of estimated cost with a $1,045 minimumGreater than $1 Million ‐ $34,000 plus 1.7% of the estimated cost over $1 Million↑93.1% 100.0% $ 14,900 FULL COST RECOVERY $ 11,900 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0467PW‐LAND DEV.ON‐SITE GRADING INSPECTIONTo perform field inspection of on‐site grading, erosion control devices and drainage/storm drain features of stand alone rough grading.Cubic Yards: <= 50 ‐ No Fee51 to 100 ‐ $150.00101 to 1,000 ‐ $225.001,001 to 10,000 ‐ $300.0010,001 to 100,000 ‐ $300.00 plus $100.00 for each 10K CY > 10,000100,001 to 200,000 ‐ $300.00 plus $100.00 for each 10K CY > 100,000200,001 and up ‐ $300.00 plus $100.00 for Cubic Yards: 1 to 1,000 ‐ $225 1,001 to 10,000 ‐ $340 10,001 to 100,000 ‐ $340 plus $115 for each 10K CY > 10,000 100,001 to 200,000 ‐ $1,375 plus $55 for each 10K CY > 100,000 200,001 and up ‐ $1,870 plus $10 for each 10K CY > 200,000↑82.6% 100.0% $ 3,100 FULL COST RECOVERY $ 2,400 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0471PW‐LAND DEV.HYDRAULIC/HYDROLOGY STUDY REVIEWTo review a hydraulic/hydrology study prepared by a developer's engineer to determine the impact of a development on the ground water and the storm drainage Actual Time:$487 ‐ for the first 3 hours$100 ‐ for each add'l hour$825↑71.0% 100.0% $ 12,000 FULL COST RECOVERY $ 9,600 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0472PW‐LAND DEV.ALQUIST PRIOLO FAULT LINE INVESTIG.To make a finding that a proposed development is not on or near a known fault line.None $940NEW 0.0% 100.0% $ 900 FULL COST RECOVERY $ 700 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.15 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0480PW‐STORMWATER MGTFEMA FLOODPLAIN REVIEWTo perform a FEMA plan review of a project located within floodplain designations Zone "A", "AE", or "shaded X".None $940 plus consultant costs including 10% City administrative overhead charged against an initial deposit determined by staff.NEW 0.0% 100.0% $ 3,800 FULL COST RECOVERY $ 3,000 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0481PW‐STRMWTR MGMTREV.OF STORM WTR POLLUTION PREV.PLNTo review the storm water run‐off pollution plan for a project over 1 acre in size to insure that the run‐off meets the requirements of NPDES. To inspect the site during construction to insure that the conditions of the plan are being met.$410 ‐ Commercial & Residential Projects (#57; $23,370)$265 ‐ Industrial and Linear (CIP/Utility) Projects (#56; $14,840)$405 ‐ Commercial & ResidenƟal Projects$615 ‐ Industrial and Linear (CIP/Utility) Projects↑66.3% 100.0% $ 19,500 FULL COST RECOVERY $ 15,600 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0488PW‐STRMWTR MGMTREVIEW OF WTR QUALITY MGMT PLANSTo review the Stormwater Pollution Plan for run‐off after a development is completed. This review occurs before the grading and/or building permits are issued. Includes three plan reviews.$80 ‐ Non‐Categorical (#450; $36,000) $365 ‐ Categorical without Conditions of Concern (#75; $27,375)$1,130 ‐ Categorical with Conditions of Concern (#75; $84,750) $99 ‐ per hour for reviews after the third review (#1; $99)$155 ‐ Non‐Categorical$1,440 ‐ Categorical $120 ‐ per hour for reviews after the third review↑52.0% 100.0% $ 137,000 FULL COST RECOVERY $ 109,600 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0489CD‐WSTWTR MGMTREV‐EROSION/WSTE MGMT CONTROL PLANTo review the erosion and waste management control plan for a construction site.$75 $180↑41.1% 100.0% $ 5,900 FULL COST RECOVERY $ 4,700 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.16 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0490CD‐STRMWTR MGTNPDES CONSTRUCTION INSPECTIONTo inspect a construction site to mitigate hazardous run‐off.$98 ‐ Less than 10 Acres$179 ‐ 10 Acres or More$140↑70.5% 100.0% $ 8,500 FULL COST RECOVERY $ 6,800 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0495PW‐STRMWTR MGMTNPDES BUSINESS INSPECTIONTo review a business for hazardous discharge into the sewer or storm drainage system.$143 $175↑81.7% 100.0% $ 7,100 FULL COST RECOVERY $ 5,600 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0501PW‐ENGINEERINGBASIC PERMIT FEE See note in "Suggested Fee" below$45.00 ‐ Engineering Permit$53.00 ‐ Blanket Permit$43.00 ‐ Permit ExtensionEngineering Permit ‐ This fee is included with each permitBlanket Permit ‐ see S‐0523Permit Extension ‐ see S‐0560DELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff recommends deleting this fee, it is included with each permitBlanket Permit ‐ see S‐0523Permit Extension ‐ see S‐0560S‐0503PW‐ENGINEERINGPERMANENT ENCROACHMENT PERMITTo review a request for a permanent encroachment into the public right‐of‐way.$670.00 ‐ Initial Permit ($625 for the encroachment permit and $45 for the basic permit ‐ both to be combined into one fee.)$150.00 ‐ Annual $1,515 ‐ IniƟal Permit $340 ‐ Annual Renewal↑44.2% 100.0% $ 4,200 FULL COST RECOVERY $ 3,200 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0505PW‐ENGINEERINGTEMPORARY ENCROACHMENT PERMITTo process a request for a temporary encroachment into the public right‐of‐way.$25.00 ‐ No Lane Closure (#100; $2,500)$136.00 ‐ Lane Closure: First Day (#2,400; $326,400) $60.00 ‐ Lane Closure: Each Additional Day (#9,600; $576,000) $70.00 ‐ Trash Bin, 1st week $28.00 ‐ Trash Bin, each add'l week$160 ‐ No Lane Closure ‐ Parking Only$175 ‐ Lane Closure: First Day $25 ‐ Lane Closure: Each AddiƟonal Day $100 ‐ Trash Bin, 1st week $25 ‐ Trash Bin, each add'l week↑130.6% 100.0% $ 105,000 FULL COST RECOVERY $ 84,000 Demand may decrease when full cost recovery is implemented, but overall additional revenue generation. Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.17 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0507PW‐ENGINEERINGLANE CLOSURE WITH EXCAVATIONSee note in "Suggested Fee" below$286.00 Staff recommends deleting this fee as the cost of reviewing/inspecting the lane closure is covered by the excavation permit.DELETE 0.0% 100.0% $ ‐ DELETE $ ‐ Staff recommends deleting this fee as the cost of reviewing/inspecting the lane closure is covered by the excavation permit.S‐0509PW‐ENGINEERINGSPECIAL EVENT ENCROACHMENTTo process a request to hold a special event in the public right‐of‐way.$545.00 ‐ With a Lane Closure (#4; $2,180)$559.00 ‐ With a Street Closure (#8; $4,472)$347.00 ‐ With a Road Closure (1st day) **$302.00 ‐ Each Additional Day (#4, $1,208)(**Note: Staff recommends combining the fees for a street and a road as they take the same effort. Also, each of the above fees, except the "additional day" fee, include the $45 basic fee $925 ‐ Lane Closure$1,495 ‐ Street/Road Closure, 1st day $1,040 ‐ Street/Road Closure, each add'l day↑39.7% 100.0% $ 12,000 FULL COST RECOVERY $ 9,600 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0511PW‐ENGINEERINGOVERSIZE LOAD/BLDG.MOVE PERMITTo process a permit for an oversize/overload transport through the City. This fee is controlled by the State.$17.00 ‐ One Day (State‐Mandated Fee is $16) (#600; $10,200)$95.00 ‐ Annual Permit (State‐Mandated Fee is $90) (#3; $285)$16 ‐ One Day Permit$90 ‐ Annual Permit(Note: City may only charge the State‐Mandated fee. There is no provision for a technology surcharge.)‐‐54.1% 100.0% $ ‐ LEGAL LIMITS $ ‐ Limited by State and/or Federal regulations/lawS‐0513PW‐ENGINEERINGHAULING PERMIT To process a request to haul construction supplies/debris either into or out of the City.$438.00 ‐ First Day (#6; $2,628) (Includes S‐501 Basic Fee)$100.00 ‐ Each Additional Day (#24; $2,400)$650 ‐ First Day$285 ‐ Each Additional Day↑46.9% 100.0% $ 7,600 FULL COST RECOVERY $ 5,700 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.18 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0515PW‐ENGINEERINGEXCAVATION PERMIT See note in "Suggested Fee" below$150.00 ‐ Per day Staff Recommends Deleting This ServiceDELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff Recommends Deleting This ServiceS‐0517PW‐ENGINEERINGTRAFFIC STUDY REPORT To review a developer's traffic study to ensure compliance with City standards.$719.00 ‐ Basic Review (#12; $8,628) $80.00 ‐ Extended Review per Hour (#0; $0)Actual Consultant charge (currently $1,440 for a basic review) plus 10% overhead for City contract administration and review.↑53.2% 100.0% $ 8,700 FULL COST RECOVERY $ 6,900 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0518PW‐ENGINEERINGOFF‐SITE IMPROVEMENT PLAN CHECKTo review grading plans for off‐site improvements. Three plan checks are included with the original off‐site improvement plan check. Fourth and subsequent plan checks are charged an additional plan check fee.$45 plus 4% of Estimated Construction Cost with a $50 minimum$3,585 ‐ 1st Sheet, plus$1,515‐ Each Additional Sheet, plus $265 ‐ if the project is over $25K in estimated cost $605 ‐ Additional Plan Check (minimum 4 hours) plus $150 for each hour over four(Note: Sheets with only standards & conditions are not counted.)↑93.9% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Methodology Change won't impact revenues significantlyS‐0520PW‐ENGINEERINGREVIEW REVISIONS TO APPROVED PLANSTo review changes to approved plans due to changes to conditions or other reasons.$137.00 $210 for the 1st hour plus $150 for each additional hour↑64.9% 100.0% $ 400 FULL COST RECOVERY $ 400 Minimal revenue increase, no change to RCS projection.19 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0521PW‐ENGINEERINGOFF‐SITE IMPROVEMENT INSPECTIONTo inspect off‐site construction to insure that it complies with the City's standards & conditions as well as the approved plans, if applicable.$45 plus 4% of Estimated Construction Cost$240 ‐ Driveway & Sidewalk ReplacementOther Fees based on Estimated Construction Cost: $0 to $175,000 ‐ $630 plus 12.4% of the Cost over $15,000 $175,001 to $750,000 ‐ $20,470 plus 3.4% of the Cost over $175,000Greater than $750,000 ‐ $40,020 plus 1.1% of the ↑97.0% 100.0% $ 4,000 FULL COST RECOVERY $ 3,200 Change in methodology should not impact overall revenue, just more equitable distribution of charges. Because based on project valuation, % of recovery varies year to year but on average is 100%S‐0523PW‐ENGINEERINGANNUAL UTILITY BLANKET PERMITTo issue an annual blanket permit to utilities in advance of emergency work to avoid delaying the work. To inspect the work as it occurs. The cost of the permit and inspection are deducted from an initial deposit as required.$53.00 ‐ Permit Issuance$73.00 ‐ Inspection Per Location$130 for the initial blanket permit annually plus $105 per day for inspection per location after the first day/location deducted from an initial annual deposit of $5,500. Deposit balance can be carried forward to a new year but a new initial blanket permit is required and the deposit balance must be restored to $5,500.↑53.4% 100.0% $ 800 FULL COST RECOVERY $ 800 Minimal revenue increase, no change to RCS projection.S‐0529PW‐ENGINEERINGBOND RELEASE INSPECTION ‐ PWTo perform an inspection to confirm that all issues covered by the bond are satisfied so that the City can release the bond.$45.00 ‐ Issuance$59.00 ‐ Inspection$230↑45.1% 100.0% $ 600 FULL COST RECOVERY $ 600 Minimal revenue increase, no change to RCS projection.20 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0531PW‐REAL PROPERYSTREET NAME CHANGE To change the name of a street at the request of a private party or group.$1,345.00 Plus the Cost of Street SignsActual Cost based on the "Fully‐Burdened" hourly rate of City staff plus consultant costs including 10% contract administrative overhead and all other costs, including new street signage, charged against an initial deposit determined ↑100.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increasedS‐0533PW‐REAL PROPERTYSTREET/ALLEY VACATION To process a request to terminate the City's interest (easement) in an alley or street.$1,000.00 ‐ Deposit$1,000.00 ‐ Balance Due Prior to Processing$1,840 plus initial deposit for noticing and publishing as determined by staff↑54.3% 100.0% $ 1,700 FULL COST RECOVERY $ 1,300 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0535PW‐REAL PROPERTYDEDICATION OF RIGHT‐OF‐WAYTo legally accept the ownership of property (right‐of‐way) at the request of a private party.$315.00 ‐ If Legal and Map are Provided$800.00 ‐ If City Prepares Legal & MapIf Legal and Map are Provided ‐ $920 If City Prepares Legal & Map ‐ Actual Cost based on the "Fully‐Burdened" hourly rate of City staff plus consultant costs including 10% contract administrative overhead and all other costs charged against an initial deposit determined by staff.↑34.2% 100.0% $ 6,100 FULL COST RECOVERY $ 4,800 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0537PW‐REAL PROPERTYPRIVATE PARTY ANNEXATION REQUESTTo process the request of a private party to annex their property to the City.$14,750.00 Actual Cost based on the "Fully‐Burdened" hourly rate of City staff plus consultant costs including 10% contract administrative overhead and all other costs charged against an initial deposit of $17,000.↑100.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increased21 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0539PW‐REAL PROPERTYCITY PROPERTY LEASE PROCESSINGTo process a City property lease.$2,100.00 Actual Cost based on the "Fully‐Burdened" hourly rate of City staff plus consultant costs including 10% contract administrative overhead and all other costs charged against an initial deposit of $5,500.↑100.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increasedS‐0542PW‐ENGINEERINGENGINEERING LETTER See note in "Suggested Fee" below$100.00 Staff recommends deleting this service as it is not being provided.DELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff recommends deleting this service as it is not being provided.S‐0560PW‐ENGINEERINGPERMIT EXTENSION To review a request for a permit extension to determine if there are reasons to deny it.$43.00 $80 each↑52.7% 100.0% $ 7,700 FULL COST RECOVERY $ 6,000 Minimal revenue increase, no change to RCS projection.S‐0565PW‐ENGINEERINGRE‐INSPECTION To re‐inspect due to failure to have work ready on the initial inspection or because more inspections were required than covered by the initial permit. This inspection is during normal working hours.$59.00 $105 per hour with a one‐hour minimum↑84.9% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increasedS‐0567PW‐ENGINEERINGAFTER HOURS & HOLIDAY INSPECTIONTo perform an inspection at the request of a developer outside of normal working hours.$369.00 ‐ 4 hr. minimum $92.45 ‐ each additional hourEmployee's current hourly rated at time and 1/2 (overtime rate) plus 20% overhead with a four hour minimum↑57.9% 100.0% $ ‐ FULL COST RECOVERY $ 40,000 City estimate based on past level of inspections22 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0571PW‐ENGINEERINGASMT.DIST./COMM.FACILITIES DIST.To perform the legal requirements to establish an assessment district or a Community Facilities District usually in a new development at the request of the developer.$5,900 Actual Cost based on the "Fully‐Burdened" hourly rate of City staff plus consultant costs including 10% contract administrative overhead and all other costs charged against an initial deposit determined by staff.↑100.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increasedS‐0602POLICECONCEALED WEAPONS PERMITTo process a request to authorize carrying a concealed weapon.$400 ‐ IniƟal$325 ‐ RenewalThe general public applies for Concealed Weapons Permits at the Sheriff's Office. The Police Department only issues permits to retired SBPD Officers who are not charged a fee. Staff recommends deleting this DELETE 0.0% 0.0% $ ‐ DELETE $ ‐ The general public applies for Concealed Weapons Permits at the Sheriff's Office. The Police Department only issues permits to retired SBPD Officers who are not charged a fee. Staff recommends deleting this fee as it is not being used.S‐0609POLICERECORDS CHECK LETTER To prepare a one‐page document on departmental letterhead that gives the result of researching local $25 ‐ With Record$20 ‐ Without Record$40↑59.5% 100.0% $ 200 FULL COST RECOVERY $ 200 Minimal revenue increase, no change to RCS projection.S‐0611POLICE2ND HAND DEALER/PAWNSHOP LICENSETo license a second‐hand dealer or pawnshop.$475 ‐ IniƟal$126 ‐ Renewal$480 ‐Initial $135 renewal‐‐95.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Minimal revenue increase, no change to RCS projection.S‐0613POLICELIVE SCAN FINGERPRINT PROCESSINGTo roll a set of fingerprints using the digital "Live Scan" equipment instead of the "old" ink on cards. Service is provided to the public on Wednesday from 1 to 5 PM.$2 ‐ Live Scan Processing Fee (Note: Staff is charging $15 plus the DOJ fee.)$15 ‐ Fingerprint card(Note: Applicants for City jobs are not charged the Live Scan fee or the DOJ fee.)$20 plus applicable DOJ/FBI fee (currently $33)↑74.1% 100.0% $ 1,200 FULL COST RECOVERY $ 900 Minimal revenue increase, no increase in revenue projections23 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0616POLICEFIX‐IT TICKET SIGN‐OFF To review vehicle repairs when a ticket has been issued to the vehicle owner for a problem such as $20 $25↑83.1% 100.0% $ 400 FULL COST RECOVERY $ 400 Council in 2009 stopped collection of fee. Suggest reinstatement‐need estimate from PD of what revenue would be generated with reinstatementS‐0618POLICEPOLICE SERVICES FOR SPECIAL EVENTSWhen the Police Department is asked to provide law enforcement services at special eventsOvertime rate of police personnel providing service per number of hours plus overhead rate of 4.95%Officer's current hourly rate at times & 1/2 (overtime rate) plus 20% overhead with four (4) hour minimum↑85.0% 100.0% $ 500 FULL COST RECOVERY $ 51,600 City estimate based on past events, reduced by 60% for economic downturn and expected implementation date of August 1, 2020.CITY ANALYSISPOLICECASSETTE TAPE REPRODUCTIONCassette Tape Reproduction $ 60.00 Staff recommends deletion; no longer usedDELETE 0.0% 0.0% $ ‐ $ ‐ CITY ANALYSISPOLICETRAFFIC ACCIDENT REPORTPhoto copies of traffic accident reports $0.15 per copy $0.25 per copy ↑0.0% 0.0% $ ‐ FULL COST RECOVERY $ ‐ 100% cost recovery not possible with copies for public, would be out of line with City Clerk fees for photo copies.CITY ANALYSISPOLICECAD INCIDENT PRINTOUT Printout from CAD system $ 30.00 $ 30.00 ‐‐0.0% 0.0% $ ‐ $ ‐ No change recommendedCITY ANALYSISPOLICEDISPATCH TAPE REPRODUCTIONRequests for copies of dispatch recordings $ 80.00 $ 80.00 ‐‐0.0% 0.0% $ ‐ $ ‐ No change recommendedCITY ANALYSISPOLICERECORDED INVESTIGATIVE EVIDENCErequests for copies of audio recordings $ 19.00 $ 19.00 ‐‐0.0% 0.0% $ ‐ $ ‐ No change recommended24 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleCITY ANALYSISPOLICEPHOTOGRAPHS Copies of investigation photos 5x7 $29.25; 8x10 $33; Photos on CD $47; Photos requiring lab assistance $53 $52 for CD, $0.25/per copy from laserfiche. Any special requests will be actual costs plus 10% administrative fee.‐‐100.0% 100.0% $ ‐ $ ‐ Restructuring of fees should not impact overall revenue, just updated to reflect changes with technologyCITY ANALYSISPOLICEVIDEO TAPE REPRODUCTIONVideo Tape reproductionsStaff recommends deletion; no longer usedDELETE 0.0% 0.0% $ ‐ $ ‐ CITY ANALYSISPOLICECOMPUTER LOCATION ACTIVITY PRINTOUTComputer Location Activity Printout$75 $75 ‐‐100.0% 100.0% $ ‐ $ ‐ No change recommendedALARM SYSTEMS‐0621POLICETo encourage the proper maintenance of alarm systems by charging the alarm owner for wasted police time spent responding to false alarms.$25/$50/$10 ‐ Ann.Res'l/Com'l/LIR Alarm Pmt. (LIR=Low Income Resident) $25 ‐ Alarm Sys.Installation $10 ‐ Alarm Sys.Monitoring Tsfr.False Alarms in 12‐month period [Intrusion: Reg./LIR]/[Robbery or panic: Reg./LIR]: [$75/$10]/[$200/$20] ‐ 1st thru 4th Non‐Permitted [$90/$10]/[$250/$20] ‐ 5th & 6th [$90/$20]/[$300/$40] ‐ 7th thru 9th[$175/$20]/[$350/$40] ‐ 10th & SubsequentConsultant Recommendation: $96 ‐ Annual Alarm Permit ($75‐City plus $21‐Alarm Vendor)$25 ‐ Alarm Sys.Installation$10 ‐ Alarm Sys.Monitoring Tsfr.False Alarm Charge:$256 ‐ All False Alarms without a Permit ($200‐City plus $56‐Alarm Vendor) and after the 3rd False Alarm in a 12 month period with a Permit. (Note: No distinction found between residential and commercial response or between intrusion and panic/robbery response.) $ 10,000 Conservatively estimated revenue, unknown how changes will affect behaviourCity Staff Recommendation: $30 ‐ Annual Alarm Permit $15 Annual Alarm Permit Low Income; $25 ‐ Alarm Sys.Installation$10 ‐ Alarm Sys.Monitoring Tsfr.False Alarm Charge:With Permit: $0 charge 1st and 2nd; $100 3rd, $200 4th, $300 5th and above. Without Permit: $200 1st, $250 2nd; $350 3rd, $400 4th and above.25 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0655CD‐CODE ENFORCEMENTBIENNEAL RENTAL PROPERTY INSPECTIONTo perform an exterior property maintenance inspection every two years of all single family rental properties to insure that the property is properly maintained.$100 per owner of SFR rentals$180 per SFR rentalStaff recommends increasing the inspections to every year and including an interior inspection.↑55.2% 100.0% $ 83,500 FULL COST RECOVERY $ 20,000 Reduced RCS estimate by 75% due to expected implementation date of August 1, 2020, economic downturn and sufficient staffingS‐0657CD‐CODE ENFORCEMENTNOTICE OF PENDENCY RELEASETo process the release of a Notice of Pendency that was previously filed with the property's deed to guarantee payment of a judgement against the property. The Notice makes it impossible to sell the property or get $180 for the first four units$160 base fee plus $7.45 for each unit inspected (over four)$165 plus $8.50 for any unit over four‐‐109.3% 100.0% $ (1,500) FULL COST RECOVERY $ (1,500)Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0640ANIMAL CONTROLANIMAL CONTROL SERVICESTo protect public health by requiring rabies vaccinations of dogs. To remove dead animals that could be infected. To care for animals that are brought to the animal shelter until adopted or reclaimed.Various Fees to cover licensing, boarding and miscellaneous servicesSee Exhibit D. City Recommendation. Animal Control services are considered a public safety function. Fees, rather than attempting for full cost recovery, are to encourage compliance. Only 20% to 30% of dogs are licensed. Increasing these fees by an unreasonable amount discourages compliance. The Police Department completed an analysis that looked at cost and comparable fees from surrounding agencies. It is recommended that the fees in the study be adopted.↑17.5% 20.0% $ 100,000 PUBLIC SAFETY/LEVEL OF SUBSIDIZATION $ 80,000 See Exhibit D. City Recommendation. Animal Control services are considered a public safety function. Fees, rather than attempting for full cost recovery, are to encourage compliance. Only 20% to 30% of dogs are licensed. Increasing these fees by an unreasonable amount discourages compliance. The Police Department completed an analysis that looked at cost and comparable fees from surrounding agencies. It is recommended that the fees in the study be adopted.D26 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐0659CD‐CODE ENFORCMENTABATEMENT LIEN ADMINISTRATIVE CHGETo include the cost to initially process a lien against property that has failed to comply with a demand to abate a code violation and the cost to release the lien. This charge would be payable before release.$115 per lien $130 per lien↑87.0% 100.0% $ 800 FULL COST RECOVERY $ 800 Minimal revenue increase, no change to RCS projection.S‐0662CD‐CODE ENFORCEMENTLIEN DEMAND LETTER ADMIN.CHARGETo respond to a request for a demand letter regarding the status or release of a lien and/or abatement costs imposed.$95 $185↑51.2% 100.0% $ 51,100 FULL COST RECOVERY $ 40,800 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐0664CD‐CODE ENFORCEMENTDUPLICATE LIEN RELEASE To prepare a duplicate release of a lien at the request of the property owner due to the loss of the original release.$28 $15↓169.4% 100.0% $ (300) FULL COST RECOVERY $ (300)Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐0666CD‐CODE ENFORCEMENTWEED ABATEMENT CHARGESTo recover the full cost of weed abatement on lots and partial lots where the owner has failed to abate the weeds prior to the City's deadline. Process involves multiple inspections & noticing. Preparation of Lien Resolution and the discing of lot.$375 per lot or partial lot plus actual cost of discing$515 per lot or partial lot plus actual cost of discing↑73.1% 100.0% $ 100 FULL COST RECOVERY $ ‐ Currently contract with County Fire, updated fee if City resumes27 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐6000RECREATIONAQUATICS SERVICES Providing a 10 week summer session to the community at the various community pools. Pools are also available for rental by the schools for 3 weeks before that.See Appendix CIn addition, the City has received $39,750 from a Kaiser Grant.See appendix C Fees for recreation programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in dff↑13.4% 25.0% $ 14,000 PUBLIC SERVICE/ COMMUNITY ENRICHMENT/ LEVEL OF SUBSIDIZATION $ 11,200 See Exhibit C. Fees for recreation programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in cost recovery and offering programs to its residents that are affordable. CS‐6060RECREATIONYOUTH SPORTS Providing youth sports to the community.Resident ‐ $30 per childNon‐Resident ‐ $33 per child Resident ‐ $45 per child Non‐Resident ‐ $50 per child↑30.2% 75.0% $ 1,500 PUBLIC SERVICE/ COMMUNITY ENRICHMENT/ LEVEL OF SUBSIDIZATION $ 1,200 Fees for recreation programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in cost recovery and offering programs to its residents that are affordable. S‐6070RECREATIONADULT SPORTS Providing adult sports programs to the community.Soccer: Resident ‐ $300 per team Non‐Resident Team ‐ $350 per teamBasketball ‐ Charging direct staff and program costSoccer: Resident ‐ $375 per team Non‐Resident Team ‐ $425 per teamBasketball ‐ Charging direct staff and program cost‐‐24.1% 45.0% $ 4,000 PUBLIC SERVICE/ COMMUNITY ENRICHMENT/ LEVEL OF SUBSIDIZATION $ 3,200 Fees for recreation programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in cost recovery and offering programs to its residents that are affordable. S‐6100RECREATIONCOMM. CENTER PROG/RENTALSProviding Community Center programs and rental of Community Center facilities.See Appendix CSee Fees for recreation programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in cost recovery and offering ↑0.3% 2.0% $ 4,000 PUBLIC SERVICE/ COMMUNITY ENRICHMENT/ LEVEL OF SUBSIDIZATION $ 3,200 See Exhibit C. Fees for recreation programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in cost recovery and offering programs to its residents that are affordable. See C28 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐6130RECREATIONBALLFIELD RENTAL/USE Maintenance and rentals of ballfields to the community.Reservation ‐ $10 per hour for first hour and $5 per hour thereafterTournament Use: $120 per field per day without lights $180 per field per day with lightsPreparation ‐ $25 per field upon requestLighting ‐ $20 per hour for first hour and $10 per hour thereafterLocal Sports Groups do not pay for use of the fields or lights.Reservation ‐ $10 per hourTournament Use ‐ $120 per field per dayLighting ‐ $20 per hour for first hour and $15 per hour thereafterPreparation ‐ determined by the needs of the eventLocal Sports Groups: Field Use ‐ No Charge Lighting ‐ No Charge↑3.6% 10.0% $ 2,000 PUBLIC SERVICE/ COMMUNITY ENRICHMENT/ LEVEL OF SUBSIDIZATION $ 1,600 Fees for recreation programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in cost recovery and offering programs to its residents that are affordable. S‐6700LIBRARYLIBRARY CARD REPLACEMENTProcessing the replacement of a lost library card.$1 per card $1 per card‐‐21.3% 21.3% $ 500 PUBLIC SERVICE/ COMMUNITY ENRICHMENT/ LEVEL OF SUBSIDIZATION $ ‐ Fees for Library programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in cost recovery and offering programs to its residents that are affordable. The Library Board has adopted fees without going to Council. Recommendation is to adopt Library Board's recommendations but future increases cannot be implemented with Board 29 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐6710LIBRARYINTER‐LIBRARY LOAN REQUESTProcessing a request to borrow a library item from another library.$3 per item $3 per item‐‐0.3% 0.3% $ 200 PUBLIC SERVICE/ COMMUNITY ENRICHMENT/ LEVEL OF SUBSIDIZATION $ ‐ Fees for Library programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in cost recovery and offering programs to its residents that are affordable. The Library Board has adopted fees without going to Council. Recommendation is to adopt Library Board's recommendations but future increases cannot be implemented with Board S‐6720LIBRARYLIBRARY RESEARCH SERVICEProviding library research services, primarily obituaries, on request$20 per hour $20 per hour‐‐20.2% 22.0% $ 10 PUBLIC SERVICE/ COMMUNITY ENRICHMENT/ LEVEL OF SUBSIDIZATION $ ‐ Fees for Library programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in cost recovery and offering programs to its residents that are affordable. The Library Board has adopted fees without going to Council. Recommendation is to adopt Library Board's recommendations but future increases cannot be implemented with Board 30 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐6730LIBRARYREPLACE LOST/DAMAGED LIBRARY MAT'LSProcessing and replacing lost and damaged library materials.Lost Items: Magazines ‐ $1 processing fee plus $10 replacement cost Other items ‐ $5 processing fee plus $40 replacement costDamaged Items ‐ $3‐$5Missing Barcode ‐ $1Missing or Damaged Book cover ‐ $5Lost Items: Magazines ‐ $5 processing fee plus $10 replacement cost Other items ‐ $10 processing fee plus $40 replacement costDamaged Items ‐ $3‐$5Missing Barcode ‐ $10Missing or Damaged Book cover ‐ $10↑17.7% 35.0% $ 25 PUBLIC SERVICE/ COMMUNITY ENRICHMENT/ LEVEL OF SUBSIDIZATION $ ‐ Fees for Library programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in cost recovery and offering programs to its residents that are affordable. The Library Board has adopted fees without going to Council. Recommendation is to adopt Library Board's recommendations but future increases cannot be implemented with Board S‐6740LIBRARYLIBRARY ROOM RENTAL Rental of meetings rooms at the Library.Bing Wong Auditorium ‐ $25 per hour (4 hour minimum)Kellogg Room A or B ‐ $25 per hour for eachStudy Room ‐ $15 per hour (waived with student ID)Projector ‐ $5 per dayVCR and Monitor ‐ $10 per dayDigital Projector in Bing Wong Auditorium ‐ $30Computer/Internet Technical Support ‐ $20 per hourPortable Public Address S$5d($50Bing Wong Auditorium: Non‐Profit ‐ $25/hr For Profit ‐ $50/hr (4 hr min)Kellogg Room A or B ‐ Non‐Profit ‐ $25/hr for each For Profit ‐ $50/hr for eachStudy Room ‐ $15 per hour (waived with student ID)Projector ‐ $5 per dayVCR and Monitor ‐ $10 per dayDigital Projector in Bing Wong Auditorium ‐ $30Computer/Internet Technical Support ‐ $20 per hourPortable Public Address S$5d($50↑14.5% 100.0% $ 700 PUBLIC SERVICE/ COMMUNITY ENRICHMENT/ LEVEL OF SUBSIDIZATION $ 500 Fees for Library programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in cost recovery and offering programs to its residents that are affordable. The Library Board has adopted fees without going to Council. Recommendation is to adopt Library Board's recommendations but future increases cannot be implemented with Board approval, must go to Council. Reduced RCS estimate for downturn in economy and il idfA131 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐7000CEMETERYCEMETERY INTERMENT Interment of a casket or urn at the Cemetery.Adult: Single ‐ $600 Double ‐ $850Child: Single ‐ $350 Double ‐ $650Baby ‐ $150CremaƟon ‐ $200For many sites, the City has a contractual obligation to provide the interment at the fee that was in place when the contract was signed.Single ‐ $2,295Double ‐ $2,590CremaƟon ‐ $915↑27.5% 100.0% $ 14,000 FULL COST RECOVERY $ 11,200 Demand may decrease when full cost recovery is implemented, but overall additional revenue generation. Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐7010PW‐CEMETERYCEMETERY DISINTERMENT Disinterment of a casket or urn on request.Disinterment/Reinterment (within Cemetery) ‐$1,500Adult Disinterment (Shipped Out) ‐ $1,200Baby/Child Disinterment (Shipped Out) ‐ $800Disinterment/Reinterment (within Cemetery) ‐$5,545Adult Disinterment (Shipped Out) ‐ $3,820↑31.4% 100.0% $ 50 FULL COST RECOVERY $ ‐ Demand may decrease when full cost recovery is implemented, but overall additional revenue generation. .S‐7020PW‐CEMETERYCEMETERY MARKER SETTINGSInstallation of grave marker settings.Single ‐ $140Double ‐ $200Marker InscripƟon: 4 digits ‐ $50 Month, Day, Year ‐ $100 Name and years ‐ $130Single ‐ $595Double ‐ $565Marker Inscription ‐ Actual costs↑40.9% 100.0% $ 100 FULL COST RECOVERY $ 100 Demand may decrease when full cost recovery is implemented, but overall additional revenue generation. S‐7030PW‐CEMETERYCEMETERY FLOWER VASE INSTALLATIONInstallation of a flower vase at a grave site.$30 per vase. No installation fee$95 per installation and vase↑30.9% 100.0% $ 30 FULL COST RECOVERY $ ‐ Demand may decrease when full cost recovery is implemented, but overall minor additional revenue generation. S‐7040PW‐CEMETERYREMOVE/REPLACE CEMETERY MARKERRemove or replace a cemetery marker on request.None Single ‐ $420 per markerDouble ‐ $735 per marker↑0.0% 100.0% $ 230 FULL COST RECOVERY $ 200 Demand may decrease when full cost recovery is implemented, but overall additional revenue generation. 32 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐7050PW‐CEMETERYGRAVE PROPERTY OWNER TRANSFERProcessing a request to transfer ownership of a grave site.$50 per transfer $125 per transfer↑39.4% 100.0% $ 200 FULL COST RECOVERY $ 200 Demand may decrease when full cost recovery is implemented, but overall additional revenue generation. S‐7100PW‐CEMETERYCEMETERY SERVICES Maintenance and operation of the Cemetery.Grave Spaces: Adult ‐ $1,200 Public Guardian ‐ $800 Child ‐ $800 Baby ‐ $200 CremaƟon ‐ $400Burial Vault ‐ $445plus fees for Concrete Bell Liners and re‐sale of concrete vaults to mortuaries.Grave Spaces: Adult ‐ $1,950 Public Guardian ‐ $1,950 Child ‐ $1,950 Baby ‐ $1,000 CremaƟon ‐ $1,300Burial Vault/Bell Liners ‐ Actual cost plus 10%↑0.0% 100.0% $ 5,000 FULL COST RECOVERY $ 4,000 Demand may decrease when full cost recovery is implemented, but overall additional revenue generation. Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐7250PW‐PARK MAINTENANCEREPAIR TO CITY PROPERTY DAMAGERepair of damage to City property by a member of the public.Actual Costs Charge the fully allocated hourly rates for all personnel involved plus any outside costs.↑100.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increased. Additionally, finding responsible parties is difficultS‐7260RECREATIONPARK RENTAL/RESERVATIONRental of a City Park See Appendix CSee Appendix C↑77.8% 100.0% $ ‐ PUBLIC SERVICE/ COMMUNITY ENRICHMENT/ LEVEL OF SUBSIDIZATION $ ‐ See Exhibit C. Fees for recreation programs, if based on 100% cost recovery, would actually reduce revenue because they would be cost prohibitive to the community. Determining fees is finding a balance in cost recovery and offering programs to its residents that are affordable. Demand may decrease with higher fees so no new net C33 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐7270RECREATIONFISCALLINI FIELD MAINTENANCEMaintenance of the Fiscallini baseball field for use by the CSUSB Baseball team and SB Youth Baseball.Field ‐ $500 per use (6 hours) plus $40 per hour for lightsClub House ‐ $88.60 per dayCSUSB pays $17,000 per year. They also provide in‐kind maintenance services.SB Youth Baseball does not pay for use of the field. They are to pay $6,000 per year for capital improvements to the field.Field ‐ $500 per use (6 hours) plus $40 per hour for lightsClub House ‐ $200 per dayCSUSB pays $17,000 per year. They also provide in‐kind maintenance services.SB Youth Baseball does not pay for use of the field. They are to pay $6,000 per year for capital improvements to the field.↑84.0% 100.0% $ 3,200 PUBLIC SERVICE/ COMMUNITY ENRICHMENT/ LEVEL OF SUBSIDIZATION $ 3,200 Major source of revenue is contract with Cal State San BernardinoS‐8000CITY CLERKDOCUMENT REPRODUCTIONProviding copies of public documents under the terms of the State Public Records First Page ‐ $0.35Each additional page ‐ $0.15First five copies ‐ No ChargeEach additional copy ‐ $0.25 per copyFPPC Copies ‐ $0.10 per ‐30.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Change in structure but no net change in revenue.S‐8020CITY CLERKELECTRONIC FILE COPY Providing copies of public records in an electronic format under the terms of the State Public Records Act.None $10 per disk if a disk is requestedNEW 0.0% 100.0% $ 1,000 FULL COST RECOVERY $ 1,000 Minimal revenue increase, no change to RCS projection.S‐8040CITY ATTORNEYADMIN CIVIL PENALTY PROCESSINGProcessing of administrative penalties for municipal code violations.None Recover the fully allocated actual costs at the discretion of the Hearing Officer.↑0.0% 100.0% $ 5,000 FULL COST RECOVERY $ 4,000 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐8050CITY ATTORNEYACP DEMAND LETTER Processing an Administrative Civil Penalty demand letter.$31.84 per letter $65 per letter↑48.0% 100.0% $ 5,900 FULL COST RECOVERY $ 4,700 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.34 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐8060CITY ATTORNEYLIEN RELEASE Processing the release of a lien.None $65 plus any County feesNEW 48.6% 100.0% $ 10,200 FULL COST RECOVERY $ 8,100 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐8300FINANCENEW BUSINESS REGISTRATIONProcessing the registration information for a new business in the City.None $40 per applicationDELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff recommends deletion, fee hasn't been collected since it was determined not allowable in 2012S‐8310FINANCEBUSINESS REGISTRATION RENEWALProcessing the renewal of a business registration. This is not for the processing of the business tax renewal but rather for the updating of business registration None $15 per renewalDELETE 0.0% 0.0% $ ‐ DELETE $ ‐ Staff recommends deletion, fee hasn't been collected since it was determined not allowable in 2012S‐8320FINANCEBUSINESS REGISTRATION LIEN ASSESSProcessing of a lien on a property due to non‐payment of business registration fees and taxes.$125 per lien (City receives $104 of the fee and the County receives $21)$90 per lien plus any County processing fees↑0.0% 100.0% $ (18,300) FULL COST RECOVERY $ (18,300)Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐8330FINANCEBUSINESS REGISTRATION DEMAND LETTERProcessing a demand letter for a business registration lien.$11 per letter $10 per letter↓117.1% 100.0% $ (100) FULL COST RECOVERY $ (100)Based on study, fee lowered; staff time increased in other areas and was reduced here. S‐8340FINANCEBUSINESS REGISTRATION LIEN RELEASEProcessing the release of a business registration lien.None $35 per release plus any County processing feesNEW 104.7% 100.0% $ 39,400 FULL COST RECOVERY $ 31,500 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐8350FINANCEDUPLICATE BUSINESS REG CERTIFICATEProviding a duplicate of a business registration certificate on request.$0.50 per certificate $10 per certificate↑4.8% 100.0% $ 400 FULL COST RECOVERY $ 400 Minimal revenue increase, no change to RCS projection.35 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐8360CITY CLERKPASSPORT PROCESSING Processing passport applications for the public.$25 per application plus $15 per photograph$35 per application plus $15 per photographThe application fee is set by the federal government.↑39.0% 100.0% $ 29,100 LEGAL LIMITS $ 23,200 Limited by State and/or Federal regulations/law. Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐8370CITY CLERKNOTARY PUBLIC Providing Notary Public fees to the public.$10 per document $15 per document.This fee is set by the State.↑30.3% 100.0% $ ‐ LEGAL LIMITS $ ‐ Limited by State and/or Federal regulations/lawS‐8380CITY CLERKRECORDS COMPILATION Creating or compiling records that do not currently exist as a public record on request.Actual Costs Charge the fully allocated hourly rate for all personnel needed plus any outside costs.↑67.3% 100.0% $ ‐ FULL COST RECOVERY $ ‐ Cost recovery is based on hourly rates for actual time incurred. Fee did not previously include overhead. Without a consistent pattern and in light of economic downturn, revenue estimates will not be increasedS‐8390CITY CLERKCANDIDATE FILING Processing a filing for a candidate for a local office.$25 per candidateThis is the maximum allowed under State law (Elections Code section 10228)No change‐‐n/a n/a $ ‐ LEGAL LIMIT $ ‐ No change, legal limit for fee36 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐8400CITY CLERKINITIATIVE FILING Processing a local initiative.$200 per applicationFee is to be refunded to the filer if, within one year of the date of filing the notice of intent, the elections official certifies the sufficiency of the petition.This is the maximum allowed under State law (Elections Code section 9202(b)).No change‐‐n/a n/a $ ‐ LEGAL LIMIT $ ‐ No change, legal limit for feeS‐8410CITY CLERKWEDDING CEREMONY Providing a wedding ceremony on request.$65 per ceremony $70 per ceremony↑90.9% 100.0% $ ‐ FULL COST RECOVERY $ ‐ ALMOST AT FULL RECOVERY, ADDITIONAL REVENUE IS NEGLIGIBLES‐8500CITY MANAGERFILM PERMIT Processing a film permit for filming within the City.$63 per permit $250 per permit↑25.3% 100.0% $ 5,600 FULL COST RECOVERY $ 4,400 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.S‐8500CITY MANAGER/& PUBLIC WORKSSTREET BANNER INSTALL Review request for street banner, if approved install and remove$200 per banner $410 per permit↑48.7% 100.0% $ 2,000 FULL COST RECOVERY $ 1,600 Reduced RCS estimate by 20% for economic downturn and expected implementation date of August 1, 2020.37 of 38
City Review of Consultant "Service Cost Study" and Recommended Fee AdjustmentsMay 6, 2020Attachment 1STUDY REF #DEPARTMENT/ DIVISIONFEE TITLE DESCRIPTION CURRENT FEE PROPOSED FEEIncrease (↑) Decrease (↓) No Change (‐‐)CURRENT RECOVERY %RECOMMENDED RECOVERY %RCS PROJECTION INCREASE/ (DECREASE) IN REVENUECATEGORYCITY PROJECTION INCREASE/ (DECREASE) IN REVENUEFINANCE NOTES/COMMENTSExhibit at end of this scheduleS‐8600FINANCENSF CHECK PROCESSING Processing a check returned due to insufficient funds.$26 per NSF Check Consultant recommendation: $65 per NSF check. City recommendation $30 first returned check; $65 each subsequent returned check in 12 month period↑40.2% 100.0% $ 3,600 FULL COST RECOVERY $ 1,000 Compared to surrounding jurisdiction's (and what is allowed for business/non‐government agencies to charge) staff has lowered recommendation but added a higher tier for repeat offendersS‐9000FINANCEOTHER CHARGEABLE SERVICESTo cover the cost for services requested for which there is no fee establishedHourly rate of city staff involved in providing servicesFully burdened hourly rate of staff involved in providing service plus any materials cost↑100.0% 100.0% $ ‐ FULL COST RECOVERY $ ‐ No revenue projection included because of nature of fee, unable to determine $ 1,325,045 $ 1,007,400 $ (50,000) $ (40,000) $ 1,275,045 $ 967,400 Net Revenue Increase:Reserved for General Plan Maintenance38 of 38
SCHEDULE OF FEES
Building & Safety Division,
Community Development Department
300 North D Street, San Bernardino, CA 92418
Ph: (909) 384-5071 Fax: (909) 384-5080
Website: www.sbcity.org
I. Plan Review and Building Permits Fees
The plan review and building permit fees applicable to building construction projects in the City of San
Bernardino are provided in the following tables. These fees are collected to cover the costs of the plan review
and building inspection services provided as part of the building permit process.
These fees do not include Development Impact Fees, School Fees, Engineering Division Fees, Planning
Division Fees, Water Department Fees, Health Department Fees, or other fees collected for other purposes,
unless noted otherwise.
A. Determining Plan Review Fees
In order to determine the Plan Review Fee for a project the following procedure should be followed:
1.Plan Review Deposit (all except 1 and 2 family dwellings):
a.) Identify the Construction Cost Factor in Table 2 based on the building’s occupancy group
(use) and type of construction, then multiply this factor by the square footage of the use. The
result is the valuation of the construction. If the building contains mixed uses, compute the
valuation of each distinct use and add the valuations together to get the total valuation of the
building.
b.) Find the appropriate valuation range in the left-hand column of Table 3 that corresponds to
the total valuation. Select the appropriate column (residential or commercial) to determine
the plan review deposit fee.
2.Total Plan Review Fees:
The Total Plan Review Fee is the sum of the following fee components, when applicable:
Total = Plan Review Deposit + Expeditious Plan Review + E/P/M Plan Review + Energy
Plan Review + Fire Plan Review + Accessibility Plan Review + Zoning Review
3.Hourly Plan Review Rate
The hourly rate for in-house plan review is $94.15. When expeditious review is requested by the
applicant and performed by an outside vendor, any plan review billed hourly shall be at the
vendor’s prevailing hourly rate, which is typically higher than the City rate.
4.One & Two Family Residential Construction – Plan Review
Plan reviews of new single-family and duplex residential construction, additions or alteration
thereto, will be performed at the hourly rate. Repetitive tract housing units will be billed at one
hour. The plan review deposit for new 1 & 2 family dwellings is equal to 5 hours. The deposit
for additions is equal to 3 hours.
CURRENT FEE SCHEDULE B&SExhibit A
s:/fees/schedule of fees (revised Sept. 8, 2008) Page 2
B. Determining Building Permit Fees
1. Single-family Residential Construction
A. Additions
- Additions without a bath or kitchen: $1.39 per sq. ft.
- Additions with a bath or kitchen: $1.54 per sq. ft.
- Minimum fee for additions: $300
- Maximum fee for additions up to 1200 sq. ft.: $1166
- The fee for additions over 1200 sq. ft. is as indicated in Table 1B
B. New Single-family Tract Homes (constructed in phases of five or more homes)
- Refer to Table 1A
C. New Single-family Infill or Custom Homes
- Refer to Table 1B
2. Commercial, Industrial, and Multifamily
Basic Building Permit Fee:
The basic building permit fee is listed in the 2nd column of Table 3.
Total Building Permit Fee:
The Total Building Permit Fee is the sum of the following fee components, when applicable:
Total = Basic Building Permit Fee + Issuance Fees + Elec/Plbg/Mech Permit Fees +
Certificate of Occupancy Fee + SMIP Fee* + Cultural Development Impact Fee + Archive
Fee + Technology Fee (*SMIP = Strong Motion Instrumentation Program Fees)
BUILDING VALUATION DATA
The Community Development Department uses the following cost factors (dollars per square foot) to
determine project valuation under Section 304.2 of the Uniform Administrative Code as adopted by the City
of San Bernardino. Plan check and building permit fees for occupancies other than single-family residences
are based on value of the project per Section 304. Valuation of a project is determined by the Building
Official. The cost factors contained in Table 2 are used to calculate building valuation, which in turn is used
to determine permit and plan check fees in Table 3. Valuation may or may not have a resemblance to actual
square foot cost of a project. In most cases the costs indicated are below market rates compared to a bid,
contract price, assessed value or sales price. The use of these cost factors by the City simply assures
consistency and uniformity in the amount of fees collected for projects of similar size, construction, and
occupancy.
CURRENT FEE SCHEDULE B&SExhibit A
s:/fees/schedule of fees (revised Sept. 8, 2008) Page 3
Table 1A Building Permit Fees ‐Tract Homes
Square Feet Insp. Time(hr) Permit Fee Square Feet Insp. Time(hr.) Permit Fee
to 1200 4.77 $451
1300 4.94 $467
1400 5.11 $483
1500 5.28 $499
1600 5.45 $515 4600 10.51 $ 993
1700 5.62 $531 4700 10.68 $1,009
1800 5.78 $546 4800 10.85 $1,025
1900 5.95 $562 4900 11.02 $1,041
2000 6.12 $578 5000 11.18 $1,056
2100 6.29 $594 5100 11.35 $1,072
2200 6.46 $610 5200 11.52 $1,088
2300 6.63 $626 5300 11.69 $1,104
2400 6.80 $642 5400 11.86 $1,120
2500 6.97 $658 5500 12.03 $1,136
2600 7.13 $673 5600 12.2 $1,152
2700 7.30 $689 5700 12.37 $1,168
2800 7.47 $706 5800 12.53 $1,183
2900 7.64 $722 5900 12.7 $1,200
3000 7.81 $738 6000 12.87 $1,216
3100 7.98 $754 6100 13.04 $1,232
3200 8.15 $770 6200 13.21 $1,248
3300 8.32 $786 6300 13.38 $1,264
3400 8.48 $801 6400 13.55 $1,280
3500 8.65 $817 6500 13.71 $1,295
3600 8.82 $833 6600 13.88 $1,311
3700 8.99 $849 6700 14.05 $1,327
3800 9.16 $865 6800 14.22 $1,343
3900 9.33 $881 6900 14.39 $1,359
4000 9.50 $897 7000 14.56 $1,375
4100 9.66 $912 7100 14.73 $1,391
4200 9.83 $928 7200 14.9 $1,407
4300 10.00 $945 7300 15.06 $1,422
4400 10.17 $961 7400 15.23 $1,438
4500 10.34 $977 7500 15.4 $1,455
Notes: 1. The indicated fees include building, electrical, plumbing and mechanical inspection fees.
2. The indicated fees do not include plan review, issuance or other applicable fees.
3. The indicated fees include a standard 2‐car garage.
4. For homes larger than 7500 sq. ft., use the following formula: $1455 + (size‐7500)/100 X 15.94 .
5. This table applies to tract homes built in phases of 5 or more.
CURRENT FEE SCHEDULE B&SExhibit A
s:/fees/schedule of fees (revised Sept. 8, 2008) Page 4
Table 1B Building Permit Fees ‐Infill Homes
Square Feet Insp. Time(hr) Permit Fee Square Feet Insp. Time(hr.) Permit Fee.
to 1200 12.35 $1,166
1300 12.65 $1,195
1400 12.95 $1,223
1500 13.25 $1,251
1600 13.55 $1,280 4600 22.50 $2,125
1700 13.84 $1,307 4700 22.80 $2,153
1800 14.14 $1,336 4800 23.10 $2,182
1900 14.44 $1,364 4900 23.40 $2,210
2000 14.74 $1,392 5000 23.69 $2,238
2100 15.04 $1,421 5100 23.99 $2,266
2200 15.34 $1,449 5200 24.29 $2,294
2300 15.64 $1,477 5300 24.59 $2,323
2400 15.93 $1,505 5400 24.89 $2,351
2500 16.23 $1,533 5500 25.19 $2,379
2600 16.53 $1,561 5600 25.49 $2,408
2700 16.83 $1,590 5700 25.78 $2,435
2800 17.13 $1,618 5800 26.08 $2,463
2900 17.43 $1,646 5900 26.38 $2,492
3000 17.72 $1,674 6000 26.68 $2,520
3100 18.02 $1,702 6100 26.98 $2,548
3200 18.32 $1,730 6200 27.28 $2,577
3300 18.62 $1,759 6300 27.58 $2,605
3400 18.92 $1,787 6400 27.87 $2,632
3500 19.22 $1,815 6500 28.17 $2,661
3600 19.52 $1,844 6600 28.47 $2,689
3700 19.81 $1,871 6700 28.77 $2,717
3800 20.11 $1,899 6800 29.07 $2,746
3900 20.41 $1,928 6900 29.37 $2,774
4000 20.71 $1,956 7000 29.66 $2,801
4100 21.01 $1,984 7100 29.96 $2,830
4200 21.31 $2,013 7200 30.26 $2,858
4300 21.61 $2,041 7300 30.56 $2,886
4400 21.90 $2,068 7400 30.86 $2,915
4500 22.20 $2,097 7500 31.16 $2,943
Notes: 1. The indicated fees, include building, electrical, plumbing and mechanical inspection fees.
2. The indicated fees do not include plan review, issuance or other applicable fees.
3. The indicated fees include a standard 2‐car garage.
4. For homes larger than 7500 sq. ft., use the following formula: $2943 + (size‐7500)/100 X 28.19 .
5. This table applies to infill, custom, and tract homes built in phases of 4 or less.
CURRENT FEE SCHEDULE B&SExhibit A
Table 2 Building Construction Valuations
(Construction costs per square foot ($))
Occupancy Classification (2006 IBC)
Type of Construction
IA IB IIA IIB IIIA IIIB IV VA VB
A-1 Assembly, theaters, with stage
196.11 189.78 185.37 177.60 167.20 162.27 171.92 152.56 146.94
A
-1 Assembly, theaters, w thout stage i 177.62 171.29 166.88 159.10 148.75 143.82 153.43 134.10 128.49
A-2 Assembly, nightclubs 149.94 145.74 142.04 136.49 128.53 124.91 131.71 116.50 112.58
A-2 Assembly, restaurants, bars, banquet halls 148.94 144.74 140.04 135.49 126.53 123.91 130.71 114.50 111.58
A-3 Assembly, churches 180.72 174.39 169.98 162.21 151.82 146.89 156.54 137.18 131.57
A
m
-3 Assembly, general, community halls, libraries,
useums
1
52.81 146.48 141.07 134.30 122.33 118.97 128.63 108.26 103.65
A-4 Assembly, arenas 176.62 170.29 164.88 158.10 146.75 142.82 152.43 132.10 127.49
B Business 154.16 148.70 144.00 137.27 125.07 120.41 131.97 109.81 105.37
E Educational 166.52 160.91 156.34 149.52 140.14 132.98 144.59 123.34 118.69
F-1 Factory and industrial, moderate hazard 92.68 88.42 83.70 80.93 72.45 69.29 77.68 59.67 56.50
F-2 Factory and industrial, low hazard 91.68 87.42 83.70 79.93 72.45 68.29 76.68 59.67 55.50
H-1 High Hazard, explosives
86.84 82.58 78.86 75.09 67.79 63.63 71.84 55.02 N.P.
H234 High Hazard 86.84 82.58 78.86 75.09 67.79 63.63 71.84 55.02 50.85
H-5 HPM 154.16 148.70 144.00 137.27 125.07 120.41 131.97 109.81 105.37
I-1 Institutional, supervised environment 152.30 147.08 143.14 137.34 128.24 124.73 138.61 116.09 111.54
I-2 Institutional, hospitals 256.26 250.80 246.11 239.38 226.55 N.P. 234.08 211.31 N.P.
I-2 Institutional, nursing homes 179.18 173.72 169.02 162.30 150.51 N.P. 157.00 135.27 N.P.
I-3 Institutional, restrained 1
74.99 169.52 164.83 158.10 147.16 141.52 152.80 131.92 125.48
I
-4 Institutional, day care facilities 152.30 147.08 143.14 137.34 128.24 124.73 138.61 116.09 111.54
M Mercantile 111.44 107.24 102.53 97.99 89.62 87.00 93.21 77.59 74.67
R-1 Residential, hotels 154.24 149.02 145.08 139.28 129.95 126.44 140.32 117.80 113.25
R-2 Residential, multiple family 129.33 124.11 120.17 114.37 105.16 101.65 115.53 93.01 88.46
R-3 Residential, one- and two-family 122.11 118.76 115.86 112.68 108.62 105.77 110.77 101.74 95.91
R-4 Residential, care/assisted l ving facilities i 152.30 147.08 143.14 137.34 128.24 124.73 138.61 116.09 111.54
S-1 Storage, moderate hazard 85.84 81.58 76.86 74.09 65.79 62.63 70.84 53.02 49.85
S-2 Storage, low hazard 84.84 80.58 76.86 73.09 65.79 61.63 69.84 53.02 48.85
U Utility, miscellaneous 65.15 61.60 57.92 55.03 49.70 46.33 51.94 39.23 37
s:/fees/schedule of fees (revised Sept. 8, 2008) Page 5
.34
Notes: (Source: Building Safety Journal Jan‐Feb 2008)
a. Private Garages use Utility, miscellaneous
b. Unfinished basements (all use group) = $15.00 per sq. ft.
c. For shell only buildings deduct 20 percent.
d. N.P. = not permitted
CURRENT FEE SCHEDULE B&SExhibit A
Table 2 (continued) Other Costs UNIT CONSTRUCTION COST
BLOCK WALLS: - 4’ high
- 5’ high
- 6’ high
- other
$30.00 /ln. ft.
$37.00 /ln. ft.
$44.00 /ln. ft.
$7.35 /sq. ft.
DEMOLITION: (valuation = contract price) (valuation = contract price)
DRYWALL $18.00 / sheet
FIREPLACE $3000.00 ea.
PATIOS, PORCHES $19.55 /sq. ft.
PATIO SLAB ONLY WITH FOOTING $6.45 /sq. ft
PATIO COVER ONLY $13.10 /sq. ft.
REROOFING (1 square = 100 sq. ft.)
- Built-up
- Composition Shingles
- Shake or Tile
- Resheathing
$210.00 /square
$165.00 /square
$320.00 /square
$ 96.00/square
SIGNS: (by valuation)
SIDING, EXTERIOR $3.00/sq. ft.
STUCCO : $4.44 /sq. ft.
SWIMMING POOLS AND SPAS – GUNITE (valuation = contract price)
- MANUFACTURED ABOVE-GROUND POOL/SPA $125/$75
TENANT IMPROVEMENT (Use 30% of cost per square foot ) 30%
WINDOW CHANGE OUTS (per window) $370.00 ea.
* Deduct 20 % for shell only buildings. ** Use 30% for tenant improvements.
s:/fees/schedule of fees (revised Sept. 8, 2008) Page 6
CURRENT FEE SCHEDULE B&SExhibit A
s:/fees/schedule of fees (revised Sept. 8, 2008) Page 7
TABLE 3 Plan Review and Building Permit Fees
Commercial, Industrial, and Multifamily Residential Occupancies
Note: The following table provides basic permit and plan review fees based on valuation for commercial, industrial, and
multifamily residential occupancies. Additional fees for permit issuance, electrical, plumbing, mechanical, development
impacts, sewer capacity, schools, etc may apply.
TOTAL
VALUATION ($)
Bldg.
Permit
Fee
Plan
Review
Fee
Sub
Total
TOTAL
VALUATION ($)
Bldg.
Permit
Fee
Plan
Review Fee
Sub
Total
1.00 - 500 60.00 14.25 74.25
501 - 600 60.00 16.15 76.15
601 - 700 60.00 18.05 78.05
701 - 800 60.00 19.95 79.95
801 - 900 60.00 21.85 81.85
901 - 1,000 60.00 23.75 83.75
1,001 - 1,100 60.00 25.65 85.65 30,001 – 31,000 291.00 276.45 567.45
1,101 - 1,200 60.00 27.55 87.55 31,001 – 32,000 297.50 282.63 580.13
1,201 - 1,300 60.00 29.45 89.45 32,001 – 33,000 304.00 288.80 592.80
1,301 - 1,400 60.00 31.35 91.35 33,001 – 34,000 310.50 294.98 605.48
1,401 - 1,500 60.00 33.25 93.25 34,001 – 35,000 317.00 301.15 618.15
1,501 - 1,600 60.00 35.15 95.15 35,001 – 36,000 323.50 307.33 630.83
1,601 - 1,700 60.00 37.05 97.05 36,001 – 37,000 330.00 313.50 643.50
1,701 - 1,800 60.00 38.95 98.95 37,001 – 38,000 336.50 319.68 656.18
1,801 - 1,900 60.00 40.85 100.85 38,001 – 39,000 343.00 325.85 668.85
1,901 - 2,000 60.00 42.75 102.75 39,001 – 40,000 349.50 332.50 682.00
40,001 – 41,000 356.00 338.20 694.20
41,001 – 42,000 362.50 344.38 706.88
2,001 - 3,000 60.00 51.30 111.30 42,001 – 43,000 369.00 350.55 719.55
3,001 – 4,000 63.00 59.85 122.85 43,001 – 44,000 375.50 356.73 732.23
4,001 – 5,000 72.00 68.40 140.40 44,001 – 45,000 382.00 362.90 744.90
5,001 – 6,000 81.00 76.95 157.95 45,001 – 46,000 388.50 369.08 757.58
6,001 – 7,000 90.00 85.50 175.50 46,001 – 47,000 395.00 375.25 770.25
7,001 – 8,000 99.00 94.05 193.05 47,001 – 48,000 401.50 381.43 782.93
8,001 – 9,000 108.00 102.60 210.60 48,001 – 49,000 408.50 387.60 796.10
9,001 – 10,000 117.00 111.15 228.15 49,001 – 50,000 414.50 393.78 808.28
10,001 – 11,000 126.00 119.70 245.70 50,001 – 51,000 419.50 398.05 817.55
11,001 – 12,000 135.00 128.25 263.25 51,001 – 52,000 423.00 402.33 825.33
12,001 – 13,000 144.00 136.80 280.80 52,001 – 53,000 428.00 406.60 834.60
13,001 – 14,000 153.00 145.35 298.35 53,001 – 54,000 432.50 410.88 843.38
14,001 – 15,000 162.00 153.90 315.90 54,001 – 55,000 437.00 415.15 852.15
15,001 – 16,000 171.00 162.45 333.45 55,001 – 56,000 441.50 419.43 860.93
16,001 – 17,000 180.00 171.00 351.00 56,001 – 57,000 446.00 423.70 869.70
17,001 – 18,000 189.00 179.55 368.55 57,001 – 58,000 450.50 427.98 878.48
18,001 – 19,000 198.00 188.10 386.10 58,001 – 59,000 455.00 432.25 887.25
19,001 – 20,000 207.00 196.65 403.65 59,001 – 60,000 459.50 436.53 896.03
20,001 – 21,000 216.00 205.20 421.20 60,001 – 61,000 464.00 440.80 904.80
21,001 – 22,000 225.00 213.75 438.75 61,001 – 62,000 468.50 445.08 913.58
22,001 – 23,000 234.00 222.30 456.30 62,001 – 63,000 473.00 449.35 922.35
23,001 – 24,000 243.00 230.85 473.85 63,001 – 64,000 477.50 453.63 931.13
24,001 – 25,000 252.00 239.45 491.45 64,001 – 65,000 482.00 457.90 939.90
25,001 – 26,000 258.00 245.10 503.10 65,001 – 66,000 486.50 462.18 948.68
26,001 – 27,000 265.00 251.75 516.75 66,001 – 67,000 491.00 466.45 957.45
27,001 – 28,000 271.00 257.45 528.45 67,001 – 68,000 495.50 470.73 966.23
28,001 – 29,000 278.00 264.10 542.10 68,001 – 69,000 500.00 475.00 975.00
29,001 – 30,000 284.00 269.80 553.80 69,001 – 70,000 504.50 479.28 983.78
CURRENT FEE SCHEDULE B&SExhibit A
s:/fees/schedule of fees (revised Sept. 8, 2008) Page 8
TOTAL
VALUATION ($)
Bldg.
Permit
Fee
Plan
Review
Fee
Sub
Total
TOTAL
VALUATION ($)
Bldg.
Permit
Fee
Plan
Review Fee
Sub
Total
70,001 – 71,000 509.00 483.55 992.55 120,001 – 121,000 713.00 677.35 1390.35
71,001 – 72,000 513.50 487.83 1001.33 121,001 – 122,000 716.50 680.68 1397.18
72,001 – 73,000 518.00 492.10 1010.10 122,001 – 123,000 720.00 684.00 1404.00
73,001 – 74,000 522.40 496.38 1018.78 123,001 – 124,000 723.50 687.33 1410.83
74,001 – 75,000 527.00 500.65 1027.65 124,001 – 125,000 727.00 690.65 1417.65
75,001 – 76,000 531.50 504.93 1036.43 125,001 – 126,000 730.50 693.98 1424.48
76,001 – 77,000 536.00 509.20 1045.20 126,001 – 127,000 734.00 697.30 1431.30
77,001 – 78,000 540.40 513.38 1053.78 127.001 – 128,000 737.50 700.63 1438.13
78,001 – 79,000 545.00 517.75 1062.75 128,001 – 129,000 741.00 703.95 1444.95
79,001 – 80,000 549.50 522.03 1071.53 129,001 – 130,000 744.50 707.28 1451.78
80,001 – 81,000 554.00 526.50 1080.50 130,001 – 131,000 748.00 710.60 1458.60
81,001 – 82,000 558.50 530.58 1089.08 131,001 – 132,000 751.50 713.93 1465.43
82,001 – 83,000 563.00 534.85 1097.85 132,001 – 133,000 755.00 717.25 1472.25
83,001 – 84,000 567.50 539.13 1106.63 133,001 – 134,000 758.50 720.58 1479.08
84,001 – 85,000 572.00 543.40 1115.40 134,001 – 135,000 762.00 723.90 1485.90
85,001 – 86,000 576.00 547.68 1123.68 135,001 – 136,000 765.50 727.23 1492.73
86,001 – 87,000 581.00 551.95 1132.95 136,001 – 137,000 769.00 730.55 1499.55
87,001 – 88,000 585.00 556.23 1141.23 137,001 – 138,000 772.50 733.88 1506.38
88,001 – 89,000 590.00 560.50 1150.50 138,001 – 139,000 776.00 737.20 1513.20
89,001 – 90,000 594.50 564.78 1159.28 139,001 – 140,000 779.50 740.53 1520.03
90,001 – 91,000 599.00 569.05 1168.05 140,001 – 141,000 783.00 743.85 1526.85
91,001 – 92,000 603.50 573.33 1176.83 141,001 – 142,000 786.50 747.18 1533.68
92,001 – 93,000 608.50 577.60 1186.10 142,001 – 143,000 790.00 750.50 1540.50
93,001 – 94,000 612.50 581.88 1194.38 143,001 – 144,000 793.50 753.83 1547.33
94,001 – 95,000 617.00 586.15 1203.15 144,001 – 145,000 797.00 757.15 1554.15
95,001 – 96,000 621.50 590.43 1211.93 145,001 – 146,000 800.50 760.98 1560.98
96,001 – 97,000 626.00 594.70 1220.70 146,001 – 147,000 804.00 763.80 1567.80
97,001 – 98,000 630.50 598.98 1229.48 147,001 – 148,000 807.50 767.13 1574.63
98,001 – 99,000 635.00 603.25 1238.25 148,001 - 149,000 811.00 770.45 1581.45
99,001 – 100,000 639.50 607.53 1247.03 149,001 – 150,000 814.50 773.78 1588.28
100,001 – 101,000 643.00 610.85 1253.85 150,001 – 151,000 818.00 777.10 1595.10
101,001 – 102,000 646.50 614.18 1260.68 151,001 –152.,000 821.50 780.43 1601.93
102,001 – 102,000 650.00 617.50 1267.50 152,001 – 153,000 825.00 783.75 1608.75
103,001 – 104,000 653.50 620.83 1274.33 153,001 – 154,000 828.50 787.08 1615.58
104,001 – 105,000 657.00 624.15 1281.15 154,001 – 155,000 832.00 790.40 1622.40
105,001 – 106,000 660.50 627.48 1287.98 155,001 – 156,000 835.50 793.73 1629.23
106,001 – 107,000 664.00 630.80 1294.80 156,001 – 157,000 839.00 797.05 1636.05
107,001 – 108,000 667.50 634.11 1301.61 157,001 – 158,000 842.50 800.38 1642.88
108,001 – 109,000 671.00 637.45 1308.45 158,001 – 159,000 846.00 803.70 1649.70
109,001 – 110,000 674.50 640.78 1315.28 159,001 – 160,000 849.50 807.03 1656.53
110,001 – 111,000 678.00 644.10 1322.10 160,001 – 161,000 853.00 810.35 1663.35
111,001 – 112,000 681.50 647.43 1328.93 161,001 – 162,000 856.50 813.68 1670.18
112,001 – 113,000 685.00 650.75 1335.75 162,001 – 163,000 860.00 817.00 1677.00
113,001 – 114,000 688.50 654.08 1342.58 163,001 – 164,000 863.50 820.33 1683.83
114,001 – 115,000 692.00 657.40 1349.40 164,001 – 165,000 867.00 823.65 1690.65
115,001 – 116,000 695.50 660.73 1356.23 165,001 – 166,000 870.50 826.98 1697.48
116,001 – 117,000 699.00 664.05 1363.05 166,001 – 167,000 874.00 830.30 1704.30
117,001 – 118,000 702.50 667.38 1369.88 167,001 – 168,000 877.50 833.63 1711.13
118,001 – 119,000 706.00 670.70 1376.70 168,001 – 169,000 881.00 836.95 1717.95
119,001 – 120,000 709.50 674.03 1383.53 169,001 – 170,000 884.50 840.28 1774.78
For higher valuations use the formulas below.
CURRENT FEE SCHEDULE B&SExhibit A
Building Permit Fees:
For valuation ranges beyond the scope of the above table the following formulas can be used to determine the basic building
permit fee :
Where the valuation (V) is between $100,000.00 and $500,000.00 -- $639.50 for first $100,000.00 and $3.50 per 1,000.00
thereafter, or
Building Permit Fee = $639.50 + ( )( 3.50 ) _V-100,000_
1000
Where the valuation (V) is between $500,000.00 thru $1,000,000.00 – $2,039.50 for first $500,000.00 and $3.00 per 1,000.00
thereafter, or
Building Permit Fee = $2039.50 + ( )( 3.00 ) _V-500,000_
1000
Where the valuation (V) is $1,000,000,00 or greater – $3,539.50 for first $1,000,000.00 and $2.00 per 1,000.00 thereafter, or
Building Permit Fee = $3539.50 + ( )( 2.00 )
_V-1,000,000_
1000
Plan Review Fees:
For valuation ranges beyond the scope of this table the Plan Review Fee shall be as follows:
Commercial/Industrial and Multifamily Residential: 95% of the calculated building permit fee
s:/fees/schedule of fees (revised Sept. 8, 2008) Page 9
CURRENT FEE SCHEDULE B&SExhibit A
s:/fees/schedule of fees (revised Sept. 8, 2008) Page 10
Table 4 ELECTRICAL FEES
Single-family Residential Rewire (plus service)
Apartments, condominiums per sq. ft. (plus service)
Commercial buildings per sq. ft. (plus service)
Electrical Service : Up to 200 amps
200 amps to 1000 amps
1000 amps and over
Subpanels
Temporary Power Poles
Meter pole
Each extension pole (no meter)
Unit Schedule
Receptacles, lights, switches-first 20, each
After 20, each
Range/oven, washer/dryer, a/c unit, evaporative cooler, each
Electrical Signs (for electrical work – does not include the sign structure)
Additional branch circuit within same sign
Meter Reset
When issued in conjunction with other work
Each additional meter on same building or lot
Minimum Fee
Solar Energy Systems
Private Swimming Pools
Power Apparatus (motors, generators, transformer, industrial
heating, cooling or cooking equipment, etc.)
- Up to 1 hp
- Over 1 to 10 hp
- Over 10 to 50 hp
- Over 50 to 100 hp
- Over 100 hp
Carnivals and Circuses
- Generators and Electrically Driven Rides
- Mechanically Driven Rides, Walk-thru attractions w/elec. lighting
- System of area booth lighting
$.056
$.050
$.015
$30.50
$62.15
$124.30
18.20
$23.50
$ 12.30
$ 1.10
$ .73
$ 4.75
$24.60
$ 4.75
$40.00
$11.00
$10.00
$60.00
No Charge
$49.50
$ 4.75
$12.30
$24.60
$49.50
$74.50
$23.50
$ 7.25
$ 7.25
CURRENT FEE SCHEDULE B&SExhibit A
s:/fees/schedule of fees (revised Sept. 8, 2008) Page 11
Table 5 Plumbing Fees
Plumbing fixture, each
Gas meter reset (gauge test required)
Gas meter reset (when issued in conjunction w/other work)
Gas meter-each additional meter on same building or lot
House sewer, each
Cesspool
Private Sewage Disposal System
Demo Septic/Pit
Water heater, each
Repair or alteration of drainage or vent piping
Gas piping system of 1 to 5 outlets
Each additional outlet over 5, per outlet
Industrial Waste, pretreatment interceptor, except kitchen
type grease interceptors functioning as fixture traps.
Water Piping installation, alteration or repair
Drainage/vent Piping
Lawn Sprinkler System on any one meter
Rainwater systems-per drain (inside building)
Minimum Fee
Solar Energy Systems
$ 9.80
$40.00
$11.00
$10.00
$24.65
$37.25
$74.50
$22.00
$12.30
$ 4.75
$ 6.15
$ 1.10
$19.90
$ 4.75
$4.75
$ 14.80
$9.80
$60.00
No Charge
Table 6 Mechanical Fees
FAU to 100,000 BTU
FAU over 100,000 BTU
A/C unit up to 3 tons
A/C unit over 3 tons up to 15 tons
Twin-pack (new or replacement, includes gas or electric)
Wall heater, floor furnace, suspended heater
Evaporative cooler
Bath exhaust fan
Grease hood and duct systems
Duct alter
Air-handling unit HVAC
$14.80
$18.20
$14.80
$27.15
$29.60
$14.80
$10.65
$ 7.25
$10.65
$10.65
$10.65
CURRENT FEE SCHEDULE B&SExhibit A
s:/fees/schedule of fees (revised Sept. 8, 2008) Page 12
Table 7 Mobile Home Park Fees
Installation/Set-up
Earthquake Bracing Systems
Accessory Buildings (Cabanas, Ramadas, Patios, Blockwalls, Garages,
Awnings, Carports, Porches, etc.)
- Without Standard Plans
- With Standard Plans
Fees For Constr./Alteration of Mobilehome Park Facilities
- For Each Lot
- Electrical Fee: Park Service
- Street Lights
- Unit Substation/Secondary Distribution Transformer
- Alter/Replace Service or Transformer
- Mobilehome Lot Service
- Alter/repair/replace lot service
Plan Review Fees (not charged to HCD Standard Plans)
Plumbing Fees
Park Drain System
Private Sewage Disposal or Water Treatment System
Lot Drain Inlet
Alter/Repair of Drainage/Vent Piping
Park Water System
Water Service Outlets (water meters)
Fire Hydrant or Riser
Water Conditioner
Plumbing Fixtures/Equipment (alter/repair/replace)
Park Gas Piping System
LPG or Natural Gas Tank of 60 gal. or more
Mobilehome Lot Gas Outlet Riser
Gas Distribution Equipment (alter/repair/replace)
Miscellaneous Equipment (each installation)
$196
$196
Based on valuation
$196
$ 5.75
$14.00
$ 3.00
$10.50
$10.50
$7.00
$7.00
Based on valuation
$14.00
$14.00
$ 7.00
$ 7.00
$ 7.00
$ 4.25
$ 4.25
$ 4.25
$ 4.25
$ 7.00
$ 7.00
$ 4.25
$ 4.25
$ 7.00
Table 8 Miscellaneous Fees
Permit Issuance Fees (to be included on all permits)
Supplemental Issuance Fee
Minimum Permit Fee
Inspections – Hourly
Reinspection Fee
Inspection Outside Normal Business Hours
Zoning Consistency Review Fee (Bldg. Permits, Demo, etc)
Certificate of Occupancy
(if included on building permit)
Strong Motion Instrumentation Program (SMIP) Fees:
Strong Motion Instrumentation Program (SMIP) fees are imposed by the State of
California and provide funding for seismic monitoring and instrumentation
throughout the State.
Technology Fee
Archive Fees
- Per Permit or Application
- Plans
- Documents
$40.00
$10.00
$60.00
$94.45
$94.45
$188.90 + $94.45/hr. beyond 2 hr
$54.00
$475.08
$133.62
Residential = .0001 x Valuation
Com/Ind. = .00021 x Valuation
(including hotels)
2% of plan review & permit fees
$1.00
$2.00/sheet
$ .25/page
CURRENT FEE SCHEDULE B&SExhibit A
s:/fees/schedule of fees (revised Sept. 8, 2008) Page 13
CURRENT FEE SCHEDULE B&SExhibit A
Schedule of Fees – Building & Safety Division 1 04/2020
Community & Economic Development Department • Building & Safety Division
Office: 201 North E Street, 3rd Floor
Mail: 290 North D Street
San Bernardino, CA 92401
P: (909) 384-5357 F: (909) 384-5155
www.sbcity.org
SCHEDULE OF FEES – BUILDING & SAFETY DIVISION
Plan Review and Building Permit Fees
The plan review and building permit fees applicable to building construction projects in the City of San Bernardino
are provided in the following tables. These fees are collected to cover the costs of the plan review and building
inspection services provided as part of the building process.
These fees do not include Development Impact Fees, School Fees, Engineering Division Fees, Planning Division Fees,
Water Department Fees, Health Department Fees, or other fees collected for other purposes unless noted
otherwise.
A.Determining Plan Review Fees
In order to determine the Plan Review Fee for a project the following procedure should be followed:
1.Plan Review Fee (all except 1 and 2 family dwellings):
a.Identify the Construction Cost Factor in Table 2 based on the building’s occupancy group (use) and type
of construction, then multiply this factor by the square footage of the use. The result is the valuation of
the construction. If the building contains mixed uses, compute the valuation of each distinct use and
add the valuations together to get the total valuation of the building.
b.Find the appropriate valuation range in the column of Table 3 that corresponds to the total valuation.
Select the appropriate column to determine the plan review fee.
2.Total Plan Review Fees:
The Total Plan Review Fee is the sum of the following fee components, when applicable:
Total = Plan Review Fee + Expeditious Plan Review + Electrical/Plumbing/Mechanical Plan Review +
Energy Plan Review + Fire Plan Review + Accessibility Plan Review + Zoning Review
3.Hourly Plan Review Rate
The hourly rate for in-house plan review is $122.37. When expeditious review is requested by the applicant
and performed by an outside vendor, any plan review billed hourly shall be at the vendor’s prevailing hourly
rate, which is typically higher than the City rate.
4.One and Two-Family Residential Construction – Plan Review
Plan reviews of new single-family and duplex residential construction, additions or alteration thereto, will be
performed at the hourly rate. Repetitive tract housing units will be billed at one hour. The plan review fee
for new 1 & 2 family dwellings and for each model of a tract is equal to 5 hours. The fee for additions is
equal to 3 hours.
PROPOSEDExhibit B
Schedule of Fees – Building & Safety Division 2 04/2020
B.Determining Building Permit Fees
1.Single-Family Residential Construction
a.Additions
-Additions without a bath or kitchen:$1.74 per sq. ft.
-Additions with a bath or kitchen:$1.92 per sq. ft.
-Minimum fee for additions:$375.00
-Maximum fee for additions up to 1,200 square feet: $1,459.00
-Fees for additions over 1,200 square feet:As indicated in Table 1B
b.New Single-Family Tract Homes (constructed in phases of five or more homes)
-Refer to Table 1A
c.New Single-Family In-Fill or Custom Homes
-Refer to Table 1B
2.Commercial, Industrial and Multi-Family
Basic Building Permit Fee:
-The basic building permit fee is listed in the 2nd column of Table 3
Total Building Permit Fee:
-The Total Building Permit Fee is the sum of the following fee components, when applicable:
Total = Basic Building Permit Fee + Issuance Fees + Electrical/Plumbing/Mechanical Permit Fees +
Certificate of Occupancy Fee + SMIP Fee* + Cultural Development Impact Fee + Archive Fee +
Technology Fee + General Plan Update Surcharge
(*SMIP = Strong Motion Instrumentation Program Fees)
BUILDING VALUATION DATA
The Community & Economic Development Department uses the following cost factors (dollars per square foot) to
determine project valuation under Section 304.2 of the Uniform Administrative Code as adopted by the City of San
Bernardino. Plan check and building permit fees for occupancies other than single-family residences are based on
value of the project per Section 304. Valuation of a project is determined by the Building Official. The cost factors
contained in Table 2 are used to calculate building valuation, which in turn is used to determine permit and plan
check fees in Table 3. Valuation may or may not have a resemblance to actual square foot cost of a project. In most
cases the costs indicated are below market rates compared to a bid, contract price, assessed value or sales price.
The use of these cost factors by the City simply assures consistency and uniformity in the amount of fees collected
for projects of similar size, construction, and occupancy.
PROPOSEDExhibit B
Schedule of Fees – Building & Safety Division 3 04/2020
Table 1A Building Permit Fees (Tract Homes)
Square Feet Inspector Time
(hou r) Permit Fee Square Feet Inspector Time
(hour) Permit Fee
to 1,200 4.77 $564 4,400 10.21 $1,208
1,300 4.94 $585 4,500 10.38 $1,228
1,400 5.11 $605 4,600 10.55 $1,248
1,500 5.28 $625 4,700 10.72 $1,268
1,600 5.45 $645 4,800 10.89 $1,289
1,700 5.62 $665 4,900 11.06 $1,309
1,800 5.79 $685 5,000 11.23 $1,329
1,900 5.96 $705 5,100 11.40 $1,349
2,000 6.13 $725 5,200 11.57 $1,369
2,100 6.30 $745 5,300 11.74 $1,389
2,200 6.47 $766 5,400 11.91 $1,409
2,300 6.64 $786 5,500 12.08 $1,429
2,400 6.81 $806 5,600 12.25 $1,450
2,500 6.98 $826 5,700 12.42 $1,470
2,600 7.15 $846 5,800 12.59 $1,490
2,700 7.32 $866 5,900 12.76 $1,510
2,800 7.49 $886 6,000 12.93 $1,530
2,900 7.66 $906 6,100 13.10 $1,550
3,000 7.83 $927 6,200 13.27 $1,570
3,100 8.00 $947 6,300 13.44 $1,590
3,200 8.17 $967 6,400 13.61 $1,610
3,300 8.34 $987 6,500 13.78 $1,631
3,400 8.51 $1,007 6,600 13.95 $1,651
3,500 8.68 $1,027 6,700 14.12 $1,671
3,600 8.85 $1,047 6,800 14.29 $1,691
3,700 9.02 $1,067 6,900 14.46 $1,711
3,800 9.19 $1,087 7,000 14.63 $1,731
3,900 9.36 $1,108 7,100 14.80 $1,751
4,000 9.53 $1,128 7,200 14.97 $1,771
4,100 9.70 $1,148 7,300 15.14 $1,792
4,200 9.87 $1,168 7,400 15.31 $1,812
4,300 10.04 $1,188 7,500 15.48 $1,832
Notes: 1. The indicated fees include building, electrical, plumbing and mechanical inspection fees
2.The indicated fees do not include plan review, issuance or other applicable fees
3.The indicated fees include a standard 2-car garage
4.For homes larger than 7,500 square feet, use the following formula: $1,832.00 + (size-7,500)/100 X 19.72
5.This table applies to tract homes built in phases of 5 or more.
PROPOSEDExhibit B
Schedule of Fees – Building & Safety Division 4 04/2020
Table 1B Building Permit Fees (In-Fill Homes)
Square Feet Inspector Time
(hou r) Permit Fee Square Feet Inspector Time
(hour) Permit Fee.
to 1,200 12.35 $1,461 4,400 21.95 $2,597
1,300 12.65 $1,497 4,500 22.25 $2,633
1,400 12.95 $1,532 4,600 22.55 $2,668
1,500 13.25 $1,568 4,700 22.85 $2,704
1,600 13.55 $1,603 4,800 23.15 $2,739
1,700 13.85 $1,639 4,900 23.45 $2,775
1,800 14.15 $1,674 5,000 23.75 $2,810
1,900 14.45 $1,710 5,100 24.05 $2,846
2,000 14.75 $1,745 5,200 24.35 $2,881
2,100 15.05 $1,781 5,300 24.65 $2,917
2,200 15.35 $1,816 5,400 24.95 $2,952
2,300 15.65 $1,852 5,500 25.25 $2,998
2,400 15.95 $1,887 5,600 25.55 $3,023
2,500 16.25 $1,923 5,700 25.85 $3,059
2,600 16.55 $1,958 5,800 26.15 $3,094
2,700 16.85 $1,994 5,900 26.45 $3,130
2,800 17.15 $2,029 6,000 26.75 $3,165
2,900 17.45 $2,065 6,100 27.05 $3,201
3,000 17.75 $2,100 6,200 27.35 $3,236
3,100 18.05 $2,136 6,300 27.65 $3,272
3,200 18.35 $2,171 6,400 27.95 $3,307
3,300 18.65 $2,207 6,500 28.25 $3,343
3,400 18.95 $2,242 6,600 28.55 $3,378
3,500 19.25 $2,278 6,700 28.85 $3,414
3,600 19.55 $2,313 6,800 29.15 $3,449
3,700 19.85 $2,349 6,900 29.45 $3,485
3,800 20.15 $2,384 7,000 29.75 $3,520
3,900 20.45 $2,420 7,100 30.05 $3,556
4,000 20.75 $2,455 7,200 30.35 $3,591
4,100 21.05 $2,491 7,300 30.65 $3,627
4,200 21.35 $2,526 7,400 30.95 $3,662
4,300 21.65 $2,562 7,500 31.25 $3,698
Notes: 1. The indicated fees, include building, electrical, plumbing and mechanical inspection fees
2.The indicated fees do not include plan review, issuance or other applicable fees
3.The indicated fees include a standard 2-car garage
4.For homes larger than 7,500 square feet, use the following formula: $3,698.00 + (size-7,500)/100 X $35.50
5.This table applies to in-fill, custom, and tract homes built in phases of 4 or less.
PROPOSEDExhibit B
Schedule of Fees – Building & Safety Division 5 04/2020
Table 2: Building Construction Valuations
( Construction costs per square foot [$] )
Occupancy Classification
(2006 IBC)
Type of Construction
IA IB IIA IIB IIIA IIIB IV VA VB
A-1 Assembly, Theaters, with Stage 247.86 239.47 233.25 223.81 210.17 204.10 216.62 195.46 188.40
A-1 Assembly, Theaters, without
Stage 227.10 218.71 212.49 203.05 189.41 183.34 195.86 174.70 167.65
A-2 Assembly, Nightclubs 191.96 186.56 182.12 174.70 164.94 160.39 168.64 149.29 144.33
A-2 Assembly, Restaurants, Bars,
Banquet Halls 190.96 185.56 180.12 173.70 162.94 159.39 167.64 147.29 143.33
A-3 Assembly, Churches 229.69 221.30 215.08 205.64 192.37 187.27 198.45 177.66 170.60
A-3 Assembly, General, Community
Halls, Libraries, Museums 192.20 183.81 176.59 168.15 153.51 148.44 160.96 138.80 132.75
A-4 Assembly, Arenas 226.10 217.71 210.49 202.05 187.41 182.34 194.86 172.70 166.65
B Business 200.26 192.96 186.54 177.38 161.90 155.84 170.40 142.43 136.08
E Educational 209.90 202.64 196.82 188.34 175.49 166.60 181.86 153.45 148.75
F-1 Factory and Industrial,
Moderate Hazard 117.60 112.19 105.97 101.84 91.54 87.26 97.61 75.29 70.95
F-2 Factory and Industrial,
Low Hazard 116.60 111.19 105.97 100.84 91.54 86.26 96.61 75.29 69.95
H-1 High Hazard, Explosives 109.99 104.58 99.35 94.22 85.14 79.87 89.99 68.89 N.P.
H-2/3/4 High Hazard 109.99 104.58 99.35 94.22 85.14 79.87 89.99 68.89 63.56
H-5 HPM 200.26 192.96 186.54 177.38 161.90 155.84 170.40 142.43 136.08
I-1 Institutional, Supervised
Environment 197.83 191.05 185.12 177.91 163.28 158.81 178.06 146.98 142.33
I-2 Institutional, Hospitals 335.53 328.23 321.81 312.65 296.45 N.P. 305.67 276.99 N.P.
I-2 Institutional, Nursing Homes 233.12 225.82 219.40 210.24 195.51 N.P. 203.26 176.05 N.P.
I-3 Institutional, Restrained 227.71 220.41 213.99 204.83 190.84 183.78 197.85 171.37 163.02
I-4 Institutional, Day Care Facilities 197.83 191.05 185.12 177.91 163.28 158.81 178.06 146.98 142.33
M Mercantile 142.95 137.54 132.11 125.68 115.38 111.83 119.62 99.73 95.77
R-1 Residential, Hotels 199.70 192.92 186.99 179.78 164.90 160.43 179.93 148.60 143.96
R-2 Residential, Multiple-Family 167.27 160.49 154.56 147.35 133.71 129.23 147.50 117.40 112.76
R-3 Residential, One and
Two-Family 155.84 151.61 147.83 144.09 138.94 135.27 141.72 130.04 122.46
R-4 Residential, Care/Assisted Living
Facilities 197.83 191.05 185.12 177.91 163.28 158.81 178.06 146.98 142.33
S-1 Storage, Moderate Hazard 108.99 103.58 97.35 93.22 83.14 78.87 88.99 66.89 62.56
S-2 Storage, Low Hazard 107.99 102.58 97.35 92.22 83.14 77.87 87.99 66.89 61.56
U Utility, Miscellaneous 84.66 79.81 74.65 71.30 64.01 59.80 68.04 50.69 48.30
Notes: 1. Private Garages use Utility, Miscellaneous
2.Unfinished basements (Group R-3) = $22.45 per square foot
3.For shell only buildings deduct 20%
4.N.P. = Not Permitted
PROPOSEDExhibit B
Schedule of Fees – Building & Safety Division 6 04/2020
Table 2: Building Construction Costs (Continued)
Other Costs
( Unit Construction Cost )
Block Walls:
-4’ high $33.00 (per Lineal Foot)
-5’ high $40.70 (per Lineal Foot)
-6’ high $48.40 (per Lineal Foot)
-Other $8.10 (per Square Foot)
Demolition (Valuation = Contract Price) (Valuation = Contract Price)
Drywall $19.80 (per Sheet)
Fireplace $3,300.00 (Each)
Patios/Porches $21.50 (per Square Foot)
Patio Slab Only with Footing $7.10 (per Square Foot)
Patio Cover Only $14.40 (per Square Foot)
Reroofing (1 Square = 100 Square Foot):
-Built-up $230.00 (per Square)
-Composition Shingles $180.00 (per Square)
-Shake or Tile $350 (per Square)
-Resheathing $107.00 (per Square)
Signs (by Valuation)
Siding, Exterior $3.30 (per Square Foot)
Stucco $4.88 (per Square Foot)
Swimming Pools and Spas – Gunite (Valuation = Contract Price)
Manufactured Above-Ground Pool $140
Spa $85
Tenant Improvement (Use 30% of Cost per Square Foot) 30%
Window Change-Outs $405.00 (per Window)
Notes: 1. Deduct 20% for shell only buildings.
PROPOSEDExhibit B
Schedule of Fees – Building & Safety Division 7 04/2020
Table 3 Plan Review and Building Permit Fees
Commercial, Industrial, and Multifamily Residential Occupancies
Note: The following table provides basic permit and plan review fees based on valuation for commercial, industrial, and multifamily residential
occupancies. Additional fees for permit issuance, electrical, plumbing, mechanical, development impacts, sewer capac ity, schools, etc. may apply.
TOTAL VALUATION
($)
Building
Permit
Fee
Plan
Review
Fee
Sub
Total
TOTAL VALUATION
($)
Building
Permit
Fee
Plan
Review
Fee
Sub
Total
1 – 500 60.00 30.00 90.00
501 – 600 60.00 30.00 90.00
601 – 700 60.00 30.00 90.00
701 – 800 60.00 30.00 90.00
801 – 900 60.00 30.00 90.00
901 – 1,000 60.00 30.00 90.00
1,001 – 1,100 60.00 60.00 120.00 20,001 – 21,000 270.61 266.71 537.32
1,101 – 1,200 60.00 60.00 120.00 21,001 – 22,000 281.89 277.82 559.71
1,201 – 1,300 60.00 60.00 120.00 22,001 – 23,000 293.16 288.93 582.09
1,301 – 1,400 60.00 60.00 120.00 23,001 – 24,000 304.44 300.04 604.48
1,401 – 1,500 60.00 60.00 120.00 24,001 – 25,000 315.71 311.22 626.93
1,501 – 1,600 60.00 60.00 120.00 25,001 – 26,000 323.23 318.56 641.79
1,601 – 1,700 60.00 60.00 120.00 26,001 – 27,000 332.00 327.21 659.21
1,701 – 1,800 60.00 60.00 120.00 27,001 – 28,000 339.52 334.62 674.14
1,801 – 1,900 60.00 60.00 120.00 28,001 – 29,000 348.29 343.26 691.55
1,901 – 2,000 60.00 60.00 120.00 29,001 – 30,000 355.80 350.67 706.47
30,001 – 31,000 364.57 359.31 723.88
31,001 – 32,000 372.72 367.34 740.06
2,001 – 3,000 60.00 60.00 120.00 32,001 – 33,000 380.86 375.36 756.22
3,001 – 4,000 78.93 77.79 156.72 33,001 – 34,000 389.00 383.40 772.40
4,001 – 5,000 90.20 88.90 179.10 34,001 – 35,000 397.15 391.42 788.57
5,001 – 6,000 101.48 100.01 201.49 35,001 – 36,000 405.29 399.45 804.74
6,001 – 7,000 112.75 111.13 223.88 36,001 – 37,000 413.43 407.47 820.90
7,001 – 8,000 124.03 122.24 246.27 37,001 – 38,000 421.58 415.50 837.08
8,001 – 9,000 135.31 133.35 268.66 38,001 – 39,000 429.72 423.52 853.24
9,001 – 10,000 146.58 144.47 291.05 39,001 – 40,000 437.86 432.16 870.02
10,001 – 11,000 157.86 155.58 313.44 40,001 – 41,000 446.01 439.54 885.58
11,001 – 12,000 169.13 166.69 335.82 41,001 – 42,000 454.15 447.60 901.75
12,001 – 13,000 180.41 177.80 358.21 42,001 – 43,000 462.30 455.62 917.92
13,001 – 14,000 191.68 188.92 380.60 43,001 – 44,000 470.44 463.65 934.09
14,001 – 15,000 202.96 200.03 402.99 44,001 – 45,000 478.58 471.67 950.25
15,001 – 16,000 214.23 211.14 425.37 45,001 – 46,000 486.73 479.71 966.44
16,001 – 17,000 225.51 222.25 447.76 46,001 – 47,000 494.87 487.73 982.60
17,001 – 18,000 236.79 233.37 470.16 47,001 – 48,000 503.01 495.76 998.77
18,001 – 19,000 248.06 244.48 492.54 48,001 – 49,000 511.78 503.78 1015.56
19,001 – 20,000 259.34 255.59 514.93 49,001 – 50,000 519.30 511.81 1031.11
PROPOSEDExhibit B
Schedule of Fees – Building & Safety Division 8 04/2020
TOTAL VALUATION
($)
Building
Permit
Fee
Plan
Review
Fee
Sub
Total
TOTAL VALUATION
($)
Building
Permit
Fee
Plan
Review
Fee
Sub
Total
50,001 – 51,000 525.56 517.36 1042.92 90,001 – 91,000 750.45 739.61 1490.06
51,001 – 52,000 529.95 522.92 1052.87 91,001 – 92,000 756.08 745.18 1501.26
52,001 – 53,000 536.21 528.47 1064.68 92,001 – 93,000 762.35 750.73 1513.08
53,001 – 54,000 541.85 534.03 1075.88 93,001 – 94,000 767.36 756.29 1523.65
54,001 – 55,000 547.49 539.58 1087.07 94,001 – 95,000 773.00 761.84 1534.84
55,001 – 56,000 553.13 545.15 1098.28 95,001 – 96,000 778.64 767.40 1546.04
56,001 – 57,000 558.76 550.70 1109.46 96,001 – 97,000 784.27 772.95 1557.22
57,001 – 58,000 564.40 556.26 1120.66 97,001 – 98,000 789.91 778.51 1568.42
58,001 – 59,000 570.04 561.81 1131.85 98,001 – 99,000 795.55 784.06 1579.61
59,001 – 60,000 575.68 567.37 1143.05 99,001 – 100,000 801.19 789.63 1590.82
60,001 – 61,000 581.31 572.92 1154.23 100,001 – 101,000 805.57 793.94 1599.51
61,001 – 62,000 586.95 578.49 1165.44 101,001 – 102,000 809.96 798.27 1608.23
62,001 – 63,000 592.59 584.04 1176.63 102,001 – 103,000 814.34 802.59 1616.93
63,001 – 64,000 598.23 589.60 1187.83 103,001 – 104,000 818.73 806.91 1625.64
64,001 – 65,000 603.87 595.15 1199.02 104,001 – 105,000 823.11 811.23 1634.34
65,001 – 66,000 609.50 600.71 1210.21 105,001 – 106,000 827.50 815.56 1643.06
66,001 – 67,000 615.14 606.26 1221.40 106,001 – 107,000 831.88 819.87 1651.75
67,001 – 68,000 620.78 611.82 1232.60 107,001 – 108,000 836.27 824.17 1660.44
68,001 – 69,000 626.42 617.37 1243.79 108,001 – 109,000 840.65 828.52 1669.17
69,001 – 70,000 632.05 622.94 1254.99 109,001 – 110,000 845.04 832.84 1677.88
70,001 – 71,000 637.69 628.49 1266.18 110,001 – 111,000 849.42 837.16 1686.58
71,001 – 72,000 643.33 634.05 1277.38 111,001 – 112,000 853.81 841.49 1695.30
72,001 – 73,000 648.97 639.60 1288.57 112,001 – 113,000 858.19 845.80 1703.99
73,001 – 74,000 654.48 645.16 1299.64 113,001 – 114,000 862.57 850.13 1712.70
74,001 – 75,000 660.24 650.71 1310.95 114,001 – 115,000 866.96 854.45 1721.41
75,001 – 76,000 665.88 656.27 1322.15 115,001 – 116,000 871.34 858.77 1730.11
76,001 – 77,000 671.52 661.82 1333.34 116,001 – 117,000 875.73 863.09 1738.82
77,001 – 78,000 677.03 667.26 1344.29 117,001 – 118,000 880.11 867.42 1747.53
78,001 – 79,000 682.79 672.94 1355.73 118,001 – 119,000 884.50 871.73 1756.23
79,001 – 80,000 688.43 678.50 1366.93 119,001 – 120,000 888.88 876.06 1764.94
80,001 – 81,000 694.07 684.31 1378.38 120,001 – 121,000 893.27 880.38 1773.65
81,001 – 82,000 699.71 689.61 1389.32 121,001 – 122,000 897.65 884.70 1782.35
82,001 – 83,000 705.34 695.16 1400.50 122,001 – 123,000 902.04 889.02 1791.06
83,001 – 84,000 710.98 700.73 1411.71 123,001 – 124,000 906.42 893.35 1799.77
84,001 – 85,000 716.62 706.28 1422.90 124,001 – 125,000 910.81 897.66 1808.47
85,001 – 86,000 721.63 711.84 1433.47 125,001 – 126,000 915.19 901.99 1817.18
86,001 – 87,000 727.90 717.39 1445.29 126,001 – 127,000 919.58 906.30 1825.88
87,001 – 88,000 732.91 722.95 1455.86 127.001 – 128,000 923.96 910.63 1834.59
88,001 – 89,000 739.17 728.50 1467.67 128,001 – 129,000 928.35 914.95 1843.30
89,001 – 90,000 744.81 734.06 1478.87 129,001 – 130,000 932.73 919.28 1852.01
PROPOSEDExhibit B
Schedule of Fees – Building & Safety Division 9 04/2020
TOTAL VALUATION
($)
Building
Permit
Fee
Plan
Review
Fee
Sub
Total
TOTAL VALUATION
($)
Building
Permit
Fee
Plan
Review
Fee
Sub
Total
130,001 – 131,000 937.12 923.59 1860.71 150,001 – 151,000 1024.82 1010.02 2034.84
131,001 – 132,000 941.50 927.92 1869.42 151,001 – 152,000 1029.20 1014.35 2043.55
132,001 – 133,000 945.89 932.23 1878.12 152,001 – 153,000 1033.59 1018.67 2052.26
133,001 – 134,000 950.27 936.56 1886.83 153,001 – 154,000 1037.97 1023.00 2060.97
134,001 – 135,000 954.66 940.88 1895.54 154,001 – 155,000 1042.36 1027.31 2069.67
135,001 – 136,000 959.04 945.21 1904.25 155,001 – 156,000 1046.74 1031.64 2078.38
136,001 – 137,000 963.43 949.52 1912.95 156,001 – 157,000 1051.13 1035.95 2087.08
137,001 – 138,000 967.81 953.85 1921.66 157,001 – 158,000 1055.51 1040.28 2095.79
138,001 – 139,000 972.20 958.16 1930.36 158,001 – 159,000 1059.90 1044.60 2104.50
139,001 – 140,000 976.58 962.49 1939.07 159,001 – 160,000 1064.28 1048.92 2113.20
140,001 – 141,000 980.97 966.81 1947.78 160,001 – 161,000 1068.27 1053.24 2121.91
141,001 – 142,000 985.35 971.14 1956.49 161,001 – 162,000 1073.05 1057.57 2130.62
142,001 – 143,000 989.74 975.45 1965.19 162,001 – 163,000 1077.44 1061.88 2139.32
143,001 – 144,000 994.12 979.78 1973.90 163,001 – 164,000 1081.82 1066.21 2148.03
144,001 – 145,000 998.51 984.09 1982.60 164,001 – 165,000 1086.21 1070.53 2156.74
145,001 – 146,000 1002.89 989.07 1991.96 165,001 – 166,000 1090.59 1074.85 2165.44
146,001 – 147,000 1007.28 992.74 2000.02 166,001 – 167,000 1094.98 1079.17 2174.15
147,001 – 148,000 1011.66 997.07 2008.73 167,001 – 168,000 1099.36 1083.50 2182.86
148,001 – 149,000 1016.05 1001.38 2017.43 168,001 – 169,000 1103.75 1087.81 2191.56
149,001 – 150,000 1020.43 1005.71 2026.14 169,001 – 170,000 1108.13 1092.14 2200.27
BUILDING PERMIT FEES
For valuation ranges beyond the scope of the above table the following formulas can be used to determine the
basic building permit fee:
Where the valuation (V) is between $170,001.00 and $500,000.00 – $1108.13 for first $170,000.00 and $4.40 per
1,000.00 thereafter, or
Building Permit Fee = $1108.13 + ( V-170,000 )( 4.40 )
1000
Where the valuation (V) is between $500,000.00 and $1,000,000.00 – $2,560.13 for first $500,000.00 and $3.75 per
1,000.00 thereafter, or
Building Permit Fee = $2560.13 + ( V-500,000 )( 3.75 )
1000
Where the valuation (V) is $1,000,000,00 or greater – $4,435.13 for first $1,000,000.00 and $2.50 per 1,000.00
thereafter, or
Building Permit Fee = $4435.13 + ( V-1,000,000 )( 2.50 )
1000
PLAN REVIEW FEES
For valuation ranges beyond the scope of this table the Plan Review Fee shall be as follows:
Commercial/Industrial and Multiple-Family Residential: 95% of the calculated Building Permit Fee
PROPOSEDExhibit B
Schedule of Fees – Building & Safety Division 10 04/2020
Table 4: Electrical Fees
Single-family Residential Rewire (Plus Service) $0.070
Apartments, Condominiums per Square Foot (Plus Service) $0.063
Commercial Buildings per Square Foot (Plus Service) $0.019
Electrical Service:
-Up to 200 amps $38.21
-200 Amps to 1000 Amps $77.86
-1000 Amps and Over $155.73
Subpanels $22.80
Temporary Power Poles:
-Meter Pole $29.44
-Each Extension Pole (no Meter)$15.79
Unit Schedule:
-Receptacles, Lights, Switches - First 20 (Each)$1.38
-After 20 (Each)$0.91
Range/Oven, Washer/Dryer, A/C Unit, Evaporative Cooler $5.95 (Each)
Electrical Signs (for Electrical Work – Does not Include the Sign Structure) $30.82
-Additional Branch Circuit within Same Sign $5.95
Meter Reset $51.11
-When Issued in Conjunction with Other Work $13.78
-Each Additional Meter on Same Building or Lot $12.53
Minimum Fee $60.00
Solar Energy Systems No Charge
Private Swimming Pools $62.00
Power Apparatus (Motors, Generators, Transformer, Industrial Heating, Cooling, or
Cooking Equipment, etc.)
-Up to 1 hp $5.95
-Over 1 to 10 hp $15.40
-Over 10 to 50 hp $30.10
-Over 50 to 100 hp $62.00
-Over 100 hp $93.25
Carnivals and Circuses:
-Generators and Electrically Driven Rides $29.50
-Mechanically Driven Rides, Walk-Thru Attractions with Electrical Lighting $9.00
-System of Area Booth Lighting $9.00
PROPOSEDExhibit B
Schedule of Fees – Building & Safety Division 11 04/2020
Table 5: Plumbing Fees
Plumbing Fixture $12.25 (Each)
Gas Meter Reset (Gauge Test Required) $50.00
Gas Meter Reset (When Issued in Conjunction with Other Work) $14.00
Gas Meter - Each Additional Meter on Same Building or Lot $12.50
House Sewer $30.90 (Each)
Cesspool $46.65
Private Sewage Disposal System $93.35
Demo Septic/Pit $27.55
Water Heater $15.40 (Each)
Repair or Alteration of Drainage or Vent Piping $5.95
Gas Piping System:
-1 to 5 Outlets $7.70
-Each Additional Outlet Over 5 $1.40 (per Outlet)
Industrial Waste, Pretreatment Interceptor, Except Kitchen Type Grease
Interceptors Functioning as Fixture Traps. $24.95
Water Piping Installation, Alteration or Repair $5.95
Drainage/Vent Piping $5.95
Lawn Sprinkler System on any one Meter $18.55
Rainwater Systems - per Drain (Inside Building) $12.30
Minimum Fee $60.00
Solar Energy Systems No Charge
Table 6: Mechanical Fees
FAU:
-Up to 100,000 BTU $18.55
-Over 100,000 BTU $22.80
A/C Unit:
-Up to 3 Tons $18.55
-Between 3 - 15 Tons $34.00
Twin-Pack (New or Replacement, Includes Gas or Electric) $37.10
Wall Heater, Floor Furnace, or Suspended Heater $18.55
Evaporative Cooler $13.35
Bath Exhaust Fan $9.10
Grease Hood and Duct Systems $13.35
Duct Alteration $13.35
Air-Handling Unit HVAC $13.35
PROPOSEDExhibit B
Schedule of Fees – Building & Safety Division 12 04/2020
Table 7: Mobile Home Park Fees
Installation/Set-up $245.00
Earthquake Bracing Systems $245.00
Accessory Buildings (Cabanas, Ramadas, Patios, Block Walls, Garages, Awnings,
Carports, Porches, etc.):
-Without Standard Plans (Based on Valuation)
-With Standard Plans $245.00
Fees for Construction/Alteration of Mobile Home Park Facilities:
-For Each Lot $7.20
-Electrical Fee: Park Service $17.50
-Street Lights $3.75
-Unit Substation/Secondary Distribution Transformer $13.15
-Alter/Replace Service or Transformer $13.15
-Mobile Home Lot Service $8.75
-Alter/Repair/Replace lot service $8.75
Plan Review Fees (not Charged to HCD Standard Plans) (Based on Valuation)
Plumbing Fees:
Park Drain System $17.50
-Private Sewage Disposal or Water Treatment System $17.50
-Lot Drain Inlet $8.75
-Alter/Repair of Drainage/Vent Piping $8.75
-Park Water System $8.75
-Water Service Outlets (Water Meters)$5.30
-Fire Hydrant or Riser $5.30
-Water Conditioner $5.30
-Plumbing Fixtures/Equipment (Alter/Repair/Replace)$5.30
Park Gas Piping System $8.75
LPG or Natural Gas Tank of 60 Gallon or More $8.75
Mobile Home Lot Gas Outlet Riser $5.30
Gas Distribution Equipment (Alter/Repair/Replace) $5.30
Miscellaneous Equipment (Each Installation) $8.75
PROPOSEDExhibit B
Schedule of Fees – Building & Safety Division 13 04/2020
Table 8: Miscellaneous Fees
Permit Issuance Fees (to be Included on all Permits) $60.00
Supplemental Issuance Fee $15.00
Minimum Permit Fee $60.00
Inspections $118.35 (per Hour)
Reinspection Fee $118.35
Inspection Outside Normal Business Hours $236.70 + 118.35 (per Hour)
Beyond 2 Hours
Zoning Consistency Review Fee (Build ing Permits, Demo, etc.) $55.00
Certificate of Occupancy $500.00
(if Included on Building Permit) $167.40
Strong Motion Instrumentation Program (SMIP) Fees: Residential = .0001 x Valuation
Strong Motion Instrumentation Program (SMIP) fees are imposed by the State of
California and provide funding for seismic monitoring and instrumentation throughout
the State.
Commercial/Industrial = .00021 x
Valuation
(Including Hotels)
Technology Fee 2% of Plan Review & Permit Fees
Archive Fees:
-Per Permit or Application $1.25
-Plans $3.15 (per Sheet)
-Documents $0.35 (per Page)
PROPOSEDExhibit B
PROPOSED
Detail of Recreation Fees
1
Aquatics Fees
Current Fee Proposed Fee
Jerry Lewis Swim Center
Daily Admission
Ages 2-7 $1 $2
Ages 8-17 $1.50 $3.00
Adults $3 $5
Ages 60 or older $1.50 $3.00
Family Season Swim Pass
1-6 members $55
7-12 members $75
1-6 people – Year 1 $60
1-6 people – Year 2 $65
1-6 people – Year 3 $70
Commercial Season Swim Pass
15-25 employees $200 $300
26-50 employees $300 $400
15-EntryPunch Card
Ages 2-7 $10 Delete Fee
Ages 8-17 $12 Delete Fee
Adults $30 Delete Fee
Ages 60 and older $12 Delete Fee
25-EntryPunch Card
Ages 2-7 $15 Delete Fee
Ages 8-17 $20 Delete Fee
Adults $45 Delete Fee
Ages 60 and older $20 Delete Fee
Swim Classes $40 $40
Exhibit C
PROPOSED
Detail of Recreation Fees
2
Current Fee Proposed Fee
Community Pools
Daily Admission
Ages 2-7 $0.50 $1.00
Ages 8-17 $1 $2.00
Adults $2 $3.00
Ages 60 or older $1 $2
Family Season Swim Pass
1-6 members $45
7-12 members $65
1-6 people – Year 1 $60
1-6 people – Year 2 $65
1-6 people – Year 3 $70
Commercial Season Swim Pass
15-25 employees $175 $200
26-50 employees $250 $300
15-EntryPunch Card
Ages 2-7 $5 Delete Fee
Ages 8-17 $10 Delete Fee
Adults $20 Delete Fee
Ages 60 and older $10 Delete Fee
25-EntryPunch Card
Ages 2-7 $7 Delete Fee
Ages 8-17 $15 Delete Fee
Adults $30 Delete Fee
Ages 60 and older $15 Delete Fee
Swim Pass Reissue $5 $5
Exhibit C
PROPOSED
Detail of Recreation Fees
3
Current Fee Proposed Fee
Facility/Park Rentals
Community Center Room $75/first 2 hrs + $25/add’l hr $75/hr (2 hr min)
Two or more Rooms $100/first 2 hrs + $40/add’l hr $100/hr (2 hr min)
Assembly Room $75/first 2 hrs + $25/add’l hr $75/hr (2 hr min)
Gymnasium $90.50/hr + $28/add’l hr $90/hr (2 hr min)
Shower Room $29/hr + $9.30/add’l hr $30/hr (2 hr min)
Kitchen $29/hr + $9.30/add’l hr $30/hr (2 hr min)
FDR Bowl (2 hr min) $130/hr + $60/add’l hr $130/hr (2 hr min)
Seccombe Lake Pavilion $55/first 2 hrs + $8/add’l hr $55/hr (2 hr min)
La Plaza Gazebo $40/first 2 hrs + $8/add’l hr $40/hr (2 hr min)
Wading Pools $36.50 per hour Delete Fee
Concessions Stands $100 per use Delete Fee
Perris Hill Crafter $75/month $75/month
Perris Hill Park Stage $25/hr + $8/add’l hr $25/hr (2 hr min)
Tennis Court Tournament $10/hr + $5/add’l hr $100/hr (2 hr min)
(per court/day)
Jerry Lewis Swim Center $92/hr + $46/add’l hr $100/hr (2 hr min)
(2 hour minimum) +$8/hr for lifeguards + actual cost for lifeguards
All Other Pools $25/hr $25/hr (2 hr min)
(2 hour minimum) +$8/hr for lifeguards + actual cost for lifeguards
Group Picnic Reservations (use fee per use)
Size of Group
Up to 50 $25 $35
51-99 $35 $35
100-199 $75 $75
200-399 $100 $100
Exhibit C
PROPOSED
Detail of Recreation Fees
4
Current Fee Proposed Fee
400-699 $200 $200
700 and up $350 $350
Picnic Shelter $30 per day $40 per day
Picnic Shelter Utility Access $25 per day $35 per day
Parks/Parking Lots for Fundraising/ Special Events (not subject to resident or non-resident use
cost adjustment) $200 per day $200 per day
Fees for Equipment and/or Service:
Bleacher (up to 4 sets) $465 per occasion $465 per occasion
Trash Receptacles $2.50 each per occasion $2.50 each per occasion
Picnic Tables $10 each per occasion $10 each per occasion
Stage Trailer $250 per occasion $250 per occasion
Folding Chairs $1.50 each per occasion $1.50 each per occasion
Folding Tables $8 each per occasion $8 each per occasion
Bunting $50 per day $50 per day
Banners $40 each per week $40 each per week
Curtain Dividers $15 each per occasion $15 each per occasion
Kiosk Sign $25 each per occasion $25 each per occasion
Choral Risers $100 set per occasion $100 set per occasion
Adult Drop-In Basketball $2 per session $2 per session
Ballfield base rental $25 per set $25 per set
Exhibit C
PROPOSED
Detail of Recreation Fees
5
Current Fee Proposed Fee
Facilities/Parks Rental Refundable Damage Bond & Clean-Up Deposit
Number of People
Fewer than 50 $75 $75
50 – 100 $650 $650
101 – 200 $1,250 $1,050
201 - 500 $1,750 $1,750
501 - 1,000 $3,500 $3,500
1,001+ $8,000 $8,000
Exhibit C
Fee Type Current Fee Recommended Fee $
Increase Reason for Change
1 Year Altered $20 $24 $4 Adopt SBC License Fee/Comparative
Analysis
2 Year Altered $30 $42 $12 Adopt SBC License Fee/Comparative
Analysis
3 Year Altered $40 $54 $14 Adopt SBC License Fee/Comparative
Analysis
1 Year Altered $10 $12 $12 Adopt SBC License Fee/Comparative
Analysis
2 Year Altered $15 $24 $9 Adopt SBC License Fee/Comparative
Analysis
3 Year Altered $20 $36 $16 Adopt SBC License Fee/Comparative
Analysis
1 Year $75 $96 $21
Adopt SBC License Fee/The increased cost
encourages responsible pet ownership and is
intended to reduce the stray population
2 Year City does not offer 2 year unaltered
3 Year City does not offer 3 year unaltered
Aviary $50 $60 $10 Increase to meet inflation of cost for services
Cat Fancier $25 $30 $5 Increase to meet inflation of cost for services
Circus $150 $200 $50 Increase to meet inflation of cost for services
Grooming $100 $250 $150 Adopt SBC License Fee/Comparative
Analysis
Pet Shop $150 $236 $86 Adopt SBC License Fee/Comparative
Analysis
Petting Zoo $100 $263 $163 Adopt SBC License Fee/Comparative
Analysis
Field Service Charge $50 $60 $10 Increase Based on Cost Analysis with a Total
Service Cost to the City of $83.90.
Owner Surrender $25 + 3 Days
Boarding $30 + 3 Days Boarding $5 Increase Based on Cost Analysis with a Total
Service Cost to the City of $70.40.
Disposal $10 $30 $20 Increase Based on Cost Analysis with a Total
Service Cost to the City of $44.41
Livestock $50 $65 $15 Increase to meet inflation of cost for service
Failure to renew within
30 days of expiration $20 $25 $5 Comparative Analysis
Failure to license a
new dog within 30
days of ownership
$20 $25 $5 Comparative Analysis
Failure to license a
dog within 30 days of
moving to SBC
$20 $25 $5 Comparative Analysis
SENIOR CITIZEN 60+
UNALTERED DOG
MISCELLANEOUS LICENSES & PERMITS
GENERAL FINE
ANIMAL LICENSE PENALTY
Schedule of Proposed Animal Control Fees Exhibit D
Fee Type Current Fee Recommended Fee $
Increase Reason for Change
Dog or Cat $30 $35 $5 Increase Based on Cost Analysis with a Total
Service Cost to the City of $86.81
Horse $250 $315 $65 Increase to meet inflation of cost for services
Rabbit $5 $7 $2 Increase to meet inflation of cost for services
Hamster $5 $7 $2 Increase to meet inflation of cost for services
Guinea Pig $5 $7 $2 Increase to meet inflation of cost for services
Snake $5 $7 $2 Increase to meet inflation of cost for services
Goat $5 $7 $2 Increase to meet inflation of cost for services
Chicken $5 $7 $2 Increase to meet inflation of cost for services
Rooster $5 $7 $2 Increase to meet inflation of cost for services
Duck $5 $7 $2 Increase to meet inflation of cost for services
Turtle $5 $7 $2 Increase to meet inflation of cost for services
Tortoise $20 $26 $6 Increase to meet inflation of cost for services
Pig $40 $52 $12 Increase to meet inflation of cost for services
1st $40 1st $60 1st $20
2nd $80 2nd $120 2nd $40
All Other Offenses
$60 X Total # of
Offenses
3rd and All Other Offenses $240 3rd $60
1st $80 1st $80
2nd $160 2nd $160
All Other
Offenses $70 x
Total # of
All Other Offenses $70 x Total # of
Offenses
Small Animals $30 + $2 Daily
Board $40 + $3 Daily Board $11 Increase Based on Cost Analysis with a Total
Service Cost to the City of $77.57
Medium Livestock $50 + $10 Daily
Board $70 + $15 Daily Board $25 Increase Based on Cost Analysis with a Total
Service Cost to the City of $207.32
Large Livestock $150 + $20
Daily Board $250 $100 Increase Based on Cost Analysis with a Total
Service Cost to the City of $366.31
Dog/Cat $10 $15 $5 Increase Based on Cost Analysis with a Total
Service Cost to the City of $30.40
Quarantine Board $15 $20 $5 Increase Based on Cost Analysis with a Total
Service Cost to the City of $34.79
Small Animal $2 $3 $1 Increase to meet inflation of cost for services
Medium Animal $10 $15 $5 Increase Based on Cost Analysis with a Total
Service Cost to the City of $34.79
Large $20 $30 $10 Increase Based on Cost Analysis with a Total
Service Cost to the City of $52.35
ANIMAL ADOPTION FEE
APPREHENSION FEE
BOARDING FEE
Field Increase Based on Cost Analysis with a Total
Service Cost to the City of $103.52
Unaltered No
Change
Schedule of Proposed Animal Control Fees Exhibit D
Fee Type Current Fee Recommended Fee $
Increase Reason for Change
Field Service Charge $50 $60 $10 Increase Based on Cost Analysis with a Total
Service Cost to the City of $83.90.
Owner Surrender $55 $60 $5 Increase Based on Cost Analysis with a Total
Service Cost to the City of $70.40
Litters not weaned $50 $60 $10 Increase Based on Cost Analysis with a Total
Service Cost to the City of $70.40
Litters weaned $30 $60 $30 Increase Based on Cost Analysis with a Total
Service Cost to the City of $70.40
Euthanasia $25 $35 $10 Comparative Analysis
Bordatell/Da2PPV $10 $15 $5 Increase Based on Cost Analysis with a Total
Service Cost to the City of $24.22
FVRCP $10 $15 $5 Increase Based on Cost Analysis with a Total
Service Cost to the City of $24.22
With Adoption $15 $20 $5 Increase Based on Cost Analysis with a Total
Service Cost to the City of $26.59
Public Walk-In $20 $25 $5 Increase Based on Cost Analysis with a Total
Service Cost to the City of $26.59
Rabies Vac. Dep.$12 $12 No
Change
Cat Trap $50 Deposit with
full refund Same deposit with $15 fee $15 Increase Based on Cost Analysis with a Total
Service Cost to the City of $24.41
Skunk Trap $100 Deposit
with full refund Same deposit with $15 fee $15 Increase Based on Cost Analysis with a Total
Service Cost to the City of $24.41
Disposal $10 $30 $20 Increase Based on Cost Analysis with a Total
Service Cost to the City of $44.41
Vet Treatment $90 $120 $30 Increase Based on Cost Analysis with a Total
Service Cost to the City of $153.28
Spay/Neuter $55 $55 No
Change
MICROCHIP IDENTIFICATION FEE
FIELD SERVICE FEE
OWNER SURRENDER FEE
VACCINATION FEE
Schedule of Proposed Animal Control Fees Exhibit D
CITY OF SAN BERNARDINO
POLICE DEPARTMENT
INTEROFFICE MEMORANDUM
TO: Teri Ledoux, City Manager
FROM: Eric McBride, Interim Chief of Police
Francisco Hernandez, Captain
SUBJECT: Animal Control Fees
DATE: April 14, 2020
COPIES: Rita Conrad, City Manager’s Office
Recommendation
Review and discuss raising fees related to animal licensing, animal field services, and
animal shelter services.
Background
The San Bernardino City Animal Shelter has provided services to the citizens of San
Bernardino for over 50 years. While the cost of goods, services, employee salaries,
staffing needs, and investment in maintaining the shelter has continued to increase,
animal license and service fees have not increased since May 18, 2009 (Resolution
2009-122). An increase in fees will help offset the rising cost of animal control
operations.
The last two years have produced an average intake of over 7,500 animals annually that
require equipment, materials, and staff resources provided by the City. During the year
2018, the City sold 4,930 animal licenses. A comparative analysis of licensing fees
between the City, the County of Riverside, and County of San Bernardino, shows that
the City would see an increase in revenue generated from licensing by bringing current
fees in line with San Bernardino County. Cost analysis of animal service fees also
reveals that the City should increase numerous fees to assist in recovering some of the
City’s cost for providing services.
Discussion
Traditionally fees for service have been determined by calculating the actual cost to
provide a service and setting fees at a rate that attempts to recover the cost of those
services. There are several reasons complete cost recovery is not an option when
considering animal services. One factor is that a large portion of animal services
provided may be unbillable. For example, there are no field service fees collected for
picking up a stray dog if an owner does not respond to collect the dog. Additionally,
Exhibit D
Page 2 of 9
raising fees to cover actual costs would likely result in greater noncompliance, which
could negate any benefit to revenue from fee increases.
Many factors support the need to increase animal service fees from the last established
fees in 2009. The animal control budget has increased from $1,167,700 in FY09/10 to
the current budget of $2,563,200 for FY2019/2020. The increase reflects a 120%
change. Revenue has also decreased significantly since FY09/210 from $1,189,939.62,
to $678,300.00 in FY19/20 for a revenue decrease of 43%. This decrease was
influenced by the loss of contract city revenue and a reduction in the number of animal
licenses sold and fees collected. The number of employees budgeted for animal control
has increased from 15 in FY09/10 to 24 full-time staff and seven part-time staff in
FY19/20. Finally, the California Consumer Price Index has shown a 26% increase in the
cost of goods and services between 2009 and 2019. Table 1 illustrates the above-
mentioned factors.
Table 1
ANIMAL CONTROL COST FACTORS
FY09/10 Actual FY19/20 Adopted % Change
Budget $1,167,700 $2,563,200 +120%
Revenue $1,189,939.62 $678,300 -43%
# of Staff 15 31 +106%
California
Consumer Price
Index
April 2009=222.896 April 2019=280.275 Inflation 26%
Compounded to the annual expense to operate the shelter and provide animal services
are the unfunded costs involved in much-needed shelter repair and upgrades required to
bring the shelter closer to safe and modern standards. Staff compared city fees to
Riverside and San Bernardino County to determine the impact increasing animal license
fees would have on animal service-related revenue. Both counties have different titles
and services offered under various fees, so only licensing fees were compared in the
below table.
Table 2 illustrates the costs of various license fees and the difference in revenue that
would be generated by adopting either San Bernardino or Riverside County Animal
licensing fees. Riverside County recently increased fees in 2016 and is currently
reviewing its fees to achieve better cost recovery. Riverside determines fee increases
based on cost analysis and comparative analysis. San Bernardino County reviews and
considers fee adjustment annually and last increased fees in 2016-2017. San
Bernardino County uses a cost analysis to determine fee increases. Only validated
licensing information was used for the year 2018.
Page 3 of 9
Table 2
2018
Lic
Sold
SB
City
Lic
Fees
Riv
Lic
Fees
SB
County
(SBC)
Lic Fees
SB City
Fee
Revenue
Riv County
Fee
Revenue
SB
County
(SBC)
Fee
Revenue
1 Year
Altered
1266 $20 $17 $24 $25,320 $21,522 $30,384
2 Year
Altered
133 $30 $34 $42 $3,990 $4,522 $5,586
3 Year
Altered
699 $40 $49 $54 $27,960 $34,251 $37,746
1 Year
Senior
Altered
676 $10 $12 $12 $6,760 $8,112 $8,112
2 Year
Senior
Altered
90 $15 $24 $24 $1,350 $2,160 $2,160
3 Year
Senior
Altered
788 $20 $36 $36 $15,760 $28,368 $28,368
1 Year
Unaltered
265 $75 $100 $96 $56,925.
0
$75,900 $72,864
2 Year
Unaltered
1 $150 $200 $192 $150.00 $20 $192
3 Year
Unaltered
2 $225 $300 $288 $675.00 $900 $864
Total $138,890 $175,935 $186,276
%
Increase
$37,045
(27%)
$47,386
(34%)
Adopting Riverside’s licensing fees would have produced an increase in annual licensing
revenue of $37,045 (27%), while San Bernardino County fees would have provided an
increase of $47,386 (34%) during the year 2018.
During FY18/19, the actual revenue generated by animal control was $391,033.49,
which accounted for 18.7% of the animal control budget. The total expenditure for
FY18/19 was $2,083,903.57, which left a gap of $1,692,870.80 to be covered by the City
from the general fund. Raising fees will increase revenue and help reduce the gap
between revenue and expenses to operate animal control and shelter services.
Page 4 of 9
Methodology
Staff’s recommendations are based on comparison with San Bernardino and Riverside
County Fees, as well as cost analysis of the recommended fees involving an increase.
Cost analysis, consistent to those used in 2009 for the previous fee increase, was used
for many of the fees to determine the actual cost to the City for providing
services. Animal service employees with a combined total of 34 years of experience
working for the City providing animal control and shelter services were interviewed and
helped to identify the amount of time and resources required for each service. Table 3
illustrates the current fees, recommended fees, and method used to suggest the
recommended fees.
Table 3
Recommended Fees
Fee Type Current
Fee
Rec.
Fee
$ Increase Reason for Change
1 Year Altered $20 $24 $4 Adopt SBC License
Fee/Comparative Analysis
2 Year Altered $30 $42 $12 Adopt SBC License
Fee/Comparative Analysis
3 Year Altered $40 $54 $14 Adopt SBC License
Fee/Comparative Analysis
SENIOR CITIZEN
60+
Adopt SBC License
Fee/Comparative Analysis
1 Year Altered $10 $12 $12 Adopt SBC License
Fee/Comparative Analysis
2 Year Altered $15 $24 $9 Adopt SBC License
Fee/Comparative Analysis
3 Year Altered $20 $36 $16 Adopt SBC License
Fee/Comparative Analysis
UNALTERED
DOG
1 Year $75 $96 $21 Adopt SBC License Fee/The
increased cost encourages
responsible pet ownership
and is intended to reduce the
stray population
2 Year City does not offer 2 year
unaltered
3 Year City does not offer 3 year
unaltered
MISCELLANEOUS
LICENSES &
Page 5 of 9
PERMITS
Aviary $50 $60 $10 Increase to meet inflation of
cost for services
Cat Fancier $25 $30 $5 Increase to meet inflation of
cost for services
Circus $150 $200 $50 Increase to meet inflation of
cost for services
Grooming $100 $250 $150 Adopt SBC License
Fee/Comparative Analysis
Pet Shop $150 $236 $86 Adopt SBC License
Fee/Comparative Analysis
Petting Zoo $100 $263 $163 Adopt SBC License
Fee/Comparative Analysis
GENERAL FINE
Field Service
Charge
$50 $60 $10 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $83.90.
Owner Surrender $25 + 3
Days
Boarding
$30 + 3
Days
Boarding
$5 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $70.40.
Disposal $10 $30 $20 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $44.41
Livestock $50 $65 $15 Increase to meet inflation of
cost for service
ANIMAL LICENSE
PENALTY
Failure to renew
within 30 days of
expiration
$20 $25 $5 Comparative Analysis
Failure to license
a new dog within
30 days of
ownership
$20 $25 $5 Comparative Analysis
Failure to license
a dog within 30
days of moving to
SBC
$20 $25 $5 Comparative Analysis
ANIMAL
ADOPTION FEE
Dog or Cat $30 $35 $5 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $86.81
Horse $250 $315 $65 Increase to meet inflation of
Page 6 of 9
cost for services
Rabbit $5 $7 $2 Increase to meet inflation of
cost for services
Hamster $5 $7 $2 Increase to meet inflation of
cost for services
Guinea Pig $5 $7 $2 Increase to meet inflation of
cost for services
Snake $5 $7 $2 Increase to meet inflation of
cost for services
Goat $5 $7 $2 Increase to meet inflation of
cost for services
Chicken $5 $7 $2 Increase to meet inflation of
cost for services
Rooster $5 $7 $2 Increase to meet inflation of
cost for services
Duck $5 $7 $2 Increase to meet inflation of
cost for services
Turtle $5 $7 $2 Increase to meet inflation of
cost for services
Tortoise $20 $26 $6 Increase to meet inflation of
cost for services
Pig $40 $52 $12 Increase to meet inflation of
cost for services
Apprehension
Fee
Field 1st $40
2nd $80
All Other
Offenses
$60 X
Total # of
Offenses
1st $60
2nd $120
3rd and All
Other
Offenses
$240
1st $20
2nd $40
3rd $60
Increase Based on Cost
Analysis with a Total Service
Cost to the City of $103.52
Unaltered 1st $80
2nd $160
All Other
Offenses
$70 x
Total # of
Offenses
1st $80
2nd $160
All Other
Offenses
$70 x
Total #
of
Offenses
No
Change
Small Animals $30 + $2
Daily
Board
$40 + $3
Daily
Board
$11 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $77.57
Medium Livestock $50 +
$10 Daily
Board
$70 +
$15
Daily
$25 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $207.32
Page 7 of 9
Board
Large Livestock $150 +
$20 Daily
Board
$250 $100 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $366.31
BOARDING FEE
Dog/Cat $10 $15 $5 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $30.40
Quarantine Board $15 $20 $5 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $34.79
Small Animal $2 $3 $1 Increase to meet inflation of
cost for services
Medium Animal $10 $15 $5 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $34.79
Large $20 $30 $10 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $52.35
FIELD SERVICE
FEE
Field Service
Charge
$50 $60 $10 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $83.90.
OWNER
SURRENDER FEE
Owner Surrender $55 $60 $5 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $70.40
Litters not
weaned
$50 $60 $10 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $70.40
Litters weaned $30 $60 $30 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $70.40
Euthanasia $25 $35 $10 Comparative Analysis
VACCINATION
FEE
Bordatell/Da2PPV $10 $15 $5 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $24.22
FVRCP $10 $15 $5 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $24.22
Page 8 of 9
MICROCHIP
IDENTIFICATION
FEE
With Adoption $15 $20 $5 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $26.59
Public Walk-In $20 $25 $5 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $26.59
Rabies Vac. Dep. $12 $12 No
Change
Cat Trap $50
Deposit
with full
refund
Same
deposit
with $15
fee
$15 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $24.41
Skunk Trap $100
Deposit
with full
refund
Same
deposit
with $15
fee
$15 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $24.41
Disposal $10 $30 $20 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $44.41
Vet Treatment $90 $120 $30 Increase Based on Cost
Analysis with a Total Service
Cost to the City of $153.28
Spay/Neuter $55 $55 No
Change
Staff added the recommended fees to the revenue generated from FY 2018/19. A
percentage rate of 34% was added to licensing fees based on information gained from
table 2. Table 4 illustrates an increase in fee generated revenue by $104,645.66 with
the addition of the recommended fees.
Table 4
Fee Description
FY2018/19
Actual Revenue
With
Recommended
Fees
Revenue
Increase
4320 Animal Licenses $130,220.00 $174,494.80 $44,274.80
4352 Miscellaneous
Licenses & Permits
$1,710.00 Unknown
4410 General Fine $7,473.00 $8,967.60 $1,494.60
4430 Animal License
Penalty
$10,400.00 $13,000.00 $2,600.00
4756 Animal Adoption Fee $46,521.00 $54,276.05 $7,755.05
4757 Contracted Shelter $71,968.36 N/A
Page 9 of 9
Fee
4758 Animal Alteration Fee $0.00 $0.00 $0.00
4759 Apprehension Fee $23,400.00 $35,100.00 $11,700.00
4760 Boarding Fee $29,803.00 $44,704.50 $14,901.50
4761 Field Service Fee $1,550.00 $1,860.00 $310.00
4763 Owner Release Fee $9,400.13 $10,340.14 $940.01
4764 Vaccination Fee $26,100.00 $39,150.00 $13,050.00
4765 Microchip
Identification Fee
$23,090.00 $30,709.70 $7,619.70
Total Revenue Increase $104,645.66
2020-2025 Strategic Targets and Goals
The request to increase animal control fees aligns with Goal No. 1: Financial Stability.
Implement, maintain, and update a fiscal accountability plan.
Fiscal Impact
Adopting the recommended fees has the potential to generate approximately $100,000
in additional revenue based on the previous year’s budget report.
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino raise
current fees to increase revenue and offset the cost of animal control operations.
Comparisons of Fees to Other CitiesExhibit EFee Title DepartmentCurrent Proposed Riverside Ontario Fontana Redlands Rialto VictorvilleTemporary Enroachment Permit PW$25-$136 $25-$175 $163-$651 $700 $98 $330 NA NAOff‐Site Improvement Plan Check ($100K) PW$4,045 $3,850 $4,452 $4,650 $4,465 $1,391+$555/sht $1,570+$800/sht $4,900Off‐Site Improvement Inspection ($100K)PW$4,045 $11,170 $2,531+$108/hr $5,450 $4,290 $84+$126/cu.yd. NA $4,000NPDES Business InspectionPW$143 $175 NA NA NA $83 NA NANPDES Construction InspectionPW$98-$179 $140 NA $451 $1,500 $257 $4,964 NATraffic Study ReportPW$719 $1,320 $380-$1,519 VARIES $1,410 NA $3,465 $723Review of Water Quality Mgmt Plans PW$80-$1,130 $155-$1,440 $3,151 NA NA $806+$199/lot $3,545 $667Conditional Use Permit (Commercial) CED$7,133 $5,555 $8,615 $2,869 $1,220 $7,778 $3,109 $2,454Tentative Parcel Map CED$4,262+$65/pcl $5,170 $8,125 $3,544 $6,535+$100/ac $6,514 $2,706 $1,227Pre Application Review D/ERC Review CED$2,424 $3,440 $1,712 $1,356 $1,000 $332 NA $0Zoning Verification Review CED$450 $245 $219 $77 $300 $1,068 $182 NAAquatics Parks/Rec$1 $1 NA NA $0-$5 NA $1.20-$5.10 NAYouth Sports Parks/Rec$30 $45 $50 $30 $70 $55 tennis $52-$110 $63Adult Sports (per team) Parks/Rec$300 $300 $310=$370 $52-$305 $60-$350 $50 tennis $377-$520 $390Park Rental Reservation ‐shelter Parks/Rec$30 $40 $85 NA $50-$100 NA $15-$45/hr:field $45-$60/dayAlarm Systems PD$25/$50/$10 - Ann.Res'l/Com'l/LIR Alarm Pmt. (LIR=Low Income Resident) $25 - Alarm Sys.Installation $10 - Alarm Sys.Monitoring Tsfr.False Alarms in 12-month period [Intrusion: Reg./LIR]/[Robbery or panic: Reg./LIR]: [$75/$10]/[$200/$20] - 1st thru 4th Non-Permitted [$90/$10]/[$250/$20] - 5th & 6th [$90/$20]/[$300/$40] - 7th thru 9th[$175/$20]/[$350/$40] - 10th & SubsequentConsultant Recommendation: $96 - Annual Alarm Permit ($75-City plus $21-Alarm Vendor)$25 - Alarm Sys.Installation$10 - Alarm Sys.Monitoring Tsfr.False Alarm Charge:$256 - All False Alarms without a Permit ($200-City plus $56-Alarm Vendor) and after the 3rd False Alarm in a 12 month period with a Permit. (Note: No distinction found between residential and commercial response or between intrusion and panic/robbery response.) City Staff Recommendation: $30 - Annual Alarm Permit $15 Annual Alarm Permit Low Income; $25 - Alarm Sys.Installation$10 - Alarm Sys.Monitoring Tsfr.False Alarm Charge:With Permit: $0 charge 1st and 2nd; $100 3rd, $200 4th, $300 %the and above. Without Permit: $200 1st, $250 2nd; $350 3rd, $400 4th and above.$16 - One-time Permit Fee Residential / Commercial 1st response No charge Warning2nd response No charge $3503rd response $100 $4004th response $150 $4505th response $200 $5006th+ response $250 $500 $50 - One-time Permit Fee (Commercial) $25 - One time Permit Fee (Residential) 1st response No fine, Alarm Card Issued2nd response No fine, Alarm Card Issued3rd response $75 / $504th response $100 / $755th response $150 / $1006th+ response $200 / $100 Alarm Permit and Response RevokedPermit Fee: N/A False Alarm Charge: Up to $350N/A $25.90 - One-time Permit Fee (Commercial) $19.40 - One time Permit Fee (Residential) 1st response No fine2nd response No fine3rd response $97.40/ $1304th response $130 / $1955th response $162.50 / $260.10N/ANSF Check Processing FIN$26 per NSF CheckConsultant recommendation: $65 per NSF check. City recommendation $30 first returned check; $65 each subsequent returned check in 12 month period$25 per NSF Check. $35 for additional $25 per NSF Check $25.00 per check/$35.00 second check w/in 6 month$43 per NSF Check$25 per NSF Check plus bank charges.N/ASan Bernardino
Comparisons of Fees to Other CitiesExhibit EComparison of Fees for Various ProjectsResidentialproject descriptionCurrent ProposedRiversideOntarioFontanaRedlandsRialto Victorville500 sq. ft. addition (new family room and bathroom) $71,000 Valuation :: V‐ Building Plan Check$282.45 $367.11 $225.00 $632.60 $402.00 included (R1) $357.18 Building Permit$810.00 $1,020.00 $594.50 $790.75 $706.00 $574.65 (R2) $549.50Total$1,092.45 $1,387.11 $819.50 $1,423.35 $1,108.00 $574.65 $0.00 $906.682,500 sq. ft. new Custom SFD (4 bd. 3 bath, 2‐car garage) $361,000 Valuation Building Plan Check$470.75 $611.85 $375.00 $1,964.28 $1,072.00 included (R1) $1,041.30 Building Permit$1,573.00 $1,983.00 $1,629.50 $2,455.35 $1,317.00 $4,679.00 (R2) $1,602.00Total$2,043.75 $2,594.85 $2,004.50 $4,419.63 $2,389.00 $4,679.00 $0.00 $2,643.30Non‐residential1,000 sq. ft. office/retail tenant improvement $46,000 Valuation :: II‐B, M Building Plan Check$598.98 $901.99 $552.83 $482.68 $1,206.00 included (R1) $269.43 Building Permit$670.50 $975.19 $492.00 $603.35 $429.00 $4,839.00 (R2) $414.50Total$1,269.48 $1,877.18 $1,044.83 $1,086.03 $1,635.00 $4,839.00 $0.00 $683.935,000 sq. ft. restaurant TI in existing building $420,000 Valuation :: IIA‐B Categorical Exemption$0.00 $0.00 $0.00 $0.00 $350.00 $0.00 $325.10 $122.71 Precise Plan of Design ‐ Staff$1,000.00 $1,965.00 $3,560.00 $0.00 $0.00 $0.00 $2,367.60 $2,454.18 Building Plan Check$993.23 $1,513.24 $927.46 $2,228.60 $536.00 included (R1) $1,155.05 Building Permit$1,085.50 $1,652.88 $1,804.50 $2,785.75 $799.00 $9,574.00 (R2) $1,777.00Total$3,078.73 $5,131.12 $6,291.96 $5,014.35 $1,685.00 $9,574.00 $2,692.70$5,508.94100,000 sq. ft. new industrial warehouse/distribution building with a value of $8,584,000. :: I‐B, S Negative Declaration$0.00 $0.00 $0.00 $1,127.00 $2,400.00 actual cost $1,521.90 $1,227.08 Precise Plan of Design ‐ DRC$6,438.00 $6,810.00 $3,560.00 $5,611.00 $6,700.00 $0.00 $2,367.60 $2,454.18 Zone Change$0.00 $0.00 $6,868.00 $3,334.00 $6,075.00 $3,797.00 $4,410.00 $1,840.63 General Plan Amendment$1,500.00 $3,570.00 $9,933.00 $7,500.00 $6,600.00 $6,068.00 $3,920.50$1,840.63 Tentative Tract Map $7,626.00 $6,875.00 $10,516.00 $5,091.00 $1,800.00 $12,493.00 $5,684.90 $1,859.03 Master Sign Program $610.00 $490.00 $919.00 $1,225.00 $1,525.00 $1,542.00 $0.00 $613.54 Conditional Use Permit$7,133.00 $5,555.00 $8,615.00 $2,869.00 $4,710.00 $6,712.00 $3,109.10$2,454.18 Grading Plan Check/Inspection$0.00 $0.00 $2,197.00 $0.00 $96.00 $191.55 $195.00 $0.00 Building Plan Check$16,962.73 $26,439.34 $16,204.55 $26,632.28 $2,011.00 included (R1) $12,180.68 Building Permit$17,895.50 $27,890.88 $18,764.50 $33,290.35 $3,647.00 $22,453.00 (R2)$18,739.50Total$58,165.23 $77,630.22 $77,577.05 $86,679.63 $35,564.00 $53,256.55 $21,209.00 $43,209.45San Bernardino
SERVICE COST UPDATE
for the
City of San Bernardino, CA
As of April 29, 2020
Publication Date: April 29, 2020
Copyright, 2020 by Revenue & Cost Specialists, LLC
All rights reserved. No part of this work covered by the copyright hereon may be reproduced or copied in
any form or by any means — graphic, electronic, mechanical, including any photocopying, recording,
taping or information storage and retrieval systems — without written permission of:
Revenue & Cost Specialists, LLC
1519 East Chapman Avenue, Suite C
Fullerton, California 92831
(714) 992-9020
Attachment 2
THIS PAGE IS BLANK
THIS PAGE IS BLANK
EXECUTIVE SUMMARY
Revenue & Cost Specialists, LLC (RCS) has prepared two reports for the City. The first report
was a Total-Cost Cost Allocation Plan that allocated general City overhead and indirect services
to the departments providing services to the public. The City has already received that report.
This report uses the fully-burdened hourly rate of positions to identify the cost of services that
those positions perform. In addition to staff cost, the cost of services also includes any required
contractual or professional services. The cost of each service is compared to the revenue received
for that service and the following is a summary of that match-up:
RCS identified fee and potential fee services that currently generate a little over $6.1
Million in revenues but cost the City more than $16 Million.
The Summary Schedule below, shows how the City is using $10 Million in tax dollars to
cover the shortfall in fees.
Some of the subsidies are for quality-of-life services such as recreation programs and
library services. Charging the full-cost of these services would price them out of the
market.
RCS suggests about $1.3 Million in fee increases to eliminate or reduce the taxpayer
subsidy for services that only benefit a few individuals.
The suggested fee changes are listed in Appendix B and the detail for those changes are
found in Appendix A.
Several services require additional narrative which is found following the Summary
Schedule below.
Page 1 of 4
CITY OF SAN BERNARDINO, CALIFORNIA
SCHEDULE OF SERVICE REVENUES, COSTS & PROFIT/SUBSIDY
As of April 29, 2020
POSSIBLE
TOTAL TOTAL PROFIT/ PCT.RECOVERY NEW
REF# SERVICE TITLE REVENUE COST (SUBSIDY) CURRENT SUGGESTED REVENUE
S-0005 BUILDING ISSUANCE FEE $200,000 $308,500 ($108,500) 64.8% 100.0% $108,500
S-0010 BUILDING PLAN CHECK $520,537 $729,304 ($208,767)71.4% 100.0% $0 *
S-0020 BUILDING INSPECTION $872,800 $857,500 $15,300 101.8% 100.0% $0 *
S-0022 SPECIAL BUILDING INSPECTION $22,800 $35,821 ($13,021) 63.7% 100.0% $6,500 &
S-0025 CERTIFICATE OF OCCUPANCY $11,252 $15,065 ($3,813) 74.7% 100.0% $3,800
S-0030 TEMPORARY CERTIFICATE OF OCCUPANCY $3,739 $4,017 ($278) 93.1% 100.0% $300
S-0201 AMENDMENT TO CONDITIONS-ADM.REV. $2,332 $2,300 $32 101.4% 100.0% $0
S-0203 AMENDMENT TO CONDITIONS-PLN.COMM. $5,100 $8,142 ($3,042) 62.6% 100.0% $3,000
S-0205 AMENDMENT TO CONDITIONS-D/ERC $2,466 $8,666 ($6,200) 28.5% 100.0% $3,500 &
S-0208 ANTENNA DEVELOPMENT PERMIT-ADM.REV. $0 $0 $0 0.0%100.0% $0 X
S-0211 APPEAL TO MAYOR & COUNCIL $1,766 $2,848 ($1,082)62.0% 100.0% $1,100
S-0213 APPEAL TO THE PLANNING COMMISSION $5,544 $8,592 ($3,048) 64.5% 100.0% $3,000
S-0216 CUP-MINOR USE PMT/ALCOHOL $36,050 $46,250 ($10,200) 78.0% 100.0% $10,200
S-0217 CONDITIONAL USE PERMIT $155,600 $222,164 ($66,564) 70.0% 100.0% $66,600
S-0219 CUP REVISION $10,565 $18,895 ($8,330) 55.9% 100.0% $8,300
S-0222 DESIGN REVIEW $0 $0 $0 0.0% 100.0% $0 X
S-0224 DEVELOPMENT AGMT OR AMENDMENT $0 $0 $0 0.0% 100.0%$0 HR
S-0227 DEVELOPMENT CODE/ZONING MAP AMEND. $34,800 $49,616 ($14,816) 70.1% 100.0% $14,800
S-0230 DEV.PMT-DIRECTOR REVIEW $50,000 $98,276 ($48,276) 50.9% 100.0% $48,300
S-0233 DEV.PMT-D/ERC REVIEW $96,570 $127,603 ($31,033) 75.7% 100.0% $31,000
S-0235 DEV.PMT-PLANNING COMMISSION REVIEW $100,800 $157,643 ($56,843) 63.9% 100.0% $56,800
S-0238 DEV.PMT-MAYOR/COUNCIL REVIEW $0 $0 $0 0.0% 100.0% $0 X
S-0241 ENVIRONMENTAL (INITIAL) STUDY $0 $0 $0 0.0% 100.0%$0 HR
S-0244 ENVIRONMENTAL IMPACT REPORT $0 $0 $0 0.0% 100.0% $0 HR
S-0246 EXTENSION OF TIME $55,524 $22,318 $33,206 248.8% 100.0% ($33,200)
S-0251 FENCE/WALL PERMIT $6,720 $7,404 ($684) 90.8% 100.0% $700
S-0257 GENERAL PLAN AMENDMENT (TEXT/MAP) $6,000 $14,290 ($8,290) 42.0% 100.0% $8,300
S-0259 HISTORIC PRESERVATION PROJECT $0 $0 $0 0.0% 100.0%$0 HR
S-0262 HOME OCCUPATION PERMIT $80,400 $43,107 $37,293 186.5% 100.0% ($37,300)
S-0264 LETTER OF ZONING & GEN.PLAN CONSIST $22,500 $12,313 $10,187 182.7% 100.0% ($10,200)
S-0266 PLANNING LOT LINE ADJUSTMENT $4,770 $12,566 ($7,796) 38.0% 100.0% $7,800
S-0268 MINOR EXCEPTION $1,152 $410 $742 281.0% 100.0% ($700) X
S-0270 MISC.ENVIRONMENTAL REPORT REVIEW $0 $0 $0 0.0% 100.0% $0 X
S-0271 MINOR MODIFICATION/REVISION $5,610 $3,787 $1,823 148.1% 100.0% ($1,800)
S-0273 PHASING PLAN REVIEW $0 $0 $0 0.0% 100.0% $0 X
S-0275 PLANNING COMMISSION INTERPRETATION $0 $0 $0 0.0% 100.0% $0 X
S-0277 PUBLIC CONVENIENCE/NECESSITY LETTER $9,540 $41,105 ($31,565) 23.2% 100.0% $31,600
S-0279 PRE-APPLICATION REVIEW-D/ERC REVIEW $60,600 $85,962 ($25,362) 70.5% 100.0% $25,400
S-0280 RECONSIDERATION BY THE PLAN.COMM. $506 $2,671 ($2,165) 18.9% 100.0% $2,200
S-0282 SIGN PERMIT-REGULAR $18,200 $8,226 $9,974 221.3% 100.0% ($10,000)
S-0283 SIGN PERMIT-REQUIRING CUP $0 $0 $0 0.0% 100.0% $0 X
S-0284 SIGN PERMIT-TEMPORARY $5,550 $4,113 $1,437 134.9%100.0% ($1,400)
S-0286 SIGN PROGRAM $6,100 $4,901 $1,199 124.5% 100.0% ($1,200)
S-0288 SPECIFIC PLAN/AMENDMENT $0 $0 $0 0.0% 100.0% $0 HR
S-0291 TEMPORARY USE/SPECIAL EVENT PERMIT $13,797 $44,316 ($30,519) 31.1% 100.0% $30,500
S-0293 TENTATIVE PARCEL MAP $44,570 $51,719 ($7,149) 86.2% 100.0% $7,100
Page 2 of 4
CITY OF SAN BERNARDINO, CALIFORNIA
SCHEDULE OF SERVICE REVENUES, COSTS & PROFIT/SUBSIDY
As of April 29, 2020
POSSIBLE
TOTAL TOTAL PROFIT/ PCT.RECOVERY NEW
REF# SERVICE TITLE REVENUE COST (SUBSIDY) CURRENT SUGGESTED REVENUE
S-0295 TENTATIVE TRACT MAP (SFR/CONDO/PRD) $42,680 $36,047 $6,633 118.4% 100.0% ($6,600)
S-0297 TENTATIVE MAP REVISION-TRACT/PARCEL $6,339 $12,371 ($6,032) 51.2% 100.0% $6,000
S-0301 TREE REMOVAL PERMIT $1,012 $365 $647 277.3% 100.0%($600)
S-0303 VARIANCE-REGULAR $2,724 $2,065 $659 131.9% 100.0% ($700)
S-0304 VARIANCE WITH ANOTHER APPLICATION $1,820 $1,982 ($162) 91.8% 100.0% $200
S-0306 VESTING TENTATIVE MAP $0 $0 $0 0.0% 100.0% $0 HR
S-0308 ZONING FORM $0 $0 $0 0.0% 100.0% $0 X
S-0309 ZONING VERIFICATION REVIEW $66,600 $97,938 ($31,338) 68.0% 100.0% $31,300
S-0315 GENERAL PLAN MAINTENANCE $0 $0 $0 0.0% 100.0% $50,000 *
S-0322 TECHNOLOGY FEE $0 $0 $0 0.0% 100.0% $0
S-0326 ARCHIVE FEES $0 $0 $0 0.0% 100.0% $2,000
S-0441 FINAL/PARCEL MAP REVIEW $2,497 $5,926 ($3,429) 42.1% 100.0% $3,400
S-0445 ON-SITE IMPROVEMENT PLAN CHECK $134,733 $133,868 $865 100.7% 100.0% $0
S-0447 GRADING PLAN CHECK FEE $804 $1,939 ($1,135) 41.5%100.0% $1,100
S-0452 REVIEW-CERTIFICATE OF COMPLIANCE $828 $1,372 ($544) 60.4% 100.0% $500
S-0453 REVIEW-LOT MERGER $14,076 $22,138 ($8,062) 63.6% 100.0% $8,100
S-0454 REVIEW-LOT LINE ADJSTMT $3,726 $9,527 ($5,801) 39.1% 100.0% $5,800
S-0463 ON-SITE CONSTRUCTION INSPECTION $202,100 $216,999 ($14,899) 93.1% 100.0% $14,900
S-0467 ON-SITE GRADING INSPECTION $14,853 $17,978 ($3,125) 82.6% 100.0% $3,100
S-0471 HYDRAULIC/HYDROLOGY STUDY REVIEW $29,350 $41,350 ($12,000) 71.0% 100.0% $12,000
S-0472 ALQUIST PRIOLO FAULT LINE INVESTIG. $0 $939 ($939) 0.0% 100.0% $900
S-0480 FEMA FLOODPLAIN REVIEW $0 $3,758 ($3,758) 0.0% 100.0% $3,800
S-0481 REV.OF STORM WTR POLLUTION PREV.PLN $38,210 $57,664 ($19,454) 66.3% 100.0% $19,500
S-0488 REVIEW OF WTR QUALITY MGMT PLANS $148,224 $285,257 ($137,033) 52.0% 100.0% $137,000
S-0489 REV-EROSION/WSTE MGMT CONTROL PLAN $4,125 $10,028 ($5,903) 41.1% 100.0% $5,900
S-0490 NPDES CONSTRUCTION INSPECTION $20,316 $28,803 ($8,487) 70.5% 100.0% $8,500
S-0495 NPDES BUSINESS INSPECTION $31,603 $38,699 ($7,096) 81.7% 100.0% $7,100
S-0501 BASIC PERMIT FEE $0 $0 $0 0.0% 100.0% $0 X
S-0503 PERMANENT ENCROACHMENT PERMIT $3,350 $7,574 ($4,224) 44.2% 100.0% $4,200
S-0505 TEMPORARY ENCROACHMENT PERMIT $904,998 $693,133 $211,865 130.6% 100.0% $105,000 &
S-0507 LANE CLOSURE WITH EXCAVATION $0 $0 $0 0.0% 100.0% $0
S-0509 SPECIAL EVENT ENCROACHMENT $7,860 $19,812 ($11,952) 39.7% 100.0% $12,000
S-0511 OVERSIZE LOAD/BLDG.MOVE PERMIT $17,234 $32,150 ($14,916) 53.6% 100.0% $0 **
S-0513 HAULING PERMIT $6,704 $14,292 ($7,588) 46.9% 100.0% $7,600
S-0515 EXCAVATION PERMIT $0 $0 $0 0.0% 100.0% $0 X
S-0517 TRAFFIC STUDY REPORT $7,190 $15,912 ($8,722) 45.2% 100.0% $8,700
S-0518 OFF-SITE IMPROVEMENT PLAN CHECK $321,389 $342,265 ($20,876) 93.9% 100.0% $0
S-0520 REVIEW REVISIONS TO APPROVED PLANS $685 $1,056 ($371) 64.9% 100.0% $400
S-0521 OFF-SITE IMPROVEMENT INSPECTION $188,000 $191,976 ($3,976) 97.9% 100.0% $4,000
S-0523 ANNUAL UTILITY BLANKET PERMIT $882 $1,654 ($772)53.3% 100.0% $800
S-0529 BOND RELEASE INSPECTION - PW $520 $1,154 ($634) 45.1% 100.0% $600
S-0531 STREET NAME CHANGE $0 $0 $0 0.0% 100.0% $0 HR
S-0533 STREET/ALLEY VACATION $2,000 $3,685 ($1,685) 54.3% 100.0% $1,700
S-0535 DEDICATION OF RIGHT-OF-WAY $3,150 $9,212 ($6,062) 34.2% 100.0% $6,100
S-0537 PRIVATE PARTY ANNEXATION REQUEST $0 $0 $0 0.0% 100.0% $0 HR
S-0539 CITY PROPERTY LEASE PROCESSING $0 $0 $0 0.0% 100.0% $0 HR
Page 3 of 4
CITY OF SAN BERNARDINO, CALIFORNIA
SCHEDULE OF SERVICE REVENUES, COSTS & PROFIT/SUBSIDY
As of April 29, 2020
POSSIBLE
TOTAL TOTAL PROFIT/ PCT.RECOVERY NEW
REF# SERVICE TITLE REVENUE COST (SUBSIDY) CURRENT SUGGESTED REVENUE
S-0542 ENGINEERING LETTER $0 $0 $0 0.0% 100.0% $0 X
S-0560 PERMIT EXTENSION $8,600 $16,306 ($7,706) 52.7% 100.0% $7,700
S-0565 RE-INSPECTION $90 $106 ($16) 84.9% 100.0% $0
S-0567 AFTER HOURS & HOLIDAY INSPECTION $0 $0 $0 0.0% 100.0% $0
S-0571 ASMT.DIST./COMM.FACILITIES DIST. $0 $0 $0 0.0% 100.0% $0 HR
S-0602 CONCEALED WEAPONS PERMIT $0 $0 $0 0.0% 100.0% $0 X
S-0609 RECORDS CHECK LETTER $250 $420 ($170) 59.5% 100.0%$200
S-0611 2ND HAND DEALER/PAWNSHOP REGULATION $853 $889 ($36) 0.0% 100.0% $0 X
S-0613 LIVE SCAN FINGERPRINT PROCESSING $3,450 $4,653 ($1,203) 74.2% 100.0% $1,200
S-0616 FIX-IT TICKET SIGN-OFF $2,000 $2,408 ($408) 83.1%100.0% $400
S-0618 SPECIAL POLICE SERVICE $0 $0 $0 0.0% 100.0% $500
S-0621 ALARM SYSTEM $238,890 $538,810 ($299,920) 44.3% 100.0% $100,000 *
S-0640 ANIMAL CONTROL SERVICES $615,196 $3,519,650 ($2,904,454) 17.5% 50.0% $100,000 *
S-0655 BIENNIAL RENTAL PROPERTY INSPECTION $103,000 $186,533 ($83,533) 55.2% 100.0% $83,500
S-0657 NOTICE OF PENDENCY RELEASE $18,037 $16,498 $1,539 109.3% 100.0% ($1,500)
S-0659 ABATEMENT LIEN ADMINISTRATIVE CHGE $5,520 $6,348 ($828) 87.0% 100.0% $800
S-0662 LIEN DEMAND LETTER ADMIN.CHARGE $53,675 $104,802 ($51,127) 51.2% 100.0% $51,100
S-0664 DUPLICATE LIEN RELEASE $840 $496 $344 169.4% 100.0% ($300)
S-0666 WEED ABATEMENT CHARGES $375 $513 ($138) 73.1% 100.0% $100
S-6000 AQUATICS SERVICES $94,350 $702,761 ($608,411) 13.4% 25.0% $14,000 *
S-6060 YOUTH SPORTS $10,756 $35,599 ($24,843) 30.2% 75.0% $1,500 *
S-6070 ADULT SPORTS $21,460 $89,215 ($67,755) 24.1% 45.0% $4,000 *
S-6100 COMM. CENTER PROG/RENTALS $13,000 $3,819,489 ($3,806,489) 0.3% 2.0% $4,000 *
S-6130 BALLFIELD RENTAL/USE $9,500 $261,502 ($252,002) 3.6% 10.0% $2,000 *
S-6700 LIBRARY CARD REPLACEMENT $4,000 $18,800 ($14,800) 21.3% 50.0% $500
S-6710 INTER-LIBRARY LOAN REQUEST $135 $41,171 ($41,036) 0.3% 1.0% $200
S-6720 LIBRARY RESEARCH SERVICE $80 $396 ($316) 20.2% 22.0% $10
S-6730 REPLACE LOST/DAMAGED LIBRARY MAT'LS $125 $706 ($581) 17.7% 35.0% $25
S-6740 LIBRARY ROOM RENTAL $5,260 $36,160 ($30,900) 14.6% 100.0% $700
S-7000 CEMETERY INTERMENT $15,550 $56,615 ($41,065) 27.5% 100.0% $14,000 &
S-7010 CEMETERY DISINTERMENT $1,200 $3,822 ($2,622) 31.4% 100.0% $50 &
S-7020 CEMETERY MARKER SETTINGS $2,440 $5,972 ($3,532) 40.9% 100.0% $100 &
S-7030 CEMETERY FLOWER VASE INSTALLATION $210 $680 ($470) 30.9% 100.0% $30 &
S-7040 REMOVE/REPLACE CEMETERY MARKER $0 $2,834 ($2,834) 0.0% 100.0% $230 &
S-7050 GRAVE PROPERTY OWNER TRANSFER $150 $381 ($231) 39.4% 100.0% $200
S-7100 CEMETERY SERVICES $0 $182,961 ($182,961) 0.0% 100.0% $5,000 &
S-7220 STREET BANNER INSTALL/REMOVE $4,000 $8,219 ($4,219) 48.7% 100.0% $2,000 &
S-7250 REPAIR TO CITY PROPERTY DAMAGE $0 $92,617 ($92,617) 0.0% 100.0% $0
S-7260 PARK RENTAL/RESERVATION $28,000 $35,983 ($7,983)77.8% 100.0% $0
S-7270 FISCALLINI FIELD MAINTENANCE $17,000 $20,243 ($3,243) 84.0% 100.0% $3,200
S-8000 DOCUMENT REPRODUCTION $408 $141,105 ($140,697) 0.3% 100.0% $0
S-8020 ELECTRONIC FILE COPY $0 $3,344 ($3,344) 0.0% 100.0% $1,000 &
S-8040 ADMIN CIVIL PENALTY PROCESSING $0 $591,843 ($591,843) 0.0% 100.0% $5,000 &
S-8050 ACP DEMAND LETTER $5,604 $11,537 ($5,933) 48.6% 100.0% $5,900 &
S-8060 LIEN RELEASE $0 $10,154 ($10,154) 0.0% 100.0% $10,200 &
S-8320 BUSINESS REGISTRATION LIEN ASSESS $124,800 $106,548 $18,252 117.1% 100.0% ($18,300)
Page 4 of 4
CITY OF SAN BERNARDINO, CALIFORNIA
SCHEDULE OF SERVICE REVENUES, COSTS & PROFIT/SUBSIDY
As of April 29, 2020
POSSIBLE
TOTAL TOTAL PROFIT/ PCT.RECOVERY NEW
REF# SERVICE TITLE REVENUE COST (SUBSIDY) CURRENT SUGGESTED REVENUE
S-8330 BUSINESS REGISTRATION DEMAND LETTER $2,640 $2,522 $118 104.7% 100.0% ($100)
S-8340 BUSINESS REGISTRATION LIEN RELEASE $0 $39,432 ($39,432) 0.0% 100.0% $39,400
S-8350 DUPLICATE BUSINESS REG CERTIFICATE $18 $378 ($360) 4.8% 100.0% $400
S-8360 PASSPORT PROCESSING $35,000 $64,110 ($29,110) 54.6% 55.0% $29,100 **
S-8370 NOTARY PUBLIC $15 $33 ($18) 45.5% 50.0% $0 **
S-8380 RECORDS COMPILATION $70 $104 ($34) 67.3% 100.0% $0
S-8390 CANDIDATE FILING $725 $21,333 ($20,608) 0.0% 5.0% $0 **
S-8400 INITIATIVE FILING $0 $1,525 ($1,525) 0.0% 15.0% $0 **
S-8410 WEDDING CEREMONY $260 $286 ($26) 90.9% 100.0% $0
S-8500 FILM PERMIT $1,890 $7,458 ($5,568) 25.3% 100.0% $5,600
S-8600 NSF CHECK PROCESSING $2,392 $5,957 ($3,565) 40.2%100.0% $3,600 **
S-9000 OTHER CHARGEABLE SERVICES $0 $0 $0 0.0% 100.0% $0
TOTALS $6,156,656 $16,243,525 ($10,086,869) 37.9% 46.1% $1,325,045
Key to Symbols:
* - See text for discussion
** - Fee is limited by State/Federal Code
& - Demand will decline as user is required to pay full cost.
x - Staff recommends deleting the service as it is not used.
HR - The service is charged based on the hourly rate of staff plus other costs.
Service Narrative
The above Summary Schedule indicated for several services that the reader should “See text for
discussion.” That discussion follows:
S-0010 :: Building Plan Check; and, S-0020 :: Building Inspection. RCS updated the fee
schedule (Appendix D) based on the current staff salaries. The Building & Safety Division of
Community Development has been understaffed for a number of years. The understaffing may
have “balanced the books” for the Division but one has to wonder if the quality of work suffered
as a result. The additional revenue from the new fees should be used by the City to restore
staffing levels so that the development community can continue to receive excellent service on a
timely basis.
S-0315 :: General Plan Maintenance. California Law requires that cities periodically update their
General Plan. Development can be challenged in a city where the General Plan is out of date. For
this reason, RCS suggests that development services cover 50% of the cost. Residents also
benefit from an updated General Plan, so there is logic in the balance of the cost being borne by
the local taxpayers. The suggested 2% surcharge on all Community Development fees would
begin the process of recovering development’s 50% share of the cost. Staff must insure that the
monies collected are properly reserved for the intended purpose.
S-0621 :: Alarm System. The “system” is comprised of alarm permits and Police response to
false alarms. Ideally, the permit revenue would recover the cost of the “free” false alarms for
permit holders and the false alarm charge would recover the rest of the Police response.
Currently, the City’s mix of fees recovers only about 50% of the cost with the taxpayer footing
the bill for the rest. The suggested fee changes would begin the process of reducing the
taxpayers’ burden but the City uses a 3rd-party vendor that gets 22% of City revenues for
permits and false alarms. Consequently, the City may wish to link fee increases to a reduction in
the vendor’s fee.
S-0640 :: Animal Control Services. Animal Control services are a public safety function and
RCS generally recommends that taxpayers subsidize 50% of the cost to recognize this fact. At
present, only 20% to 30% of dogs are licensed and the service is only recovering about 17% of
the total cost or 35% of its share of costs. A significant increase in these fees would discourage
compliance. Additional license checkers might improve compliance and generate additional
revenue but that additional revenue would only pay their costs, not generate new revenue. Same
with charges for dropping off stray or owner surrender animals, if fees are too high, compliance
will go down and jeopardize public safety. The Police Department has completed an analysis that
looked at cost and comparable fees from surrounding agencies. It is suggested that the City
Council consider adopting the fees in that study.
S-6000 to S-6740 :: Recreation & Library Services. We’re now in the area of services that
improve the quality of life in the community. RCS strongly recommends that the department be
responsible for setting program fees based on what the market will bear. The limiting factor for
that policy should be the amount of tax monies that the City can afford for quality of life issues
and the effectiveness of the department head getting the best program for those monies.
Additional information on the nature of the costs and the suggested fees is found in Appendix E.
APPENDICES
A - REVENUE & COST SHEET FOR EACH SERVICE
B - COMPARISON OF CURRENT FEE TO SUGGESTED FEE
C - CURRENT BUILDING & SAFETY FEES
D - PROPOSED BUILDING & SAFETY FEES
E - RECREATION DETAIL
F - AVERAGE FULLY-BURDENED HOURLY RATE
THIS PAGE IS BLANK
APPENDIX A
DETAIL REVENUE & COST SHEETS
A - 1
INDEX
REF# SERVICE PAGE
S-0005 BUILDING ISSUANCE FEE A-6
S-0010 BUILDING PLAN CHECK A-8
S-0020 BUILDING INSPECTION A-10
S-0022 SPECIAL BUILDING INSPECTION A-12
S-0025 CERTIFICATE OF OCCUPANCY A-14
S-0030 TEMPORARY CERTIFICATE OF OCCUPANCY A-16
S-0201 AMENDMENT TO CONDITIONS-ADM.REV. A-18
S-0203 AMENDMENT TO CONDITIONS-PLN.COMM. A-20
S-0205 AMENDMENT TO CONDITIONS-D/ERC A-22
S-0208 ANTENNA DEVELOPMENT PERMIT-ADM.REV. A-24
S-0211 APPEAL TO MAYOR & COUNCIL A-26
S-0213 APPEAL TO THE PLANNING COMMISSION A-28
S-0216 CUP-MINOR USE PMT/ALCOHOL A-30
S-0217 CONDITIONAL USE PERMIT A-32
S-0219 CUP REVISION A-34
S-0222 DESIGN REVIEW A-36
S-0224 DEVELOPMENT AGMT OR AMENDMENT A-38
S-0227 DEVELOPMENT CODE/ZONING MAP AMEND. A-40
S-0230 DEV.PMT-DIRECTOR REVIEW A-42
S-0233 DEV.PMT-D/ERC REVIEW A-44
S-0235 DEV.PMT-PLANNING COMMISSION REVIEW A-46
S-0238 DEV.PMT-MAYOR/COUNCIL REVIEW A-48
S-0241 ENVIRONMENTAL (INITIAL) STUDY A-50
S-0244 ENVIRONMENTAL IMPACT REPORT A-52
S-0246 EXTENSION OF TIME A-54
S-0251 FENCE/WALL PERMIT A-56
S-0257 GENERAL PLAN AMENDMENT (TEXT/MAP) A-58
S-0259 HISTORIC PRESERVATION PROJECT A-60
S-0262 HOME OCCUPATION PERMIT A-62
S-0264 LETTER OF ZONING & GEN.PLAN CONSIST A-64
S-0266 PLANNING LOT LINE ADJUSTMENT A-66
S-0268 MINOR EXCEPTION A-68
S-0270 MISC.ENVIRONMENTAL REPORT REVIEW A-70
S-0271 MINOR MODIFICATION/REVISION A-72
S-0273 PHASING PLAN REVIEW A-74
S-0275 PLANNING COMMISSION INTERPRETATION A-76
S-0277 PUBLIC CONVENIENCE/NECESSITY LETTER A-78
S-0279 PRE-APPLICATION REVIEW-D/ERC REVIEW A-80
A - 2
INDEX
REF# SERVICE PAGE
S-0280 RECONSIDERATION BY THE PLAN.COMM. A-82
S-0282 SIGN PERMIT-REGULAR A-84
S-0283 SIGN PERMIT-REQUIRING CUP A-86
S-0284 SIGN PERMIT-TEMPORARY A-88
S-0286 SIGN PROGRAM A-90
S-0288 SPECIFIC PLAN/AMENDMENT A-92
S-0291 TEMPORARY USE/SPECIAL EVENT PERMIT A-94
S-0293 TENTATIVE PARCEL MAP A-96
S-0295 TENTATIVE TRACT MAP (SFR/CONDO/PRD) A-98
S-0297 TENTATIVE MAP REVISION-TRACT/PARCEL A-100
S-0301 TREE REMOVAL PERMIT A-102
S-0303 VARIANCE-REGULAR A-104
S-0304 VARIANCE WITH ANOTHER APPLICATION A-106
S-0306 VESTING TENTATIVE MAP A-108
S-0308 ZONING FORM A-110
S-0309 ZONING VERIFICATION REVIEW A-112
S-0315 GENERAL PLAN MAINTENANCE A-114
S-0322 TECHNOLOGY FEE A-116
S-0326 ARCHIVE FEES A-118
S-0441 FINAL/PARCEL MAP REVIEW A-120
S-0445 ON-SITE IMPROVEMENT PLAN CHECK A-122
S-0447 GRADING PLAN CHECK FEE A-124
S-0452 REVIEW-CERTIFICATE OF COMPLIANCE A-126
S-0453 REVIEW-LOT MERGER A-128
S-0454 REVIEW-LOT LINE ADJSTMT A-130
S-0463 ON-SITE CONSTRUCTION INSPECTION A-132
S-0467 ON-SITE GRADING INSPECTION A-134
S-0471 HYDRAULIC/HYDROLOGY STUDY REVIEW A-136
S-0472 ALQUIST PRIOLO FAULT LINE INVESTIG. A-138
S-0480 FEMA FLOODPLAIN REVIEW A-140
S-0481 REV.OF STORM WTR POLLUTION PREV.PLN A-142
S-0488 REVIEW OF WTR QUALITY MGMT PLANS A-144
S-0489 REV-EROSION/WSTE MGMT CONTROL PLAN A-146
S-0490 NPDES CONSTRUCTION INSPECTION A-148
S-0495 NPDES BUSINESS INSPECTION A-150
S-0501 BASIC PERMIT FEE A-152
S-0503 PERMANENT ENCROACHMENT PERMIT A-154
S-0505 TEMPORARY ENCROACHMENT PERMIT A-156
A - 3
INDEX
REF# SERVICE PAGE
S-0507 LANE CLOSURE WITH EXCAVATION A-158
S-0509 SPECIAL EVENT ENCROACHMENT A-160
S-0511 OVERSIZE LOAD/BLDG.MOVE PERMIT A-162
S-0513 HAULING PERMIT A-164
S-0515 EXCAVATION PERMIT A-166
S-0517 TRAFFIC STUDY REPORT A-168
S-0518 OFF-SITE IMPROVEMENT PLAN CHECK A-170
S-0520 REVIEW REVISIONS TO APPROVED PLANS A-172
S-0521 OFF-SITE IMPROVEMENT INSPECTION A-174
S-0523 ANNUAL UTILITY BLANKET PERMIT A-176
S-0529 BOND RELEASE INSPECTION - PW A-178
S-0531 STREET NAME CHANGE A-180
S-0533 STREET/ALLEY VACATION A-182
S-0535 DEDICATION OF RIGHT-OF-WAY A-184
S-0537 PRIVATE PARTY ANNEXATION REQUEST A-186
S-0539 CITY PROPERTY LEASE PROCESSING A-188
S-0542 ENGINEERING LETTER A-190
S-0560 PERMIT EXTENSION A-192
S-0565 RE-INSPECTION A-194
S-0567 AFTER HOURS & HOLIDAY INSPECTION A-196
S-0571 ASMT.DIST./COMM.FACILITIES DIST. A-198
S-0602 CONCEALED WEAPONS PERMIT A-200
S-0609 RECORDS CHECK LETTER A-202
S-0611 2ND HAND DEALER/PAWNSHOP REGULATION A-204
S-0613 LIVE SCAN FINGERPRINT PROCESSING A-206
S-0616 FIX-IT TICKET SIGN-OFF A-208
S-0618 SPECIAL POLICE SERVICE A-210
S-0621 ALARM SYSTEM A-212
S-0640 ANIMAL CONTROL SERVICES A-214
S-0655 BIENNEAL RENTAL PROPERTY INSPECTION A-216
S-0657 NOTICE OF PENDENCY RELEASE A-218
S-0659 ABATEMENT LIEN ADMINISTRATIVE CHGE A-220
S-0662 LIEN DEMAND LETTER ADMIN.CHARGE A-222
S-0664 DUPLICATE LIEN RELEASE A-224
S-0666 WEED ABATEMENT CHARGES A-226
S-6000 AQUATICS SERVICES A-228
S-6060 YOUTH SPORTS A-230
S-6070 ADULT SPORTS A-232
A - 4
INDEX
REF# SERVICE PAGE
S-6100 COMM. CENTER PROG/RENTALS A-234
S-6130 BALLFIELD RENTAL/USE A-236
S-6700 LIBRARY CARD REPLACEMENT A-238
S-6710 INTER-LIBRARY LOAN REQUEST A-240
S-6720 LIBRARY RESEARCH SERVICE A-242
S-6730 REPLACE LOST/DAMAGED LIBRARY MAT'LS A-244
S-6740 LIBRARY ROOM RENTAL A-246
S-7000 CEMETERY INTERMENT A-248
S-7010 CEMETERY DISINTERMENT A-250
S-7020 CEMETERY MARKER SETTINGS A-252
S-7030 CEMETERY FLOWER VASE INSTALLATION A-254
S-7040 REMOVE/REPLACE CEMETERY MARKER A-256
S-7050 GRAVE PROPERTY OWNER TRANSFER A-258
S-7100 CEMETERY SERVICES A-260
S-7220 STREET BANNER INSTALL/REMOVE A-262
S-7250 REPAIR TO CITY PROPERTY DAMAGE A-264
S-7260 PARK RENTAL/RESERVATION A-266
S-7270 FISCALLINI FIELD MAINTENANCE A-268
S-8000 DOCUMENT REPRODUCTION A-270
S-8020 ELECTRONIC FILE COPY A-272
S-8040 ADMIN CIVIL PENALTY PROCESSING A-274
S-8050 ACP DEMAND LETTER A-276
S-8060 LIEN RELEASE A-278
S-8320 BUSINESS REGISTRATION LIEN ASSESS A-280
S-8330 BUSINESS REGISTRATION DEMAND LETTER A-282
S-8340 BUSINESS REGISTRATION LIEN RELEASE A-284
S-8350 DUPLICATE BUSINESS REG CERTIFICATE A-286
S-8360 PASSPORT PROCESSING A-288
S-8370 NOTARY PUBLIC A-290
S-8380 RECORDS COMPILATION A-292
S-8390 CANDIDATE FILING A-294
S-8400 INITIATIVE FILING A-296
S-8410 WEDDING CEREMONY A-298
S-8500 FILM PERMIT A-300
S-8600 NSF CHECK PROCESSING A-302
S-9000 OTHER CHARGEABLE SERVICES A-304
A - 5
S-0005BUILDING ISSUANCE FEE
APPLICATIONCD-BLDG+SAFETY
To process an application for a building permit. This is not a plan check or inspection.
$40 - 1st permit
$10 - each additional permit on the same application
$60 - 1st permit
$10 - each additional permit on the same application
100%
$40.00
$61.70
$(21.70)
5,000
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 64.83%
$(108,500)
$308,500
$200,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 6
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
BUILDING ISSUANCE FEE S-0005
5,000
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.75 $61.70 5,000 $308,500
$308,500 $61.70 0.75TYPE SUBTOTAL
$308,500 0.75TOTALS $61.70
A - 7
S-0010BUILDING PLAN CHECK
APPLICATIONCD-BLDG+SAFETY
To review plans for construction.
Various fees - see current Schedule of Fees - Appendix C
Hourly Rate - $94.15
Various fees - see proposed Schedule of Fees - Apendix D
Hourly Rate - $122.37
100%
$897.48
$1,257.42
$(359.94)
580
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 71.37%
$(208,767)
$729,304
$520,537
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 8
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
BUILDING PLAN CHECK S-0010
580
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY CHIEF BLDG.OFFICIAL 0.70 $130.13 580 $75,475
C.DEV-BLDG+SAFETY SR.PLANS EXAMINER 2.80 $342.85 580 $198,853
C.DEV-BLDG+SAFETY COM.DEV.TECH. 4.93 $405.13 580 $234,975
C.DEV-BLDG+SAFETY Contract Svcs 0.00 $379.31 580 $220,000
$729,304 $1,257.42 8.43TYPE SUBTOTAL
$729,304 8.43TOTALS $1,257.42
A - 9
S-0020BUILDING INSPECTION
PERMITCD-BLDG+SAFETY
To inspect building, electrical, plumbing and mechanical construction to insure that it is in conformance with
approved plans and the various construction codes.
Various fees - see current Schedule of Fees - Appendix C
Hourly Rate - $94.45
Various fees - see proposed Schedule of Fees - Apendix D
Hourly Rate - $118.33
100%
$349.12
$343.00
$6.12
2,500
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 101.78%
$15,300
$857,500
$872,800
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 10
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
BUILDING INSPECTION S-0020
2,500
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY CHIEF BLDG.OFFICIAL 0.32 $60.38 2,500 $150,950
C.DEV-BLDG+SAFETY BLDG INSPECT.II 1.81 $191.04 2,500 $477,600
C.DEV-BLDG+SAFETY CONST.INSP.II 0.49 $58.04 2,500 $145,100
C.DEV-PLANNING ASSIST/ASSOC.PLNR 50% Of 1 Position 0.33 $33.54 2,500 $83,850
$857,500 $343.00 2.95TYPE SUBTOTAL
$857,500 2.95TOTALS $343.00
A - 11
S-0022SPECIAL BUILDING INSPECTION
INSPECTIONCD-BLDG+SAFETY
To perform a special inspection at the request of the applicant.
$380 Minimum for the 1st 4 hours plus $95 for each additional hour
$595 for the 1st 4 hours plus $105 for each add'l hour
100%
$380.00
$597.02
$(217.02)
60
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 63.65%
$(13,021)
$35,821
$22,800
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 12
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
SPECIAL BUILDING INSPECTION S-0022
60
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY EXEC.ASSISTANT 0.50 $39.43 60 $2,366
C.DEV-BLDG+SAFETY CHIEF BLDG.OFFICIAL 0.50 $93.13 60 $5,588
C.DEV-BLDG+SAFETY BLDG INSPECT.II 4.00 $423.32 60 $25,399
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 60 $2,468
$35,821 $597.01 5.50TYPE SUBTOTAL
$35,821 5.50TOTALS $597.02
A - 13
S-0025CERTIFICATE OF OCCUPANCY
PERMITCD-BLDG+SAFETY
To review a construction project to insure that it has received all required inspections and met all conditions of
approval, including those conditions of other Divisions.
$475.08 - as a separate application (of which $100 was for Fire Review)
$133.62 - if included on the building permit (Deleted as All Fire)
$500
100%
$375.07
$502.17
$(127.10)
30
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 74.69%
$(3,813)
$15,065
$11,252
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 14
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
CERTIFICATE OF OCCUPANCY S-0025
30
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY EXEC.ASSISTANT 1.00 $78.85 30 $2,366
C.DEV-BLDG+SAFETY BLDG INSPECT.II 4.00 $423.32 30 $12,700
$15,065 $502.17 5.00TYPE SUBTOTAL
$15,065 5.00TOTALS $502.17
A - 15
S-0030TEMPORARY CERTIFICATE OF OCCUPANCY
REQUESTCD-LAND DEV.
To issue a Temporary C.of O. good for one (1) month.
$467.34
$500
100%
$467.38
$502.13
$(34.75)
8
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 93.08%
$(278)
$4,017
$3,739
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 16
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
TEMPORARY CERTIFICATE OF OCCUPANCY S-0030
8
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY EXEC.ASSISTANT 1.00 $78.85 8 $631
C.DEV-BLDG+SAFETY BLDG INSPECT.II 4.00 $423.32 8 $3,387
$4,017 $502.17 5.00TYPE SUBTOTAL
$4,017 5.00TOTALS $502.13
A - 17
S-0201AMENDMENT TO CONDITIONS-ADM.REV.
APPLICATIONCD-PLANNING
To review a request to amend the conditions of approval for a development that was originally approved by the
Development Services Director.
$583
$575
100%
$583.00
$575.00
$8.00
4
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 101.39%
$32
$2,300
$2,332
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 18
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
AMENDMENT TO CONDITIONS-ADM.REV.S-0201
4
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 4 $165
C.DEV-PLANNING EXEC.ASSISTANT 0.50 $38.72 4 $155
C.DEV-PLANNING PLANNING MGR 1.00 $187.36 4 $749
C.DEV-PLANNING ASSIST/ASSOC.PLNR 3.00 $307.68 4 $1,231
$2,300 $574.89 5.00TYPE SUBTOTAL
$2,300 5.00TOTALS $575.00
A - 19
S-0203AMENDMENT TO CONDITIONS-PLN.COMM.
APPLICATIONCD-PLANNING
To review a request to amend the conditions of approval for a development that was originally approved by the
Planning Commission.
$2,550
$4,070 plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$2,550.00
$4,071.00
$(1,521.00)
2
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 62.64%
$(3,042)
$8,142
$5,100
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 20
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
AMENDMENT TO CONDITIONS-PLN.COMM.S-0203
2
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 2 $82
C.DEV-PLANNING DIR.OF COMM.DEVEL. 1.00 $313.77 2 $628
C.DEV-PLANNING EXEC.ASSISTANT 4.00 $309.76 2 $620
C.DEV-PLANNING PLANNING MGR 4.00 $749.44 2 $1,499
C.DEV-PLANNING ASSIST/ASSOC.PLNR 20.00 $2,051.20 2 $4,102
C.DEV-LAND DEV SR.CIVIL ENGINEER 2.00 $366.96 2 $734
C.DEV-LAND DEV ENGIN'G ASSIST III 2.00 $238.88 2 $478
$8,142 $4,071.14 33.50TYPE SUBTOTAL
$8,142 33.50TOTALS $4,071.00
A - 21
S-0205AMENDMENT TO CONDITIONS-D/ERC
APPLICATIONCD-PLANNING
To review a request to amend the conditions of approval for a development that was originally approved by the
Development/Environmental Review Committee.
$822
$2,890
100%
$822.00
$2,888.67
$(2,066.67)
3
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 28.46%
$(6,200)
$8,666
$2,466
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 22
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
AMENDMENT TO CONDITIONS-D/ERC S-0205
3
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 3 $123
C.DEV-PLANNING DIR.OF COMM.DEVEL. 0.50 $156.89 3 $471
C.DEV-PLANNING EXEC.ASSISTANT 4.00 $309.76 3 $929
C.DEV-PLANNING PLANNING MGR 4.00 $749.44 3 $2,248
C.DEV-PLANNING ASSIST/ASSOC.PLNR 10.00 $1,025.60 3 $3,077
C.DEV-LAND DEV SR.CIVIL ENGINEER 2.00 $366.96 3 $1,101
C.DEV-LAND DEV ENGIN'G ASSIST III 2.00 $238.88 3 $717
$8,666 $2,888.66 23.00TYPE SUBTOTAL
$8,666 23.00TOTALS $2,888.67
A - 23
S-0208ANTENNA DEVELOPMENT PERMIT-ADM.REV.
APPLICATIONCD-PLANNING
To review an application for the placement of an antenna or other telecommunication device that requires
Director Review according to the municipal code.
$2,938
Staff recommends deleting this fee as antennas are covered using a CUP or a development permit.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 24
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ANTENNA DEVELOPMENT PERMIT-ADM.REV.S-0208
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 25
S-0211APPEAL TO MAYOR & COUNCIL
APPLICATIONCD-PLANNING
To appeal a project to the Mayor and Council that was denied by the Planning Commission.
$177 - Non-Applicant, City Resident (10% Recovery)
$1,766 - All others
$285 - Non-Applicant, City Resident (10% Recovery)
$2,850 - All others, plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$1,766.00
$2,848.00
$(1,082.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 62.01%
$(1,082)
$2,848
$1,766
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 26
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
APPEAL TO MAYOR & COUNCIL S-0211
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 1 $41
C.DEV-PLANNING DIR.OF COMM.DEVEL. 2.00 $627.54 1 $628
C.DEV-PLANNING EXEC.ASSISTANT 2.00 $154.88 1 $155
C.DEV-PLANNING PLANNING MGR 4.00 $749.44 1 $749
C.DEV-PLANNING ASSIST/ASSOC.PLNR 8.00 $820.48 1 $820
C.DEV-LAND DEV SR.CIVIL ENGINEER 1.50 $275.22 1 $275
C.DEV-LAND DEV ENGIN'G ASSIST III 1.50 $179.16 1 $179
$2,848 $2,847.85 19.50TYPE SUBTOTAL
$2,848 19.50TOTALS $2,848.00
A - 27
S-0213APPEAL TO THE PLANNING COMMISSION
APPLICATIONCD-PLANNING
To appeal a project to the Planning Commission that was denied by the D/ERC or the Community Development
Director.
$278 - Non-Applicant, City Resident (10%)
$2,772 - All others
$430 - Non-Applicant, City Resident (10%)
$4,295 - All others, plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$2,772.00
$4,296.00
$(1,524.00)
2
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 64.53%
$(3,048)
$8,592
$5,544
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 28
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
APPEAL TO THE PLANNING COMMISSION S-0213
2
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 2 $82
C.DEV-PLANNING DIR.OF COMM.DEVEL. 4.00 $1,255.08 2 $2,510
C.DEV-PLANNING EXEC.ASSISTANT 2.00 $154.88 2 $310
C.DEV-PLANNING PLANNING MGR 4.00 $749.44 2 $1,499
C.DEV-PLANNING ASSIST/ASSOC.PLNR 16.00 $1,640.96 2 $3,282
C.DEV-LAND DEV SR.CIVIL ENGINEER 1.50 $275.22 2 $550
C.DEV-LAND DEV ENGIN'G ASSIST III 1.50 $179.16 2 $358
$8,592 $4,295.87 29.50TYPE SUBTOTAL
$8,592 29.50TOTALS $4,296.00
A - 29
S-0216CUP-MINOR USE PMT/ALCOHOL
APPLICATIONCD-PLANNING
To prepare a conditional use permit for a minor use or for the sale of alcohol in an existing building.
$3,605
$4,625 plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$3,605.00
$4,625.00
$(1,020.00)
10
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 77.95%
$(10,200)
$46,250
$36,050
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 30
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
CUP-MINOR USE PMT/ALCOHOL S-0216
10
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 10 $411
C.DEV-PLANNING DIR.OF COMM.DEVEL. 1.00 $313.77 10 $3,138
C.DEV-PLANNING EXEC.ASSISTANT 4.00 $309.76 10 $3,098
C.DEV-PLANNING PLANNING MGR 8.00 $1,498.88 10 $14,989
C.DEV-PLANNING ASSIST/ASSOC.PLNR 24.00 $2,461.44 10 $24,614
$46,250 $4,624.98 37.50TYPE SUBTOTAL
$46,250 37.50TOTALS $4,625.00
A - 31
S-0217CONDITIONAL USE PERMIT
APPLICATIONCD-PLANNING
To review a request for a conditional use permit for conditional uses.
$7,133 - CUP for Commercial/Industrial (#10; $71,330)
$2,809 - CUP for Condo, PRD, HMOD (#30; $84,270)
$5,555 plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$3,890.00
$5,554.10
$(1,664.10)
40
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 70.04%
$(66,564)
$222,164
$155,600
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 32
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
CONDITIONAL USE PERMIT S-0217
40
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 40 $1,645
C.DEV-PLANNING DIR.OF COMM.DEVEL. 2.00 $627.54 40 $25,102
C.DEV-PLANNING EXEC.ASSISTANT 4.00 $309.76 40 $12,390
C.DEV-PLANNING PLANNING MGR 8.00 $1,498.88 40 $59,955
C.DEV-PLANNING ASSIST/ASSOC.PLNR 30.00 $3,076.80 40 $123,072
$222,164 $5,554.11 44.50TYPE SUBTOTAL
$222,164 44.50TOTALS $5,554.10
A - 33
S-0219CUP REVISION
APPLICATIONCD-PLANNING
To review a request to modify an existing conditional use permit.
$2,113
$3,780 plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$2,113.00
$3,779.00
$(1,666.00)
5
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 55.91%
$(8,330)
$18,895
$10,565
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 34
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
CUP REVISION S-0219
5
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 5 $206
C.DEV-PLANNING DIR.OF COMM.DEVEL. 2.00 $627.54 5 $3,138
C.DEV-PLANNING EXEC.ASSISTANT 4.00 $309.76 5 $1,549
C.DEV-PLANNING PLANNING MGR 4.00 $749.44 5 $3,747
C.DEV-PLANNING ASSIST/ASSOC.PLNR 20.00 $2,051.20 5 $10,256
$18,895 $3,779.07 30.50TYPE SUBTOTAL
$18,895 30.50TOTALS $3,779.00
A - 35
S-0222DESIGN REVIEW
APPLICATIONCD-PLANNING
To review the design of a proposed development.
Full Consultant Cost
Staff recommends deleting this service as service time is included with Conditional Use Permit, Development
Permit or Temporary Use Permit
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 36
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
DESIGN REVIEW S-0222
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 37
S-0224DEVELOPMENT AGMT OR AMENDMENT
APPLICATIONCD-PLANNING
To prepare or amend a development agreement which sets out the City's and the developer's obligations for a
proposed development. Typically used where a developer prefers to construct an improvement in-lieu of paying
development impact fees.
Direct Cost Recovery Fee
Actual Cost based on the "Fully-Burdened" hourly rate of City staff plus consultant costs including 10% contract
administrative overhead and all other costs charged against an initial deposit as determined by staff.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 38
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
DEVELOPMENT AGMT OR AMENDMENT S-0224
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 39
S-0227DEVELOPMENT CODE/ZONING MAP AMEND.
APPLICATIONCD-PLANNING
To process a request to amend the development code or the zoning map at the request of, and for the benefit of,
a developer.
$6,960 plus full consultant cost
$9,925 plus any consultant cost including 10% contract administrative overhead, plus the estimated cost of noticing
and publishing as estimated by City staff.
100%
$6,960.00
$9,923.20
$(2,963.20)
5
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 70.14%
$(14,816)
$49,616
$34,800
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 40
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
DEVELOPMENT CODE/ZONING MAP AMEND.S-0227
5
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 5 $206
C.DEV-PLANNING DIR.OF COMM.DEVEL. 10.00 $3,137.70 5 $15,689
C.DEV-PLANNING EXEC.ASSISTANT 6.00 $464.64 5 $2,323
C.DEV-PLANNING PLANNING MGR 16.00 $2,997.76 5 $14,989
C.DEV-PLANNING ASSIST/ASSOC.PLNR 32.00 $3,281.92 5 $16,410
$49,616 $9,923.15 64.50TYPE SUBTOTAL
$49,616 64.50TOTALS $9,923.20
A - 41
S-0230DEV.PMT-DIRECTOR REVIEW
APPLICATIONCD-PLANNING
To review a development that can be approved by the Community Development Director.
$1,000
$1,965
100%
$1,000.00
$1,965.52
$(965.52)
50
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 50.88%
$(48,276)
$98,276
$50,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 42
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
DEV.PMT-DIRECTOR REVIEW S-0230
50
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 50 $2,057
C.DEV-PLANNING DIR.OF COMM.DEVEL. 0.50 $156.89 50 $7,845
C.DEV-PLANNING EXEC.ASSISTANT 1.00 $77.44 50 $3,872
C.DEV-PLANNING PLANNING MGR 2.00 $374.72 50 $18,736
C.DEV-PLANNING ASSIST/ASSOC.PLNR 10.00 $1,025.60 50 $51,280
C.DEV-LAND DEV SR.CIVIL ENGINEER 1.00 $183.48 50 $9,174
C.DEV-LAND DEV ENGIN'G ASSIST III 0.50 $59.72 50 $2,986
C.DEV-LAND DEV ENGIN'G ASST I/II 0.50 $46.54 50 $2,327
$98,276 $1,965.52 16.00TYPE SUBTOTAL
$98,276 16.00TOTALS $1,965.52
A - 43
S-0233DEV.PMT-D/ERC REVIEW
APPLICATIONCD-PLANNING
To review a development that can be approved by the Development/Environmental Review Committee.
$6,438
0 to 5 Acres - $6,810 plus the estimated cost of noticing and publishing as estimated by City Staff.
> than 5 Acres - $11,905 plus the estimated cost of noticing and publishing as estimated by City Staff.
100%
$6,438.00
$8,506.87
$(2,068.87)
15
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 75.68%
$(31,033)
$127,603
$96,570
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 44
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
DEV.PMT-D/ERC REVIEW S-0233
15
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH.0 To 5 Acres 0.50 $41.13 10 $411
C.DEV-PLANNING DIR.OF COMM.DEVEL. 1.00 $313.77 10 $3,138
C.DEV-PLANNING EXEC.ASSISTANT 4.00 $309.76 10 $3,098
C.DEV-PLANNING PLANNING MGR 4.00 $749.44 10 $7,494
C.DEV-PLANNING ASSIST/ASSOC.PLNR 30.00 $3,076.80 10 $30,768
C.DEV-LAND DEV SR.CIVIL ENGINEER 8.00 $1,467.84 10 $14,678
C.DEV-LAND DEV ENGIN'G ASSIST III 4.00 $477.76 10 $4,778
C.DEV-LAND DEV ENGIN'G ASST I/II 4.00 $372.28 10 $3,723
$68,088 $6,808.78 55.50TYPE SUBTOTAL
C.DEV-BLDG+SAFETY COM.DEV.TECH.Greater Than 5 Acres 0.50 $41.13 5 $206
C.DEV-PLANNING DIR.OF COMM.DEVEL. 2.00 $627.54 5 $3,138
C.DEV-PLANNING EXEC.ASSISTANT 4.00 $309.76 5 $1,549
C.DEV-PLANNING PLANNING MGR 10.00 $1,873.60 5 $9,368
C.DEV-PLANNING ASSIST/ASSOC.PLNR 60.00 $6,153.60 5 $30,768
C.DEV-LAND DEV SR.CIVIL ENGINEER 10.00 $1,834.80 5 $9,174
C.DEV-LAND DEV ENGIN'G ASSIST III 5.00 $597.20 5 $2,986
C.DEV-LAND DEV ENGIN'G ASST I/II 5.00 $465.35 5 $2,327
$59,515 $11,902.98 96.50TYPE SUBTOTAL
$127,603 152.00TOTALS $8,506.87
A - 45
S-0235DEV.PMT-PLANNING COMMISSION REVIEW
APPLICATIONCD-PLANNING
To review the following types of projects: 12 or more residential units, a cell tower taller than 75 feet, a
conditional use permit, tentative tract map where the development requires a Planning Commission public
hearing.
$6,720 - 0 to 5 Acres (#10; $67,200)
$6,720 - Greater than 5 Acres (#5, $33,600)
0 to 5 Acres - $8,040 plus the estimated cost of noticing and publishing as estimated by City Staff.
> than 5 Acres - $15,455 plus the estimated cost of noticing and publishing as estimated by City Staff.
100%
$6,720.00
$10,509.53
$(3,789.53)
15
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 63.94%
$(56,843)
$157,643
$100,800
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 46
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
DEV.PMT-PLANNING COMMISSION REVIEW S-0235
15
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH.0 To 5 Acres 0.50 $41.13 10 $411
C.DEV-PLANNING EXEC.ASSISTANT 1.00 $77.44 10 $774
C.DEV-PLANNING PLANNING MGR 8.00 $1,498.88 10 $14,989
C.DEV-PLANNING ASSIST/ASSOC.PLNR 40.00 $4,102.40 10 $41,024
C.DEV-LAND DEV SR.CIVIL ENGINEER 8.00 $1,467.84 10 $14,678
C.DEV-LAND DEV ENGIN'G ASSIST III 4.00 $477.76 10 $4,778
C.DEV-LAND DEV ENGIN'G ASST I/II 4.00 $372.28 10 $3,723
$80,377 $8,037.73 65.50TYPE SUBTOTAL
C.DEV-BLDG+SAFETY COM.DEV.TECH.Greater Than 5 Acres 0.50 $41.13 5 $206
C.DEV-PLANNING DIR.OF COMM.DEVEL. 2.00 $627.54 5 $3,138
C.DEV-PLANNING EXEC.ASSISTANT 4.00 $309.76 5 $1,549
C.DEV-PLANNING PLANNING MGR 18.00 $3,372.48 5 $16,862
C.DEV-PLANNING ASSIST/ASSOC.PLNR 80.00 $8,204.80 5 $41,024
C.DEV-LAND DEV SR.CIVIL ENGINEER 10.00 $1,834.80 5 $9,174
C.DEV-LAND DEV ENGIN'G ASSIST III 5.00 $597.20 5 $2,986
C.DEV-LAND DEV ENGIN'G ASST I/II 5.00 $465.35 5 $2,327
$77,265 $15,453.06 124.50TYPE SUBTOTAL
$157,643 190.00TOTALS $10,509.53
A - 47
S-0238DEV.PMT-MAYOR/COUNCIL REVIEW
APPLICATIONCD-PLANNING
To review a residential project in a commercial zone where a Public Hearing by the Mayor & Council is required
for approval.
$7,288
Staff recommends deleting this service as it is no longer used.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 48
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
DEV.PMT-MAYOR/COUNCIL REVIEW S-0238
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 49
S-0241ENVIRONMENTAL (INITIAL) STUDY
APPLICATIONCD-PLANNING
To review a proposed development and determine that it has no impact on the environment or that the impact
can be mitigated and the mitigation monitored.
$3,273
Actual Cost based on the "Fully-Burdened" hourly rate of City staff plus consultant costs including 10% contract
administrative overhead and all other costs, including noticing & publishing, charged against an initial deposit
determined by staff.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 50
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ENVIRONMENTAL (INITIAL) STUDY S-0241
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 51
S-0244ENVIRONMENTAL IMPACT REPORT
APPLICATIONCD-PLANNING
To prepare an environmental impact report on a proposed development to comply with the California
Environmental Quality Act (CEQA).
Direct Cost Recovery Fee plus full consultant cost
Actual Cost based on the "Fully-Burdened" hourly rate of City staff plus consultant costs including 10% contract
administrative overhead and all other costs, including noticing & publishing, charged against an initial deposit
determined by staff.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 52
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ENVIRONMENTAL IMPACT REPORT S-0244
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 53
S-0246EXTENSION OF TIME
APPLICATIONCD-PLANNING
To process a time extension for a permit that requires the review of the Development/Environmental Review
Committee or Planning Commission or Mayor and Council.
$3,922 - CUP & Development Permit (#2; $7,844)
$4,768 - Tentative Tract Map (#10; $47,680)
$1,860 plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$4,627.00
$1,859.83
$2,767.17
12
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 248.79%
$33,206
$22,318
$55,524
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 54
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
EXTENSION OF TIME S-0246
12
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 12 $494
C.DEV-PLANNING DIR.OF COMM.DEVEL. 1.00 $313.77 12 $3,765
C.DEV-PLANNING EXEC.ASSISTANT 4.00 $309.76 12 $3,717
C.DEV-PLANNING PLANNING MGR 2.00 $374.72 12 $4,497
C.DEV-PLANNING ASSIST/ASSOC.PLNR 8.00 $820.48 12 $9,846
$22,318 $1,859.86 15.50TYPE SUBTOTAL
$22,318 15.50TOTALS $1,859.83
A - 55
S-0251FENCE/WALL PERMIT
APPLICATIONCD-PLANNING
To review plans and inspect a fence or wall that is not part of another application.
$56
$60
100%
$56.00
$61.70
$(5.70)
120
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 90.76%
$(684)
$7,404
$6,720
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 56
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
FENCE/WALL PERMIT S-0251
120
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.75 $61.70 120 $7,404
$7,404 $61.70 0.75TYPE SUBTOTAL
$7,404 0.75TOTALS $61.70
A - 57
S-0257GENERAL PLAN AMENDMENT (TEXT/MAP)
APPLICATIONCD-PLANNING
To review and process an application to make an amendment to the City's General Plan text or map at the
request of, and for the benefit of, a developer. Only additional costs as always done in conjunction with
Dev.Code Amend. or other primary application.
Direct Cost Recovery Fee ($1,500 Deposit treated as actual cost)
$3,570 plus consultant costs including 10% contract administrative overhead and all other costs, including noticing
& publishing, charged against an initial deposit determined by staff.
100%
$1,500.00
$3,572.50
$(2,072.50)
4
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 41.99%
$(8,290)
$14,290
$6,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 58
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
GENERAL PLAN AMENDMENT (TEXT/MAP)S-0257
4
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 4 $165
C.DEV-PLANNING DIR.OF COMM.DEVEL. 5.00 $1,568.85 4 $6,275
C.DEV-PLANNING PLANNING MGR 5.00 $936.80 4 $3,747
C.DEV-PLANNING ASSIST/ASSOC.PLNR 10.00 $1,025.60 4 $4,102
$14,290 $3,572.38 20.50TYPE SUBTOTAL
$14,290 20.50TOTALS $3,572.50
A - 59
S-0259HISTORIC PRESERVATION PROJECT
APPLICATIONCD-PLANNING
To prepare a report on whether an existing building has historic significance and, if so, how changes to the
building can be made that preserve its historic significance.
Direct Cost Recovery Fee ($815 deposit plus consultant cost)
Actual Cost based on the "Fully-Burdened" hourly rate of City staff plus consultant costs including 10% contract
administrative overhead and all other costs charged against an initial deposit determined by staff.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 60
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
HISTORIC PRESERVATION PROJECT S-0259
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 61
S-0262HOME OCCUPATION PERMIT
APPLICATIONCD-PLANNING
To review a request to operate a business in a residential zone to insure that can be operated safely and that it
will not impact neighbors.
$268
$145
100%
$268.00
$143.69
$124.31
300
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 186.51%
$37,293
$43,107
$80,400
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 62
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
HOME OCCUPATION PERMIT S-0262
300
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 300 $12,339
C.DEV-PLANNING ASSIST/ASSOC.PLNR 1.00 $102.56 300 $30,768
$43,107 $143.69 1.50TYPE SUBTOTAL
$43,107 1.50TOTALS $143.69
A - 63
S-0264LETTER OF ZONING & GEN.PLAN CONSIST
APPLICATIONCD-PLANNING
To prepare a letter at the request of a realtor or lender confirming that a particular use of a property is permitted
by the Zoning Code and/or in conformance with the City's General Plan. Also known as a rebuild letter.
$450
$245
100%
$450.00
$246.26
$203.74
50
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 182.73%
$10,187
$12,313
$22,500
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 64
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
LETTER OF ZONING & GEN.PLAN CONSIST S-0264
50
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 50 $2,057
C.DEV-PLANNING ASSIST/ASSOC.PLNR 2.00 $205.12 50 $10,256
$12,313 $246.25 2.50TYPE SUBTOTAL
$12,313 2.50TOTALS $246.26
A - 65
S-0266PLANNING LOT LINE ADJUSTMENT
APPLICATIONCD-PLANNING
To review a lot line application to check for building setbacks, zoning, general plan conformance and
development standards. See S-0454 for the Public Works Engineering review.
$477
$1,255
100%
$477.00
$1,256.60
$(779.60)
10
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 37.96%
$(7,796)
$12,566
$4,770
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 66
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
PLANNING LOT LINE ADJUSTMENT S-0266
10
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY SR.PLANS EXAMINER 1.00 $122.37 10 $1,224
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 10 $411
C.DEV-PLANNING EXEC.ASSISTANT 0.50 $38.72 10 $387
C.DEV-PLANNING PLANNING MGR 0.50 $93.68 10 $937
C.DEV-PLANNING ASSIST/ASSOC.PLNR 4.00 $410.24 10 $4,102
C.DEV-LAND DEV SR.CIVIL ENGINEER 3.00 $550.44 10 $5,504
$12,566 $1,256.58 9.50TYPE SUBTOTAL
$12,566 9.50TOTALS $1,256.60
A - 67
S-0268MINOR EXCEPTION
APPLICATIONCD-PLANNING
Staff approval of a minor variance (exception) to the Zoning Ordinance based on criteria that establishes the
minimal impact of the variance.
$288 - Concurrent with another application
$268 - Owner-Occupied single-family residence
$792 - Other
$105
100%
$288.00
$102.50
$185.50
4
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 280.98%
$742
$410
$1,152
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 68
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
MINOR EXCEPTION S-0268
4
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-PLANNING ASSIST/ASSOC.PLNR 1.00 $102.56 4 $410
$410 $102.56 1.00TYPE SUBTOTAL
$410 1.00TOTALS $102.50
A - 69
S-0270MISC.ENVIRONMENTAL REPORT REVIEW
APPLICATIONCD-PLANNING
Direct Cost Recovery Fee ($245 Deposit) plus Full Consultant Cost ($327 Deposit)
Staff recommends deleting this fee as the service is not performed.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 70
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
MISC.ENVIRONMENTAL REPORT REVIEW S-0270
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 71
S-0271MINOR MODIFICATION/REVISION
APPLICATIONCD-PLANNING
To review a request to make a minor change, as defined in the Zoning Ordinance, in a development's use permit
or conditions of approval where the change can be approved administratively.
$561
$380 plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$561.00
$378.70
$182.30
10
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 148.14%
$1,823
$3,787
$5,610
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 72
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
MINOR MODIFICATION/REVISION S-0271
10
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 10 $411
C.DEV-PLANNING EXEC.ASSISTANT 0.50 $38.72 10 $387
C.DEV-PLANNING PLANNING MGR 0.50 $93.68 10 $937
C.DEV-PLANNING ASSIST/ASSOC.PLNR 2.00 $205.12 10 $2,051
$3,787 $378.65 3.50TYPE SUBTOTAL
$3,787 3.50TOTALS $378.70
A - 73
S-0273PHASING PLAN REVIEW
APPLICATIONCD-PLANNING
To review a phasing plan.
$823 - If not part of original project review
$514 - D/ERC review application (DP)
$536 - Planning Comm.Application (CUP/DP/SUB)
Staff recommends deleting this fee as the service is not being performed.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 74
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
PHASING PLAN REVIEW S-0273
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 75
S-0275PLANNING COMMISSION INTERPRETATION
APPLICATIONCD-PLANNING
To prepare an interpretation of the General Plan at the request of a developer where the interpretation is required
for a particular development.
$1,119
Staff recommends deleting this fee as the service is not being performed.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 76
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
PLANNING COMMISSION INTERPRETATION S-0275
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 77
S-0277PUBLIC CONVENIENCE/NECESSITY LETTER
APPLICATIONCD-PLANNING
To make a Public Convenience or Necessity (PCN) determination as may be required by the State of California
for the issuance of an Alcoholic Beverage Control License.
$636
$2,740 plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$636.00
$2,740.33
$(2,104.33)
15
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 23.21%
$(31,565)
$41,105
$9,540
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 78
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
PUBLIC CONVENIENCE/NECESSITY LETTER S-0277
15
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 15 $617
C.DEV-PLANNING DIR.OF COMM.DEVEL. 0.50 $156.89 15 $2,353
C.DEV-PLANNING EXEC.ASSISTANT 0.50 $38.72 15 $581
C.DEV-PLANNING PLANNING MGR 1.00 $187.36 15 $2,810
C.DEV-PLANNING ASSIST/ASSOC.PLNR 4.00 $410.24 15 $6,154
POL-GEN.INVESTIG.SERGEANT 10.00 $1,906.00 15 $28,590
$41,105 $2,740.34 16.50TYPE SUBTOTAL
$41,105 16.50TOTALS $2,740.33
A - 79
S-0279PRE-APPLICATION REVIEW-D/ERC REVIEW
APPLICATIONCD-PLANNING
To review a proposed project by the Development/Environmental Review Committee at the request of a
developer before he/she submits a formal application.
$2,424
$3,440
100%
$2,424.00
$3,438.48
$(1,014.48)
25
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 70.50%
$(25,362)
$85,962
$60,600
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 80
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
PRE-APPLICATION REVIEW-D/ERC REVIEW S-0279
25
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 25 $1,028
C.DEV-PLANNING EXEC.ASSISTANT 0.50 $38.72 25 $968
C.DEV-PLANNING PLANNING MGR 2.00 $374.72 25 $9,368
C.DEV-PLANNING ASSIST/ASSOC.PLNR 8.00 $820.48 25 $20,512
C.DEV-LAND DEV SR.CIVIL ENGINEER 6.00 $1,100.88 25 $27,522
C.DEV-LAND DEV ENGIN'G ASSIST III 5.00 $597.20 25 $14,930
C.DEV-LAND DEV ENGIN'G ASST I/II 5.00 $465.35 25 $11,634
$85,962 $3,438.48 27.00TYPE SUBTOTAL
$85,962 27.00TOTALS $3,438.48
A - 81
S-0280RECONSIDERATION BY THE PLAN.COMM.
APPLICATIONCD-PLANNING
To process a request for the Planning Commission to reconsider a previously denied development in-lieu of
appealing to the Mayor and Common Council.
$506
$2,670 plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$506.00
$2,671.00
$(2,165.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 18.94%
$(2,165)
$2,671
$506
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 82
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
RECONSIDERATION BY THE PLAN.COMM.S-0280
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 1 $41
C.DEV-PLANNING DIR.OF COMM.DEVEL. 1.00 $313.77 1 $314
C.DEV-PLANNING EXEC.ASSISTANT 4.00 $309.76 1 $310
C.DEV-PLANNING PLANNING MGR 2.00 $374.72 1 $375
C.DEV-PLANNING ASSIST/ASSOC.PLNR 10.00 $1,025.60 1 $1,026
C.DEV-LAND DEV SR.CIVIL ENGINEER 2.00 $366.96 1 $367
C.DEV-LAND DEV ENGIN'G ASSIST III 2.00 $238.88 1 $239
$2,671 $2,670.82 21.50TYPE SUBTOTAL
$2,671 21.50TOTALS $2,671.00
A - 83
S-0282SIGN PERMIT-REGULAR
APPLICATIONCD-PLANNING
To review a proposed sign for compliance with the Sign Ordinance.
$182
$80
100%
$182.00
$82.26
$99.74
100
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 221.25%
$9,974
$8,226
$18,200
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 84
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
SIGN PERMIT-REGULAR S-0282
100
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 1.00 $82.26 100 $8,226
$8,226 $82.26 1.00TYPE SUBTOTAL
$8,226 1.00TOTALS $82.26
A - 85
S-0283SIGN PERMIT-REQUIRING CUP
APPLICATIONCD-PLANNING
To review and approve a sign permit subject to a conditional use permit which restricts the use in perpetuity to
the approved uses.
$3,858
Staff recommends deleting this fee as it is handled as two separate processes.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 86
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
SIGN PERMIT-REQUIRING CUP S-0283
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 87
S-0284SIGN PERMIT-TEMPORARY
APPLICATIONCD-PLANNING
To review a request to hang a temporary sign or banner to insure that it meets the requirements of the Sign
Ordinance which limits its use to 60-days.
$111
$80
100%
$111.00
$82.26
$28.74
50
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 134.94%
$1,437
$4,113
$5,550
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 88
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
SIGN PERMIT-TEMPORARY S-0284
50
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 1.00 $82.26 50 $4,113
$4,113 $82.26 1.00TYPE SUBTOTAL
$4,113 1.00TOTALS $82.26
A - 89
S-0286SIGN PROGRAM
APPLICATIONCD-PLANNING
To review a signage program for a commercial development.
$610
10 or less tenant spaces - $490
Greater than 10 tenant spaces - Actual Cost based on the "Fully-Burdened" hourly rate of City staff plus consultant
costs including 10% contract administrative overhead and all other costs charged against an initial deposit
determined by staff.
100%
$610.00
$490.10
$119.90
10
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 124.46%
$1,199
$4,901
$6,100
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 90
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
SIGN PROGRAM S-0286
10
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 10 $411
C.DEV-PLANNING EXEC.ASSISTANT 0.50 $38.72 10 $387
C.DEV-PLANNING ASSIST/ASSOC.PLNR 4.00 $410.24 10 $4,102
$4,901 $490.09 5.00TYPE SUBTOTAL
$4,901 5.00TOTALS $490.10
A - 91
S-0288SPECIFIC PLAN/AMENDMENT
APPLICATIONCD-PLANNING
To prepare or amend a specific plan which regulates land use in a specific area of the City in a more detailed
manner that the City-wide Zoning Ordinance at the request of a developer or as a condition to approving a
development.
Direct Cost Recovery Fee plus full consultant cost
Actual Cost based on the "Fully-Burdened" hourly rate of City staff plus consultant costs including 10% contract
administrative overhead and all other costs, including noticing & publishing, charged against an initial deposit
determined by staff.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 92
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
SPECIFIC PLAN/AMENDMENT S-0288
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 93
S-0291TEMPORARY USE/SPECIAL EVENT PERMIT
APPLICATIONCD-PLANNING
To review an application for a temporary use permit such as a pumpkin lot, parking lot sale, etc. or for a special
event.
$82.86 - Temporary Use Permit (#55; $4,557)
$420 - Special Event Permit (Director Review) (#22; $9,240)
$730 - Special Event Permit (Planning Commission review)
$315 - Temporary Use Permit
$1,230 - Special Event Permit (Director Review)
$0 - Special Event Permit (Planning Commission review) - Staff recommends deleting this service as it is not
used.
100%
$179.18
$575.53
$(396.35)
77
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 31.13%
$(30,519)
$44,316
$13,797
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 94
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
TEMPORARY USE/SPECIAL EVENT PERMIT S-0291
77
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH.Temporary 0.50 $41.13 55 $2,262
C.DEV-PLANNING ASSIST/ASSOC.PLNR 1.50 $153.84 55 $8,461
C.DEV-LAND DEV ENGIN'G ASSIST III 1.00 $119.44 55 $6,569
$17,293 $314.41 3.00TYPE SUBTOTAL
C.DEV-BLDG+SAFETY COM.DEV.TECH.Spcl.Event-Director 0.50 $41.13 22 $905
C.DEV-PLANNING DIR.OF COMM.DEVEL. 0.50 $156.89 22 $3,452
C.DEV-PLANNING ASSIST/ASSOC.PLNR 4.00 $410.24 22 $9,025
C.DEV-LAND DEV ENGIN'G ASSIST III 2.00 $238.88 22 $5,255
POL-GEN.INVESTIG.SERGEANT 2.00 $381.20 22 $8,386
$27,023 $1,228.34 9.00TYPE SUBTOTAL
$44,316 12.00TOTALS $575.53
A - 95
S-0293TENTATIVE PARCEL MAP
APPLICATIONCD-PLANNING
To process an application for the subdivision of land into four or fewer lots for residential, commercial or
industrial development.
$4,262 plus $65 per parcel
(NOTE: Revenue is based on an average of 3 parcels per Tentative Parcel Map.)
$5,170 plus the estimated cost of noticing & publishing as estimated by City staff.
100%
$4,457.00
$5,171.90
$(714.90)
10
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 86.18%
$(7,149)
$51,719
$44,570
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 96
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
TENTATIVE PARCEL MAP S-0293
10
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 10 $411
C.DEV-PLANNING EXEC.ASSISTANT 0.50 $38.72 10 $387
C.DEV-PLANNING PLANNING MGR 4.00 $749.44 10 $7,494
C.DEV-PLANNING ASSIST/ASSOC.PLNR 6.00 $615.36 10 $6,154
C.DEV-LAND DEV SR.CIVIL ENGINEER 10.00 $1,834.80 10 $18,348
C.DEV-LAND DEV ENGIN'G ASSIST III 10.00 $1,194.40 10 $11,944
C.DEV-LAND DEV ENGIN'G ASST I/II 7.50 $698.03 10 $6,980
$51,719 $5,171.88 38.50TYPE SUBTOTAL
$51,719 38.50TOTALS $5,171.90
A - 97
S-0295TENTATIVE TRACT MAP (SFR/CONDO/PRD)
APPLICATIONCD-PLANNING
To process a proposed tract map (5 or more lots) to assure that it complies with City requirements and standards.
$7,561 plus $65 per lot or dwelling unit
(NOTE: Revenue is based on an average of 15 lots per Tentative Tract Map.)
$6,850 plus $25 per lot and the estimated cost of noticing & publishing as estimated by City staff.
100%
$8,536.00
$7,209.40
$1,326.60
5
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 118.40%
$6,633
$36,047
$42,680
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 98
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
TENTATIVE TRACT MAP (SFR/CONDO/PRD)S-0295
5
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH.Base Fee 0.50 $41.13 5 $206
C.DEV-PLANNING DIR.OF COMM.DEVEL. 0.50 $156.89 5 $784
C.DEV-PLANNING EXEC.ASSISTANT 0.50 $38.72 5 $194
C.DEV-PLANNING PLANNING MGR 5.00 $936.80 5 $4,684
C.DEV-PLANNING ASSIST/ASSOC.PLNR 20.00 $2,051.20 5 $10,256
C.DEV-LAND DEV SR.CIVIL ENGINEER 10.00 $1,834.80 5 $9,174
C.DEV-LAND DEV ENGIN'G ASSIST III 15.00 $1,791.60 5 $8,958
$34,256 $6,851.14 51.50TYPE SUBTOTAL
C.DEV-LAND DEV ENGIN'G ASSIST III Per Lot 0.20 $23.89 75 $1,792
$1,792 $23.89 0.20TYPE SUBTOTAL
$36,047 51.70TOTALS $7,209.40
A - 99
S-0297TENTATIVE MAP REVISION-TRACT/PARCEL
APPLICATIONCD-PLANNING
To process a request to revise a previously approved tentative parcel or tract map.
$2,113
$4,125 plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$2,113.00
$4,123.67
$(2,010.67)
3
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 51.24%
$(6,032)
$12,371
$6,339
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 100
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
TENTATIVE MAP REVISION-TRACT/PARCEL S-0297
3
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 3 $123
C.DEV-PLANNING DIR.OF COMM.DEVEL. 0.50 $156.89 3 $471
C.DEV-PLANNING EXEC.ASSISTANT 0.50 $38.72 3 $116
C.DEV-PLANNING PLANNING MGR 4.00 $749.44 3 $2,248
C.DEV-PLANNING ASSIST/ASSOC.PLNR 10.00 $1,025.60 3 $3,077
C.DEV-LAND DEV SR.CIVIL ENGINEER 5.00 $917.40 3 $2,752
C.DEV-LAND DEV ENGIN'G ASSIST III 10.00 $1,194.40 3 $3,583
$12,371 $4,123.58 30.50TYPE SUBTOTAL
$12,371 30.50TOTALS $4,123.67
A - 101
S-0301TREE REMOVAL PERMIT
APPLICATIONCD-PLANNING
To process an application for removing 5 or more, 3" or greater diameter trunk, mature trees.
$506
$180
100%
$506.00
$182.50
$323.50
2
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 277.26%
$647
$365
$1,012
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 102
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
TREE REMOVAL PERMIT S-0301
2
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 2 $82
C.DEV-PLANNING EXEC.ASSISTANT 0.50 $38.72 2 $77
C.DEV-PLANNING ASSIST/ASSOC.PLNR 1.00 $102.56 2 $205
$365 $182.41 2.00TYPE SUBTOTAL
$365 2.00TOTALS $182.50
A - 103
S-0303VARIANCE-REGULAR
APPLICATIONCD-PLANNING
To process an application for a variance from the Zoning Code
$322 - Single-family residence (12% Recovery)
$2,724 - All others
$250 - Single-family residence (12% Recovery)
$2,065 - All others, plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$2,724.00
$2,065.00
$659.00
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 131.91%
$659
$2,065
$2,724
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 104
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
VARIANCE-REGULAR S-0303
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 1 $41
C.DEV-PLANNING DIR.OF COMM.DEVEL. 1.00 $313.77 1 $314
C.DEV-PLANNING EXEC.ASSISTANT 4.00 $309.76 1 $310
C.DEV-PLANNING PLANNING MGR 2.00 $374.72 1 $375
C.DEV-PLANNING ASSIST/ASSOC.PLNR 10.00 $1,025.60 1 $1,026
$2,065 $2,064.98 17.50TYPE SUBTOTAL
$2,065 17.50TOTALS $2,065.00
A - 105
S-0304VARIANCE WITH ANOTHER APPLICATION
APPLICATIONCD-PLANNING
To process a variance that is submitted as part of another application. This represents the incremental cost of
processing the variance.
$910
$990 plus the estimated cost of noticing and publishing as estimated by City staff.
100%
$910.00
$991.00
$(81.00)
2
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 91.83%
$(162)
$1,982
$1,820
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 106
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
VARIANCE WITH ANOTHER APPLICATION S-0304
2
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 2 $82
C.DEV-PLANNING DIR.OF COMM.DEVEL. 1.00 $313.77 2 $628
C.DEV-PLANNING EXEC.ASSISTANT 0.50 $38.72 2 $77
C.DEV-PLANNING PLANNING MGR 1.00 $187.36 2 $375
C.DEV-PLANNING ASSIST/ASSOC.PLNR 4.00 $410.24 2 $820
$1,982 $991.22 7.00TYPE SUBTOTAL
$1,982 7.00TOTALS $991.00
A - 107
S-0306VESTING TENTATIVE MAP
APPLICATIONCD-PLANNING
To process an application for vesting rights in a tentative map.
Direct Cost Recovery Fee plus full consultant cost
"Fully-Burdened" hourly rate of City staff plus consultant costs including 10% City administrative overhead and all
other costs, including noticing & publishing, charged against an initial deposit determined by staff.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 108
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
VESTING TENTATIVE MAP S-0306
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 109
S-0308ZONING FORM
APPLICATIONCD-PLANNING
To prepare a written verification of zoning at the request of an applicant.
$22
Staff recommends deleting this service as it is handled by S-0264.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 110
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ZONING FORM S-0308
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 111
S-0309ZONING VERIFICATION REVIEW
APPLICATIONCD-PLANNING
To verify that an applicant for a City business license will be operating in the correct zone for that business.
$37
$55
100%
$37.00
$54.41
$(17.41)
1,800
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 68.00%
$(31,338)
$97,938
$66,600
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 112
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ZONING VERIFICATION REVIEW S-0309
1,800
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.25 $20.57 1,800 $37,026
C.DEV-PLANNING ASSIST/ASSOC.PLNR 0.33 $33.84 1,800 $60,912
$97,938 $54.41 0.58TYPE SUBTOTAL
$97,938 0.58TOTALS $54.41
A - 113
S-0315GENERAL PLAN MAINTENANCE
NACD-PLANNING
To recover a portion of the cost of the periodic update to the City's General Plan which benefits all development
in the City.
None
2% added to all Community Development fees. This would split the cost with the general taxpayer. This fee is to be
reserved for the major general plan updates that are required every 10 to 15 years.
100%
$0.00
$0.00
$0.00
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 114
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
GENERAL PLAN MAINTENANCE S-0315
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 115
S-0322TECHNOLOGY FEE
DEVLMNT SVCSCD-PLANNING
To recover the cost of upgrading the permit system which is estimated to cost $700,000. This fee will recover the
cost in seven to ten years.
2% of Plan Review & Permit Fees
2% charged against all Development Department Fees
100%
$0.00
$0.00
$0.00
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 116
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
TECHNOLOGY FEE S-0322
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 117
S-0326ARCHIVE FEES
VARIOUSCOMM.DEVELOPMENT
To cover the cost of archiving current development materials.
$1.00 - Per Permit or Application
$2.00/sheet - Plans
$0.25/page - Documents
$1.25 - Per Permit or Application
$3.15/sheet - Plans
$0.35/page - Documents
100%
$0.00
$0.00
$0.00
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 118
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ARCHIVE FEES S-0326
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 119
S-0441FINAL/PARCEL MAP REVIEW
MAPCD-LAND DEV.
To perform a final map check on a development and record the documents. Includes a Reversion to Acreage as
a single lot Final Map. Confirm conformity with State Subdivision Map Act & City Ordinances.
$2,210 - Base Fee
$55 - Per Lot Fee
$135 - Each additional Review
$404 - Final Map Continuance
$97 - Certificate of Correction per Hour
$5,195 - Base Fee
$275 - Per Lot Fee
$270 - Each additional Review
$0 - Final Map Continuance - Staff recommends deleting as not used.
$185 - Certificate of Correction per Hour
100%
$2,497.00
$5,926.00
$(3,429.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 42.14%
$(3,429)
$5,926
$2,497
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 120
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
FINAL/PARCEL MAP REVIEW S-0441
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 1 $41
C.DEV-LAND DEV SR.CIVIL ENGINEER Base 10.00 $1,834.80 1 $1,835
C.DEV-LAND DEV ENGIN'G ASSIST III 20.00 $2,388.80 1 $2,389
C.DEV-LAND DEV ENGIN'G ASST I/II 10.00 $930.70 1 $931
$5,195 $5,195.43 40.50TYPE SUBTOTAL
C.DEV-LAND DEV SR.CIVIL ENGINEER Per Lot 1.00 $183.48 1 $183
C.DEV-LAND DEV ENGIN'G ASST I/II 1.00 $93.07 1 $93
$277 $276.55 2.00TYPE SUBTOTAL
C.DEV-LAND DEV SR.CIVIL ENGINEER Per Add'l Review 0.50 $91.74 1 $92
C.DEV-LAND DEV ENGIN'G ASSIST III 1.50 $179.16 1 $179
$271 $270.90 2.00TYPE SUBTOTAL
C.DEV-LAND DEV SR.CIVIL ENGINEER Per Hour 1.00 $183.48 1 $183
$183 $183.48 1.00TYPE SUBTOTAL
$5,926 45.50TOTALS $5,926.00
A - 121
S-0445ON-SITE IMPROVEMENT PLAN CHECK
PLAN SETCD-LAND DEV.
Plan check on-site precise site plans for conformance with City Ordinances for paved parking areas, ADA
accessibility, drainage, NPDES stds, sewer utilities, on-site lighting, wall locations/elevations, trash enclosures
and accessible paths of travel.
2% of engineer's cost estimate for on-site improvements
$3,585 - 1st Sheet, plus
$1,515 - Each Additional Sheet, plus
$265 - if the project is over $25K in estimated cost
$605 - Additional Plan Check (minimum 4 hours) plus $150 for each hour over four
(Note: Sheets with only standards & conditions are not counted.)
100%
$134,733.00
$133,868.00
$865.00
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 100.65%
$865
$133,868
$134,733
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 122
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ON-SITE IMPROVEMENT PLAN CHECK S-0445
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH.Minimum 1.00 $82.26 1 $82
C.DEV-LAND DEV SR.CIVIL ENGINEER 2.00 $366.96 1 $367
C.DEV-LAND DEV ENGIN'G ASSIST III 4.00 $477.76 1 $478
$927 $926.98 7.00TYPE SUBTOTAL
C.DEV-LAND DEV SR.CIVIL ENGINEER 405.25 $74,355.27 1 $74,355
C.DEV-LAND DEV ENGIN'G ASSIST III 490.50 $58,585.32 1 $58,585
$132,941 $132,940.59 895.75TYPE SUBTOTAL
$133,868 902.75TOTALS $133,868.00
A - 123
S-0447GRADING PLAN CHECK FEE
CUBIC YARDSCD-LAND DEV.
To review a grading plan for compliance with City Ordinances and State Codes. Review grading bonds if
required. Review drainage and erosion control measures to be used.
Cubic Yards: <= 50 - No Fee
51 to 100 - $15.00
101 to 1,000 - $22.50
1,001 to 10,000 - $30.00
10,001 to 100,000 - $30.00 plus $15.00 for each 10K CY > 10,000
100,001 to 200,000 - $165.00 plus $9.00 for each 10K CY > 100,000
200,001 and up - $255.00 plus $4.50 for each 10K CY > 200,000
$390 for all plans with more than 50 Cubic Yards
100%
$160.80
$387.80
$(227.00)
5
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 41.46%
$(1,135)
$1,939
$804
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 124
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
GRADING PLAN CHECK FEE S-0447
5
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 5 $206
C.DEV-LAND DEV SR.CIVIL ENGINEER 0.75 $137.61 5 $688
C.DEV-LAND DEV ENGIN'G ASSIST III 1.75 $209.02 5 $1,045
$1,939 $387.76 3.00TYPE SUBTOTAL
$1,939 3.00TOTALS $387.80
A - 125
S-0452REVIEW-CERTIFICATE OF COMPLIANCE
CERTIFICATECD-LAND DEV.
To review a lot to determine if it is in conformity with the State Subdivision Map Act and City Ordinances, If it is,
issue a Certificate of Compliance which allows future construction permits on the lot.
$828
$1,370
100%
$828.00
$1,372.00
$(544.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 60.35%
$(544)
$1,372
$828
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 126
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
REVIEW-CERTIFICATE OF COMPLIANCE S-0452
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 1 $41
C.DEV-LAND DEV SR.CIVIL ENGINEER 4.00 $733.92 1 $734
C.DEV-LAND DEV ENGIN'G ASSIST III 5.00 $597.20 1 $597
$1,372 $1,372.25 9.50TYPE SUBTOTAL
$1,372 9.50TOTALS $1,372.00
A - 127
S-0453REVIEW-LOT MERGER
APPLICATIONCD-LAND DEV.
To process an application to merge multiple lots into one new lot.
$828
$1,300
100%
$828.00
$1,302.24
$(474.24)
17
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 63.58%
$(8,062)
$22,138
$14,076
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 128
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
REVIEW-LOT MERGER S-0453
17
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 17 $699
C.DEV-LAND DEV SR.CIVIL ENGINEER 2.00 $366.96 17 $6,238
C.DEV-LAND DEV ENGIN'G ASST I/II 2.00 $186.14 17 $3,164
C.DEV-LAND DEV Consultant (6hrs) 0.00 $708.00 17 $12,036
$22,138 $1,302.23 4.50TYPE SUBTOTAL
$22,138 4.50TOTALS $1,302.24
A - 129
S-0454REVIEW-LOT LINE ADJSTMT
APPLICATIONCD-LAND DEV.
To review the adjustment of the lot line between two parcels.
$414 - SFR Occupancy (#3; $1,242)
$828 - Com'l/Ind'l (#3; $2,484)
$1,590
100%
$621.00
$1,587.83
$(966.83)
6
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 39.11%
$(5,801)
$9,527
$3,726
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 130
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
REVIEW-LOT LINE ADJSTMT S-0454
6
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 6 $247
C.DEV-LAND DEV SR.CIVIL ENGINEER 5.50 $1,009.14 6 $6,055
C.DEV-LAND DEV ENGIN'G ASSIST III 4.50 $537.48 6 $3,225
$9,527 $1,587.75 10.50TYPE SUBTOTAL
$9,527 10.50TOTALS $1,587.83
A - 131
S-0463ON-SITE CONSTRUCTION INSPECTION
PROJECTCD-LAND DEV.
To provide field inspecion of on-site improvements including sewers, storm drains, parking areas, accessibility
per ADA requirements, curbs, planters, Water Quality Control Plan features, erosion controls and finish grade.
3% of Estimated Construction Cost
Fee Based on Engineer's Estimate of Construction Cost:
$0 to $1 Million - 3.4% of estimated cost with a $1,045 minimum
Greater than $1 MIllion - $34,000 plus 1.7% of the estimated cost over $1 Million
100%
$202,100.00
$216,999.00
$(14,899.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 93.13%
$(14,899)
$216,999
$202,100
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 132
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ON-SITE CONSTRUCTION INSPECTION S-0463
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-LAND DEV CONST.INSP.II Minimum 6.00 $531.90 1 $532
C.DEV-LAND DEV SR.CIVIL ENGINEER 1.00 $183.48 1 $183
C.DEV-LAND DEV ENGIN'G ASSIST III 2.00 $238.88 1 $239
C.DEV-LAND DEV ENGIN'G ASST I/II 1.00 $93.07 1 $93
$1,047 $1,047.33 10.00TYPE SUBTOTAL
C.DEV-LAND DEV CONST.INSP.II 1,471.50 $130,448.48 1 $130,448
C.DEV-LAND DEV SR.CIVIL ENGINEER 81.05 $14,871.05 1 $14,871
C.DEV-LAND DEV ENGIN'G ASSIST III 81.75 $9,764.22 1 $9,764
C.DEV-LAND DEV ENGIN'G ASST I/II 654.00 $60,867.78 1 $60,868
$215,952 $215,951.53 2,288.30TYPE SUBTOTAL
$216,999 2,298.30TOTALS $216,999.00
A - 133
S-0467ON-SITE GRADING INSPECTION
CD-LAND DEV.
To perform field inspection of on-site grading, erosion control devices and drainage/storm drain features of stand
alone rough grading.
Cubic Yards: <= 50 - No Fee
51 to 100 - $150.00
101 to 1,000 - $225.00
1,001 to 10,000 - $300.00
10,001 to 100,000 - $300.00 plus $100.00 for each 10K CY > 10,000
100,001 to 200,000 - $300.00 plus $100.00 for each 10K CY > 100,000
200,001 and up - $300.00 plus $100.00 for each 10K CY > 200,000
Cubic Yards:
1 to 1,000 - $225
1,001 to 10,000 - $340
10,001 to 100,000 - $340 plus $115.00 for each 10K CY > 10,000
100,001 to 200,000 - $1,375 plus $55 for each 10K CY > 100,000
200,001 and up - $1,870 plus $10 for each 10K CY > 200,000
100%
$14,853.00
$17,978.00
$(3,125.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 82.62%
$(3,125)
$17,978
$14,853
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 134
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ON-SITE GRADING INSPECTION S-0467
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-LAND DEV CONST.INSP.II Minimum 2.00 $177.30 1 $177
C.DEV-LAND DEV ENGIN'G ASST I/II 0.50 $46.54 1 $47
$224 $223.84 2.50TYPE SUBTOTAL
C.DEV-LAND DEV CONST.INSP.II 114.45 $10,145.99 1 $10,146
C.DEV-LAND DEV ENGIN'G ASST I/II 81.75 $7,608.47 1 $7,608
$17,754 $17,754.46 196.20TYPE SUBTOTAL
$17,978 198.70TOTALS $17,978.00
A - 135
S-0471HYDRAULIC/HYDROLOGY STUDY REVIEW
STUDYCD-LAND DEV.
To review a hydraulic/hydrology study prepared by a developer's engineer to determine the impact of a
development on the ground water and the storm drainage system.
Actual Time:
$487 - for the first 3 hours
$100 - for each add'l hour
$825
100%
$587.00
$827.00
$(240.00)
50
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 70.98%
$(12,000)
$41,350
$29,350
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 136
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
HYDRAULIC/HYDROLOGY STUDY REVIEW S-0471
50
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-LAND DEV SR.CIVIL ENGINEER 4.00 $733.92 50 $36,696
C.DEV-LAND DEV ENGIN'G ASST I/II 1.00 $93.07 50 $4,654
$41,350 $826.99 5.00TYPE SUBTOTAL
$41,350 5.00TOTALS $827.00
A - 137
S-0472ALQUIST PRIOLO FAULT LINE INVESTIG.
STUDYCD-LAND DEV.
To make a finding that a proposed development is not on or near a known fault line.
None
$940
100%
$0.00
$939.00
$(939.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$(939)
$939
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 138
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ALQUIST PRIOLO FAULT LINE INVESTIG.S-0472
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-ADMIN SR.MGMT.ANALYST 0.50 $53.60 1 $54
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 1 $41
C.DEV-LAND DEV SR.CIVIL ENGINEER 2.00 $366.96 1 $367
C.DEV-LAND DEV ENGIN'G ASSIST III 4.00 $477.76 1 $478
$939 $939.45 7.00TYPE SUBTOTAL
$939 7.00TOTALS $939.00
A - 139
S-0480FEMA FLOODPLAIN REVIEW
APPLICATIONCD-STORMWATER MGT
To perform a FEMA plan review of a project located within floodplain designations Zone "A", "AE", or "shaded X".
None
$940 plus consultant costs including 10% City administrative overhead charged against an initial deposit
determined by staff.
100%
$0.00
$939.50
$(939.50)
4
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$(3,758)
$3,758
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 140
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
FEMA FLOODPLAIN REVIEW S-0480
4
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-ADMIN SR.MGMT.ANALYST 0.50 $53.60 4 $214
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 4 $165
C.DEV-LAND DEV SR.CIVIL ENGINEER 2.00 $366.96 4 $1,468
C.DEV-LAND DEV ENGIN'G ASSIST III 4.00 $477.76 4 $1,911
$3,758 $939.45 7.00TYPE SUBTOTAL
$3,758 7.00TOTALS $939.50
A - 141
S-0481REV.OF STORM WTR POLLUTION PREV.PLN
PLANCD-STRMWTR MGMT
To review the stormwater run-off pollution plan for a project over 1 acre in size to insure that the run-off meets
the requirements of NPDES. To inspect the site during construction to insure that the conditions of the plan are
being met.
$410 - Commercial & Residential Projects (#57; $23,370)
$265 - Industrial and Linear (CIP/Utility) Projects (#56; $14,840)
$405 - Commercial & Residential Projects
$615 - Industrial and Linear (CIP/Utility) Projects
100%
$338.14
$510.30
$(172.16)
113
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 66.26%
$(19,454)
$57,664
$38,210
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 142
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
REV.OF STORM WTR POLLUTION PREV.PLN S-0481
113
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-ADMIN EXEC.ASSISTANT Com'l/Res'l 0.50 $27.22 57 $1,552
C.DEV-STRMWTR MGT NPDES COORD 3.00 $338.37 57 $19,287
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 57 $2,344
$23,183 $406.72 4.00TYPE SUBTOTAL
C.DEV-ADMIN EXEC.ASSISTANT Industrial/Linear 0.50 $27.22 56 $1,524
C.DEV-STRMWTR MGT NPDES COORD 3.00 $338.37 56 $18,949
C.DEV-STRMWTR MGT NPDES INSPECTOR 2.50 $250.15 56 $14,008
$34,481 $615.74 6.00TYPE SUBTOTAL
$57,664 10.00TOTALS $510.30
A - 143
S-0488REVIEW OF WTR QUALITY MGMT PLANS
PLANCD-STRMWTR MGMT
To review the Stormwater Pollution Plan for run-off after a development is completed. This review occurs before
the grading and/or building permits are issued. Includes three plan reviews.
$80 - Non-Categorical (#450; $36,000)
$365 - Categorical without Conditions of Concern (#75; $27,375)
$1,130 - Categorical with Conditions of Concern (#75; $84,750)
$99 - per hour for reviews after the third review (#1; $99)
$155 - Non-Categorical
$1,440 - Categorical
$120 - per hour for reviews after the third review
100%
$246.63
$474.64
$(228.01)
601
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 51.96%
$(137,033)
$285,257
$148,224
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 144
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
REVIEW OF WTR QUALITY MGMT PLANS S-0488
601
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-STRMWTR MGT NPDES COORD Non-Categorical 1.00 $112.79 450 $50,756
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 450 $18,509
$69,264 $153.92 1.50TYPE SUBTOTAL
C.DEV-STRMWTR MGT NPDES COORD Categorical 7.00 $789.53 150 $118,430
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 150 $6,170
C.DEV-LAND DEV SR.CIVIL ENGINEER 1.00 $183.48 150 $27,522
C.DEV-LAND DEV ENGIN'G ASSIST III 2.00 $238.88 150 $35,832
C.DEV-LAND DEV ENGIN'G ASST I/II 2.00 $186.14 150 $27,921
$215,874 $1,439.16 12.50TYPE SUBTOTAL
C.DEV-LAND DEV ENGIN'G ASSIST III 1.00 $119.44 1 $119
$119 $119.44 1.00TYPE SUBTOTAL
$285,257 15.00TOTALS $474.64
A - 145
S-0489REV-EROSION/WSTE MGMT CONTROL PLAN
PLANCD-WSTWTR MGMT
To review the erosion and waste management control plan for a construction site.
$75
$180
100%
$75.00
$182.33
$(107.33)
55
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 41.13%
$(5,903)
$10,028
$4,125
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 146
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
REV-EROSION/WSTE MGMT CONTROL PLAN S-0489
55
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-STRMWTR MGT NPDES INSPECTOR 1.00 $100.06 55 $5,503
C.DEV-BLDG+SAFETY COM.DEV.TECH. 1.00 $82.26 55 $4,524
$10,028 $182.32 2.00TYPE SUBTOTAL
$10,028 2.00TOTALS $182.33
A - 147
S-0490NPDES CONSTRUCTION INSPECTION
SITECD-STRMWTR MGT
To inspect a construction site to mitigate hazardous run-off.
$98 - Less than 10 Acres (#200; $19,600)
$179 - 10 Acres or More (#4; $716)
$140
100%
$99.59
$141.19
$(41.60)
204
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 70.53%
$(8,487)
$28,803
$20,316
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 148
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
NPDES CONSTRUCTION INSPECTION S-0490
204
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-STRMWTR MGT NPDES INSPECTOR 1.00 $100.06 204 $20,412
C.DEV-BLDG+SAFETY COM.DEV.TECH. 0.50 $41.13 204 $8,391
$28,803 $141.19 1.50TYPE SUBTOTAL
$28,803 1.50TOTALS $141.19
A - 149
S-0495NPDES BUSINESS INSPECTION
BUSINESSCD-STRMWTR MGMT
To review a business for hazardous discharge into the sewer or storm drainage system.
$143
$175
100%
$143.00
$175.11
$(32.11)
221
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 81.66%
$(7,096)
$38,699
$31,603
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 150
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
NPDES BUSINESS INSPECTION S-0495
221
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-STRMWTR MGT NPDES INSPECTOR 1.75 $175.11 221 $38,699
$38,699 $175.11 1.75TYPE SUBTOTAL
$38,699 1.75TOTALS $175.11
A - 151
S-0501BASIC PERMIT FEE
PERMITPW-ENGINEERING
See note in "Suggested Fee" below
$45.00 - Engineering Permit
$53.00 - Blanket Permit
$43.00 - Permit Extension
Engineering Permit - This fee is included with each permit so it does not need to be charged separately and should
be deleted
Blanket Permit - covered by S-0523, so this fee should be deleted
Permit Extension - covered by S-0560, so this fee should be deleted
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 152
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
BASIC PERMIT FEE S-0501
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 153
S-0503PERMANENT ENCROACHMENT PERMIT
PERMITPW-ENGINEERING
To review a request for a permanent encroachment into the public right-of-way.
$670.00 - Initial Permit ($625 for the encroachment permit and $45 for the basic permit - both to be combined
into one fee.)
$150.00 - Annual Renewal
$1,515 - Initial Permit
$340 - Annual Renewal
100%
$670.00
$1,514.80
$(844.80)
5
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 44.23%
$(4,224)
$7,574
$3,350
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 154
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
PERMANENT ENCROACHMENT PERMIT S-0503
5
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING CITY ENG/DEP.DIR PW 3.00 $711.78 5 $3,559
PW-ENGINEERING CONSTRUCTION INSPECTOR II 1.00 $106.10 5 $531
PW-ENGINEERING CONSTRUCTION MANAGER 1.00 $131.28 5 $656
PW-REAL PROP.ASSMNT DIST/REAL PROP MGR 5.00 $565.65 5 $2,828
$7,574 $1,514.81 10.00TYPE SUBTOTAL
$7,574 10.00TOTALS $1,514.80
A - 155
S-0505TEMPORARY ENCROACHMENT PERMIT
PERMITPW-ENGINEERING
To process a request for a temporary encroachment into the public right-of-way.
$25.00 - No Lane Closure (#100; $2,500)
$136.00 - Lane Closure: First Day (#2,400; $326,400)
$60.00 - Lane Closure: Each Additional Day (#9,600; $576,000)
$70.00 - Trash Bin, 1st week
$28.00 - Trash Bin, each add'l week
$160 - No Lane Closure - Parking Only
$175 - Lane Closure: First Day
$25 - Lane Closure: Each Additional Day
$100 - Trash Bin, 1st week
$25 - Trash Bin, each add'l week
100%
$74.78
$57.27
$17.51
12,102
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 130.57%
$211,865
$693,133
$904,998
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 156
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
TEMPORARY ENCROACHMENT PERMIT S-0505
12,102
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING CONSTRUCTION INSPECTOR II 0.50 $53.05 100 $5,305
PW-ENGINEERING CONSTRUCTION MANAGER 0.25 $32.82 100 $3,282
PW-ENGINEERING ENGINEERING ASSISTANT I/I Parking Only 0.75 $73.06 100 $7,306
$15,893 $158.93 1.50TYPE SUBTOTAL
PW-ENGINEERING CONSTRUCTION INSPECTOR II 0.50 $53.05 2,400 $127,320
PW-ENGINEERING ENGINEERING ASSISTANT I/I Lane Closure-1st Day 0.75 $73.06 2,400 $175,344
PW-TRAFFIC ENG TRAFFIC ENGINEER 0.33 $49.90 2,400 $119,760
$422,424 $176.01 1.58TYPE SUBTOTAL
PW-ENGINEERING CONSTRUCTION INSPECTOR II Closure-Ea.Add'l Day 0.25 $26.53 9,600 $254,688
$254,688 $26.53 0.25TYPE SUBTOTAL
PW-ENGINEERING CONSTRUCTION INSPECTOR II 0.50 $53.05 1 $53
PW-ENGINEERING ENGINEERING ASSISTANT I/I Trash Bin-1st Week 0.50 $48.71 1 $49
$102 $101.76 1.00TYPE SUBTOTAL
PW-ENGINEERING CONSTRUCTION INSPECTOR II Tr.Bin-Add'l Wk. 0.25 $26.53 1 $27
$27 $26.53 0.25TYPE SUBTOTAL
$693,133 4.58TOTALS $57.27
A - 157
S-0507LANE CLOSURE WITH EXCAVATION
PERMITPW-ENGINEERING
See note in "Suggested Fee" below
$286.00
Staff recommends deleting this fee as the cost of reviewing/inspecting the lane closure is covered by the
excavation permit.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 158
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
LANE CLOSURE WITH EXCAVATION S-0507
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 159
S-0509SPECIAL EVENT ENCROACHMENT
PERMITPW-ENGINEERING
To process a request to hold a special event in the public right-of-way.
$545.00 - With a Lane Closure (#4; $2,180)
$559.00 - With a Street Closure (#8; $4,472)
$347.00 - With a Road Closure (1st day) **
$302.00 - Each Additional Day of a Street/Road Closure (#4, $1,208)
(**Note: Staff recomends combining the fees for a street and a road as they take the same effort. Also, each of
the above fees, except the "additional day" fee, include the $45 basic fee from S-0501.)
$925 - Lane Closure
$1,495 - Street/Road Closure, 1st day
$1,040 - Street/Road Closure, each add''l day
100%
$491.25
$1,238.25
$(747.00)
16
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 39.67%
$(11,952)
$19,812
$7,860
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 160
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
SPECIAL EVENT ENCROACHMENT S-0509
16
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING ENGINEERING ASSISTANT I/I Lane 0.75 $73.06 4 $292
PW-TRAFFIC ENG TRAFFIC ENGINEERING ASSOC 6.00 $852.12 4 $3,408
$3,701 $925.18 6.75TYPE SUBTOTAL
PW-ENGINEERING CITY ENG/DEP.DIR PW 0.10 $23.73 8 $190
PW-ENGINEERING ENGINEERING ASSISTANT I/I Street/Road 0.75 $73.06 8 $584
PW-TRAFFIC ENG TRAFFIC ENGINEERING ASSOC 6.00 $852.12 8 $6,817
PW-GAS TX-ST.MTC MAINTENANCE WORKER I 8.00 $544.32 8 $4,355
$11,946 $1,493.23 14.85TYPE SUBTOTAL
PW-TRAFFIC ENG TRAFFIC ENGINEERING ASSOC Add'l Days 3.50 $497.07 4 $1,988
PW-GAS TX-ST.MTC MAINTENANCE WORKER I 8.00 $544.32 4 $2,177
$4,166 $1,041.39 11.50TYPE SUBTOTAL
$19,812 33.10TOTALS $1,238.25
A - 161
S-0511OVERSIZE LOAD/BLDG.MOVE PERMIT
PERMITPW-ENGINEERING
To process a permit for an oversize/overload transport through the City. This fee is controlled by the State.
$17.00 - One Day (State-Mandated Fee is $16) (#997; $16,949)
$95.00 - Annual Permit (State-Mandated Fee is $90) (#3; $285)
$16 - One Day Permit
$90 - Annual Permit
(Note: City may only charge the State-Mandated fee. There is no provision for a technology surcharge.)
100%
$17.23
$32.15
$(14.92)
1,000
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 53.60%
$(14,916)
$32,150
$17,234
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 162
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
OVERSIZE LOAD/BLDG.MOVE PERMIT S-0511
1,000
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING ENGINEERING ASSISTANT I/I 0.33 $32.15 1,000 $32,150
$32,150 $32.15 0.33TYPE SUBTOTAL
$32,150 0.33TOTALS $32.15
A - 163
S-0513HAULING PERMIT
PERMITPW-ENGINEERING
To process a request to haul construction supplies/debris either into or out of the City.
$438.00 - First Day (#8; $3,504) (Includes S-501 Basic Fee)
$100.00 - Each Additional Day (#32; $3,200)
$650 - First Day
$285 - Each Additional Day
100%
$167.60
$357.30
$(189.70)
40
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 46.91%
$(7,588)
$14,292
$6,704
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 164
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
HAULING PERMIT S-0513
40
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING ENGINEERING ASSISTANT I/I 1st Day 0.75 $73.06 8 $584
PW-TRAFFIC ENG TRAFFIC ENGINEER 1.00 $151.20 8 $1,210
PW-TRAFFIC ENG TRAFFIC ENGINEERING ASSOC 3.00 $426.06 8 $3,408
$5,203 $650.32 4.75TYPE SUBTOTAL
PW-TRAFFIC ENG TRAFFIC ENGINEERING ASSOC Add'l Day 2.00 $284.04 32 $9,089
$9,089 $284.04 2.00TYPE SUBTOTAL
$14,292 6.75TOTALS $357.30
A - 165
S-0515EXCAVATION PERMIT
PERMITPW-ENGINEERING
See note in "Suggested Fee" below
$150.00 - Per day
Staff Recommends Deleting This Service
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 166
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
EXCAVATION PERMIT S-0515
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 167
S-0517TRAFFIC STUDY REPORT
REPORTPW-ENGINEERING
To review a developer's traffic study to ensure compliance with City standards.
$719.00 - Basic Review (#10; $7,190)
$80.00 - Extended Review per Hour (#0; $0)
Actual Consultant charge (currently $1,440 for a basic review) plus 10% overhead for City contract administration
and review.
100%
$719.00
$1,591.20
$(872.20)
10
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 45.19%
$(8,722)
$15,912
$7,190
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 168
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
TRAFFIC STUDY REPORT S-0517
10
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-TRAFFIC ENG TRAFFIC ENGINEER 1.00 $151.20 10 $1,512
PW-TRAFFIC ENG Consultant 0.00 $1,440.00 10 $14,400
$15,912 $1,591.20 1.00TYPE SUBTOTAL
$15,912 1.00TOTALS $1,591.20
A - 169
S-0518OFF-SITE IMPROVEMENT PLAN CHECK
SHEETPW-ENGINEERING
To review grading plans for off-site improvements. Three plan checks are included with the original off-site
improvement plan check. Fourth and subsequent plan checks are charged an additional plan check fee.
$45 plus 4% of Estimated Construction Cost with a $50 minimum
$3,585 - 1st Sheet, plus
$1,515 - Each Additional Sheet, plus
$265 - if the project is over $25K in estimated cost
$605 - Additional Plan Check (minimum 4 hours) plus $150 for each hour over four
(Note: Sheets with only standards & conditions are not counted.)
100%
$2,114.40
$2,251.74
$(137.34)
152
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 93.90%
$(20,876)
$342,265
$321,389
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 170
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
OFF-SITE IMPROVEMENT PLAN CHECK S-0518
152
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING ENGINEERING ASSOCIATE 1st Sheet 16.00 $2,429.28 50 $121,464
PW-ENGINEERING ENGINEERING ASSISTANT I/I 1.00 $97.41 50 $4,871
PW-TRAFFIC ENG TRAFFIC ENGINEER 7.00 $1,058.40 50 $52,920
$179,255 $3,585.09 24.00TYPE SUBTOTAL
PW-ENGINEERING ENGINEERING ASSOCIATE Add'l Sheet 7.00 $1,062.81 100 $106,281
PW-TRAFFIC ENG TRAFFIC ENGINEER 3.00 $453.60 100 $45,360
$151,641 $1,516.41 10.00TYPE SUBTOTAL
PW-ENGINEERING CONSTRUCTION INSPECTOR II Over $25K 2.50 $265.25 40 $10,610
$10,610 $265.25 2.50TYPE SUBTOTAL
PW-ENGINEERING ENGINEERING ASSOCIATE Add'l P.Ck.-Min. 4.00 $607.32 1 $607
$607 $607.32 4.00TYPE SUBTOTAL
PW-ENGINEERING ENGINEERING ASSOCIATE Ea.Add'l Hour 1.00 $151.83 1 $152
$152 $151.83 1.00TYPE SUBTOTAL
$342,265 41.50TOTALS $2,251.74
A - 171
S-0520REVIEW REVISIONS TO APPROVED PLANS
REVIEWPW-ENGINEERING
To review changes to approved plans due to changes to conditions or other reasons.
$137.00
$210 for the 1st hour plus $150 for each additional hour
100%
$137.00
$211.20
$(74.20)
5
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 64.87%
$(371)
$1,056
$685
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 172
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
REVIEW REVISIONS TO APPROVED PLANS S-0520
5
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING CITY ENG/DEP.DIR PW 0.25 $59.32 5 $297
PW-ENGINEERING ENGINEERING ASSOCIATE 1.00 $151.83 5 $759
$1,056 $211.15 1.25TYPE SUBTOTAL
$1,056 1.25TOTALS $211.20
A - 173
S-0521OFF-SITE IMPROVEMENT INSPECTION
PROJECTPW-ENGINEERING
To inspect off-site construction to insure that it complies with the City's standards & conditions as well as the
approved plans, if applicable.
$45 plus 4% of Estimated Construction Cost
$240 - Driveway & Sidewalk Replacement
Other Fees based on Estimated Construction Cost:
$0 to $175,000 - $630 plus 12.4% of the Cost over $15,000
$175,001 to $750,000 - $20,470 plus 3.4% of the Cost over $175,000
Greater than $750,000 - $40,020 plus 1.1% of the Cost over $750,000
100%
$1,566.67
$1,599.80
$(33.13)
120
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 97.93%
$(3,976)
$191,976
$188,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 174
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
OFF-SITE IMPROVEMENT INSPECTION S-0521
120
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING CONSTRUCTION INSPECTOR II 1.00 $106.10 20 $2,122
PW-ENGINEERING ENGINEERING ASSOCIATE 0.25 $37.96 20 $759
PW-ENGINEERING ENGINEERING ASSISTANT I/I Basic D/W, S/W Repl. 1.00 $97.41 20 $1,948
$4,829 $241.47 2.25TYPE SUBTOTAL
PW-ENGINEERING CONSTRUCTION INSPECTOR II 5.00 $530.50 60 $31,830
PW-ENGINEERING ENGINEERING ASSISTANT I/I Base 1.00 $97.41 60 $5,845
$37,675 $627.91 6.00TYPE SUBTOTAL
PW-ENGINEERING CONSTRUCTION INSPECTOR II 20.41 $2,165.10 40 $86,604
PW-ENGINEERING CONSTRUCTION MANAGER 8.18 $1,073.21 40 $42,928
PW-ENGINEERING ENGINEERING ASSOCIATE 2.00 $303.66 40 $12,146
PW-ENGINEERING ENGINEERING ASSISTANT I/I 2.00 $194.82 40 $7,793
$149,472 $3,736.79 32.58TYPE SUBTOTAL
$191,976 40.83TOTALS $1,599.80
A - 175
S-0523ANNUAL UTILITY BLANKET PERMIT
LOCATIONPW-ENGINEERING
To issue an annual blanket permit to utilities in advance of emergency work to avoid delaying the work. To
inspect the work as it occurs. The cost of the permit and inspection are deducted from an initial deposit as
required.
$53.00 - Permit Issuance (#7; $371)
$73.00 - Inspection Per Location (#7; $511)
$130 for the initial blanket permit annually plus $105 per day for inspection per location after the first day/location
deducted from an initial annual deposit of $5,500. Deposit balance can be carried forward to a new year but a new
initial blanket permit is required and the deposit balance must be restored to $5,500.
100%
$63.00
$118.14
$(55.14)
14
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 53.33%
$(772)
$1,654
$882
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 176
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ANNUAL UTILITY BLANKET PERMIT S-0523
14
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING CONSTRUCTION MANAGER Blanket Permit 0.25 $32.82 7 $230
PW-ENGINEERING ENGINEERING ASSISTANT I/I 1.00 $97.41 7 $682
$912 $130.23 1.25TYPE SUBTOTAL
PW-ENGINEERING CONSTRUCTION INSPECTOR II Per Day Per Location 1.00 $106.10 7 $743
$743 $106.10 1.00TYPE SUBTOTAL
$1,654 2.25TOTALS $118.14
A - 177
S-0529BOND RELEASE INSPECTION - PW
BONDPW-ENGINEERING
To perform an inspection to confirm that all issues covered by the bond are satisfied so that the City can release
the bond.
$45.00 - Issuance
$59.00 - Inspection
$230
100%
$104.00
$230.80
$(126.80)
5
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 45.06%
$(634)
$1,154
$520
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 178
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
BOND RELEASE INSPECTION - PW S-0529
5
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING CONSTRUCTION INSPECTOR II 1.00 $106.10 5 $531
PW-ENGINEERING ENGINEERING ASSOCIATE 0.50 $75.92 5 $380
PW-ENGINEERING ENGINEERING ASSISTANT I/I 0.50 $48.71 5 $244
$1,154 $230.73 2.00TYPE SUBTOTAL
$1,154 2.00TOTALS $230.80
A - 179
S-0531STREET NAME CHANGE
NAMEPW-REAL PROPERY
To change the name of a street at the request of a private party or group.
$1,345.00 Plus the Cost of Street Signs
Actual Cost based on the "Fully-Burdened" hourly rate of City staff plus consultant costs including 10% contract
administrative overhead and all other costs, including new street signage, charged against an initial deposit
determined by staff.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 180
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
STREET NAME CHANGE S-0531
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 181
S-0533STREET/ALLEY VACATION
VACATIONPW-REAL PROPERTY
To process a request to terminate the City's interest (easement) in an alley or street.
$1,000.00 - Deposit
$1,000.00 - Balance Due Prior to Processing
$1,840 plus a deposit for noticing and publishing determined by staff
100%
$1,000.00
$1,842.50
$(842.50)
2
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 54.27%
$(1,685)
$3,685
$2,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 182
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
STREET/ALLEY VACATION S-0533
2
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING CITY ENG/DEP.DIR PW 3.00 $711.78 2 $1,424
PW-REAL PROP.ASSMNT DIST/REAL PROP MGR 4.00 $452.52 2 $905
PW-REAL PROP.ASSMNT DIST/REAL PROP SPE 8.00 $678.00 2 $1,356
$3,685 $1,842.30 15.00TYPE SUBTOTAL
$3,685 15.00TOTALS $1,842.50
A - 183
S-0535DEDICATION OF RIGHT-OF-WAY
EACHPW-REAL PROPERTY
To legally accept the ownership of property (right-of-way) at the request of a private party.
$315.00 - If Legal and Map are Provided (#10; $3,150)
$800.00 - If City Prepares Legal & Map
If Legal and Map are Provided - $920
If City Prepares Legal & Map - Actual Cost based on the "Fully-Burdened" hourly rate of City staff plus consultant
costs including 10% contract administrative overhead and all other costs charged against an initial deposit
determined by staff.
100%
$315.00
$921.20
$(606.20)
10
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 34.19%
$(6,062)
$9,212
$3,150
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 184
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
DEDICATION OF RIGHT-OF-WAY S-0535
10
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING CITY ENG/DEP.DIR PW 1.50 $355.89 10 $3,559
PW-REAL PROP.ASSMNT DIST/REAL PROP MGR 2.00 $226.26 10 $2,263
PW-REAL PROP.ASSMNT DIST/REAL PROP SPE 4.00 $339.00 10 $3,390
$9,212 $921.15 7.50TYPE SUBTOTAL
$9,212 7.50TOTALS $921.20
A - 185
S-0537PRIVATE PARTY ANNEXATION REQUEST
REQUESTPW-REAL PROPERTY
To process the request of a private party to annex their property to the City.
$14,750.00
Actual Cost based on the "Fully-Burdened" hourly rate of City staff plus consultant costs including 10% contract
administrative overhead and all other costs charged against an initial deposit of $17,000.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 186
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
PRIVATE PARTY ANNEXATION REQUEST S-0537
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 187
S-0539CITY PROPERTY LEASE PROCESSING
LEASEPW-REAL PROPERTY
To process a City property lease.
$2,100.00
Actual Cost based on the "Fully-Burdened" hourly rate of City staff plus consultant costs including 10% contract
administrative overhead and all other costs charged against an initial deposit of $5,500.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 188
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
CITY PROPERTY LEASE PROCESSING S-0539
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 189
S-0542ENGINEERING LETTER
LETTERPW-ENGINEERING
See note in "Suggested Fee" below
$100.00
Staff recommends deleting this service as it is not being provided.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 190
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ENGINEERING LETTER S-0542
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 191
S-0560PERMIT EXTENSION
REQUESTPW-ENGINEERING
To review a request for a permit extension to determine if there are reasons to deny it.
$43.00
$80 each
100%
$43.00
$81.53
$(38.53)
200
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 52.74%
$(7,706)
$16,306
$8,600
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 192
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
PERMIT EXTENSION S-0560
200
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING CONSTRUCTION MANAGER 0.25 $32.82 200 $6,564
PW-ENGINEERING ENGINEERING ASSISTANT I/I 0.50 $48.71 200 $9,742
$16,306 $81.53 0.75TYPE SUBTOTAL
$16,306 0.75TOTALS $81.53
A - 193
S-0565RE-INSPECTION
HOURPW-ENGINEERING
To re-inspect due to failure to have work ready on the initial inspection or because more inspections were
required than covered by the initial permit. This inspection is during normal working hours.
$90 ($45 permit fee + $45 reinspection fee)
$105 per hour with a one-hour minimum
100%
$90.00
$106.00
$(16.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 84.91%
$(16)
$106
$90
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 194
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
RE-INSPECTION S-0565
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PW-ENGINEERING CONSTRUCTION INSPECTOR II 1.00 $106.10 1 $106
$106 $106.10 1.00TYPE SUBTOTAL
$106 1.00TOTALS $106.00
A - 195
S-0567AFTER HOURS & HOLIDAY INSPECTION
INSPECTIONPW-ENGINEERING
To perform an inspection at the request of a developer outside of normal working hours.
$369.00 - 4 hr. minimum
$92.45 - each additional hour
Employee's current hourly rate at time & 1/2 plus 20% overhead with a four (4) hour minimum
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 196
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
AFTER HOURS & HOLIDAY INSPECTION S-0567
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 197
S-0571ASMT.DIST./COMM.FACILITIES DIST.
DISTRICTPW-ENGINEERING
To perform the legal requirements to establish an assessment district or a Community Facilities District usually in
a new development at the request of the developer.
$5,900
Actual Cost based on the "Fully-Burdened" hourly rate of City staff plus consultant costs including 10% contract
administrative overhead and all other costs charged against an initial deposit determined by staff.
100%
$0.00
$0.00
$0.00
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 198
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ASMT.DIST./COMM.FACILITIES DIST.S-0571
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 199
S-0602CONCEALED WEAPONS PERMIT
PERMITPOLICE
To process a request to authorize carrying a concealed weapon.
$400 - Initial
$325 - Renewal
The general public applies for Concealed Weapons Permits at the Sheriff's Office. The Police Department only
issues permits to retired SBPD Officers who are not charged a fee. Staff recommends deleting this fee as it is not
being used.
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 200
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
CONCEALED WEAPONS PERMIT S-0602
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 201
S-0609RECORDS CHECK LETTER
LETTERPOLICE
To prepare a one-page document on departmental letterhead that gives the result of researching local records.
$25 - With Record
$20 - Without Record
$40
100%
$25.00
$42.00
$(17.00)
10
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 59.52%
$(170)
$420
$250
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 202
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
RECORDS CHECK LETTER S-0609
10
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
POL-RECORDS LIEUTENANT 0.08 $22.37 10 $224
POL-RECORDS PD RECORDS TECH .II 0.32 $19.62 10 $196
$420 $41.99 0.40TYPE SUBTOTAL
$420 0.40TOTALS $42.00
A - 203
S-06112ND HAND DEALER/PAWNSHOP REGULATION
LICENSEPOLICE
To process an application for the DOJ Secondhand Dealer and Pawnbroker Unit which conducts a background
check and provides the City with the background check results and a license number. A renewal updates the
information.
$475 - Initial (#1; $475)
$126 - Renewal (#3; $378)
$480 - Initial
$135 - Renewal
100%
$213.25
$222.25
$(9.00)
4
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 95.95%
$(36)
$889
$853
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 204
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
2ND HAND DEALER/PAWNSHOP REGULATION S-0611
4
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
POL-RECORDS LIEUTENANT 0.25 $69.90 1 $70
POL-RECORDS PD RECORDS SUPVSR Initial 1.25 $110.71 1 $111
POL-RECORDS Init.DOJ Bkgrnd,Ck 0.00 $300.00 1 $300
$481 $480.61 1.50TYPE SUBTOTAL
POL-RECORDS LIEUTENANT 0.17 $47.53 3 $143
POL-RECORDS PD RECORDS SUPVSR Renewal 1.00 $88.57 3 $266
$408 $136.10 1.17TYPE SUBTOTAL
$889 2.67TOTALS $222.25
A - 205
S-0613LIVE SCAN FINGERPRINT PROCESSING
PERSONPOLICE
To roll a set of fingerprints using the digital "Live Scan" equipment instead of the "old" ink on cards. Service is
provided to the public on Wednesday from 1 to 5 PM.
$2 - Live Scan Processing Fee (Note: Staff is charging $15 plus the DOJ fee.)
$15 - Fingerprint card
(Note: Applicants for City jobs are not charged the Live Scan fee or the DOJ fee.)
$20 plus applicable DOJ/FBI fee (currently $33)
100%
$15.00
$20.23
$(5.23)
230
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 74.15%
$(1,203)
$4,653
$3,450
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 206
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
LIVE SCAN FINGERPRINT PROCESSING S-0613
230
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
POL-RECORDS PD RECORDS TECH .II 0.33 $20.23 230 $4,653
$4,653 $20.23 0.33TYPE SUBTOTAL
$4,653 0.33TOTALS $20.23
A - 207
S-0616FIX-IT TICKET SIGN-OFF
TICKETPOLICE
To review vehicle repairs when a ticket has been issued to the vehicle owner for a problem such as defective
lights.
$20
$25
100%
$20.00
$24.08
$(4.08)
100
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 83.06%
$(408)
$2,408
$2,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 208
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
FIX-IT TICKET SIGN-OFF S-0616
100
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
POL-TRAFFIC POLICE OFFICER 0.17 $24.08 100 $2,408
$2,408 $24.08 0.17TYPE SUBTOTAL
$2,408 0.17TOTALS $24.08
A - 209
S-0618SPECIAL POLICE SERVICE
HOURPOLICE
To provide City Police Officers on overtime at the request of a special event.
Officer's hourly rate at time & 1/2 plus Medicare and Workers' Comp. Insurance
Officer's current hourly rate at time & 1/2 plus 20% overhead with a four (4) hour minimum
100%
$0.00
$0.00
$0.00
0
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 210
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
SPECIAL POLICE SERVICE S-0618
0
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 211
S-0621ALARM SYSTEM
VARIOUSPOLICE
To encourage the proper maintenance of alarm systems by charging the alarm owner for wasted police time
spent responding to false alarms.
$25/$50/$10 - Ann.Res'l/Com'l/LIR Alarm Pmt. (LIR=Low Income Resident)
$25 - Alarm Sys.Installation
$10 - Alarm Sys.Monitoring Tsfr.
False Alarms in 12-month period [Intrusion: Reg./LIR]/[Robbery or panic: Reg./LIR]:
[$75/$10]/[$200/$20] - 1st thru 4th Non-Permitted
[$90/$10]/[$250/$20] - 5th & 6th
[$90/$20]/[$300/$40] - 7th thru 9th
[$175/$20]/[$350/$40] - 10th & Subsequent
$96 - Annual Alarm Permit ($75-City plus $21-Alarm Vendor)
$25 - Alarm Sys.Installation
$10 - Alarm Sys.Monitoring Tsfr.
False Alarm Charge:
$256 - All False Alarms without a Permit ($200-City plus $56-Alarm Vendor) and after the 3rd False Alarm in a 12
month period with a Permit.
(Note: No distinction found between residential and commercial response or between intrusion and panic/robbery
response.)
100%
$52.24
$117.82
$(65.58)
4,573
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 44.34%
$(299,920)
$538,810
$238,890
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 212
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ALARM SYSTEM S-0621
4,573
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
POL-ADMIN ADMIN ANALYST II 0.02 $1.84 4,573 $8,414
POL-ADMIN 3rd Party Admin. 0.00 $3.78 4,573 $17,286
POL-PTRL.FLD.SVCS POLICE OFFICER Two For 15 Min. Avg. 0.50 $76.36 4,573 $349,194
POL-DISPATCH PD DISPATCHER II 0.17 $15.27 4,573 $69,830
$444,724 $97.25 0.69TYPE SUBTOTAL
POL-ADMIN ADMIN ANALYST II Administration 0.11 $11.59 5,072 $58,784
POL-ADMIN 3rd Party Admin. 0.00 $6.96 5,072 $35,301
$94,086 $18.55 0.11TYPE SUBTOTAL
$538,810 0.80TOTALS $117.82
A - 213
S-0640ANIMAL CONTROL SERVICES
VARIOUSPOLICE-ANIMAL CONT'L
To protect public health by requiring rabies vaccinations of dogs. To remove dead animals that could be infected.
To care for animals that are brought to the animal shelter until adopted or reclaimed.
Various Fees to cover licensing, boarding and miscellaneous services
To recognize the Public Health importance of animal control, we suggest that 50% of the cost should come from
the general taxpayer. The Police Department has prepared a study that will move the City in that direction.
50%
$123.04
$703.93
$(580.89)
5,000
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 17.48%
$(2,904,454)
$3,519,650
$615,196
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 214
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ANIMAL CONTROL SERVICES S-0640
5,000
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
POL-AN.CTRL-ADM A/S KENNEL SUPVSR 0.33 $29.62 5,000 $148,100
POL-AN.CTRL-ADM A/S OFFICE SUPVSR 0.33 $29.62 5,000 $148,100
POL-AN.CTRL-ADM SR.CUST.SVC.REP/DSPTCH 1.31 $121.04 5,000 $605,200
POL-AN.CTRL-ADM A/S ATTENDANT 2.62 $227.70 5,000 $1,138,500
POL-AN.CTRL-ADM SR.OFFICE ASSIST. 0.33 $26.92 5,000 $134,600
POL-AN.CTRL-ADM OVERTIME 0.05 $1.78 5,000 $8,900
POL-AN.CTRL-ADM PART TIME SALARIES 1.60 $45.94 5,000 $229,700
POL-AN.CTRL-FLD.SV.ANIMAL CTRL OFFICER 2.62 $192.85 5,000 $964,250
POL-AN.CTRL-FLD.SV.PART TIME SALARIES 1.60 $28.46 5,000 $142,300
$3,519,650 $703.93 10.77TYPE SUBTOTAL
$3,519,650 10.77TOTALS $703.93
A - 215
S-0655BIENNIAL RENTAL PROPERTY INSPECTION
SFD RENTALCD-CODE ENFORCEMENT
To perform an exterior property maintenance inspection every two years of all single family rental properties to
insure that the property is properly maintained.
$100 per owner of SFR rentals
$180 per SFR rental
Staff recommends increasing the inspections to every year and including an interior inspection.
100%
$100.00
$181.10
$(81.10)
1,030
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 55.22%
$(83,533)
$186,533
$103,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 216
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
BIENNIAL RENTAL PROPERTY INSPECTION S-0655
1,030
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-ENF/BEAUTIF CODE ENF.DIV.MGR 0.25 $42.24 1,030 $43,507
C.DEV-ENF/BEAUTIF CODE ENF.OFF.II/III Annualized Cost 1.00 $105.79 1,030 $108,964
C.DEV-ENF/BEAUTIF CUSTOMER SVC REP 0.50 $33.07 1,030 $34,062
$186,533 $181.10 1.75TYPE SUBTOTAL
$186,533 1.75TOTALS $181.10
A - 217
S-0657NOTICE OF PENDENCY RELEASE
NOTICECD-CODE ENFORCEMENT
To process the release of a Notice of Pendency that was previously filed with the property's deed to guarantee
payment of a judgement against the property. The Notice makes it impossible to sell the property or get a
mortgage on it.
$180 for the first four units
$180 base fee plus $7.45 for each unit inspected (over four)
$165 plus $8.50 for any unit over four
100%
$180.37
$164.98
$15.39
100
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 109.33%
$1,539
$16,498
$18,037
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 218
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
NOTICE OF PENDENCY RELEASE S-0657
100
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-ENF/BEAUTIF CODE ENF.DIV.MGR Base 0.25 $42.24 100 $4,224
C.DEV-ENF/BEAUTIF CODE ENF.OFF.II/III 1.00 $105.79 100 $10,579
C.DEV-ENF/BEAUTIF CUSTOMER SVC REP 0.25 $16.53 100 $1,653
$16,456 $164.56 1.50TYPE SUBTOTAL
C.DEV-ENF/BEAUTIF CODE ENF.OFF.II/III Add'l Units 0.08 $8.46 5 $42
$42 $8.46 0.08TYPE SUBTOTAL
$16,498 1.58TOTALS $164.98
A - 219
S-0659ABATEMENT LIEN ADMINISTRATIVE CHGE
LIENCD-CODE ENFORCMENT
To include the cost to initially process a lien against property that has failed to comply with a demand to abate a
code violation and the cost to release the lien. This charge would be payable before release.
$115 per lien
$130 per lien
100%
$115.00
$132.25
$(17.25)
48
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 86.96%
$(828)
$6,348
$5,520
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 220
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ABATEMENT LIEN ADMINISTRATIVE CHGE S-0659
48
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-ENF/BEAUTIF CUSTOMER SVC REP 2.00 $132.26 48 $6,348
$6,348 $132.26 2.00TYPE SUBTOTAL
$6,348 2.00TOTALS $132.25
A - 221
S-0662LIEN DEMAND LETTER ADMIN.CHARGE
LETTERCD-CODE ENFORCEMENT
To respond to a request for a demand letter regarding the status or release of a lien and/or abatement costs
imposed.
$95
$185
100%
$95.00
$185.49
$(90.49)
565
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 51.22%
$(51,127)
$104,802
$53,675
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 222
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
LIEN DEMAND LETTER ADMIN.CHARGE S-0662
565
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-ENF/BEAUTIF CODE ENF.DIV.MGR 1.00 $168.96 565 $95,462
C.DEV-ENF/BEAUTIF CUSTOMER SVC REP 0.25 $16.53 565 $9,339
$104,802 $185.49 1.25TYPE SUBTOTAL
$104,802 1.25TOTALS $185.49
A - 223
S-0664DUPLICATE LIEN RELEASE
LIEN RELEASECD-CODE ENFORCEMENT
To prepare a duplicate release of a lien at the request of the property owner due to the loss of the original
release.
$28
$15
100%
$28.00
$16.53
$11.47
30
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 169.35%
$344
$496
$840
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 224
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
DUPLICATE LIEN RELEASE S-0664
30
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-ENF/BEAUTIF CUSTOMER SVC REP 0.25 $16.53 30 $496
$496 $16.53 0.25TYPE SUBTOTAL
$496 0.25TOTALS $16.53
A - 225
S-0666WEED ABATEMENT CHARGES
LOTCD-CODE ENFORCEMENT
To recover the full cost of weed abatement on lots and partial lots where the owner has failed to abate the weeds
prior to the City's deadline. Process involves multiple inspections & noticing. Preparation of Lien Resolution and
the discing of lot.
$375 per lot or partial lot plus actual cost of discing
$515 per lot or partial lot plus actual cost of discing
100%
$375.00
$513.00
$(138.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 73.10%
$(138)
$513
$375
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 226
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
WEED ABATEMENT CHARGES S-0666
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.DEV-ENF/BEAUTIF CODE ENF.DIV.MGR 0.50 $84.48 1 $84
C.DEV-ENF/BEAUTIF CODE ENF.OFF.II/III 2.00 $211.58 1 $212
C.DEV-ENF/BEAUTIF WEED ABATE.COORD 2.00 $216.80 1 $217
$513 $512.86 4.50TYPE SUBTOTAL
$513 4.50TOTALS $513.00
A - 227
S-6000AQUATICS SERVICES
N/A Resident/Non-ResidentRECREATION
Providing a 10 week summer session to the community at the various community pools. Pools are also available
for rental by the schools for 3 weeks before that.
See Appendix C
In addition, the City has received $39,750 from a Kaiser Grant.
See Appendix C
25%
$94,350.00
$702,761.00
$(608,411.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 13.43%
$(608,411)
$702,761
$94,350
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 228
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
AQUATICS SERVICES S-6000
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-ADMIN COMMUNITY RECREATION MGR 40% Of Mitch 654.00 $96,281.88 1 $96,282
PR+C-AQUATICS PART TIME SALARIES $181,866 18,000.00 $441,540.00 1 $441,540
PR+C-AQUATICS Supplies/Op Exp 0.00 $59,050.00 1 $59,050
PR+C-AQUATICS Prof Svcs 0.00 $35,800.00 1 $35,800
PR+C-OUTDOOR FAC.COMM REC PROGRAM COORD 70% 1,144.50 $70,089.18 1 $70,089
$702,761 $702,761.06 19,798.50TYPE SUBTOTAL
$702,761 19,798.50TOTALS $702,761.00
A - 229
S-6060YOUTH SPORTS
PARTICIPANT Resident/Non-ResidentRECREATION
Providing youth sports to the community.
Resident - $30 per child
Non-Resident - $33 per child
Resident - $45 per child
Non-Resident - $50 per child
75%
$29.63
$98.07
$(68.44)
363
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 30.21%
$(24,843)
$35,599
$10,756
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 230
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
YOUTH SPORTS S-6060
363
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-YOUTH SPORTS PART TIME SALARIES $23,912 5.27 $71.90 363 $26,100
PR+C-YOUTH SPORTS Supplies & Equipment 0.00 $26.17 363 $9,500
$35,599 $98.07 5.27TYPE SUBTOTAL
$35,599 5.27TOTALS $98.07
A - 231
S-6070ADULT SPORTS
N/A Resident/Non-ResidentRECREATION
Providing adult sports programs to the community.
Soccer:
Resident - $300 per team
Non-Resident Team - $350 per team
Basketball - Charging direct staff and program cost
Soccer:
Resident - $375 per team
Non-Resident Team - $425 per team
Basketball - Charging direct staff and program cost
45%
$21,460.00
$89,215.00
$(67,755.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 24.05%
$(67,755)
$89,215
$21,460
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 232
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ADULT SPORTS S-6070
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-SPORTS PART TIME SALARIES $15,516 1,000.00 $49,990.00 1 $49,990
PR+C-SPORTS Suppl/Print/Prof Svc 0.00 $19,200.00 1 $19,200
PR+C-OUTDOOR FAC.COMM REC PROGRAM COORD 20% 327.00 $20,025.48 1 $20,025
$89,215 $89,215.48 1,327.00TYPE SUBTOTAL
$89,215 1,327.00TOTALS $89,215.00
A - 233
S-6100COMM. CENTER PROG/RENTALS
N/A Resident/Non-ResidentRECREATION
Providing Community Center programs and rental of Community Center facilities.
Se Appendix C
See Appendix C
2%
$13,000.00
$3,819,489.00
$(3,806,489.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.34%
$(3,806,489)
$3,819,489
$13,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 234
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
COMM. CENTER PROG/RENTALS S-6100
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-ADMIN COMMUNITY RECREATION MGR 45% Of Cynthia 735.75 $108,317.12 1 $108,317
PR+C-ADMIN Building Expenses 0.00 $1,764,000.00 1 $1,764,000
PR+C REC/CMTY PROG COMM REC PROGRAM COORD 100% Of 4 6,540.00 $417,448.20 1 $417,448
PR+C REC/CMTY PROG COMM SVCS CENTER SUPERVIS 100% 1,635.00 $155,063.40 1 $155,063
PR+C REC/CMTY PROG PART TIME SALARIES $265,565 22,000.00 $654,280.00 1 $654,280
PR+C REC/CMTY PROG Facility Maint/Repl 0.00 $709,879.86 1 $709,880
PR+C REC/CMTY PROG Prof/Contract Svcs 0.00 $10,500.00 1 $10,500
$3,819,489 $3,819,488.58 30,910.75TYPE SUBTOTAL
$3,819,489 30,910.75TOTALS $3,819,489.00
A - 235
S-6130BALLFIELD RENTAL/USE
N/A Resident/Non-ResidentRECREATION
Maintenance and rentals of ballfields to the community.
Reservation - $10 per hour for first hour and $5 per hour thereafter
Tournament Use:
$120 per field per day without lights
$180 per field per day with lights
Preparation - $25 per field upon request
Lighting - $20 per hour for first hour and $10 per hour thereafter
Local Sports Groups do not pay for use of the fields or lights.
Reservation - $10 per hour
Tournament Use - $120 per field per day
Lighting - $20 per hour for first hour and $15 per hour thereafter
Preparation - determined by the needs of the event
Local Sports Groups:
Field Use - No Charge
Lighting - No Charge
10%
$9,500.00
$261,502.00
$(252,002.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 3.63%
$(252,002)
$261,502
$9,500
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 236
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
BALLFIELD RENTAL/USE S-6130
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-ADMIN COMMUNITY RECREATION MGR 25% Of Mitch 408.75 $60,176.18 1 $60,176
PR+C-PARKS MTC LANDSCAPE INSPECTOR I 6 Wk/Yr Of 1 196.20 $20,952.20 1 $20,952
PR+C-PARKS MTC LANDSCAPE INSPECTOR II 3 Wk/Yr Of 1 229.92 $25,518.82 1 $25,519
PR+C-PARKS MTC LEAD PARK MAINT SUPERVISO 2 Months/Year 272.55 $34,248.63 1 $34,249
PR+C-PARKS MTC PART TIME SALARIES 2 Mo/Yr Of 2 545.45 $31,843.37 1 $31,843
PR+C-OUTDOOR FAC.COMM REC PROGRAM COORD 10% 163.50 $10,012.74 1 $10,013
PR+C-OUTDOOR FAC.PART TIME SALARIES $15,515 1,000.00 $39,150.00 1 $39,150
PR+C-OUTDOOR FAC.Suppl/Rental/Prof 0.00 $39,600.00 1 $39,600
$261,502 $261,501.94 2,816.37TYPE SUBTOTAL
$261,502 2,816.37TOTALS $261,502.00
A - 237
S-6700LIBRARY CARD REPLACEMENT
CARD Resident/Non-ResidentLIBRARY
Processing the replacement of a lost library card.
$1 per card
$1 per card (Staff Recommendation)
50%
$1.00
$4.70
$(3.70)
4,000
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 21.28%
$(14,800)
$18,800
$4,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 238
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
LIBRARY CARD REPLACEMENT S-6700
4,000
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
LIB-CENTRAL LIB SVCS PART TIME SALARIES 0.08 $4.70 4,000 $18,800
$18,800 $4.70 0.08TYPE SUBTOTAL
$18,800 0.08TOTALS $4.70
A - 239
S-6710INTER-LIBRARY LOAN REQUEST
ITEM Resident/Non-ResidentLIBRARY
Processinga request to borrow a library item from another library.
$3 per item
$3 per item
1%
$0.77
$235.26
$(234.49)
175
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.33%
$(41,036)
$41,171
$135
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 240
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
INTER-LIBRARY LOAN REQUEST S-6710
175
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
LIB-CENTRAL LIB SVCS LIBRARIAN II Loaned Out 2.00 $235.26 130 $30,584
$30,584 $235.26 2.00TYPE SUBTOTAL
LIB-CENTRAL LIB SVCS LIBRARIAN II Received In 2.00 $235.26 45 $10,587
$10,587 $235.26 2.00TYPE SUBTOTAL
$41,171 4.00TOTALS $235.26
A - 241
S-6720LIBRARY RESEARCH SERVICE
REQUEST Resident/Non-ResidentLIBRARY
Providing library research services, primarily obituaries, on request
$20 per hour
$20 per hour
22%
$20.00
$99.00
$(79.00)
4
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 20.20%
$(316)
$396
$80
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 242
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
LIBRARY RESEARCH SERVICE S-6720
4
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
LIB-CENTRAL LIB SVCS TECHNOLOGY LIBRARIAN 0.75 $98.90 4 $396
$396 $98.90 0.75TYPE SUBTOTAL
$396 0.75TOTALS $99.00
A - 243
S-6730REPLACE LOST/DAMAGED LIBRARY MAT'LS
ITEM Resident/Non-ResidentLIBRARY
Processing and prelacing lost and damaged library materials.
Lost Items:
Magazines - $1 processing fee plus $10 replacement cost
Other items - $5 processing fee plus $40 replacement cost
Damaged Items - $3-$5
Missing Barcode - $1
Missing or Damaged Bookcover - $5
Lost Items:
Magazines - $5 processing fee plus $10 replacement cost
Other items - $10 processing fee plus $40 replacement cost
Damaged Items - $3-$5
Missing Barcode - $10
Missing or Damaged Bookcover - $10
35%
$5.00
$28.24
$(23.24)
25
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 17.71%
$(581)
$706
$125
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 244
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
REPLACE LOST/DAMAGED LIBRARY MAT'LS S-6730
25
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
LIB-SUPPORT SERVICESLIBRARY TECHNICIAN II 0.17 $13.57 25 $339
LIB-CENTRAL LIB SVCS PART TIME SALARIES 0.25 $14.68 25 $367
$706 $28.25 0.42TYPE SUBTOTAL
$706 0.42TOTALS $28.24
A - 245
S-6740LIBRARY ROOM RENTAL
RENTAL Resident/Non-ResidentLIBRARY
Rental of meetings rooms at the Library.
Bing Wong Auditorium - $25 per hour (4 hour minimum)
Kellogg Room A or B - $25 per hour for each
Study Room - $15 per hour (waived with student ID)
Projector - $5 per day
VCR and Monitor - $10 per day
Digital Projector in Bing Wong Auditorium - $30
Computer/Internet Techincal Support - $20 per hour
Portable Public Address System - $5 per day ($50 deposit)
Bing Wong Auditorium: Non-Profit - $25/hr For Profit - $50/hr (4 hr min)
Kellogg Room A or B - Non-Profit - $25/hr for each For Profit - $50/hr for each
Study Room - $15 per hour (waived with student ID)
Projector - $5 per day
VCR and Monitor - $10 per day
Digital Projector in Bing Wong Auditorium - $30
Computer/Internet Techincal Support - $20 per hour
Portable Public Address System - $5 per day ($50 deposit)
100%
$21.74
$149.42
$(127.68)
242
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 14.55%
$(30,900)
$36,160
$5,260
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 246
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
LIBRARY ROOM RENTAL S-6740
242
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
LIB-ADMINISTRATION LIBRARY ADMIN TECH/WEBMAS 0.17 $19.15 242 $4,634
LIB-CENTRAL LIB SVCS Facility Replacement 0.00 $84.42 242 $20,430
LIB-CENTRAL LIB SVCS Facility Maintenance 0.00 $45.85 242 $11,096
$36,160 $149.42 0.17TYPE SUBTOTAL
$36,160 0.17TOTALS $149.42
A - 247
S-7000CEMETERY INTERMENT
INTERMENT Resident/Non-ResidentCEMETERY
Interment of a casket or urn at the Cemetery.
Adult: Single - $600 Double - $850
Child: Single - $350 Double - $650
Baby - $150
Cremation - $200
For many sites, the City has a contractual obligation to provide the interment at the fee that was in place when
the contract was signed.
Single - $2,295
Double - $2,590
Cremation - $915
100%
$501.61
$1,826.29
$(1,324.68)
31
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 27.47%
$(41,065)
$56,615
$15,550
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 248
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
CEMETERY INTERMENT S-7000
31
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-PARKS MTC LANDSCAPE INSPECTOR II Single 4.00 $443.96 12 $5,328
PR+C-PARKS MTC LEAD PARK CONST/MAINT WKR Single 7.00 $825.86 12 $9,910
PR+C-PARKS MTC PART TIME SALARIES Single 4.00 $233.52 12 $2,802
PR+C-CEMETERY ADMINISTRATIVE ASSISTANT 7.25 $614.15 12 $7,370
PR+C-CEMETERY PART TIME SALARIES Single 7.00 $174.72 12 $2,097
$27,507 $2,292.21 29.25TYPE SUBTOTAL
PR+C-PARKS MTC LANDSCAPE INSPECTOR II Double 4.50 $499.46 7 $3,496
PR+C-PARKS MTC LEAD PARK CONST/MAINT WKR Double 8.50 $1,002.83 7 $7,020
PR+C-PARKS MTC PART TIME SALARIES Double 4.50 $262.71 7 $1,839
PR+C-CEMETERY ADMINISTRATIVE ASSISTANT 7.25 $614.15 7 $4,299
PR+C-CEMETERY PART TIME SALARIES Double 8.50 $212.16 7 $1,485
$18,139 $2,591.31 33.25TYPE SUBTOTAL
PR+C-PARKS MTC PART TIME SALARIES Cremation 3.00 $175.14 12 $2,102
PR+C-CEMETERY ADMINISTRATIVE ASSISTANT 7.25 $614.15 12 $7,370
PR+C-CEMETERY PART TIME SALARIES Cremation 5.00 $124.80 12 $1,498
$10,969 $914.09 15.25TYPE SUBTOTAL
$56,615 77.75TOTALS $1,826.29
A - 249
S-7010CEMETERY DISINTERMENT
DISNTERMENT Resident/Non-ResidentCEMETERY
Disinterment of a casket or urn on request.
Disinterment/Reinterment (within Cemetery) -$1,500
Adult Disinterment (Shipped Out) - $1,200
Baby/Child Disinterment (Shipped Out) - $800
Disinterment/Reinterment (within Cemetery) - $5,545
Adult Disinterment (Shipped Out) - $3,820
100%
$1,200.00
$3,822.00
$(2,622.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 31.40%
$(2,622)
$3,822
$1,200
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 250
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
CEMETERY DISINTERMENT S-7010
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-PARKS MTC LANDSCAPE INSPECTOR II 6.00 $665.94 1 $666
PR+C-PARKS MTC LEAD PARK CONST/MAINT WKR 6.00 $707.88 1 $708
PR+C-PARKS MTC PART TIME SALARIES 6.00 $350.28 1 $350
PR+C-CEMETERY ADMINISTRATIVE ASSISTANT 23.00 $1,948.33 1 $1,948
PR+C-CEMETERY PART TIME SALARIES 6.00 $149.76 1 $150
$3,822 $3,822.19 47.00TYPE SUBTOTAL
$3,822 47.00TOTALS $3,822.00
A - 251
S-7020CEMETERY MARKER SETTINGS
MARKER Resident/Non-ResidentCEMETERY
Installation of grave marker settings.
Single - $140
Double - $200
Marker Inscription:
4 digits - $50
Month, Day, Year - $100
Name and years - $130
Single - $335
Double - $595
Marker Inscription - Actual costs
100%
$143.53
$351.29
$(207.76)
17
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 40.86%
$(3,532)
$5,972
$2,440
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 252
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
CEMETERY MARKER SETTINGS S-7020
17
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-PARKS MTC PART TIME SALARIES Single 2.00 $116.76 16 $1,868
PR+C-CEMETERY ADMINISTRATIVE ASSISTANT Single 2.00 $169.42 16 $2,711
PR+C-CEMETERY PART TIME SALARIES Single 2.00 $49.92 16 $799
$5,378 $336.10 6.00TYPE SUBTOTAL
PR+C-PARKS MTC PART TIME SALARIES Double 6.00 $350.28 1 $350
PR+C-CEMETERY ADMINISTRATIVE ASSISTANT Double 2.00 $169.42 1 $169
PR+C-CEMETERY PART TIME SALARIES Double 3.00 $74.88 1 $75
$595 $594.58 11.00TYPE SUBTOTAL
$5,972 17.00TOTALS $351.29
A - 253
S-7030CEMETERY FLOWER VASE INSTALLATION
INSTALLATION Resident/Non-ResidentCEMETERY
Installation of a flower vase at a grave site.
$30 per vase. No installation fee
$95 per installation and vase
100%
$30.00
$97.14
$(67.14)
7
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 30.88%
$(470)
$680
$210
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 254
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
CEMETERY FLOWER VASE INSTALLATION S-7030
7
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-CEMETERY ADMINISTRATIVE ASSISTANT 1.00 $84.71 7 $593
PR+C-CEMETERY PART TIME SALARIES 0.50 $12.48 7 $87
$680 $97.19 1.50TYPE SUBTOTAL
$680 1.50TOTALS $97.14
A - 255
S-7040REMOVE/REPLACE CEMETERY MARKER
MARKER Resident/Non-ResidentCEMETERY
Remove or replace a cemetery marker on request.
None
Single - $420 per marker
Double - $735 per marker
100%
$0.00
$472.33
$(472.33)
6
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$(2,834)
$2,834
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 256
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
REMOVE/REPLACE CEMETERY MARKER S-7040
6
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-PARKS MTC PART TIME SALARIES Single 3.00 $175.14 5 $876
PR+C-CEMETERY ADMINISTRATIVE ASSISTANT Single 2.00 $169.42 5 $847
PR+C-CEMETERY PART TIME SALARIES Single 3.00 $74.88 5 $374
$2,097 $419.44 8.00TYPE SUBTOTAL
PR+C-PARKS MTC PART TIME SALARIES Double 8.00 $467.04 1 $467
PR+C-CEMETERY ADMINISTRATIVE ASSISTANT Double 2.00 $169.42 1 $169
PR+C-CEMETERY PART TIME SALARIES Double 4.00 $99.84 1 $100
$736 $736.30 14.00TYPE SUBTOTAL
$2,834 22.00TOTALS $472.33
A - 257
S-7050GRAVE PROPERTY OWNER TRANSFER
TRANSFER Resident/Non-ResidentCEMETERY
Processing a request to transfer ownership of a grave site.
$50 per transfer
$125 per transfer
100%
$50.00
$127.00
$(77.00)
3
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 39.37%
$(231)
$381
$150
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 258
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
GRAVE PROPERTY OWNER TRANSFER S-7050
3
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-CEMETERY ADMINISTRATIVE ASSISTANT 1.50 $127.07 3 $381
$381 $127.07 1.50TYPE SUBTOTAL
$381 1.50TOTALS $127.00
A - 259
S-7100CEMETERY SERVICES
N/A Resident/Non-ResidentCEMETERY
Maintenance and operation of the Cemetery.
Grave Spaces:
Adult - $1,200
Public Guardian - $800
Child - $800
Baby - $200
Cremation - $400
Burial Vault - $445
plus fees for Concrete Bell Liners and re-sale of concrete vaults to mortuaries.
Grave Spaces:
Adult - $1,950
Public Guardian - $1,950
Child - $1,950
Baby - $1,000
Cremation - $1,300
Burial Vault/Bell Liners - Actual cost plus 10%
100%
$0.00
$182,961.00
$(182,961.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$(182,961)
$182,961
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 260
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
CEMETERY SERVICES S-7100
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-CEMETERY ADMINISTRATIVE ASSISTANT Remainder Of Time 716.62 $60,704.88 1 $60,705
PR+C-CEMETERY PART TIME SALARIES Remainder Of $34,929 1,733.00 $43,255.68 1 $43,256
PR+C-CEMETERY Suppl/Prof/Contract 0.00 $79,000.00 1 $79,000
$182,961 $182,960.56 2,449.62TYPE SUBTOTAL
$182,961 2,449.62TOTALS $182,961.00
A - 261
S-7220STREET BANNER INSTALL/REMOVE
BANNERPW-
To review a request for a street banner. If approved, install the banner and remove it when the time period has
ended.
$200
$410
100%
$200.00
$410.95
$(210.95)
20
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 48.67%
$(4,219)
$8,219
$4,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 262
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
STREET BANNER INSTALL/REMOVE S-7220
20
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.MGR-COMM+CMTY RELADMIN ASST TO THE CITY MG 1.50 $93.23 20 $1,865
PW-GAS TX-T/S MTC TRAFFIC SIGNAL TECHNICIAN 2.50 $317.70 20 $6,354
$8,219 $410.93 4.00TYPE SUBTOTAL
$8,219 4.00TOTALS $410.95
A - 263
S-7250REPAIR TO CITY PROPERTY DAMAGE
N/A Resident/Non-ResidentPARK MAINTENANCE
Repair of damage to City property by a member of the public.
Actual Costs
Charge the fully allocated hourly rates for all personnel involved plus any outside costs.
100%
$0.00
$92,617.00
$(92,617.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$(92,617)
$92,617
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 264
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
REPAIR TO CITY PROPERTY DAMAGE S-7250
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-PARKS MTC LEAD PARK CONST/MAINT WKR 10 Hr/Week 500.00 $58,990.00 1 $58,990
PR+C-PARKS MTC PART TIME SALARIES 24 Hr/Mo Of 2 576.00 $33,626.88 1 $33,627
$92,617 $92,616.88 1,076.00TYPE SUBTOTAL
$92,617 1,076.00TOTALS $92,617.00
A - 265
S-7260PARK RENTAL/RESERVATION
N/A Resident/Non-ResidentPARK MAINTENANCE
Rental of a City Park
See Appendix C
See Appendix C
100%
$28,000.00
$35,983.00
$(7,983.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 77.81%
$(7,983)
$35,983
$28,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 266
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
PARK RENTAL/RESERVATION S-7260
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-ADMIN ADMINISTRATIVE ASSISTANT 5% 81.75 $7,323.98 1 $7,324
PR+C-PARKS MTC PART TIME SALARIES 4.5 Hr/Weekend Of 2 490.91 $28,659.33 1 $28,659
$35,983 $35,983.31 572.66TYPE SUBTOTAL
$35,983 572.66TOTALS $35,983.00
A - 267
S-7270FISCALLINI FIELD MAINTENANCE
N/A Resident/Non-ResidentPARK MAINTENANCE
Maintnenace of the Fiscallini baseball field for use by the CSUSB Baseball team and SB Youth Baseball.
Field - $500 per use (6 hours) plus $40 per hour for lights
Club House - $88.60 per day
CSUSB pays $17,000 per year. They also provide in-kind maintenance services.
SB Youth Baseball does not pay for use of the field. They are to pay $6,000 per year for capital improvements to
the field.
Field - $500 per use (6 hours) plus $40 per hour for lights
Club House - $200 per day
CSUSB pays $17,000 per year. They also provide in-kind maintenance services.
SB Youth Baseball does not pay for use of the field. They are to pay $6,000 per year for capital improvements to
the field.
100%
$17,000.00
$20,243.00
$(3,243.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 83.98%
$(3,243)
$20,243
$17,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 268
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
FISCALLINI FIELD MAINTENANCE S-7270
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
PR+C-PARKS MTC LEAD PARK MAINT SUPERVISO 10 Days/Year 80.00 $10,052.80 1 $10,053
PR+C-PARKS MTC PART TIME SALARIES 10 Day/Year Of 2 174.55 $10,190.23 1 $10,190
$20,243 $20,243.03 254.55TYPE SUBTOTAL
$20,243 254.55TOTALS $20,243.00
A - 269
S-8000DOCUMENT REPRODUCTION
COPY Resident/Non-ResidentCITY ATTORNEY
Providing copies of public documents under the terms of the State Public Records Act.
First Page - $0.35
Each additional page - $0.15
First five copies - No Charge
Each additional copy - $0.25 per copy
FPPC Copies - $0.10 per copy
100%
$0.35
$121.12
$(120.77)
1,165
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.29%
$(140,697)
$141,105
$408
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 270
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
DOCUMENT REPRODUCTION S-8000
1,165
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.CLK-REC.MGMT RECORDS MGMT SPECIALIST 0.01 $1.04 1,165 $1,212
CITY ATTORNEY DEPUTY CITY ATTORNEY IV 17% Of 1 - PRA 0.24 $51.82 1,165 $60,370
CITY ATTORNEY LEGAL SECRETARY I 0.01 $0.83 1,165 $967
CITY ATTORNEY OFFICE ASSISTANT 3 Hr/Day - PRA 1.04 $67.43 1,165 $78,556
$141,105 $121.12 1.30TYPE SUBTOTAL
$141,105 1.30TOTALS $121.12
A - 271
S-8020ELECTRONIC FILE COPY
DISK Resident/Non-ResidentCITY ATTORNEY
Providig copies of public records in an electronic format under the terms of the State Public Records Act.
None
$10 per disk
100%
$0.00
$22.29
$(22.29)
150
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$(3,344)
$3,344
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 272
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ELECTRONIC FILE COPY S-8020
150
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
CITY ATTORNEY ADMIN ANALYST II 0.17 $22.29 150 $3,344
$3,344 $22.29 0.17TYPE SUBTOTAL
$3,344 0.17TOTALS $22.29
A - 273
S-8040ADMIN CIVIL PENALTY PROCESSING
VIOLATION Resident/Non-ResidentCITY ATTORNEY
Processing of administrative penalties for municipal code violations.
None
Recover the fully allocated actual costs at the discretion of the Hearing Officer.
100%
$0.00
$1,060.65
$(1,060.65)
558
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$(591,843)
$591,843
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 274
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ADMIN CIVIL PENALTY PROCESSING S-8040
558
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
CITY ATTORNEY ADMIN ANALYST I 100% 2.91 $343.87 558 $191,879
CITY ATTORNEY ADMIN ANALYST II Remainder Of 2 5.47 $716.78 558 $399,963
$591,843 $1,060.65 8.37TYPE SUBTOTAL
$591,843 8.37TOTALS $1,060.65
A - 275
S-8050ACP DEMAND LETTER
LETTER Resident/Non-ResidentCITY ATTORNEY
Processing an Administrative Civil Penalty demand letter.
$31.84 per letter
$65 per letter
100%
$31.84
$65.55
$(33.71)
176
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 48.57%
$(5,933)
$11,537
$5,604
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 276
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
ACP DEMAND LETTER S-8050
176
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
CITY ATTORNEY ADMIN ANALYST II 0.50 $65.55 176 $11,537
$11,537 $65.55 0.50TYPE SUBTOTAL
$11,537 0.50TOTALS $65.55
A - 277
S-8060LIEN RELEASE
RELEASE Resident/BusinessCITY ATTORNEY
Processing the release of a lien.
None
$65 plus any County fees
100%
$0.00
$63.46
$(63.46)
160
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$(10,154)
$10,154
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 278
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
LIEN RELEASE S-8060
160
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
CITY ATTORNEY ADMIN ANALYST II 0.17 $22.29 160 $3,566
CITY ATTORNEY ADMIN ANALYST II 60 Min/Week 0.31 $41.17 160 $6,587
$10,154 $63.46 0.48TYPE SUBTOTAL
$10,154 0.48TOTALS $63.46
A - 279
S-8320BUSINESS REGISTRATION LIEN ASSESS
LIEN BusinessCITY CLERK
Processing of a lien on a property due to non-payment of business registration fees and taxes.
$125 per lien (City receives $104 of the fee and the County receives $21)
$90 per lien plus any County processing fees
100%
$104.00
$88.79
$15.21
1,200
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 117.13%
$18,252
$106,548
$124,800
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 280
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
BUSINESS REGISTRATION LIEN ASSESS S-8320
1,200
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.CLK-BUS.REG/TLT COLLBUSINESS REG MGR/SR REP/R 50% Of 1 0.68 $88.79 1,200 $106,548
$106,548 $88.79 0.68TYPE SUBTOTAL
$106,548 0.68TOTALS $88.79
A - 281
S-8330BUSINESS REGISTRATION DEMAND LETTER
LETTER BusinessCITY CLERK
Processing a demand letter for a business registration lien.
$11 per letter
$10 per letter
100%
$11.00
$10.51
$0.49
240
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 104.68%
$118
$2,522
$2,640
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 282
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
BUSINESS REGISTRATION DEMAND LETTER S-8330
240
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.CLK-BUS.REG/TLT COLLBUSINESS REG MGR/SR REP/R 0.08 $10.51 240 $2,522
$2,522 $10.51 0.08TYPE SUBTOTAL
$2,522 0.08TOTALS $10.51
A - 283
S-8340BUSINESS REGISTRATION LIEN RELEASE
RELEASE BusinessCITY CLERK
Processing the release of a business registration lien.
None
$35 per release plus any County processing fees
100%
$0.00
$32.86
$(32.86)
1,200
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$(39,432)
$39,432
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 284
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
BUSINESS REGISTRATION LIEN RELEASE S-8340
1,200
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.CLK-BUS.REG/TLT COLLBUSINESS REG MGR/SR REP/R 0.25 $32.86 1,200 $39,432
$39,432 $32.86 0.25TYPE SUBTOTAL
$39,432 0.25TOTALS $32.86
A - 285
S-8350DUPLICATE BUSINESS REG CERTIFICATE
CERTIFICATE BusinessCITY CLERK
Providing a duplicate of a business registration certificate on request.
$0.50 per certificate
$10 per certificate
100%
$0.50
$10.50
$(10.00)
36
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 4.76%
$(360)
$378
$18
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 286
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
DUPLICATE BUSINESS REG CERTIFICATE S-8350
36
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.CLK-BUS.REG/TLT COLLBUSINESS REG MGR/SR REP/R 0.08 $10.51 36 $378
$378 $10.51 0.08TYPE SUBTOTAL
$378 0.08TOTALS $10.50
A - 287
S-8360PASSPORT PROCESSING
APPLICATION Resident/Non-ResidentCITY CLERK
Processing passport applications for the public.
$35 per application plus $15 per photograph
$35 per application plus $15 per photograph
The application fee is set by the federal government.
55%
$35.00
$64.11
$(29.11)
1,000
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 54.59%
$(29,110)
$64,110
$35,000
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 288
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
PASSPORT PROCESSING S-8360
1,000
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.CLK-PASSPORT Supplies 0.00 $1.50 1,000 $1,500
C.CLK-REC.MGMT SR CUSTOMER SERVICE REP 50% 0.81 $62.61 1,000 $62,610
$64,110 $64.11 0.81TYPE SUBTOTAL
$64,110 0.81TOTALS $64.11
A - 289
S-8370NOTARY PUBLIC
DOCUMENT Resident/Non-ResidentCITY CLERK
Providing Notary Public fees to the public.
$15 per document
$15 per document.
This fee is set by the State.
50%
$15.00
$33.00
$(18.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 45.45%
$(18)
$33
$15
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 290
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
NOTARY PUBLIC S-8370
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.CLK-ADMIN.DEPUTY CITY CLERK 0.33 $33.21 1 $33
$33 $33.21 0.33TYPE SUBTOTAL
$33 0.33TOTALS $33.00
A - 291
S-8380RECORDS COMPILATION
REQUEST Resident/Non-ResidentCITY CLERK
Creating or compiling records that do not currently exist as a public record on request.
Actual Costs
Charge the fully allocated hourly rate for all personnel needed plus any outside costs.
100%
$70.00
$104.00
$(34.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 67.31%
$(34)
$104
$70
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 292
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
RECORDS COMPILATION S-8380
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.CLK-REC.MGMT RECORDS MGMT SPECIALIST 1.00 $104.20 1 $104
$104 $104.20 1.00TYPE SUBTOTAL
$104 1.00TOTALS $104.00
A - 293
S-8390CANDIDATE FILING
CANDIDATE ResidentCITY CLERK
Processing a filing for a candidate for a local office.
$25 per candidate
This is the maximum allowed under State law (Elections Code section 10228)
$25 per candidate
This is the maximum allowed under State law (Elections Code section 10228)
5%
$25.00
$735.62
$(710.62)
29
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 3.40%
$(20,608)
$21,333
$725
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 294
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
CANDIDATE FILING S-8390
29
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.CLK-ADMIN.CITY CLERK 2.00 $433.74 29 $12,578
C.CLK-ADMIN.DEPUTY CITY CLERK 3.00 $301.89 29 $8,755
$21,333 $735.63 5.00TYPE SUBTOTAL
$21,333 5.00TOTALS $735.62
A - 295
S-8400INITIATIVE FILING
INITIATIVE Resident/BusinessCITY CLERK
Processing a local initiative.
$200 per application
Fee is to be refunded to the filer if, within one year of the date of filing the notice of intent, the elections official
certifies the sufficiency of the petition.
This is the maximum allowed under State law (Elections Code section 9202(b)).
$200 per application
Fee is to be refunded to the filer if, within one year of the date of filing the notice of intent, the elections official
certifies the sufficiency of the petition.
This is the maximum allowed under State law (Elections Code section 9202(b)).
15%
$0.00
$1,525.00
$(1,525.00)
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$(1,525)
$1,525
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 296
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
INITIATIVE FILING S-8400
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.CLK-ADMIN.CITY CLERK 1.00 $216.87 1 $217
C.CLK-ADMIN.CHIEF DEPUTY CITY CLERK 4.00 $489.20 1 $489
C.CLK-ADMIN.DEPUTY CITY CLERK 4.00 $402.52 1 $403
C.CLK-REC.MGMT RECORDS MGMT SPECIALIST 4.00 $416.80 1 $417
$1,525 $1,525.39 13.00TYPE SUBTOTAL
$1,525 13.00TOTALS $1,525.00
A - 297
S-8410WEDDING CEREMONY
CEREMONY Resident/Non-ResidentCITY CLERK
Providing a weddig a ceremony on request.
$65 per ceremony
$70 per ceremony
100%
$65.00
$71.50
$(6.50)
4
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 90.91%
$(26)
$286
$260
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 298
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
WEDDING CEREMONY S-8410
4
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.CLK-ADMIN.CITY CLERK 0.33 $71.57 4 $286
$286 $71.57 0.33TYPE SUBTOTAL
$286 0.33TOTALS $71.50
A - 299
S-8500FILM PERMIT
APPLICATION BusinessCITY MANAGER
Processing a film permit for filming within the City.
$63 per permit
$250 per permit
100%
$63.00
$248.60
$(185.60)
30
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 25.34%
$(5,568)
$7,458
$1,890
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 300
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
FILM PERMIT S-8500
30
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
C.MGR-COMM+CMTY RELADMIN ASST TO THE CITY MG 4.00 $248.60 30 $7,458
$7,458 $248.60 4.00TYPE SUBTOTAL
$7,458 4.00TOTALS $248.60
A - 301
S-8600NSF CHECK PROCESSING
NSF CHECK Developer/Resident/BusinessFINANCE
Processing a check returned due to insufficient funds.
$26 per NSF Check
$65 per NSF check
(According to Government Code section 6157 (b), a city may charge a "reasonable charge for the returned check,
not to exceed the actual costs incurred by the public agency" in order to recover its processing and collection
costs.)
100%
$26.00
$64.75
$(38.75)
92
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 40.15%
$(3,565)
$5,957
$2,392
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 302
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
NSF CHECK PROCESSING S-8600
92
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
FIN-ADMIN EXEC ASST TO DIRECTOR 0.50 $51.63 92 $4,750
FIN-ACCOUNTING ACCOUNTANT III 0.08 $11.87 92 $1,092
FIN-ACCOUNTING Bank Charge 0.00 $1.25 92 $115
$5,957 $64.75 0.58TYPE SUBTOTAL
$5,957 0.58TOTALS $64.75
A - 303
S-9000OTHER CHARGEABLE SERVICES
VARIOUSALL
This is a service charge for all services that should be charged for, but for which no fee was established.
None
Actual Cost based on the "Fully-Burdened" hourly rate of City staff
100%
$0.00
$0.00
$0.00
1
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
REVENUE AND COST SUMMARY WORKSHEET
SERVICE REFERENCE NO.
PRIMARY DEPARTMENT UNIT OF SERVICE SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY: 0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
April 30, 2020
A - 304
April 29, 2020
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
COST DETAIL WORKSHEET
SERVICE
OTHER CHARGEABLE SERVICES S-9000
1
REFERENCE NO.
TOTAL UNITSNOTE
Unit Costs are an Average of Total Units
DEPARTMENT POSITION TYPE UNIT TIME UNIT COST ANN. UNITS TOTAL COST
0.00 $0.00 0 $0
$0 $0.00 0.00TYPE SUBTOTAL
$0 0.00TOTALS $0.00
A - 305
THIS PAGE IS BLANK
A - 306
APPENDIX B
CURRENT FEE COMPARED TO SUGGESTED FEE
B - 1
THIS PAGE IS BLANK
B - 2
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0005 BUILDING ISSUANCE FEEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$60 - 1st permit
$10 - each additional permit on the same application
$40 - 1st permit
$10 - each additional permit on the same application
S-0010 BUILDING PLAN CHECKREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Various fees - see proposed Schedule of Fees - Apendix D
Hourly Rate - $122.37
Various fees - see current Schedule of Fees - Appendix C
Hourly Rate - $94.15
S-0020 BUILDING INSPECTIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Various fees - see proposed Schedule of Fees - Apendix D
Hourly Rate - $118.33
Various fees - see current Schedule of Fees - Appendix C
Hourly Rate - $94.45
S-0022 SPECIAL BUILDING INSPECTIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$595 for the 1st 4 hours plus $105 for each add'l hour$380 Minimum for the 1st 4 hours plus $95 for each additional hour
S-0025 CERTIFICATE OF OCCUPANCYREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$500$475.08 - as a separate application (of which $100 was for Fire
Review)
$133.62 - if included on the building permit (Deleted as All Fire)
S-0030 TEMPORARY CERTIFICATE OF OCCUPANCYREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$500$467.34
April 30, 2020
2
B - 3
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0201 AMENDMENT TO CONDITIONS-ADM.REV.REF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$575$583
S-0203 AMENDMENT TO CONDITIONS-PLN.COMM.REF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$4,070 plus the estimated cost of noticing and publishing as
estimated by City staff.
$2,550
S-0205 AMENDMENT TO CONDITIONS-D/ERCREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$2,890$822
S-0208 ANTENNA DEVELOPMENT PERMIT-ADM.REV.REF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Staff recommends deleting this fee as antennas are covered using
a CUP or a development permit.
$2,938
S-0211 APPEAL TO MAYOR & COUNCILREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$285 - Non-Applicant, City Resident (10% Recovery)
$2,850 - All others, plus the estimated cost of noticing and
publishing as estimated by City staff.
$177 - Non-Applicant, City Resident (10% Recovery)
$1,766 - All others
S-0213 APPEAL TO THE PLANNING COMMISSIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$430 - Non-Applicant, City Resident (10%)
$4,295 - All others, plus the estimated cost of noticing and
publishing as estimated by City staff.
$278 - Non-Applicant, City Resident (10%)
$2,772 - All others
April 30, 2020
3
B - 4
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0216 CUP-MINOR USE PMT/ALCOHOLREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$4,625 plus the estimated cost of noticing and publishing as
estimated by City staff.
$3,605
S-0217 CONDITIONAL USE PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$5,555 plus the estimated cost of noticing and publishing as
estimated by City staff.
$7,133 - CUP for Commercial/Industrial (#10; $71,330)
$2,809 - CUP for Condo, PRD, HMOD (#30; $84,270)
S-0219 CUP REVISIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$3,780 plus the estimated cost of noticing and publishing as
estimated by City staff.
$2,113
S-0222 DESIGN REVIEWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Staff recommends deleting this service as service time is included
with Conditional Use Permit, Development Permit or Temporary
Use Permit
Full Consultant Cost
S-0224 DEVELOPMENT AGMT OR AMENDMENTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Actual Cost based on the "Fully-Burdened" hourly rate of City staff
plus consultant costs including 10% contract administrative
overhead and all other costs charged against an initial deposit as
determined by staff.
Direct Cost Recovery Fee
S-0227 DEVELOPMENT CODE/ZONING MAP AMEND.REF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$9,925 plus any consultant cost including 10% contract
administrative overhead, plus the estimated cost of noticing and
publishing as estimated by City staff.
$6,960 plus full consultant cost
April 30, 2020
4
B - 5
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0230 DEV.PMT-DIRECTOR REVIEWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$1,965$1,000
S-0233 DEV.PMT-D/ERC REVIEWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
0 to 5 Acres - $6,810 plus the estimated cost of noticing and
publishing as estimated by City Staff.
> than 5 Acres - $11,905 plus the estimated cost of noticing and
publishing as estimated by City Staff.
$6,438
S-0235 DEV.PMT-PLANNING COMMISSION REVIEWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
0 to 5 Acres - $8,040 plus the estimated cost of noticing and
publishing as estimated by City Staff.
> than 5 Acres - $15,455 plus the estimated cost of noticing and
publishing as estimated by City Staff.
$6,720 - 0 to 5 Acres (#10; $67,200)
$6,720 - Greater than 5 Acres (#5, $33,600)
S-0238 DEV.PMT-MAYOR/COUNCIL REVIEWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Staff recommends deleting this service as it is no longer used.$7,288
S-0241 ENVIRONMENTAL (INITIAL) STUDYREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Actual Cost based on the "Fully-Burdened" hourly rate of City staff
plus consultant costs including 10% contract administrative
overhead and all other costs, including noticing & publishing,
charged against an initial deposit determined by staff.
$3,273
S-0244 ENVIRONMENTAL IMPACT REPORTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Actual Cost based on the "Fully-Burdened" hourly rate of City staff
plus consultant costs including 10% contract administrative
overhead and all other costs, including noticing & publishing,
charged against an initial deposit determined by staff.
Direct Cost Recovery Fee plus full consultant cost
April 30, 2020
5
B - 6
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0246 EXTENSION OF TIMEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$1,860 plus the estimated cost of noticing and publishing as
estimated by City staff.
$3,922 - CUP & Development Permit (#2; $7,844)
$4,768 - Tentative Tract Map (#10; $47,680)
S-0251 FENCE/WALL PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$60$56
S-0257 GENERAL PLAN AMENDMENT (TEXT/MAP)REF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$3,570 plus consultant costs including 10% contract administrative
overhead and all other costs, including noticing & publishing,
charged against an initial deposit determined by staff.
Direct Cost Recovery Fee ($1,500 Deposit treated as actual cost)
S-0259 HISTORIC PRESERVATION PROJECTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Actual Cost based on the "Fully-Burdened" hourly rate of City staff
plus consultant costs including 10% contract administrative
overhead and all other costs charged against an initial deposit
determined by staff.
Direct Cost Recovery Fee ($815 deposit plus consultant cost)
S-0262 HOME OCCUPATION PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$145$268
S-0264 LETTER OF ZONING & GEN.PLAN CONSISTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$245$450
April 30, 2020
6
B - 7
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0266 PLANNING LOT LINE ADJUSTMENTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$1,255$477
S-0268 MINOR EXCEPTIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$105$288 - Concurrent with another application
$268 - Owner-Occupied single-family residence
$792 - Other
S-0270 MISC.ENVIRONMENTAL REPORT REVIEWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Staff recommends deleting this fee as the service is not performed.Direct Cost Recovery Fee ($245 Deposit) plus Full Consultant Cost
($327 Deposit)
S-0271 MINOR MODIFICATION/REVISIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$380 plus the estimated cost of noticing and publishing as
estimated by City staff.
$561
S-0273 PHASING PLAN REVIEWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Staff recommends deleting this fee as the service is not being
performed.
$823 - If not part of original project review
$514 - D/ERC review application (DP)
$536 - Planning Comm.Application (CUP/DP/SUB)
S-0275 PLANNING COMMISSION INTERPRETATIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Staff recommends deleting this fee as the service is not being
performed.
$1,119
April 30, 2020
7
B - 8
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0277 PUBLIC CONVENIENCE/NECESSITY LETTERREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$2,740 plus the estimated cost of noticing and publishing as
estimated by City staff.
$636
S-0279 PRE-APPLICATION REVIEW-D/ERC REVIEWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$3,440$2,424
S-0280 RECONSIDERATION BY THE PLAN.COMM.REF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$2,670 plus the estimated cost of noticing and publishing as
estimated by City staff.
$506
S-0282 SIGN PERMIT-REGULARREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$80$182
S-0283 SIGN PERMIT-REQUIRING CUPREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Staff recommends deleting this fee as it is handled as two separate
processes.
$3,858
S-0284 SIGN PERMIT-TEMPORARYREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$80$111
April 30, 2020
8
B - 9
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0286 SIGN PROGRAMREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
10 or less tenant spaces - $490
Greater than 10 tenant spaces - Actual Cost based on the
"Fully-Burdened" hourly rate of City staff plus consultant costs
including 10% contract administrative overhead and all other costs
charged against an initial deposit determined by staff.
$610
S-0288 SPECIFIC PLAN/AMENDMENTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Actual Cost based on the "Fully-Burdened" hourly rate of City staff
plus consultant costs including 10% contract administrative
overhead and all other costs, including noticing & publishing,
charged against an initial deposit determined by staff.
Direct Cost Recovery Fee plus full consultant cost
S-0291 TEMPORARY USE/SPECIAL EVENT PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$315 - Temporary Use Permit
$1,230 - Special Event Permit (Director Review)
$0 - Special Event Permit (Planning Commission review) -
Staff recommends deleting this service as it is not used.
$82.86 - Temporary Use Permit (#55; $4,557)
$420 - Special Event Permit (Director Review) (#22; $9,240)
$730 - Special Event Permit (Planning Commission review)
S-0293 TENTATIVE PARCEL MAPREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$5,170 plus the estimated cost of noticing & publishing as
estimated by City staff.
$4,262 plus $65 per parcel
(NOTE: Revenue is based on an average of 3 parcels per Tentative
Parcel Map.)
S-0295 TENTATIVE TRACT MAP (SFR/CONDO/PRD)REF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$6,850 plus $25 per lot and the estimated cost of noticing &
publishing as estimated by City staff.
$7,561 plus $65 per lot or dwelling unit
(NOTE: Revenue is based on an average of 15 lots per Tentative
Tract Map.)
April 30, 2020
9
B - 10
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0297 TENTATIVE MAP REVISION-TRACT/PARCELREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$4,125 plus the estimated cost of noticing and publishing as
estimated by City staff.
$2,113
S-0301 TREE REMOVAL PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$180$506
S-0303 VARIANCE-REGULARREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$250 - Single-family residence (12% Recovery)
$2,065 - All others, plus the estimated cost of noticing and
publishing as estimated by City staff.
$322 - Single-family residence (12% Recovery)
$2,724 - All others
S-0304 VARIANCE WITH ANOTHER APPLICATIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$990 plus the estimated cost of noticing and publishing as
estimated by City staff.
$910
S-0306 VESTING TENTATIVE MAPREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
"Fully-Burdened" hourly rate of City staff plus consultant costs
including 10% City administrative overhead and all other costs,
including noticing & publishing, charged against an initial deposit
determined by staff.
Direct Cost Recovery Fee plus full consultant cost
S-0308 ZONING FORMREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Staff recommends deleting this service as it is handled by S-0264.$22
April 30, 2020
10
B - 11
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0309 ZONING VERIFICATION REVIEWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$55$37
S-0315 GENERAL PLAN MAINTENANCEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
2% added to all Community Development fees. This would split the
cost with the general taxpayer. This fee is to be reserved for the
major general plan updates that are required every 10 to 15 years.
None
S-0322 TECHNOLOGY FEEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
2% charged against all Development Department Fees2% of Plan Review & Permit Fees
S-0326 ARCHIVE FEESREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$1.25 - Per Permit or Application
$3.15/sheet - Plans
$0.35/page - Documents
$1.00 - Per Permit or Application
$2.00/sheet - Plans
$0.25/page - Documents
S-0441 FINAL/PARCEL MAP REVIEWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$5,195 - Base Fee
$275 - Per Lot Fee
$270 - Each additional Review
$0 - Final Map Continuance - Staff recommends deleting as
not used.
$185 - Certificate of Correction per Hour
$2,210 - Base Fee
$55 - Per Lot Fee
$135 - Each additional Review
$404 - Final Map Continuance
$97 - Certificate of Correction per Hour
April 30, 2020
11
B - 12
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0445 ON-SITE IMPROVEMENT PLAN CHECKREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$3,585 - 1st Sheet, plus
$1,515 - Each Additional Sheet, plus
$265 - if the project is over $25K in estimated cost
$605 - Additional Plan Check (minimum 4 hours) plus $150 for
each hour over four
(Note: Sheets with only standards & conditions are not counted.)
2% of engineer's cost estimate for on-site improvements
S-0447 GRADING PLAN CHECK FEEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$390 for all plans with more than 50 Cubic YardsCubic Yards: <= 50 - No Fee
51 to 100 - $15.00
101 to 1,000 - $22.50
1,001 to 10,000 - $30.00
10,001 to 100,000 - $30.00 plus $15.00 for each 10K CY >
10,000
100,001 to 200,000 - $165.00 plus $9.00 for each 10K CY >
100,000
200,001 and up - $255.00 plus $4.50 for each 10K CY >
200,000
S-0452 REVIEW-CERTIFICATE OF COMPLIANCEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$1,370$828
S-0453 REVIEW-LOT MERGERREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$1,300$828
S-0454 REVIEW-LOT LINE ADJSTMTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$1,590$414 - SFR Occupancy (#3; $1,242)
$828 - Com'l/Ind'l (#3; $2,484)
April 30, 2020
12
B - 13
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0463 ON-SITE CONSTRUCTION INSPECTIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Fee Based on Engineer's Estimate of Construction Cost:
$0 to $1 Million - 3.4% of estimated cost with a $1,045
minimum
Greater than $1 MIllion - $34,000 plus 1.7% of the estimated cost
over $1 Million
3% of Estimated Construction Cost
S-0467 ON-SITE GRADING INSPECTIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Cubic Yards:
1 to 1,000 - $225
1,001 to 10,000 - $340
10,001 to 100,000 - $340 plus $115.00 for each 10K CY >
10,000
100,001 to 200,000 - $1,375 plus $55 for each 10K CY > 100,000
200,001 and up - $1,870 plus $10 for each 10K CY > 200,000
Cubic Yards: <= 50 - No Fee
51 to 100 - $150.00
101 to 1,000 - $225.00
1,001 to 10,000 - $300.00
10,001 to 100,000 - $300.00 plus $100.00 for each 10K CY >
10,000
100,001 to 200,000 - $300.00 plus $100.00 for each 10K CY >
100,000
200,001 and up - $300.00 plus $100.00 for each 10K CY >
200,000
S-0471 HYDRAULIC/HYDROLOGY STUDY REVIEWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$825Actual Time:
$487 - for the first 3 hours
$100 - for each add'l hour
S-0472 ALQUIST PRIOLO FAULT LINE INVESTIG.REF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$940None
S-0480 FEMA FLOODPLAIN REVIEWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$940 plus consultant costs including 10% City administrative
overhead charged against an initial deposit determined by staff.
None
April 30, 2020
13
B - 14
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0481 REV.OF STORM WTR POLLUTION PREV.PLNREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$405 - Commercial & Residential Projects
$615 - Industrial and Linear (CIP/Utility) Projects
$410 - Commercial & Residential Projects (#57; $23,370)
$265 - Industrial and Linear (CIP/Utility) Projects (#56; $14,840)
S-0488 REVIEW OF WTR QUALITY MGMT PLANSREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$155 - Non-Categorical
$1,440 - Categorical
$120 - per hour for reviews after the third review
$80 - Non-Categorical (#450; $36,000)
$365 - Categorical without Conditions of Concern (#75; $27,375)
$1,130 - Categorical with Conditions of Concern (#75; $84,750)
$99 - per hour for reviews after the third review (#1; $99)
S-0489 REV-EROSION/WSTE MGMT CONTROL PLANREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$180$75
S-0490 NPDES CONSTRUCTION INSPECTIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$140 $98 - Less than 10 Acres (#200; $19,600)
$179 - 10 Acres or More (#4; $716)
S-0495 NPDES BUSINESS INSPECTIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$175$143
S-0501 BASIC PERMIT FEEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Engineering Permit - This fee is included with each permit so it
does not need to be charged separately and should be deleted
Blanket Permit - covered by S-0523, so this fee should be deleted
Permit Extension - covered by S-0560, so this fee should be
deleted
$45.00 - Engineering Permit
$53.00 - Blanket Permit
$43.00 - Permit Extension
April 30, 2020
14
B - 15
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0503 PERMANENT ENCROACHMENT PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$1,515 - Initial Permit
$340 - Annual Renewal
$670.00 - Initial Permit ($625 for the encroachment permit and $45
for the basic permit - both to be combined into one fee.)
$150.00 - Annual Renewal
S-0505 TEMPORARY ENCROACHMENT PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$160 - No Lane Closure - Parking Only
$175 - Lane Closure: First Day
$25 - Lane Closure: Each Additional Day
$100 - Trash Bin, 1st week
$25 - Trash Bin, each add'l week
$25.00 - No Lane Closure (#100; $2,500)
$136.00 - Lane Closure: First Day (#2,400; $326,400)
$60.00 - Lane Closure: Each Additional Day (#9,600; $576,000)
$70.00 - Trash Bin, 1st week
$28.00 - Trash Bin, each add'l week
S-0507 LANE CLOSURE WITH EXCAVATIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Staff recommends deleting this fee as the cost of
reviewing/inspecting the lane closure is covered by the excavation
permit.
$286.00
S-0509 SPECIAL EVENT ENCROACHMENTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$925 - Lane Closure
$1,495 - Street/Road Closure, 1st day
$1,040 - Street/Road Closure, each add''l day
$545.00 - With a Lane Closure (#4; $2,180)
$559.00 - With a Street Closure (#8; $4,472)
$347.00 - With a Road Closure (1st day) **
$302.00 - Each Additional Day of a Street/Road Closure (#4,
$1,208)
(**Note: Staff recomends combining the fees for a street and a road
as they take the same effort. Also, each of the above fees, except
the "additional day" fee, include the $45 basic fee from S-0501.)
S-0511 OVERSIZE LOAD/BLDG.MOVE PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$16 - One Day Permit
$90 - Annual Permit
(Note: City may only charge the State-Mandated fee. There is no
provision for a technology surcharge.)
$17.00 - One Day (State-Mandated Fee is $16) (#997; $16,949)
$95.00 - Annual Permit (State-Mandated Fee is $90) (#3; $285)
April 30, 2020
15
B - 16
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0513 HAULING PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$650 - First Day
$285 - Each Additional Day
$438.00 - First Day (#8; $3,504) (Includes S-501 Basic Fee)
$100.00 - Each Additional Day (#32; $3,200)
S-0515 EXCAVATION PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Staff Recommends Deleting This Service$150.00 - Per day
S-0517 TRAFFIC STUDY REPORTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Actual Consultant charge (currently $1,440 for a basic review) plus
10% overhead for City contract administration and review.
$719.00 - Basic Review (#10; $7,190)
$80.00 - Extended Review per Hour (#0; $0)
S-0518 OFF-SITE IMPROVEMENT PLAN CHECKREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$3,585 - 1st Sheet, plus
$1,515 - Each Additional Sheet, plus
$265 - if the project is over $25K in estimated cost
$605 - Additional Plan Check (minimum 4 hours) plus $150 for
each hour over four
(Note: Sheets with only standards & conditions are not counted.)
$45 plus 4% of Estimated Construction Cost with a $50 minimum
S-0520 REVIEW REVISIONS TO APPROVED PLANSREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$210 for the 1st hour plus $150 for each additional hour$137.00
April 30, 2020
16
B - 17
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0521 OFF-SITE IMPROVEMENT INSPECTIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$240 - Driveway & Sidewalk Replacement
Other Fees based on Estimated Construction Cost:
$0 to $175,000 - $630 plus 12.4% of the Cost over
$15,000
$175,001 to $750,000 - $20,470 plus 3.4% of the Cost over
$175,000
Greater than $750,000 - $40,020 plus 1.1% of the Cost over
$750,000
$45 plus 4% of Estimated Construction Cost
S-0523 ANNUAL UTILITY BLANKET PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$130 for the initial blanket permit annually plus $105 per day for
inspection per location after the first day/location deducted from an
initial annual deposit of $5,500. Deposit balance can be carried
forward to a new year but a new initial blanket permit is required
and the deposit balance must be restored to $5,500.
$53.00 - Permit Issuance (#7; $371)
$73.00 - Inspection Per Location (#7; $511)
S-0529 BOND RELEASE INSPECTION - PWREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$230$45.00 - Issuance
$59.00 - Inspection
S-0531 STREET NAME CHANGEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Actual Cost based on the "Fully-Burdened" hourly rate of City staff
plus consultant costs including 10% contract administrative
overhead and all other costs, including new street signage, charged
against an initial deposit determined by staff.
$1,345.00 Plus the Cost of Street Signs
S-0533 STREET/ALLEY VACATIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$1,840 plus a deposit for noticing and publishing determined by
staff
$1,000.00 - Deposit
$1,000.00 - Balance Due Prior to Processing
April 30, 2020
17
B - 18
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0535 DEDICATION OF RIGHT-OF-WAYREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
If Legal and Map are Provided - $920
If City Prepares Legal & Map - Actual Cost based on the
"Fully-Burdened" hourly rate of City staff plus consultant costs
including 10% contract administrative overhead and all other costs
charged against an initial deposit determined by staff.
$315.00 - If Legal and Map are Provided (#10; $3,150)
$800.00 - If City Prepares Legal & Map
S-0537 PRIVATE PARTY ANNEXATION REQUESTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Actual Cost based on the "Fully-Burdened" hourly rate of City staff
plus consultant costs including 10% contract administrative
overhead and all other costs charged against an initial deposit of
$17,000.
$14,750.00
S-0539 CITY PROPERTY LEASE PROCESSINGREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Actual Cost based on the "Fully-Burdened" hourly rate of City staff
plus consultant costs including 10% contract administrative
overhead and all other costs charged against an initial deposit of
$5,500.
$2,100.00
S-0542 ENGINEERING LETTERREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Staff recommends deleting this service as it is not being provided.$100.00
S-0560 PERMIT EXTENSIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$80 each$43.00
S-0565 RE-INSPECTIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$105 per hour with a one-hour minimum$90 ($45 permit fee + $45 reinspection fee)
April 30, 2020
18
B - 19
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0567 AFTER HOURS & HOLIDAY INSPECTIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Employee's current hourly rate at time & 1/2 plus 20% overhead
with a four (4) hour minimum
$369.00 - 4 hr. minimum
$92.45 - each additional hour
S-0571 ASMT.DIST./COMM.FACILITIES DIST.REF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Actual Cost based on the "Fully-Burdened" hourly rate of City staff
plus consultant costs including 10% contract administrative
overhead and all other costs charged against an initial deposit
determined by staff.
$5,900
S-0602 CONCEALED WEAPONS PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
The general public applies for Concealed Weapons Permits at the
Sheriff's Office. The Police Department only issues permits to
retired SBPD Officers who are not charged a fee. Staff
recommends deleting this fee as it is not being used.
$400 - Initial
$325 - Renewal
S-0609 RECORDS CHECK LETTERREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$40$25 - With Record
$20 - Without Record
S-0611 2ND HAND DEALER/PAWNSHOP REGULATIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$480 - Initial
$135 - Renewal
$475 - Initial (#1; $475)
$126 - Renewal (#3; $378)
April 30, 2020
19
B - 20
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0613 LIVE SCAN FINGERPRINT PROCESSINGREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$20 plus applicable DOJ/FBI fee (currently $33) $2 - Live Scan Processing Fee (Note: Staff is charging $15 plus
the DOJ fee.)
$15 - Fingerprint card
(Note: Applicants for City jobs are not charged the Live Scan fee or
the DOJ fee.)
S-0616 FIX-IT TICKET SIGN-OFFREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$25$20
S-0618 SPECIAL POLICE SERVICEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Officer's current hourly rate at time & 1/2 plus 20% overhead with
a four (4) hour minimum
Officer's hourly rate at time & 1/2 plus Medicare and Workers'
Comp. Insurance
S-0621 ALARM SYSTEMREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$96 - Annual Alarm Permit ($75-City plus $21-Alarm Vendor)
$25 - Alarm Sys.Installation
$10 - Alarm Sys.Monitoring Tsfr.
False Alarm Charge:
$256 - All False Alarms without a Permit ($200-City plus $56-Alarm
Vendor) and after the 3rd False Alarm in a 12 month period with a
Permit.
(Note: No distinction found between residential and commercial
response or between intrusion and panic/robbery response.)
$25/$50/$10 - Ann.Res'l/Com'l/LIR Alarm Pmt. (LIR=Low Income
Resident)
$25 - Alarm Sys.Installation
$10 - Alarm Sys.Monitoring Tsfr.
False Alarms in 12-month period [Intrusion: Reg./LIR]/[Robbery or
panic: Reg./LIR]:
[$75/$10]/[$200/$20] - 1st thru 4th Non-Permitted
[$90/$10]/[$250/$20] - 5th & 6th
[$90/$20]/[$300/$40] - 7th thru 9th
[$175/$20]/[$350/$40] - 10th & Subsequent
S-0640 ANIMAL CONTROL SERVICESREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
To recognize the Public Health importance of animal control, we
suggest that 50% of the cost should come from the general
taxpayer. The Police Department has prepared a study that will
move the City in that direction.
Various Fees to cover licensing, boarding and miscellaneous
services
April 30, 2020
20
B - 21
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-0655 BIENNIAL RENTAL PROPERTY INSPECTIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$180 per SFR rental
Staff recommends increasing the inspections to every year and
including an interior inspection.
$100 per owner of SFR rentals
S-0657 NOTICE OF PENDENCY RELEASEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$165 plus $8.50 for any unit over four$180 for the first four units
$180 base fee plus $7.45 for each unit inspected (over four)
S-0659 ABATEMENT LIEN ADMINISTRATIVE CHGEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$130 per lien$115 per lien
S-0662 LIEN DEMAND LETTER ADMIN.CHARGEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$185$95
S-0664 DUPLICATE LIEN RELEASEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$15$28
S-0666 WEED ABATEMENT CHARGESREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$515 per lot or partial lot plus actual cost of discing$375 per lot or partial lot plus actual cost of discing
April 30, 2020
21
B - 22
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-6000 AQUATICS SERVICESREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
See Appendix CSee Appendix C
In addition, the City has received $39,750 from a Kaiser Grant.
S-6060 YOUTH SPORTSREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Resident - $45 per child
Non-Resident - $50 per child
Resident - $30 per child
Non-Resident - $33 per child
S-6070 ADULT SPORTSREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Soccer:
Resident - $375 per team
Non-Resident Team - $425 per team
Basketball - Charging direct staff and program cost
Soccer:
Resident - $300 per team
Non-Resident Team - $350 per team
Basketball - Charging direct staff and program cost
S-6100 COMM. CENTER PROG/RENTALSREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
See Appendix CSe Appendix C
S-6130 BALLFIELD RENTAL/USEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Reservation - $10 per hour
Tournament Use - $120 per field per day
Lighting - $20 per hour for first hour and $15 per hour thereafter
Preparation - determined by the needs of the event
Local Sports Groups:
Field Use - No Charge
Lighting - No Charge
Reservation - $10 per hour for first hour and $5 per hour thereafter
Tournament Use:
$120 per field per day without lights
$180 per field per day with lights
Preparation - $25 per field upon request
Lighting - $20 per hour for first hour and $10 per hour thereafter
Local Sports Groups do not pay for use of the fields or lights.
April 30, 2020
22
B - 23
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-6700 LIBRARY CARD REPLACEMENTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$1 per card (Staff Recommendation)$1 per card
S-6710 INTER-LIBRARY LOAN REQUESTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$3 per item$3 per item
S-6720 LIBRARY RESEARCH SERVICEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$20 per hour$20 per hour
S-6730 REPLACE LOST/DAMAGED LIBRARY MAT'LSREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Lost Items:
Magazines - $5 processing fee plus $10 replacement cost
Other items - $10 processing fee plus $40 replacement cost
Damaged Items - $3-$5
Missing Barcode - $10
Missing or Damaged Bookcover - $10
Lost Items:
Magazines - $1 processing fee plus $10 replacement cost
Other items - $5 processing fee plus $40 replacement cost
Damaged Items - $3-$5
Missing Barcode - $1
Missing or Damaged Bookcover - $5
S-6740 LIBRARY ROOM RENTALREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Bing Wong Auditorium: Non-Profit - $25/hr For Profit - $50/hr (4 hr
min)
Kellogg Room A or B - Non-Profit - $25/hr for each For Profit -
$50/hr for each
Study Room - $15 per hour (waived with student ID)
Projector - $5 per day
VCR and Monitor - $10 per day
Digital Projector in Bing Wong Auditorium - $30
Computer/Internet Techincal Support - $20 per hour
Portable Public Address System - $5 per day ($50 deposit)
Bing Wong Auditorium - $25 per hour (4 hour minimum)
Kellogg Room A or B - $25 per hour for each
Study Room - $15 per hour (waived with student ID)
Projector - $5 per day
VCR and Monitor - $10 per day
Digital Projector in Bing Wong Auditorium - $30
Computer/Internet Techincal Support - $20 per hour
Portable Public Address System - $5 per day ($50 deposit)
April 30, 2020
23
B - 24
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-7000 CEMETERY INTERMENTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Single - $2,295
Double - $2,590
Cremation - $915
Adult: Single - $600 Double - $850
Child: Single - $350 Double - $650
Baby - $150
Cremation - $200
For many sites, the City has a contractual obligation to provide the
interment at the fee that was in place when the contract was
signed.
S-7010 CEMETERY DISINTERMENTREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Disinterment/Reinterment (within Cemetery) - $5,545
Adult Disinterment (Shipped Out) - $3,820
Disinterment/Reinterment (within Cemetery) -$1,500
Adult Disinterment (Shipped Out) - $1,200
Baby/Child Disinterment (Shipped Out) - $800
S-7020 CEMETERY MARKER SETTINGSREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Single - $335
Double - $595
Marker Inscription - Actual costs
Single - $140
Double - $200
Marker Inscription:
4 digits - $50
Month, Day, Year - $100
Name and years - $130
S-7030 CEMETERY FLOWER VASE INSTALLATIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$95 per installation and vase$30 per vase. No installation fee
S-7040 REMOVE/REPLACE CEMETERY MARKERREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Single - $420 per marker
Double - $735 per marker
None
April 30, 2020
24
B - 25
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-7050 GRAVE PROPERTY OWNER TRANSFERREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$125 per transfer$50 per transfer
S-7100 CEMETERY SERVICESREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Grave Spaces:
Adult - $1,950
Public Guardian - $1,950
Child - $1,950
Baby - $1,000
Cremation - $1,300
Burial Vault/Bell Liners - Actual cost plus 10%
Grave Spaces:
Adult - $1,200
Public Guardian - $800
Child - $800
Baby - $200
Cremation - $400
Burial Vault - $445
plus fees for Concrete Bell Liners and re-sale of concrete vaults to
mortuaries.
S-7220 STREET BANNER INSTALL/REMOVEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$410$200
S-7250 REPAIR TO CITY PROPERTY DAMAGEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Charge the fully allocated hourly rates for all personnel involved
plus any outside costs.
Actual Costs
S-7260 PARK RENTAL/RESERVATIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
See Appendix CSee Appendix C
April 30, 2020
25
B - 26
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-7270 FISCALLINI FIELD MAINTENANCEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Field - $500 per use (6 hours) plus $40 per hour for lights
Club House - $200 per day
CSUSB pays $17,000 per year. They also provide in-kind
maintenance services.
SB Youth Baseball does not pay for use of the field. They are to pay
$6,000 per year for capital improvements to the field.
Field - $500 per use (6 hours) plus $40 per hour for lights
Club House - $88.60 per day
CSUSB pays $17,000 per year. They also provide in-kind
maintenance services.
SB Youth Baseball does not pay for use of the field. They are to pay
$6,000 per year for capital improvements to the field.
S-8000 DOCUMENT REPRODUCTIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
First five copies - No Charge
Each additional copy - $0.25 per copy
FPPC Copies - $0.10 per copy
First Page - $0.35
Each additional page - $0.15
S-8020 ELECTRONIC FILE COPYREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$10 per diskNone
S-8040 ADMIN CIVIL PENALTY PROCESSINGREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Recover the fully allocated actual costs at the discretion of the
Hearing Officer.
None
S-8050 ACP DEMAND LETTERREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$65 per letter$31.84 per letter
S-8060 LIEN RELEASEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$65 plus any County feesNone
April 30, 2020
26
B - 27
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-8320 BUSINESS REGISTRATION LIEN ASSESSREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$90 per lien plus any County processing fees$125 per lien (City receives $104 of the fee and the County
receives $21)
S-8330 BUSINESS REGISTRATION DEMAND LETTERREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$10 per letter$11 per letter
S-8340 BUSINESS REGISTRATION LIEN RELEASEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$35 per release plus any County processing feesNone
S-8350 DUPLICATE BUSINESS REG CERTIFICATEREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$10 per certificate$0.50 per certificate
S-8360 PASSPORT PROCESSINGREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$35 per application plus $15 per photograph
The application fee is set by the federal government.
$35 per application plus $15 per photograph
April 30, 2020
27
B - 28
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-8370 NOTARY PUBLICREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$15 per document.
This fee is set by the State.
$15 per document
S-8380 RECORDS COMPILATIONREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Charge the fully allocated hourly rate for all personnel needed plus
any outside costs.
Actual Costs
S-8390 CANDIDATE FILINGREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$25 per candidate
This is the maximum allowed under State law (Elections Code
section 10228)
$25 per candidate
This is the maximum allowed under State law (Elections Code
section 10228)
S-8400 INITIATIVE FILINGREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$200 per application
Fee is to be refunded to the filer if, within one year of the date of
filing the notice of intent, the elections official certifies the
sufficiency of the petition.
This is the maximum allowed under State law (Elections Code
section 9202(b)).
$200 per application
Fee is to be refunded to the filer if, within one year of the date of
filing the notice of intent, the elections official certifies the
sufficiency of the petition.
This is the maximum allowed under State law (Elections Code
section 9202(b)).
April 30, 2020
28
B - 29
CITY OF SAN BERNARDINO, CALIFORNIA
As of April 29, 2020
FEE COMPARISON REPORT
S-8410 WEDDING CEREMONYREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$70 per ceremony$65 per ceremony
S-8500 FILM PERMITREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$250 per permit$63 per permit
S-8600 NSF CHECK PROCESSINGREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
$65 per NSF check
(According to Government Code section 6157 (b), a city may
charge a "reasonable charge for the returned check, not to exceed
the actual costs incurred by the public agency" in order to recover
its processing and collection costs.)
$26 per NSF Check
S-9000 OTHER CHARGEABLE SERVICESREF #:TITLE:
CURRENT FEE RECOMMENDED FEE
Actual Cost based on the "Fully-Burdened" hourly rate of City staffNone
April 30, 2020
29
B - 30
APPENDIX C
CURRENT BUILDING & SAFETY FEE SCHEDULE
C - 1
THIS PAGE IS BLANK
C - 2
1.
valuation of the construction.
2.
3.
4.
C - 3
2
1.
2.
nd
C - 4
3
Table 1A Building Permit Fees Tract Homes
Square Feet Insp. Time(hr)Permit Fee Square Feet Insp. Time(hr.)Permit Fee
to 1200 4.77 $451
1300 4.94 $467
1400 5.11 $483
1500 5.28 $499
1600 5.45 $515 4600 10.51 $ 993
1700 5.62 $531 4700 10.68 $1,009
1800 5.78 $546 4800 10.85 $1,025
1900 5.95 $562 4900 11.02 $1,041
2000 6.12 $578 5000 11.18 $1,056
2100 6.29 $594 5100 11.35 $1,072
2200 6.46 $610 5200 11.52 $1,088
2300 6.63 $626 5300 11.69 $1,104
2400 6.80 $642 5400 11.86 $1,120
2500 6.97 $658 5500 12.03 $1,136
2600 7.13 $673 5600 12.2 $1,152
2700 7.30 $689 5700 12.37 $1,168
2800 7.47 $706 5800 12.53 $1,183
2900 7.64 $722 5900 12.7 $1,200
3000 7.81 $738 6000 12.87 $1,216
3100 7.98 $754 6100 13.04 $1,232
3200 8.15 $770 6200 13.21 $1,248
3300 8.32 $786 6300 13.38 $1,264
3400 8.48 $801 6400 13.55 $1,280
3500 8.65 $817 6500 13.71 $1,295
3600 8.82 $833 6600 13.88 $1,311
3700 8.99 $849 6700 14.05 $1,327
3800 9.16 $865 6800 14.22 $1,343
3900 9.33 $881 6900 14.39 $1,359
4000 9.50 $897 7000 14.56 $1,375
4100 9.66 $912 7100 14.73 $1,391
4200 9.83 $928 7200 14.9 $1,407
4300 10.00 $945 7300 15.06 $1,422
4400 10.17 $961 7400 15.23 $1,438
4500 10.34 $977 7500 15.4 $1,455
Notes: 1. The indicated fees include building, electrical,plumbing and mechanical inspection fees.
2. The indicated fees do not includeplan review, issuance or other applicable fees.
3. The indicated fees include a standard 2 car garage.
4. For homes larger than 7500 sq. ft., use the following formula: $1455 + (size 7500)/100 X 15.94 .
5. This table applies to tract homes built in phases of 5 or more.
C - 5
4
Table 1B Building Permit Fees Infill Homes
Square Feet Insp. Time(hr)Permit Fee Square Feet Insp. Time(hr.)Permit Fee.
to 1200 12.35 $1,166
1300 12.65 $1,195
1400 12.95 $1,223
1500 13.25 $1,251
1600 13.55 $1,280 4600 22.50 $2,125
1700 13.84 $1,307 4700 22.80 $2,153
1800 14.14 $1,336 4800 23.10 $2,182
1900 14.44 $1,364 4900 23.40 $2,210
2000 14.74 $1,392 5000 23.69 $2,238
2100 15.04 $1,421 5100 23.99 $2,266
2200 15.34 $1,449 5200 24.29 $2,294
2300 15.64 $1,477 5300 24.59 $2,323
2400 15.93 $1,505 5400 24.89 $2,351
2500 16.23 $1,533 5500 25.19 $2,379
2600 16.53 $1,561 5600 25.49 $2,408
2700 16.83 $1,590 5700 25.78 $2,435
2800 17.13 $1,618 5800 26.08 $2,463
2900 17.43 $1,646 5900 26.38 $2,492
3000 17.72 $1,674 6000 26.68 $2,520
3100 18.02 $1,702 6100 26.98 $2,548
3200 18.32 $1,730 6200 27.28 $2,577
3300 18.62 $1,759 6300 27.58 $2,605
3400 18.92 $1,787 6400 27.87 $2,632
3500 19.22 $1,815 6500 28.17 $2,661
3600 19.52 $1,844 6600 28.47 $2,689
3700 19.81 $1,871 6700 28.77 $2,717
3800 20.11 $1,899 6800 29.07 $2,746
3900 20.41 $1,928 6900 29.37 $2,774
4000 20.71 $1,956 7000 29.66 $2,801
4100 21.01 $1,984 7100 29.96 $2,830
4200 21.31 $2,013 7200 30.26 $2,858
4300 21.61 $2,041 7300 30.56 $2,886
4400 21.90 $2,068 7400 30.86 $2,915
4500 22.20 $2,097 7500 31.16 $2,943
Notes: 1. The indicated fees, include building, electrical, plumbing and mechanical inspection fees.
2. The indicated fees do not include plan review, issuance or other applicable fees.
3. The indicated fees include a standard 2 cargarage.
4. For homes larger than 7500 sq. ft., use the following formula: $2943 + (size 7500)/100 X 28.19 .
5. This table applies to infill, custom, and tract homes built in phases of 4 or less.
C - 6
Occupancy Classification (2006 IBC)
5C - 7
FIREPLACE
30%
6C - 8
7
Commercial, Industrial, and Mu
1.00 - 500 60.00 14.25 74.25
501 - 600 60.00 16.15 76.15
601 - 700 60.00 18.05 78.05
701 - 800 60.00 19.95 79.95
801 - 900 60.00 21.85 81.85
901 - 1,000 60.00 23.75 83.75
1,001 - 1,100 60.00 25.65 85.65 30,001 – 31,000 291.00 276.45 567.45
1,101 - 1,200 60.00 27.55 87.55 31,001 – 32,000 297.50 282.63 580.13
1,201 - 1,300 60.00 29.45 89.45 32,001 – 33,000 304.00 288.80 592.80
1,301 - 1,400 60.00 31.35 91.35 33,001 – 34,000 310.50 294.98 605.48
1,401 - 1,500 60.00 33.25 93.25 34,001 – 35,000 317.00 301.15 618.15
1,501 - 1,600 60.00 35.15 95.15 35,001 – 36,000 323.50 307.33 630.83
1,601 - 1,700 60.00 37.05 97.05 36,001 – 37,000 330.00 313.50 643.50
1,701 - 1,800 60.00 38.95 98.95 37,001 – 38,000 336.50 319.68 656.18
1,801 - 1,900 60.00 40.85 100.85 38,001 – 39,000 343.00 325.85 668.85
1,901 - 2,000 60.00 42.75 102.75 39,001 – 40,000 349.50 332.50 682.00
40,001 – 41,000 356.00 338.20 694.20
41,001 – 42,000 362.50 344.38 706.88
2,001 - 3,000 60.00 51.30 111.30 42,001 – 43,000 369.00 350.55 719.55
3,001 – 4,000 63.00 59.85 122.85 43,001 – 44,000 375.50 356.73 732.23
4,001 – 5,000 72.00 68.40 140.40 44,001 – 45,000 382.00 362.90 744.90
5,001 – 6,000 81.00 76.95 157.95 45,001 – 46,000 388.50 369.08 757.58
6,001 – 7,000 90.00 85.50 175.50 46,001 – 47,000 395.00 375.25 770.25
7,001 – 8,000 99.00 94.05 193.05 47,001 – 48,000 401.50 381.43 782.93
8,001 – 9,000 108.00 102.60 210.60 48,001 – 49,000 408.50 387.60 796.10
9,001 – 10,000 117.00 111.15 228.15 49,001 – 50,000 414.50 393.78 808.28
10,001 – 11,000 126.00 119.70 245.70 50,001 – 51,000 419.50 398.05 817.55
11,001 – 12,000 135.00 128.25 263.25 51,001 – 52,000 423.00 402.33 825.33
12,001 – 13,000 144.00 136.80 280.80 52,001 – 53,000 428.00 406.60 834.60
13,001 – 14,000 153.00 145.35 298.35 53,001 – 54,000 432.50 410.88 843.38
14,001 – 15,000 162.00 153.90 315.90 54,001 – 55,000 437.00 415.15 852.15
15,001 – 16,000 171.00 162.45 333.45 55,001 – 56,000 441.50 419.43 860.93
16,001 – 17,000 180.00 171.00 351.00 56,001 – 57,000 446.00 423.70 869.70
17,001 – 18,000 189.00 179.55 368.55 57,001 – 58,000 450.50 427.98 878.48
18,001 – 19,000 198.00 188.10 386.10 58,001 – 59,000 455.00 432.25 887.25
19,001 – 20,000 207.00 196.65 403.65 59,001 – 60,000 459.50 436.53 896.03
20,001 – 21,000 216.00 205.20 421.20 60,001 – 61,000 464.00 440.80 904.80
21,001 – 22,000 225.00 213.75 438.75 61,001 – 62,000 468.50 445.08 913.58
22,001 – 23,000 234.00 222.30 456.30 62,001 – 63,000 473.00 449.35 922.35
23,001 – 24,000 243.00 230.85 473.85 63,001 – 64,000 477.50 453.63 931.13
24,001 – 25,000 252.00 239.45 491.45 64,001 – 65,000 482.00 457.90 939.90
25,001 – 26,000 258.00 245.10 503.10 65,001 – 66,000 486.50 462.18 948.68
26,001 – 27,000 265.00 251.75 516.75 66,001 – 67,000 491.00 466.45 957.45
27,001 – 28,000 271.00 257.45 528.45 67,001 – 68,000 495.50 470.73 966.23
28,001 – 29,000 278.00 264.10 542.10 68,001 – 69,000 500.00 475.00 975.00
29,001 – 30,000 284.00 269.80 553.80 69,001 – 70,000 504.50 479.28 983.78
C - 9
8
70,001 – 71,000 509.00 483.55 992.55 120,001 – 121,000 713.00 677.35 1390.35
71,001 – 72,000 513.50 487.83 1001.33 121,001 – 122,000 716.50 680.68 1397.18
72,001 – 73,000 518.00 492.10 1010.10 122,001 – 123,000 720.00 684.00 1404.00
73,001 – 74,000 522.40 496.38 1018.78 123,001 – 124,000 723.50 687.33 1410.83
74,001 – 75,000 527.00 500.65 1027.65 124,001 – 125,000 727.00 690.65 1417.65
75,001 – 76,000 531.50 504.93 1036.43 125,001 – 126,000 730.50 693.98 1424.48
76,001 – 77,000 536.00 509.20 1045.20 126,001 – 127,000 734.00 697.30 1431.30
77,001 – 78,000 540.40 513.38 1053.78 127.001 – 128,000 737.50 700.63 1438.13
78,001 – 79,000 545.00 517.75 1062.75 128,001 – 129,000 741.00 703.95 1444.95
79,001 – 80,000 549.50 522.03 1071.53 129,001 – 130,000 744.50 707.28 1451.78
80,001 – 81,000 554.00 526.50 1080.50 130,001 – 131,000 748.00 710.60 1458.60
81,001 – 82,000 558.50 530.58 1089.08 131,001 – 132,000 751.50 713.93 1465.43
82,001 – 83,000 563.00 534.85 1097.85 132,001 – 133,000 755.00 717.25 1472.25
83,001 – 84,000 567.50 539.13 1106.63 133,001 – 134,000 758.50 720.58 1479.08
84,001 – 85,000 572.00 543.40 1115.40 134,001 – 135,000 762.00 723.90 1485.90
85,001 – 86,000 576.00 547.68 1123.68 135,001 – 136,000 765.50 727.23 1492.73
86,001 – 87,000 581.00 551.95 1132.95 136,001 – 137,000 769.00 730.55 1499.55
87,001 – 88,000 585.00 556.23 1141.23 137,001 – 138,000 772.50 733.88 1506.38
88,001 – 89,000 590.00 560.50 1150.50 138,001 – 139,000 776.00 737.20 1513.20
89,001 – 90,000 594.50 564.78 1159.28 139,001 – 140,000 779.50 740.53 1520.03
90,001 – 91,000 599.00 569.05 1168.05 140,001 – 141,000 783.00 743.85 1526.85
91,001 – 92,000 603.50 573.33 1176.83 141,001 – 142,000 786.50 747.18 1533.68
92,001 – 93,000 608.50 577.60 1186.10 142,001 – 143,000 790.00 750.50 1540.50
93,001 – 94,000 612.50 581.88 1194.38 143,001 – 144,000 793.50 753.83 1547.33
94,001 – 95,000 617.00 586.15 1203.15 144,001 – 145,000 797.00 757.15 1554.15
95,001 – 96,000 621.50 590.43 1211.93 145,001 – 146,000 800.50 760.98 1560.98
96,001 – 97,000 626.00 594.70 1220.70 146,001 – 147,000 804.00 763.80 1567.80
97,001 – 98,000 630.50 598.98 1229.48 147,001 – 148,000 807.50 767.13 1574.63
98,001 – 99,000 635.00 603.25 1238.25 148,001 - 149,000 811.00 770.45 1581.45
99,001 – 100,000 639.50 607.53 1247.03 149,001 – 150,000 814.50 773.78 1588.28
100,001 – 101,000 643.00 610.85 1253.85 150,001 – 151,000 818.00 777.10 1595.10
101,001 – 102,000 646.50 614.18 1260.68 151,001 –152.,000 821.50 780.43 1601.93
102,001 – 102,000 650.00 617.50 1267.50 152,001 – 153,000 825.00 783.75 1608.75
103,001 – 104,000 653.50 620.83 1274.33 153,001 – 154,000 828.50 787.08 1615.58
104,001 – 105,000 657.00 624.15 1281.15 154,001 – 155,000 832.00 790.40 1622.40
105,001 – 106,000 660.50 627.48 1287.98 155,001 – 156,000 835.50 793.73 1629.23
106,001 – 107,000 664.00 630.80 1294.80 156,001 – 157,000 839.00 797.05 1636.05
107,001 – 108,000 667.50 634.11 1301.61 157,001 – 158,000 842.50 800.38 1642.88
108,001 – 109,000 671.00 637.45 1308.45 158,001 – 159,000 846.00 803.70 1649.70
109,001 – 110,000 674.50 640.78 1315.28 159,001 – 160,000 849.50 807.03 1656.53
110,001 – 111,000 678.00 644.10 1322.10 160,001 – 161,000 853.00 810.35 1663.35
111,001 – 112,000 681.50 647.43 1328.93 161,001 – 162,000 856.50 813.68 1670.18
112,001 – 113,000 685.00 650.75 1335.75 162,001 – 163,000 860.00 817.00 1677.00
113,001 – 114,000 688.50 654.08 1342.58 163,001 – 164,000 863.50 820.33 1683.83
114,001 – 115,000 692.00 657.40 1349.40 164,001 – 165,000 867.00 823.65 1690.65
115,001 – 116,000 695.50 660.73 1356.23 165,001 – 166,000 870.50 826.98 1697.48
116,001 – 117,000 699.00 664.05 1363.05 166,001 – 167,000 874.00 830.30 1704.30
117,001 – 118,000 702.50 667.38 1369.88 167,001 – 168,000 877.50 833.63 1711.13
118,001 – 119,000 706.00 670.70 1376.70 168,001 – 169,000 881.00 836.95 1717.95
119,001 – 120,000 709.50 674.03 1383.53 169,001 – 170,000 884.50 840.28 1774.78
C - 10
3.50
_V-100,000_
1000
$
3.00
_V-500,000_
1000
$
2.00
_V-1,000,000_
1000
9C - 11
10
Solar Energy Systems
- Up to 1 hp
- Over 100 hp
$.056
$.050
$.015
$30.50
$62.15
$124.30
18.20
$23.50
$ 12.30
$ 1.10
$ .73
$ 4.75
$24.60
$ 4.75
$40.00
$11.00
$10.00
$60.00
$49.50
$ 4.75
$12.30
$24.60
$49.50
$74.50
$23.50
$ 7.25
$ 7.25
C - 12
11
Cesspool
Solar Energy Systems
$ 9.80
$40.00
$11.00
$10.00
$24.65
$37.25
$74.50
$22.00
$12.30
$ 4.75
$ 6.15
$ 1.10
$19.90
$ 4.75
$4.75
$ 14.80
$9.80
$60.00
$14.80
$18.20
$14.80
$27.15
$29.60
$14.80
$10.65
$ 7.25
$10.65
$10.65
$10.65
C - 13
12
Accessory Buildings
$196
$196
$196
$ 5.75
$14.00
$ 3.00
$10.50
$10.50
$7.00
$7.00
$14.00
$14.00
$ 7.00
$ 7.00
$ 7.00
$ 4.25
$ 4.25
$ 4.25
$ 4.25
$ 7.00
$ 7.00
$ 4.25
$ 4.25
$ 7.00
Plans
$40.00
$10.00
$60.00
$94.45
$94.45
$54.00
$475.08
$133.62
$1.00
C - 14
13C - 15
THIS PAGE IS BLANK
C - 16
APPENDIX D
PROPOSED BUILDING & SAFETY FEE SCHEDULE
D - 1
THIS PAGE IS BLANK
D - 2
Schedule of Fees – Building & Safety Division 1 04/2020
Community & Economic Development Department •Building & Safety Division
201 North E Street, 3rd Floor
290 North D Street
San Bernardino, CA 92401
(909) 384-5357 (909) 384-5155
www.sbcity.org
The plan review and building permit fees applicable to building construction projects in the City of San Bernardino
are provided in the following tables. These fees are collected to cover the costs of the plan review and building
inspection services provided as part of the building process.
These fees Development Impact Fees, School Fees, Engineering Division Fees, Planning Division Fees,
Water Department Fees, Health Department Fees, or other fees collected for other purposes unless noted
otherwise.
In order to determine the for a project the following procedure should be followed:
(all except 1 and 2 family dwellings):
Identify the Construction Cost Factor in Table 2 based on the building’s occupancy group (use) and type
of construction, then multiply this factor by the square footage of the use. The result is the
If the building contains , compute the valuation of each distinct use and
add the valuations together to get the of the building.
Find the appropriate valuation range in the column of Table 3 that corresponds to the
Select the appropriate column to determine the plan review fee.
The Total Plan Review Fee is the sum of the following fee components, when applicable:
= Plan Review Fee + Expeditious Plan Review + Electrical/Plumbing/Mechanical Plan Review +
Energy Plan Review + Fire Plan Review + Accessibility Plan Review + Zoning Review
The hourly rate for in-house plan review is $122.37. When expeditious review is requested by the applicant
and performed by an outside vendor, any plan review billed hourly shall be at the vendor’s prevailing hourly
rate, which is typically higher than the City rate.
Plan reviews of new single-family and duplex residential construction, additions or alteration thereto, will be
performed at the hourly rate. Repetitive tract housing units will be billed at one hour. The plan review fee
for new 1 & 2 family dwellings and for each model of a tract is equal to 5 hours. The fee for additions is
equal to 3 hours.
D - 3
Schedule of Fees – Building & Safety Division 2 04/2020
Additions without a bath or kitchen: $1.74 per sq. ft.
Additions with a bath or kitchen: $1.92 per sq. ft.
Minimum fee for additions: $375.00
Maximum fee for additions up to 1,200 square feet: $1,459.00
Fees for additions over 1,200 square feet: As indicated in Table 1B
Refer to Table 1A
Refer to Table 1B
The basic building permit fee is listed in the 2nd column of Table 3
The Total Building Permit Fee is the sum of the following fee components, when applicable:
= Basic Building Permit Fee + Issuance Fees + Electrical/Plumbing/Mechanical Permit Fees +
Certificate of Occupancy Fee + SMIP Fee* + Cultural Development Impact Fee + Archive Fee +
Technology Fee + General Plan Update Surcharge
(*SMIP = Strong Motion Instrumentation Program Fees
The Community & Economic Development Department uses the following cost factors (dollars per square foot) to
determine project valuation under Section 304.2 of the Uniform Administrative Code as adopted by the City of San
Bernardino. Plan check and building permit fees for occupancies other than single-family residences are based on
value of the project per Section 304. Valuation of a project is determined by the Building Official. The cost factors
contained in Table 2 are used to calculate building valuation, which in turn is used to determine permit and plan
check fees in Table 3. Valuation may or may not have a resemblance to actual square foot cost of a project. In most
cases the costs indicated are below market rates compared to a bid, contract price, assessed value or sales price.
The use of these cost factors by the City simply assures consistency and uniformity in the amount of fees collected
for projects of similar size, construction, and occupancy.
D - 4
Schedule of Fees – Building & Safety Division 3 04/2020
to 1,200 4.77 $564 4,400 10.21 $1,208
1,300 4.94 $585 4,500 10.38 $1,228
1,400 5.11 $605 4,600 10.55 $1,248
1,500 5.28 $625 4,700 10.72 $1,268
1,600 5.45 $645 4,800 10.89 $1,289
1,700 5.62 $665 4,900 11.06 $1,309
1,800 5.79 $685 5,000 11.23 $1,329
1,900 5.96 $705 5,100 11.40 $1,349
2,000 6.13 $725 5,200 11.57 $1,369
2,100 6.30 $745 5,300 11.74 $1,389
2,200 6.47 $766 5,400 11.91 $1,409
2,300 6.64 $786 5,500 12.08 $1,429
2,400 6.81 $806 5,600 12.25 $1,450
2,500 6.98 $826 5,700 12.42 $1,470
2,600 7.15 $846 5,800 12.59 $1,490
2,700 7.32 $866 5,900 12.76 $1,510
2,800 7.49 $886 6,000 12.93 $1,530
2,900 7.66 $906 6,100 13.10 $1,550
3,000 7.83 $927 6,200 13.27 $1,570
3,100 8.00 $947 6,300 13.44 $1,590
3,200 8.17 $967 6,400 13.61 $1,610
3,300 8.34 $987 6,500 13.78 $1,631
3,400 8.51 $1,007 6,600 13.95 $1,651
3,500 8.68 $1,027 6,700 14.12 $1,671
3,600 8.85 $1,047 6,800 14.29 $1,691
3,700 9.02 $1,067 6,900 14.46 $1,711
3,800 9.19 $1,087 7,000 14.63 $1,731
3,900 9.36 $1,108 7,100 14.80 $1,751
4,000 9.53 $1,128 7,200 14.97 $1,771
4,100 9.70 $1,148 7,300 15.14 $1,792
4,200 9.87 $1,168 7,400 15.31 $1,812
4,300 10.04 $1,188 7,500 15.48 $1,832
The indicated fees include building, electrical, plumbing and mechanical inspection fees
The indicated fees do not include plan review, issuance or other applicable fees
The indicated fees include a standard 2-car garage
For homes larger than 7,500 square feet, use the following formula: $1,832.00 + (size-7,500)/100 X 19.72
This table applies to tract homes built in phases of 5 or more.
D - 5
Schedule of Fees – Building & Safety Division 4 04/2020
to 1,200 12.35 $1,461 4,400 21.95 $2,597
1,300 12.65 $1,497 4,500 22.25 $2,633
1,400 12.95 $1,532 4,600 22.55 $2,668
1,500 13.25 $1,568 4,700 22.85 $2,704
1,600 13.55 $1,603 4,800 23.15 $2,739
1,700 13.85 $1,639 4,900 23.45 $2,775
1,800 14.15 $1,674 5,000 23.75 $2,810
1,900 14.45 $1,710 5,100 24.05 $2,846
2,000 14.75 $1,745 5,200 24.35 $2,881
2,100 15.05 $1,781 5,300 24.65 $2,917
2,200 15.35 $1,816 5,400 24.95 $2,952
2,300 15.65 $1,852 5,500 25.25 $2,998
2,400 15.95 $1,887 5,600 25.55 $3,023
2,500 16.25 $1,923 5,700 25.85 $3,059
2,600 16.55 $1,958 5,800 26.15 $3,094
2,700 16.85 $1,994 5,900 26.45 $3,130
2,800 17.15 $2,029 6,000 26.75 $3,165
2,900 17.45 $2,065 6,100 27.05 $3,201
3,000 17.75 $2,100 6,200 27.35 $3,236
3,100 18.05 $2,136 6,300 27.65 $3,272
3,200 18.35 $2,171 6,400 27.95 $3,307
3,300 18.65 $2,207 6,500 28.25 $3,343
3,400 18.95 $2,242 6,600 28.55 $3,378
3,500 19.25 $2,278 6,700 28.85 $3,414
3,600 19.55 $2,313 6,800 29.15 $3,449
3,700 19.85 $2,349 6,900 29.45 $3,485
3,800 20.15 $2,384 7,000 29.75 $3,520
3,900 20.45 $2,420 7,100 30.05 $3,556
4,000 20.75 $2,455 7,200 30.35 $3,591
4,100 21.05 $2,491 7,300 30.65 $3,627
4,200 21.35 $2,526 7,400 30.95 $3,662
4,300 21.65 $2,562 7,500 31.25 $3,698
The indicated fees, include building, electrical, plumbing and mechanical inspection fees
The indicated fees do not include plan review, issuance or other applicable fees
The indicated fees include a standard 2-car garage
For homes larger than 7,500 square feet, use the following formula: $3,698.00 + (size-7,500)/100 X $35.50
This table applies to in-fill, custom, and tract homes built in phases of 4 or less.
D - 6
Schedule of Fees – Building & Safety Division 5 04/2020
Construction costs per square foot [$]
Assembly, Theaters, with Stage 247.86 239.47 233.25 223.81 210.17 204.10 216.62 195.46 188.40
Assembly, Theaters, without
Stage 227.10 218.71 212.49 203.05 189.41 183.34 195.86 174.70 167.65
Assembly, Nightclubs 191.96 186.56 182.12 174.70 164.94 160.39 168.64 149.29 144.33
Assembly, Restaurants, Bars,
Banquet Halls 190.96 185.56 180.12 173.70 162.94 159.39 167.64 147.29 143.33
Assembly, Churches 229.69 221.30 215.08 205.64 192.37 187.27 198.45 177.66 170.60
Assembly, General, Community
Halls, Libraries, Museums 192.20 183.81 176.59 168.15 153.51 148.44 160.96 138.80 132.75
Assembly, Arenas 226.10 217.71 210.49 202.05 187.41 182.34 194.86 172.70 166.65
Business 200.26 192.96 186.54 177.38 161.90 155.84 170.40 142.43 136.08
Educational 209.90 202.64 196.82 188.34 175.49 166.60 181.86 153.45 148.75
Factory and Industrial,
Moderate Hazard 117.60 112.19 105.97 101.84 91.54 87.26 97.61 75.29 70.95
Factory and Industrial,
Low Hazard 116.60 111.19 105.97 100.84 91.54 86.26 96.61 75.29 69.95
High Hazard, Explosives 109.99 104.58 99.35 94.22 85.14 79.87 89.99 68.89 N.P.
High Hazard 109.99 104.58 99.35 94.22 85.14 79.87 89.99 68.89 63.56
HPM 200.26 192.96 186.54 177.38 161.90 155.84 170.40 142.43 136.08
Institutional, Supervised
Environment 197.83 191.05 185.12 177.91 163.28 158.81 178.06 146.98 142.33
Institutional, Hospitals 335.53 328.23 321.81 312.65 296.45 N.P. 305.67 276.99 N.P.
Institutional, Nursing Homes 233.12 225.82 219.40 210.24 195.51 N.P. 203.26 176.05 N.P.
Institutional, Restrained 227.71 220.41 213.99 204.83 190.84 183.78 197.85 171.37 163.02
Institutional, Day Care Facilities 197.83 191.05 185.12 177.91 163.28 158.81 178.06 146.98 142.33
Mercantile 142.95 137.54 132.11 125.68 115.38 111.83 119.62 99.73 95.77
Residential, Hotels 199.70 192.92 186.99 179.78 164.90 160.43 179.93 148.60 143.96
Residential, Multiple-Family 167.27 160.49 154.56 147.35 133.71 129.23 147.50 117.40 112.76
Residential, One and
Two-Family 155.84 151.61 147.83 144.09 138.94 135.27 141.72 130.04 122.46
Residential, Care/Assisted Living
Facilities 197.83 191.05 185.12 177.91 163.28 158.81 178.06 146.98 142.33
Storage, Moderate Hazard 108.99 103.58 97.35 93.22 83.14 78.87 88.99 66.89 62.56
Storage, Low Hazard 107.99 102.58 97.35 92.22 83.14 77.87 87.99 66.89 61.56
Utility, Miscellaneous 84.66 79.81 74.65 71.30 64.01 59.80 68.04 50.69 48.30
Private Garages use Utility, Miscellaneous
Unfinished basements (Group R-3) = $22.45 per square foot
For shell only buildings deduct 20%
N.P. = Not Permitted
D - 7
Schedule of Fees – Building & Safety Division 6 04/2020
Unit Construction Cost
Block Walls:
4’ high
5’ high
6’ high
Other
Demolition Valuation Contract Price
Drywall
Fireplace
Patios/Porches
Patio Slab Only with Footing
Patio Cover Only
Reroofing 1 Square 100 Square Foot :
Built-up
Composition Shingles
Shake or Tile
Resheathing
Signs
Siding, Exterior
Stucco
Swimming Pools and Spas –Gunite
Manufactured Above-Ground Pool
Spa
Tenant Improvement Use 30% of Cost per Square Foot
Window Change-Outs
Deduct 20% for shell only buildings.
D - 8
Schedule of Fees – Building & Safety Division 7 04/2020
The following table provides basic permit and plan review fees based on valuation for commercial, industrial, and multifamily residential
occupancies. Additional fees for permit issuance, electrical, plumbing, mechanical, development impacts, sewer capacity, schools, etc. may apply.
1 –500 60.00 30.00 90.00
501 –600 60.00 30.00 90.00
601 –700 60.00 30.00 90.00
701 –800 60.00 30.00 90.00
801 –900 60.00 30.00 90.00
901 –1,000 60.00 30.00 90.00
1,001 –1,100 60.00 60.00 120.00 20,001 –21,000 270.61 266.71 537.32
1,101 –1,200 60.00 60.00 120.00 21,001 –22,000 281.89 277.82 559.71
1,201 –1,300 60.00 60.00 120.00 22,001 –23,000 293.16 288.93 582.09
1,301 –1,400 60.00 60.00 120.00 23,001 –24,000 304.44 300.04 604.48
1,401 –1,500 60.00 60.00 120.00 24,001 –25,000 315.71 311.22 626.93
1,501 –1,600 60.00 60.00 120.00 25,001 –26,000 323.23 318.56 641.79
1,601 –1,700 60.00 60.00 120.00 26,001 –27,000 332.00 327.21 659.21
1,701 –1,800 60.00 60.00 120.00 27,001 –28,000 339.52 334.62 674.14
1,801 –1,900 60.00 60.00 120.00 28,001 –29,000 348.29 343.26 691.55
1,901 –2,000 60.00 60.00 120.00 29,001 –30,000 355.80 350.67 706.47
30,001 –31,000 364.57 359.31 723.88
31,001 –32,000 372.72 367.34 740.06
2,001 –3,000 60.00 60.00 120.00 32,001 –33,000 380.86 375.36 756.22
3,001 –4,000 78.93 77.79 156.72 33,001 –34,000 389.00 383.40 772.40
4,001 –5,000 90.20 88.90 179.10 34,001 –35,000 397.15 391.42 788.57
5,001 –6,000 101.48 100.01 201.49 35,001 –36,000 405.29 399.45 804.74
6,001 –7,000 112.75 111.13 223.88 36,001 –37,000 413.43 407.47 820.90
7,001 –8,000 124.03 122.24 246.27 37,001 –38,000 421.58 415.50 837.08
8,001 –9,000 135.31 133.35 268.66 38,001 –39,000 429.72 423.52 853.24
9,001 –10,000 146.58 144.47 291.05 39,001 –40,000 437.86 432.16 870.02
10,001 –11,000 157.86 155.58 313.44 40,001 –41,000 446.01 439.54 885.58
11,001 –12,000 169.13 166.69 335.82 41,001 –42,000 454.15 447.60 901.75
12,001 –13,000 180.41 177.80 358.21 42,001 –43,000 462.30 455.62 917.92
13,001 –14,000 191.68 188.92 380.60 43,001 –44,000 470.44 463.65 934.09
14,001 –15,000 202.96 200.03 402.99 44,001 –45,000 478.58 471.67 950.25
15,001 –16,000 214.23 211.14 425.37 45,001 –46,000 486.73 479.71 966.44
16,001 –17,000 225.51 222.25 447.76 46,001 –47,000 494.87 487.73 982.60
17,001 –18,000 236.79 233.37 470.16 47,001 –48,000 503.01 495.76 998.77
18,001 –19,000 248.06 244.48 492.54 48,001 –49,000 511.78 503.78 1015.56
19,001 –20,000 259.34 255.59 514.93 49,001 –50,000 519.30 511.81 1031.11
D - 9
Schedule of Fees – Building & Safety Division 8 04/2020
50,001 –51,000 525.56 517.36 1042.92 90,001 –91,000 750.45 739.61 1490.06
51,001 –52,000 529.95 522.92 1052.87 91,001 –92,000 756.08 745.18 1501.26
52,001 –53,000 536.21 528.47 1064.68 92,001 –93,000 762.35 750.73 1513.08
53,001 –54,000 541.85 534.03 1075.88 93,001 –94,000 767.36 756.29 1523.65
54,001 –55,000 547.49 539.58 1087.07 94,001 –95,000 773.00 761.84 1534.84
55,001 –56,000 553.13 545.15 1098.28 95,001 –96,000 778.64 767.40 1546.04
56,001 –57,000 558.76 550.70 1109.46 96,001 –97,000 784.27 772.95 1557.22
57,001 –58,000 564.40 556.26 1120.66 97,001 –98,000 789.91 778.51 1568.42
58,001 –59,000 570.04 561.81 1131.85 98,001 –99,000 795.55 784.06 1579.61
59,001 –60,000 575.68 567.37 1143.05 99,001 –100,000 801.19 789.63 1590.82
60,001 –61,000 581.31 572.92 1154.23 100,001 –101,000 805.57 793.94 1599.51
61,001 –62,000 586.95 578.49 1165.44 101,001 –102,000 809.96 798.27 1608.23
62,001 –63,000 592.59 584.04 1176.63 102,001 –103,000 814.34 802.59 1616.93
63,001 –64,000 598.23 589.60 1187.83 103,001 –104,000 818.73 806.91 1625.64
64,001 –65,000 603.87 595.15 1199.02 104,001 –105,000 823.11 811.23 1634.34
65,001 –66,000 609.50 600.71 1210.21 105,001 –106,000 827.50 815.56 1643.06
66,001 –67,000 615.14 606.26 1221.40 106,001 –107,000 831.88 819.87 1651.75
67,001 –68,000 620.78 611.82 1232.60 107,001 –108,000 836.27 824.17 1660.44
68,001 –69,000 626.42 617.37 1243.79 108,001 –109,000 840.65 828.52 1669.17
69,001 –70,000 632.05 622.94 1254.99 109,001 –110,000 845.04 832.84 1677.88
70,001 –71,000 637.69 628.49 1266.18 110,001 –111,000 849.42 837.16 1686.58
71,001 –72,000 643.33 634.05 1277.38 111,001 –112,000 853.81 841.49 1695.30
72,001 –73,000 648.97 639.60 1288.57 112,001 –113,000 858.19 845.80 1703.99
73,001 –74,000 654.48 645.16 1299.64 113,001 –114,000 862.57 850.13 1712.70
74,001 –75,000 660.24 650.71 1310.95 114,001 –115,000 866.96 854.45 1721.41
75,001 –76,000 665.88 656.27 1322.15 115,001 –116,000 871.34 858.77 1730.11
76,001 –77,000 671.52 661.82 1333.34 116,001 –117,000 875.73 863.09 1738.82
77,001 –78,000 677.03 667.26 1344.29 117,001 –118,000 880.11 867.42 1747.53
78,001 –79,000 682.79 672.94 1355.73 118,001 –119,000 884.50 871.73 1756.23
79,001 –80,000 688.43 678.50 1366.93 119,001 –120,000 888.88 876.06 1764.94
80,001 –81,000 694.07 684.31 1378.38 120,001 –121,000 893.27 880.38 1773.65
81,001 –82,000 699.71 689.61 1389.32 121,001 –122,000 897.65 884.70 1782.35
82,001 –83,000 705.34 695.16 1400.50 122,001 –123,000 902.04 889.02 1791.06
83,001 –84,000 710.98 700.73 1411.71 123,001 –124,000 906.42 893.35 1799.77
84,001 –85,000 716.62 706.28 1422.90 124,001 –125,000 910.81 897.66 1808.47
85,001 –86,000 721.63 711.84 1433.47 125,001 –126,000 915.19 901.99 1817.18
86,001 –87,000 727.90 717.39 1445.29 126,001 –127,000 919.58 906.30 1825.88
87,001 –88,000 732.91 722.95 1455.86 127.001 –128,000 923.96 910.63 1834.59
88,001 –89,000 739.17 728.50 1467.67 128,001 –129,000 928.35 914.95 1843.30
89,001 –90,000 744.81 734.06 1478.87 129,001 –130,000 932.73 919.28 1852.01
D - 10
Schedule of Fees – Building & Safety Division 9 04/2020
130,001 –131,000 937.12 923.59 1860.71 150,001 –151,000 1024.82 1010.02 2034.84
131,001 –132,000 941.50 927.92 1869.42 151,001 –152,000 1029.20 1014.35 2043.55
132,001 –133,000 945.89 932.23 1878.12 152,001 –153,000 1033.59 1018.67 2052.26
133,001 –134,000 950.27 936.56 1886.83 153,001 –154,000 1037.97 1023.00 2060.97
134,001 –135,000 954.66 940.88 1895.54 154,001 –155,000 1042.36 1027.31 2069.67
135,001 –136,000 959.04 945.21 1904.25 155,001 –156,000 1046.74 1031.64 2078.38
136,001 –137,000 963.43 949.52 1912.95 156,001 –157,000 1051.13 1035.95 2087.08
137,001 –138,000 967.81 953.85 1921.66 157,001 –158,000 1055.51 1040.28 2095.79
138,001 –139,000 972.20 958.16 1930.36 158,001 –159,000 1059.90 1044.60 2104.50
139,001 –140,000 976.58 962.49 1939.07 159,001 –160,000 1064.28 1048.92 2113.20
140,001 –141,000 980.97 966.81 1947.78 160,001 –161,000 1068.27 1053.24 2121.91
141,001 –142,000 985.35 971.14 1956.49 161,001 –162,000 1073.05 1057.57 2130.62
142,001 –143,000 989.74 975.45 1965.19 162,001 –163,000 1077.44 1061.88 2139.32
143,001 –144,000 994.12 979.78 1973.90 163,001 –164,000 1081.82 1066.21 2148.03
144,001 –145,000 998.51 984.09 1982.60 164,001 –165,000 1086.21 1070.53 2156.74
145,001 –146,000 1002.89 989.07 1991.96 165,001 –166,000 1090.59 1074.85 2165.44
146,001 –147,000 1007.28 992.74 2000.02 166,001 –167,000 1094.98 1079.17 2174.15
147,001 –148,000 1011.66 997.07 2008.73 167,001 –168,000 1099.36 1083.50 2182.86
148,001 –149,000 1016.05 1001.38 2017.43 168,001 –169,000 1103.75 1087.81 2191.56
149,001 –150,000 1020.43 1005.71 2026.14 169,001 –170,000 1108.13 1092.14 2200.27
For valuation ranges beyond the scope of the above table the following formulas can be used to determine the
basic building permit fee:
– $1108.13 for first $170,000.00 and $4.40 per
1,000.00 thereafter, or
V-170,000
1000
$– $2,560.13 for first $500,000.00 and $3.75 per
1,000.00 thereafter, or
V-500,000
1000
$– $4,435.13 for first $1,000,000.00 and $2.50 per 1,000.00
thereafter, or
V-1,000,000
1000
For valuation ranges beyond the scope of this table the Plan Review Fee shall be as follows:
D - 11
Schedule of Fees – Building & Safety Division 10 04/2020
Single-family Residential Rewire Plus Service
Apartments, Condominiums per Square Foot Plus Service
Commercial Buildings per Square Foot Plus Service
Electrical Service:
Up to 200 amps
200 Amps to 1000 Amps
1000 Amps and Over
Subpanels
Temporary Power Poles:
Meter Pole
Each Extension Pole no Meter
Unit Schedule:
Receptacles, Lights, Switches - First 20 Each
After 20 Each
Range/Oven, Washer/Dryer, A/C Unit, Evaporative Cooler
Electrical Signs for Electrical Work –Does not Include the Sign Structure
Additional Branch Circuit within Same Sign
Meter Reset
When Issued in Conjunction with Other Work
Each Additional Meter on Same Building or Lot
Minimum Fee
Solar Energy Systems
Private Swimming Pools
Power Apparatus Motors,Generators, Transformer, Industrial Heating, Cooling,or
Cooking Equipment, etc.
Up to 1 hp
Over 1 to 10 hp
Over 10 to 50 hp
Over 50 to 100 hp
Over 100 hp
Carnivals and Circuses:
Generators and Electrically Driven Rides
Mechanically Driven Rides, Walk-Thru Attractions with Electrical Lighting
System of Area Booth Lighting
D - 12
Schedule of Fees – Building & Safety Division 11 04/2020
Plumbing Fixture
Gas Meter Reset Gauge Test Required
Gas Meter Reset When Issued in Conjunction with Other Work
Gas Meter - Each Additional Meter on Same Building or Lot
House Sewer
Cesspool
Private Sewage Disposal System
Demo Septic Pit
Water Heater
Repair or Alteration of Drainage or Vent Piping
Gas Piping System:
1 to 5 Outlets
Each Additional Outlet Over 5
Industrial Waste, Pretreatment Interceptor, Except Kitchen Type Grease
Interceptors Functioning as Fixture Traps.
Water Piping Installation, Alteration or Repair
Drainage Vent Piping
Lawn Sprinkler System on any one Meter
Rainwater Systems - per Drain Inside Building
Minimum Fee
Solar Energy Systems
FAU:
Up to 100,000 BTU
Over 100,000 BTU
A/C Unit:
Up to 3 Tons
Between 3 - 15 Tons
Twin-Pack New or Replacement, Includes Gas or Electric
Wall Heater, Floor Furnace, or Suspended Heater
Evaporative Cooler
Bath Exhaust Fan
Grease Hood and Duct Systems
Duct Alteration
Air-Handling Unit HVAC
D - 13
Schedule of Fees – Building & Safety Division 12 04/2020
Installation Set-up
Earthquake Bracing Systems
Accessory Buildings Cabanas, Ramadas, Patios, Block Walls, Garages, Awnings,
Carports, Porches, etc.:
Without Standard Plans
With Standard Plans
Fees for Construction Alteration of Mobile Home Park Facilities:
For Each Lot
Electrical Fee: Park Service
Street Lights
Unit Substation/Secondary Distribution Transformer
Alter/Replace Service or Transformer
Mobile Home Lot Service
Alter/Repair Replace lot service
Plan Review Fees not Charged to HCD Standard Plans
Plumbing Fees:
Park Drain System
Private Sewage Disposal or Water Treatment System
Lot Drain Inlet
Alter Repair of Drainage Vent Piping
Park Water System
Water Service Outlets Water Meters
Fire Hydrant or Riser
Water Conditioner
Plumbing Fixtures Equipment Alter Repair Replace
Park Gas Piping System
LPG or Natural Gas Tank of 60 Gallon or More
Mobile Home Lot Gas Outlet Riser
Gas Distribution Equipment Alter Repair Replace
Miscellaneous Equipment Each Installation
D - 14
Schedule of Fees – Building & Safety Division 13 04/2020
Supplemental Issuance Fee
Minimum Permit Fee
Inspections
Reinspection Fee
Inspection Outside Normal Business Hours
Zoning Consistency Review Fee Building Permits, Demo, etc.
Certificate of Occupancy
if Included on Building Permit
Strong Motion Instrumentation Program (SMIP) fees are imposed by the State of
California and provide funding for seismic monitoring and instrumentation throughout
the State.
Technology Fee
Archive Fees:
Per Permit or Application
Plans
Documents
D - 15
THIS PAGE IS BLANK
D - 16
APPENDIX E
DETAIL OF RECREATION SERVICES
E - 1
THIS PAGE IS BLANK
E - 2
CITY OF SAN BERNARDINODETAIL OF RECREATION SERVICESAs of April 29, 2020DIRECT/DIRECT COSTSDIRECT FACIL/FIELD TOTALPROGRAM FULL TIME FACILITY/ INDIRECT TOTAL COST COST COSTREF # SERVICE COST COST TOTAL FIELD COST COSTS COSTS REVENUES RECOVERY RECOVERY RECOVERYT-600 Aquatics Services $293,266 $81,774 $375,040 $0 $300,763 $675,803 $94,350 25.2% 25.2% 14.0%T-606 Youth Sports $35,588 $11 $35,599 $0 $0 $35,599 $10,756 30.2% 30.2% 30.2%T-607 Adult Sports $36,128 $11,832 $47,960 $0 $37,700 $85,660 $21,460 44.7% 44.7% 25.1%T-610 Comm. Center Programs/Rentals $300,231 $331,594 $631,825 $2,473,880 $589,990 $3,695,695 $13,000 2.1% 0.4% 0.4%SUBTOTAL - PROGRAMS $665,213 $425,211 $1,090,424 $2,473,880 $928,453 $4,492,757 $139,566 12.8% 3.9% 3.1%T-613 Ballfield Rental/Use $56,527 $31,764 $88,291 $51,097 $103,125 $242,513 $9,500 10.8% 6.8% 3.9%T-726 Park Rental/Reservation $0 $3,258 $3,258 $12,980 $18,277 $34,515 $28,000 859.4% 172.4% 81.1%T-727 Fiscallini Field Maintenance $0 $0 $0 $9,182 $9,614 $18,796 $17,000 N/A 185.1% 90.4%SUBTOTAL - RENTALS $56,527 $35,022 $91,549 $73,259 $131,016 $295,824 $54,500 59.5% 33.1% 18.4%TAX-023 Center For Individual Development $126,371 $83,446 $209,817 $0 $176,596 $386,413 $0 0.0% 0.0% 0.0%TAX-024 Senior Center Services $772,238 $360,273 $1,132,511 $0 $563,150 $1,695,661 $0 0.0% 0.0% 0.0%TAX-025 City Special Events $87,861 $61,062 $148,923 $0 $178,065 $326,988 $0 0.0% 0.0% 0.0%SUBTOTAL - TAX SUPPORTED $986,470 $504,781 $1,491,251 $0 $917,811 $2,409,062 $0 0.0% 0.0% 0.0%GRAND TOTAL $1,708,210 $965,014 $2,673,224 $2,547,139 $1,977,280 $7,197,643 $194,066 7.3% 3.7% 2.7%PROGRAM COSTS ARE PART TIME COSTS (INCLUDING BENEFITS) AND DIRECT OPERATING EXPENSESFULL TIME COSTS ARE SALARIES, BENEFITS, AND OTHER OPERATING EXPENSESINDIRECT COSTS INCLUDES CITY AND DEPT O/H, AND OTHER DEPARTMENTSE - 3
Detail of Recreation Fees
Current Fee Proposed Fee
Aquatics Fees
Jerry Lewis Swim Center
Daily Admission
Ages 2-7 $1 $2
Ages 8-17 $1.50 $3.00
Adults $3 $5
Ages 60 or older $1.50 $3.00
Family Season Swim Pass
1-6 members $55
7-12 members $75
1-6 people – Year 1 $60
1-6 people – Year 2 $65
1-6 people – Year 3 $70
Commercial Season Swim Pass
15-25 employees $200 $300
26-50 employees $300 $400
15-EntryPunch Card
Ages 2-7 $10 Delete Fee
Ages 8-17 $12 Delete Fee
Adults $30 Delete Fee
Ages 60 and older $12 Delete Fee
25-EntryPunch Card
Ages 2-7 $15 Delete Fee
Ages 8-17 $20 Delete Fee
Adults $45 Delete Fee
Ages 60 and older $20 Delete Fee
Swim Classes $40 $40
E - 4
Detail of Recreation Fees
Current Fee Proposed Fee
Community Pools
Daily Admission
Ages 2-7 $0.50 $1.00
Ages 8-17 $1 $2.00
Adults $2 $3.00
Ages 60 or older $1 $2
Family Season Swim Pass
1-6 members $45
7-12 members $65
1-6 people – Year 1 $60
1-6 people – Year 2 $65
1-6 people – Year 3 $70
Commercial Season Swim Pass
15-25 employees $175 $200
26-50 employees $250 $300
15-EntryPunch Card
Ages 2-7 $5 Delete Fee
Ages 8-17 $10 Delete Fee
Adults $20 Delete Fee
Ages 60 and older $10 Delete Fee
25-EntryPunch Card
Ages 2-7 $7 Delete Fee
Ages 8-17 $15 Delete Fee
Adults $30 Delete Fee
Ages 60 and older $15 Delete Fee
Swim Pass Reissue $5 $5
E - 5
Detail of Recreation Fees
Current Fee Proposed Fee
Facility/Park Rentals
Community Center Room $75/first 2 hrs + $25/add’l hr $75/hr (2 hr min)
Two or more Rooms $100/first 2 hrs + $40/add’l hr $100/hr (2 hr min)
Assembly Room $75/first 2 hrs + $25/add’l hr $75/hr (2 hr min)
Gymnasium $90.50/hr + $28/add’l hr $90/hr (2 hr min)
Shower Room $29/hr + $9.30/add’l hr $30/hr (2 hr min)
Kitchen $29/hr + $9.30/add’l hr $30/hr (2 hr min)
FDR Bowl (2 hr min) $130/hr + $60/add’l hr $130/hr (2 hr min)
Seccombe Lake Pavilion $55/first 2 hrs + $8/add’l hr $55/hr (2 hr min)
La Plaza Gazebo $40/first 2 hrs + $8/add’l hr $40/hr (2 hr min)
Wading Pools $36.50 per hour Delete Fee
Concessions Stands $100 per use Delete Fee
Perris Hill Crafter $75/month $75/month
Perris Hill Park Stage $25/hr + $8/add’l hr $25/hr (2 hr min)
Tennis Court Tournament $10/hr + $5/add’l hr $100/hr (2 hr min)
(per court/day)
Jerry Lewis Swim Center $92/hr + $46/add’l hr $100/hr (2 hr min)
(2 hour minimum) +$8/hr for lifeguards + actual cost for lifeguards
All Other Pools $25/hr $25/hr (2 hr min)
(2 hour minimum) +$8/hr for lifeguards + actual cost for lifeguards
Group Picnic Reservations (use fee per use)
Size of Group
Up to 50 $25 $35
51-99 $35 $35
100-199 $75 $75
200-399 $100 $100
E - 6
Detail of Recreation Fees
Current Fee Proposed Fee
400-699 $200 $200
700 and up $350 $350
Picnic Shelter $30 per day $40 per day
Picnic Shelter Utility Access $25 per day $35 per day
Parks/Parking Lots for Fundraising/ Special Events (not subject to resident or non-resident use
cost adjustment) $200 per day $200 per day
Fees for Equipment and/or Service:
Bleacher (up to 4 sets) $465 per occasion $465 per occasion
Trash Receptacles $2.50 each per occasion $2.50 each per occasion
Picnic Tables $10 each per occasion $10 each per occasion
Stage Trailer $250 per occasion $250 per occasion
Folding Chairs $1.50 each per occasion $1.50 each per occasion
Folding Tables $8 each per occasion $8 each per occasion
Bunting $50 per day $50 per day
Banners $40 each per week $40 each per week
Curtain Dividers $15 each per occasion $15 each per occasion
Kiosk Sign $25 each per occasion $25 each per occasion
Choral Risers $100 set per occasion $100 set per occasion
Adult Drop-In Basketball $2 per session $2 per session
Ballfield base rental $25 per set $25 per set
E - 7
Detail of Recreation Fees
Current Fee Proposed Fee
Facilities/Parks Rental Refundable Damage Bond & Clean-Up Deposit
Number of People
Fewer than 50 $75 $75
50 – 100 $650 $650
101 – 200 $1,250 $1,050
201 - 500 $1,750 $1,750
501 - 1,000 $3,500 $3,500
1,001+ $8,000 $8,000
E - 8
APPENDIX F
FULLY-BURDENED HOURLY RATES
IMPORTANT INFORMATION:
1) The Fully-Burdened Hourly Rate (FBHR) includes the all of the employee’s fringe benefits plus a
share of the accoun ng ac vity’s overheads and opera ng expenses.
2) Many City employees are assigned to mul ple accoun ng ac vi es. Because each ac vity will
have its own overhead alloca on and opera ng expenses, the same posi on will have a
different FBHR in the different ac vi es. The FBHRs in this appendix are an average of all their
rates.
3) If a service in Appendix A refers to an hourly rate for an employee, that is the rate to use not the
rate in this Appendix.
4) These FBHRs are based on a Full-Cost Cost Alloca on Plan and are, therefore, NOT the FBHRs to
use for State and Federal Grant programs.
F - 1
THIS PAGE IS BLANK
F - 2
AVERAGE FULLY-BURDENED HOURLY RATE
POSITION AVG.FBHR
A/S ATTENDANT $87.04
A/S KENNEL SUPVSR $90.59
A/S OFFICE SUPVSR $90.59
ACCOUNTANT II $64.00
ACCOUNTANT III $148.32
ACCOUNTING ASSISTANT $78.59
ACCOUNTING MANAGER $231.74
ACCOUNTING TECHNICIAN $94.57
ADMIN ANALYST I $118.37
ADMIN ANALYST II $104.27
ADMIN ASST TO CITY COUNCIL $59.42
ADMIN ASST TO THE CITY MGR $53.46
ADMIN SVCS SUPVSR $84.41
ADMIN.ANALYST II $72.69
ADMIN.ASSIST.$65.31
ADMINISTRATIVE ASSISTANT $77.51
ADMINSTRATIVE ANALYST $106.20
ANIMAL CTRL MGR $156.29
ANIMAL CTRL OFFICER $73.72
ASSET FORFEIT.ANALYST $77.08
ASSIST.CHIEF OF POLICE $339.73
ASSIST/ASSOC.PLNR $102.56
ASSISTANT CITY MANAGER $277.73
ASSISTANT TO THE CITY MGR $133.12
ASSISTANT TO THE MAYOR $53.45
ASSMNT DIST/REAL PROP MGR $113.13
ASSMNT DIST/REAL PROP SPEC $84.75
BLDG INSPECT.II $118.33
BLDG MAINT DIV MANAGER $98.85
BUDGET OFFICER $92.75
BUSINESS REG MGR/SR REP/REP $131.43
BUSINESS REGISTRATION INSP $120.75
CDBG COORDINATOR $71.65
CDBG PROGRAM ASSISTANT $43.89
CHIEF ASST CITY ATTORNEY $344.74
F - 3
AVERAGE FULLY-BURDENED HOURLY RATE
POSITION AVG.FBHR
CHIEF BLDG.OFFICIAL $186.25
CHIEF DEPUTY CITY CLERK $115.59
CHIEF OF POLICE $421.01
CITY ATTORNEY $353.71
CITY ATTY INVESTIG. SUPV. $151.86
CITY CLERK $204.99
CITY ENG/DEP.DIR PW $237.26
CITY MANAGER $378.28
CITY TREASURER $42.90
CIVIL SVC BOARD CHIEF EXAMINER $125.03
CODE ENF.DIV.MGR $168.96
CODE ENF.OFF.II/III $104.58
COM.DEV.TECH.$82.26
COMM REC PROGRAM COORD $63.31
COMM SVCS CENTER SUPERVISOR $91.72
COMM.POLICING SPCLST $87.02
COMM.SVCS.OFF. I $66.50
COMM.SVCS.OFF. II $64.64
COMMUNITY RECREATION MGR $147.22
CONST.INSP.II $104.36
CONSTRUCTION MANAGER $131.28
COORDINATOR OF VOLUNTEERS $54.09
COUNCIL ADMIN SUPERVISOR $78.38
CRIM.OMVEST.OFF.$91.48
CRIME ANALY.SUP.ASST $56.01
CRIME ANALYST $88.97
CRIMINAL INV.OFF.$86.49
CUSTODIAN $36.09
CUSTOMER SVC REP $66.13
DEPT ACCOUNTING TECH $59.43
DEPUTY CITY ATTORNEY I $176.39
DEPUTY CITY ATTORNEY II $167.81
DEPUTY CITY ATTORNEY III $176.39
DEPUTY CITY ATTORNEY IV $219.07
DEPUTY CITY CLERK $99.80
F - 4
AVERAGE FULLY-BURDENED HOURLY RATE
POSITION AVG.FBHR
DEPUTY CITY TREASURER $68.24
DEPUTY DIRECTOR OF HOUSING $129.03
DETECTIVE/CORP'L $174.42
DIR.OF COMM.DEVEL.$297.59
DIRECTOR OF HUMAN RESOURCES $190.25
DIRECTOR OF PARKS & RECREATION $326.49
DIRECTOR OF PUBLIC WORKS $180.64
ECON DEVELOP ANALYST $93.78
ECON DEVELOP MANAGER $162.15
ELECTRICIAN I $98.74
ENGIN'G ASSIST III $119.44
ENGIN'G ASST I/II $96.69
ENGINEERING ASSOCIATE $151.83
ENVIRON PROJECT SPECIALIST $66.09
EXECUTIVE ASSISTANT $86.79
FACILITIES MAINT MECHANIC $53.57
FACILITIES MAINT SUPV $61.48
FINANCE DIRECTOR $271.15
FINANCIAL ANALYST $131.51
FOOD SERVICE SUPERVISOR II $99.02
FORENSICS SPEC II $97.15
FORENSICS SPEC III $107.17
HEAVY EQUIPMENT OPERATOR $106.86
HUMAN RESOURCES ANALYST $84.24
HUMAN RESOURCES TECH $49.02
HVAC MECHANIC $65.41
IEMG BROADCAST ENG COORD $156.11
IT ANALYST II $98.60
IW FIELD INSPECTOR $91.35
LANDSCAPE INSPECTION SUPV $150.23
LANDSCAPE INSPECTOR I $106.79
LANDSCAPE INSPECTOR II $110.99
LEAD CUSTODIAN $41.62
LEAD MAINTENANCE WORKER $98.45
LEAD PARK CONST/MAINT WKR $117.98
F - 5
AVERAGE FULLY-BURDENED HOURLY RATE
POSITION AVG.FBHR
LEAD PARK MAINT SUPERVISOR $125.66
LEGAL ADMIN ASSISTANT $117.99
LEGAL SECRETARY I $83.47
LEGAL SECRETARY II $92.24
LIBRARIAN II $117.63
LIBRARY ADMIN TECH/WEBMASTER $114.41
LIBRARY CIRCULATION SUPV. $122.62
LIBRARY DIRECTOR $242.91
LIBRARY NETWORK ADMIN $136.60
LIBRARY NETWORK ASSISTANT $100.00
LIBRARY PROGRAM COORD $116.67
LIBRARY TECHNICIAN II $88.90
LIEUTENANT $252.22
LITERACY PROGRAM COORD. $129.87
MAINT SUPERVISOR $143.69
MAINTENANCE WORKER I $72.12
MAINTENANCE WORKER II $68.64
MANAGER OF COMMUNICATIONS $157.18
MAYOR'S CHIEF OF STAFF $130.39
NPDES COORD $112.79
NPDES INSPECTOR $100.06
OFFICE ASSISTANT $64.61
OPER & MAINT DIV MANAGER $178.31
PARK MAINT DIVISION MANAGER $191.31
PARKS MAINT WORKER II $91.95
PAYROLL MANAGER $91.04
PAYROLL TECHNICIAN $45.43
PD DISPATCH.SUPVSR $114.84
PD DISPATCHER I $75.79
PD DISPATCHER II $90.72
PD P+T TECH.$158.34
PD RECORDS SUPVSR $88.57
PD RECORDS TECH .II $61.30
PD RECORDS TECH.I $47.00
PD TRANSCRIBER $60.04
F - 6
AVERAGE FULLY-BURDENED HOURLY RATE
POSITION AVG.FBHR
PKG.ENFORCMT.OFF.$58.29
PLANNING MGR $187.36
PLUMBER $56.44
POL.FLT.MTC.EXPDITOR $63.40
POLICE CAPTAIN $298.94
POLICE OFFICER $153.80
PRINCIPAL ACCOUNTANT $156.57
PRINCIPAL CIVIL ENGINEER $172.97
PROC/CONT SUPP SVCS DIR $84.28
PROGRAM MANAGER $84.44
PROP.EVID+SUPL.SUPV $96.22
PROP+EVID.TECH I $68.62
PROP+EVID.TECH II $92.27
RECORDS MGMT SPECIALIST $103.32
RECREATION THERAPIST $86.48
REGULATORY COMPLIANCE ANALYST $111.52
SENIOR MGMT ANALYST $101.86
SENIOR OFFICE ASSISTANT $66.74
SERGEANT $201.96
SR CUSTOMER SERVICE REP $72.04
SR DEPUTY CITY ATTORNEY $212.85
SR FINANCIAL SPECIALIST $96.73
SR HUMAN RESOURCES ANALYST $95.26
SR HUMAN RESOURCES TECH $55.03
SR.ADMIN.ASSIST.$46.49
SR.CIVIL ENGINEER $183.48
SR.CUST.SVC.REP/DSPTCH $92.54
SR.MGMT.ANALYST $107.20
SR.OFF.ASSIST.$64.87
SR.PLANS EXAMINER $122.37
SR.WHSE/DEL.DRVR $32.10
STREET SIGNAL/LIGHT SUPV $169.03
SURVEY TECHNICIAN I $84.24
TECHNOLOGY LIBRARIAN $131.87
TRAFFIC ENGINEER $151.20
F - 7
AVERAGE FULLY-BURDENED HOURLY RATE
POSITION AVG.FBHR
TRAFFIC ENGINEERING ASSOC. $135.23
TRAFFIC SIGNAL TECHNICIAN I $109.53
TRAFFIC SIGNAL TECHNICIAN II $127.08
TRAFFIC SYS & OPER ANALYST $130.20
TREASURY ASSISTANT $52.94
TREE TRIMMER ASSISTANT $65.84
TREE TRIMMER I $60.37
TREE TRIMMER II $77.11
WEED ABATE.COORD $108.40
F - 8