HomeMy WebLinkAboutItem No. 06 - Award of Professional Service Agreement for ATP Cycle 2 Consent Calendar City of San Bernardino Request for Council Action Date: March 4, 2020 To: Honorable Mayor and City Council Members From: Teri Ledoux, City Manager By: Kris Jensen, Director of Public Works Subject: Award of Professional Service Agreement for ATP Cycle 2- Safe Routes to School Project at 3 Locations Recommendation It is recommended that the Mayor and City Council of the City of San Bernardino, California, adopt Resolution No. 2020-40, approving the award of a Professional Service Agreement with ALTA Planning & Design in the amount of $63,944 for ATP Cycle 2 - Safe Routes to School Project - Non Infrastructure Component (SS17-001). Background Cycle 2 of the Active Transportation Program (ATP) commenced March 2015, upon the adoption of the program guidelines by the California Transportation Commission (CTC). ATP is funded from various federal and state funds appropriated in the annual Budget Act, Pursuant to state statute. The goals of the program are to: Increase the proportion of biking and walking trips Increase safety for non-motorized users Increase mobility for non-motorized users Advance the efforts of regional agencies to achieve greenhouse gas reduction goals Enhance public health, including reduction of childhood obesity through the use of programs including, but not limited to, projects eligible for Safe Routes to School Program funding Ensure disadvantaged communities fully share in program benefits Provide a broad spectrum of projects to benefit many types of active transportation users On September 6, 2016, the Mayor and City Council adopted Resolution No. 2016-190 accepting the award of ATP Cycle 2 grant funding in the amount of $2,093,000. The funding is to be used for Safe Routes to School (SRTS) improvements to facilitate safe routes of pedestrian travel to school for students. Three project locations have been identified for SRTS improvements. The funding awarded is allocated to two categories of work: infrastructure components and non-infrastructure components. The infrastructure component of the project Page 1 6594 includes preparing a detailed need analysis and constructing sidewalk, curb & gutter, ADA ramps and street lights in the vicinity of schools located in the City of San Bernardino. Non-Infrastructure component funds will be used to pay for a qualified consultant to coordinate the project schools and perform public outreach activities. These activities support planning, implementation, incentives, supplies, and evaluation related to the project and may include: a) Highlighting the completion of the sidewalk projects b) Educating parents and students about the health benefits of walking and biking to school c) Slowing down in school zones d) Walk/bike to school day events e) Imple These activities are subject to change based on the needs of each school and the recommendations of the consultant. Funds will pay for the cost of outreach assisting with public education and encouragement activities as they relate to minority and Hispanic populations. Funds will also pay for the cost of staff at San Bernardino and Rialto school districts to assist with activities that will be aligned directly with their on- going programs. The funds will not supplement existing resources, but will be used to help pay for additional staff time necessary to implement this SRTS education and encouragement effort. Six (6) schools have indicated a willingness to participate in the program. They include: Holcomb ES, Cajon HS, Pacific HS, Roger Anton ES, Garcia ES, and Jehue MS. The consultant will develop a work plan for each school. The consultant and staff will coordinate with school district and school personnel to successfully implement the education program. On June 19, 2019, the Mayor and City Council approved Resolution No. 2019-168, included Capital Improvement Plan (CIP) SS 17-001 project for ATP Cycle 2- Safe Routes to Schools Project at three locations. Sources of funding are provided in detail in the fiscal impact section of this report. Discussion On August 19, 2019, Caltrans provided the City with form E76, authorizing the City to proceed with expenditure of $64,000 awarded for non-infrastructure component of the project. On November 21, 2019, staff issued a Request for Proposals (RFP) to consultant servicing firms that previously indicated an interest in receiving solicitations for this type of work. The RFP was also made publicly available on the Citys Request for Bidwebsite. On December 19, 2019, one (1) proposal was received from ALTA Planning and Design of San Diego, California. The proposal was reviewed by staff using the City Page 2 6594 standard rating system. The firm was interviewed and it was determined that the proposal mettherequirements oftheRFP. ALTA Planning & Design hasextensive experience in this work, and has completed many local projects in the San Bernardino area. After selecting the firm, a fee proposal was requested and negotiated for this federally funded project. The final agreed upon fee for the proposed services is $63,944. The non-infrastructure component of the project is expected to be completed in June 2020. 2020-25 Key Strategic Targets and Goals This project is consistent with Key Target No 2a: Develop and implement a community engagement plan. This project will support this goal by developing and implementing a community engagement plan related to the project that will serve as an opportunity for information sharing through the local schools and with the public (parents and students) they serve. Fiscal Impact There is no General Fund Impact. ATP funding in the amount of $2,195,000 was previously approved by the Mayor and City Council for the ATP Cycle 2 - Safe Routes to School Project (Account #123-160-8604-5504) and is available through ATP Grant funds for this project. The tables below show the funding sources allocated, expenditures to date, and available funding remaining for the project. Funding Source Amount Fund 123-ATP Grant $2,195,000.00 Total Project Funding (A) $2,195,000.00 Project Expenses (Infrastructure Component) PS&E $138,268.63 Project Management (Staff Charges) $49,570.98 Total Expenses (B) $187,839.61 Total Project Funding (A) $2,195,000.00 Total Expenses (B) $187,839.61 Remaining Project Funding $2,007,160.39 Conclusion It is recommended that the Mayor and City Council of the City of San Bernardino, California, adopt Resolution No. 2020-40, approving the award of a Professional Service Agreement with ALTA Planning & Design in the amount of $63,944 for ATP Cycle 2-Safe Routes to School Project - Non Infrastructure Component (SS17-001) to ensure compliance with federal and state granting requirements. Page 3 6594 Attachments Attachment 1 Resolution No. 2020-40 Attachment 2 Professional Service Agreement (PSA) Attachment 3 Scope of Services Attachment 4 Location Map Attachment 5 Caltrans Authorization (E76) Wards: 2, 3, 4 Synopsis of Previous Council Actions: September 6, 2016 Resolution Awarding Agreement for ATP Cycle 2 - Safe Routes to School Project June 19, 2019 Adopted Resolution No. 2019-168 approving Capital Improvement Program FY 2019/20 Page 4 Resolution No. 2020-40 RESOLUTION NO. 2020-40 RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO, CALIFORNIA, APPROVING THE AWARD OF PROFESSIONAL SERVICE AGREEMENT WITH ALTA PLANNING & DESIGN IN THE AMOUNT OF $63,944 FOR ATP CYCLE 2 - SAFE ROUTES TO SCHOOL PROJECT AT THREE LOCATIONS NON INFRASTRUCTURE COMPONENT (SS17-001) WHEREAS, On February 8, 2016 City received ATP Cycle 2 Grant approval from the California Department of Transportation in total amount of; and WHEREAS, On September 6, 2016, the Mayor and City Council adopted Resolution No. 2016-190 accepting the Active Transportation Program Cycle 2 Grant Non-infrastructure Component in the Amount of $64,000 for Project ATPL- (054); and WHEREAS, On August 19, 2019, Caltrans issued their form E76, authorizing the City ion to proceed to conduct the non-infrastructure component of the project; and WHEREAS, staff has administered a competitive process to secure a design contract to conduct ATP Cycle 2 Non-infrastructure Component tasks; and WHEREAS, the City received one proposal on December 19, 2019 from ALTA Planning & Design of San Diego California; and WHEREAS, staff has reviewed the proposal and determined that ALTA Planning & Design is a qualified to perform ATP Cycle 2 - Safe Routes to School Project Non Infrastructure Component tasks; and WHEREAS, the City now wishes to enter into a Professional service Agreement (PSA) with ALTA Planning & Design to conduct ATP Cycle 2 Non Infrastructure component tasks subject to any PSA with federal and state granting requirements. BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. The above recitals are true and correct and are incorporated herein by this reference. SECTION 2. The City Manager is hereby authorized and directed to award a Professional Service Agreement to ALTA Planning & Design of San Diego, California in the amount of $63,944, subject to state granting requirements. Resolution No. 2020-40 SECTION 3. The Director of Finance is authorized and directed to issue a Purchase Order in the amount of $63,944 to ALTA Planning & Design for this work. SECTION 4. The City Council finds this Resolution is not subject to the California Environmental Quality Act (CEQA) in that the activity is covered by the general rule that CEQA applies only to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty, as in this case, that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. SECTION 5. Severability. If any provision of this Resolution or the application thereof to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications, and to this end the provisions of this Resolution are declared to be severable. SECTION 6. Effective Date. This Resolution shall become effective immediately. APPROVED and ADOPTED by the City Council and signed by the Mayor and attested by the Acting City Clerk this ___ day of __________ 2020. John Valdivia, Mayor City of San Bernardino Attest: Genoveva Rocha, CMC, Acting City Clerk Approved as to form: Sonia Carvalho, City Attorney Resolution No. 2020-40 CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF SAN BERNARDINO) ss CITY OF SAN BERNARDINO ) I, Genoveva Rocha, CMC, Acting City Clerk, hereby certify that the attached is a true copy of Resolution No. 2020-___, adopted at a regular meeting held on the ___ day of _______ 2020 by the following vote: Council Members: AYES NAYS ABSTAIN ABSENT SANCHEZ _____ _____ _______ _______ IBARRA _____ _____ _______ _______ FIGUEROA _____ _____ _______ _______ SHORETT _____ _____ _______ _______ NICKEL _____ _____ _______ _______ RICHARD _____ _____ _______ _______ MULVIHILL _____ _____ _______ _______ WITNESS my hand and official seal of the City of San Bernardino this ___ day of ____________ 2020. Genoveva Rocha, CMC, Acting City Clerk $0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00 AC COST CALIFORNIA DEPARTMENT OF TRANSPORTATION DEMO ID PREV AUTH / AGREE DATES:PE:R/W:CON:SPR:MCS:OTH: $0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00 URB/RURAL $64,000.00$64,000.00$64,000.00 FEDERAL COST $0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00 URBAN AREA $64,000.00$64,000.00$64,000.00 ASSUMED/LOCAL ADMIN 05/04/2018 PROJECT COST FUNC SYS PROJECT LOCATION:48TH STREET FROM MAGNOLIA STREET TO RESERVOIR DRIVE, PEPPER AVENUE FROM RANDALL AVENUE TO MERIDIAN AVENUE, INTERSECTIONTYPE OF WORK:NON-INFRASTRUCTURE EDUCATIONAL AND ENCOURAGEMENT ACTIVITIESFED RR NO'S:PUC CODES:PROJ OVERSIGHT:ENV STATUS / DT:RW STATUS / DT:INV RTE:BEG MP:END MP: TOTAL: AUTHORIZATION / AGREEMENT SUMMARY - (E-76) IMPV TYPE57 OTH PREV. OBLIGATIONOTH THIS REQUESTOTH SUBTOTAL LINE NO30PE PREV. OBLIGATIONPE THIS REQUESTPE SUBTOTALRW PREV. OBLIGATIONRW THIS REQUESTRW SUBTOTALCON PREV. OBLIGATIONCON THIS REQUESTCON SUBTOTAL 08-SBD-0-SBDATPLNI5033(054)10819000053L-NSAN BERNARDINOSCAG18/19209-5000-454920151502 This is a request for $64,000 of FY 17-18 federal TAP funds allocated at the 3/14/19 CTC meeting for Construction-NI. Non-infrastructure includes educational and encouragement activities related to ATPL-5033(053).ATP ID ATP02-08-094S was programmed as an infrastructure and non-infrastructure project for $2,153,000 of ATP funding.This is a request for construction non-infrastructure funding for educational and public outreach activities as part of the San Bernardino City Sidewalk Gap Closure and Bike Lane Safe Routes to School project onPepper Avenue, 48th Street, Pacific Avenue, and Perris Hill Park Road in the City of San Bernardino using Transportation Alternatives Program (TAP) funds allocated by the CTC at its 3/14/19 meeting underPPNO 1183B and programmed for FY 18-19 in Amendment #5 approved on 3/21/19 to SCAG's 2019 FTIP. Construction infrastructure will be performed under companion project ATPL-5033(053). The originalNEPA decision approved on 5/04/18 was re-validated on 5/29/19. Federal funding is limited to $64,000 for construction non-infrastructure with a maximum reimbursement ratio of 100% using toll credits in lieu ofnon-federal matching funds. Reimburse with Z301 TAP funds at 100% on a pro rata reimbursement basis up to the federal amount shown for construction non-infrastructure. Cycle 2 ATP ID ATP02-08-094S,PPNO 08-1183B. PHASE PE R/W CON OTH MPO:FSTIP YR:STIP REF:FSTIP ID NO: 05/29/201908/04/2019 FEDERAL AID PROGRAMDLA LOCATOR:PREFIX:PROJECT NO:SEQ NO:STATE PROJ NO:AGENCY:ROUTE:DISASTER NO:TIP DATABRIDGE NO:PROG CODEZ301FUNDING SUMMARYSTATE REMARKSFEDERAL REMARKS 806-3960653-7349FOR CALTRANSFOR FHWA 2019-08-19 18:29:26.0 2019-08-132019-08-132019-08-132019-08-13 ONONONONON HABIB, MINALOUIE, PATRICKLOUIE, PATRICKSIGNATURE, NOT_REQUIREDVENESHIA SMITH REVIEWED IN FADS BY: PREPARED IN FADS BY: SUBMITTED IN FADS BY: PROCESSED IN FADS BY: E-76 AUTHORIZED DATE IN FMIS BY: SIGNED ON08/19/201908/19/201908/19/2019SIGNED ON08/13/2019 OTHEDUCATION & OUTREACHAAGR FOR: DOCUMENT TYPE: SIGNED BYLOUIE, PATRICK SIGNED BYJERILYNN FOGLEJERILYNN FOGLEVENESHIA SMITH AUTHORIZATION TO PROCEED WITH REQUEST: MOD #0 DOCUMENT TYPEAUTH/AGREE FHWA FMIS SIGNATURE HISTORYFHWA FMIS 3.0 SIGNATURE HISTORYCALTRANS SIGNATURE HISTORY AUTHORIZATIONSIGNATURE HISTORY FOR PROJECT NUMBER 5033(054) AS OF 08/22/2019